State and local · OpenGov
Courthouse Expansion
Description
The County of Greenville is seeking sealed qualifications from firms to provide architectural and engineering services for an expansion to the Greenville County Courthouse located at 305 E. North Street, Greenville, SC 29601. Scope of Work Scope of Work The County of Greenville is seeking qualifications from firms to provide all architectural and engineering design for site development, construction, utilities, data/communications, security and fixed equipment. The new expansion shall match the appearance and impression of the existing structures. The firm is expected to work closely with the County to develop a construction document that is in sufficient detail, to specifically set forth the requirements for the project, construction administration, direction, and oversight for the duration of the project. Firms responding to this Request for Qualifications must demonstrate previous success in high quality but cost-contained design development, construction document development, and construction administration. Firms shall include in their response any experience with design of similar projects in scope and size including evidence demonstrating their ability to obtain a high-quality project that can be completed on time and within budget. Firms shall submit methodologies they intend to use to perform the design, construction document development, and construction administration. Public Notice Greenville County is soliciting sealed qualifications in response to Courthouse Expansion , subject to the conditions and all provisions set forth herein and attached. Sealed qualifications will be received through the County’s online procurement portal located at https://procurement.opengov.com/portal/greenvillecounty until Friday, November 6, 2026 , 3:00 pm , then publicly opened. The service must be furnished as described and specified herein and submitted to Greenville County. All inquiries regarding this Request for Qualifications shall be submitted no later than Wednesday, October 28, 2026 , 3:00 pm via the County’s online procurement Portal, located at https://procurement.opengov.com/portal/greenvillecounty . Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the County’s online procurement Portal. Offerors may also click “Follow” on this proposal to receive an email notification when answers are posted. It is the responsibility of the Offeror to check the website for answers to inquiries. Introduction Summary Background Contact Information Timeline Instructions to Offerors Pre-Qualifications Meeting A Pre-Qualifications meeting is not scheduled for this project. Statement of Qualifications Firms shall include the following with their response: Overview of company background. Corporate/individual qualifications and experiences, including certifications. Experience on three or more similar projects (in terms of scope, complexity, and nature of use) noting project dates, names and address of owners, name of project manager, authorization to proceed date, original projected completion date, actual completion date, original budget, final completion costs, reasons for any cost overrun(s), and telephone numbers of references. Specific experience in court projects. Include record (reference letters) of satisfaction from clients at least three years after project completions. Resumes of the principal architect/engineer, project manager and other key personnel that will participate in this project. Scope of Work/Task List and methodologies to show understanding of the project and proposed steps of implementing. Submission Procedures and Requirements All submissions must be received by Friday, November 6, 2026 at 3:00 pm . Submissions will not be accepted after the deadline. There will be no exceptions. Responders submitting qualifications shall be responsible for all cost of preparing such proposals. Information requested and not received at the time of submission may disqualify the proposal. Responders to this solicitation shall closely examine the specific requirements noted herein and the attached Terms and Conditions. Facsimile transmittals, emails, hard copies or offers communicated by telephone will not be accepted or considered. Proposals shall be organized in the following manner with the subject headings and sequence indicated. Executive Summary Qualifications and Experience References Technical Proposal Implementation Plan Staffing Plan Financial Proposal Required Forms License and Permits – The Contractor shall obtain all applicable licenses, permits and promptly pay all taxes required by the State of South Carolina, and/or Greenville County. Inquiries and Addenda Offerors shall submit all inquiries regarding this RFQ via the County’s online procurement Portal, located at https://procurement.opengov.com/portal/greenvillecounty . Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the County’s online procurement Portal. Offerors may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. The County will not be responsible for or bound by any oral instructions made by any employee(s) of the County in regard to this RFQ. Addenda Notification: This RFQ represents the most definite statement Greenville County will make concerning information upon which proposals are to be based. Offerors are required to register for an account via the County’s online procurement Portal hosted by OpenGov. Once you have completed the registration, you will receive addenda notifications to your email by clicking “Follow” on this project. Ultimately, it is sole responsibility of each proposer to periodically check the site for any addenda at https://procurement.opengov.com/portal/greenvillecounty . No addenda will be issued later than five (5) working days prior to the date for receipt for proposals except an addendum which, if necessary, postpones the date for receipt of proposals or cancels this RFQ. Vendors shall acknowledge receipt of all addenda General Information Proprietary Information – The County of Greenville is a public body and governed by the South Carolina Freedom of Information Act. Documents submitted to the County relating to this Solicitation are subject to requirements of the Freedom of Information Act and may be deemed public records. Errors and Omissions – The Responder will not be allowed to take advantage of any errors or omissions in the Request for Qualifications. Where errors or omissions appear in the RFQ, the Responder shall promptly notify the County of Greenville in writing of such error or omission it discovers. Any significant error, omission and/or inconsistency in the specifications are to be reported as soon as possible but no later than five (5) days before such time the response is to be submitted. Withdrawal of Proposal – An official representative of a Responder may withdraw a Responder’s response at any time prior to the proposal submission deadline. Acceptable proof establishing that he/she is the representative of the Responder must be provided. Non-Endorsement – If the County awards a contract, the successful Responder shall not issue any news release or other statement relating to the award or servicing of the agreement which state or imply the County of Greenville’s endorsement of the successful Responder’s services. Insurance Insurance Requirements The contractor is responsible for and must have all required insurance listed below and shall not commence work under the associated contract until it has obtained all insurance required, and the County has approved such insurance in writing, nor shall the Contractor allow any subcontractor to commence work on its subcontract until all similar insurance required of the subcontractor has been obtained. All insurance policies shall be maintained for the life of the contract. THE COUNTY SHALL BE NAMED AS “ADDITIONAL INSURED” FOR ITS INTEREST on all policies of insurance except Worker’s Compensation, Automobile Liability, and Professional Errors and Omissions, as regards ongoing operations, products and completed operations, and this shall be noted on the face of the Certificate of Insurance. As a part of the certificate of insurance requirement the contractor shall also include acknowledgement and acceptance of the wavier of subrogation provision granted to Greenville County. This acknowledgement and acceptance should be included in the same section of the Certificate of Insurance that evidences the “Additional Insured” provision. Certificates for all such policies of insurance shall be provided by the Contractor's insurance agent or broker to the County within 10 working days from the date of Notice of Award. All Certificates of Insurance submitted shall provide on the face of the certificate reference to County's RFQ #27030 . Contractor will provide County a minimum of 30 days advance notice in the event the insurance policies (or an insurance policy) are canceled. Subcontractors approved to perform work on this project are subject to all of the requirements in this Section. Contractor agrees to maintain and keep in force during the life of this Agreement, with a company or companies authorized to do business in South Carolina, the following insurance policies: Comprehensive General Liability: $1,000,000 per occurrence - combined single limit / $2,000,000 general aggregate, to include products and completed operations. Automobile Liability: $1,000,000 per occurrence - combined single limit (Coverage shall include bodily injury and property damage and cover all vehicles including owned, non-owned and hired) Statutory Worker's Compensation: Coverage A - State of SC Coverage B - Employers liability $1,000,000 Each Accident $1,000,000 Disease, Per Employee $1,000,000 Disease, Policy Limit Policies shall contain a waiver of subrogation in favor of and/or that applies to Greenville County, its departments, agencies, boards, employees, and commissions for losses from work performed by or on behalf of the contractor. Umbrella Excess Liability $1,000,000 per occurrence over primary insurance $1,000,000 annual aggregate Professional Service Errors and Omissions Liability Insurance Coverage must be written for no less that the following limits: $1,000,000 per occurrence $1,000,000 aggregate Policy should state: “the limits are not to have been decreased by past liability which would substantially impact that availability of these limits.” No deviation from this coverage’s will be accepted unless, in the County’s sole discretion, it is more advantageous to the County, i.e., $1,000,000 - a $2,000,000 or $5,000,000 limit would be acceptable. Evaluation Phases The responses will be evaluated on the following criteria. Greenville County reserves the right to interview responders or have demonstrations to this RFQ at its discretion. Greenville County will not be responsible for any costs associated with interviews of responders or demonstrations. If interviews or demonstrations are needed, a second phase of the evaluation process may be implemented. Terms and Conditions Safety, Health, and Security Contractor shall be solely responsible for its activities, that of its employees on the site and activities of its consultants, contractors and/or subcontractors for maintaining a safe job site. Contractor’s activities and activities of its consultants, contractors and/or subcontractors shall comply with all local, state, and federal safety regulations and their enforcement agencies. Contractor shall at all times conduct its operations under this Contract in a manner to avoid risk of endangerment to the health and safety of persons and property. The Contractor shall have sole responsibility for implementing its safety and health programs, taking all safety and health precautions necessary and continuously inspecting all equipment, materials and work to prevent, discover, determine and correct any conditions which might result in personal injury, equipment damage or damage to property or the public. Contractor’s safety, health and security programs shall be in compliance with all regulatory requirements and shall furnish accident, incident, injury, and other records and reports required by the Occupational Safety and Health Administration, State and Local laws, or by the County. Response Opening and Award: Responses shall be publicly opened and only the names of the offerors disclosed at the opening. For IFBs, the name of the responder as well as the price will be disclosed. However, no decision will be made until Procurement Services and the user Division have had ample time to review each response. Award will be made at the earliest possible date. The County reserves the right to award in whole or in part, by item, group of items, geographic area or by section where such action serves the County’s best interest. The contract will be awarded to the response that meets the requirements and criteria set forth in the Solicitation. No response may be withdrawn for a period of sixty (60) days after the opening date. Submissions will not be accepted after the deadline. There will be no exceptions. By submission of a response, you are guaranteeing that all goods and services meet the requirement of the solicitation during the contract period. Rights Reserved by Greenville County: Greenville County reserves the right to reject any and all responses, any portion thereof, and waive any technicalities. Accordingly, the right is reserved to make awards in the best interest of the County. Integrity, reputation, experience and past performance will be heavily weighed in response evaluation. This solicitation does not commit the County of Greenville to award a contract, to pay any costs incurred in the preparation of the response, or to procure or contract for goods or services listed herein. Responders Qualification: Responders must, upon request of the County, furnish satisfactory evidence of their ability to furnish products or services in accordance with the terms and conditions of these specifications. The County reserves the right to make the final determination as to the responder’s ability to provide the products or services requested herein. Responders Responsibility: Each responder shall be fully acquainted with the conditions relating to the scope and restrictions attending the execution of the work under the conditions of this response. It is expected that this will sometimes require on-site observation. The failure or omission of a responder to be acquainted with existing conditions shall in no way relieve the responder of any obligations with respect to this response or to any contract as a result of this response. References: The County requires responders to list at least three (3) references including their company name, name of contact, address, telephone number, and email address of contact person with whom the responder has performed or provided similar work, service or product. The reference may be contacted to fill out a short questionnaire on the work with that company. If the reference does not complete the questionnaire by the time requested, the County may ask the responder to give an alternate reference. The County may also ask for additional references if needed. The County asks that responders do not list County representatives or departments as a reference. Waiver: The County reserves the right to waive any Instructions to Responders, General or Special Terms and Conditions, specifications, or technicalities when it is deemed to be in the best interest of the County to do so. Rejection: Greenville County reserves the right to reject any response that contains prices for individual items or services that are inconsistent or unrealistic when compared to pricing of like responses; or ambiguous responses which are uncertain as to terms, delivery, quantity, or compliance with specifications may be rejected or otherwise disregarded if such action is in the best interest of the County. Response Signature and Solicitation Alterations: The responder shall sign the response correctly or the response may be rejected. If the response shows any omissions, alteration of form, unauthorized additions, a conditional response or any irregularities of any kind, the response may be rejected. Specification Changes, Additions and Deletions: Responders are required to register for an account via the County’s online procurement Portal hosted by OpenGov. Once responder has completed registration, you will receive addenda notifications to your email by clicking “Follow” on this project. Ultimately, it is sole responsibility of each responder to periodically check the site for any addenda at https://procurement.opengov.com/portal/greenvillecounty. The County of Greenville shall not be responsible for any verbal information given by any employees of the County of Greenville in regard to this proposal. Response Changes: Responses, amendments thereto or withdrawal requests received after the advertised time for response opening, shall be void regardless of when they were submitted. Response Price: The price presented as a result of these specifications shall be for the contract period. The response shall be acceptable for sixty (60) days from the date of opening. All prices and notations shall be printed in ink or typewritten. Errors should be crossed out, corrections entered and initialed by the person signing the response. Erasures or use of typewriter correction fluids may be cause for rejection. No response shall be altered or amended after specified time for opening. Federal, State and Local Laws: The contractor assumes full responsibility and liability for compliance with any and all local, state and federal laws and regulations applicable to the contractor and its employees including, but not limited to, compliance with the EEO guidelines, the Occupational Safety and Health Act of 1970, and minimum wage guidelines. Tie Bids: In the case of tie bids, the County reserves the right to make the award based on the factors outlined in Section 7-305(9) of the Greenville County Code of Ordinance (Chapter 7, Article VIII), or in what it considers to be in the best interest of the County. Deduction and Holdbacks: In addition to the County’s right of termination, the County shall be entitled to full reimbursement for any costs incurred by the County by reason of the contractor’s failure to perform or to satisfactorily perform its responsibilities and duties. Such costs may include, but are not limited to, the cost of using the County’s employees or employees of any other entity to perform the obligations of the contract. The County may obtain any such reimbursement by deduction from payments otherwise due to the contractor or by any other proper and lawful means. All deductions from any money due the contractor are to be as liquidated damages and not as a penalty. It is the County’s intent to give the contractor a reasonable opportunity whenever practicable, to correct any such failure to perform or satisfactorily perform its responsibilities and duties. In no circumstances shall any uncorrected situation extend for more than five days. The County will make the following deductions from the contract sum in the event that the contractor fails to perform any of the required work within the required time limits in the event the County carries out the work using its forces or another contractor. For use of County’s forces – actual cost involved. For use of another contractor – the amount charged by said contractor. The County reserves the right to hold back an
Published attachments
Addenda and notices
Official Notice #1: Proposal Tabulation · 1
Public questions and answers
Is the budget known for this work?
No
Do we know the approximate square footage anticipated for the intended scope?
No
Has any programming, needs assessment, feasibility study, or concepts been completed? If so, will that be available?
No
Section 4.3 lists a “Financial Proposal.” Can you clarify what you are looking for here?
This is a standard format for submitting. The County does not expect any financial proposals in a firm's response.
Based on the previous answers, we are assuming that the initial tasks for the design team will be to collaborate with the County to establish desired programming and project scope, with associated concepts and initial budget estimates - with full design services to follow, budgets permitting. Is that assumption correct?
Yes
Section 2.8 begins “Contractor warrants….”. Under professional liability insurance, warranties are uninsurable. We would like to ask if “warrants” can be replaced with “represents”.
This can be negotiated after award. Responders should list any exceptions or requests in their response for County review.
Section 2.8 states, “…free from defects which would not normally be found in work of this nature…”. We would like to ask if this section can be struck, as this implies perfection and professional liability insurance will not cover perfection.
This can be negotiated after award. Responders should list any exceptions or requests in their response for County review.
Section 2.10. We would like to ask if the word “defend” could be removed. Professional liability insurance will not provide coverage for “defend”.
This can be negotiated after award. Responders should list any exceptions or requests in their response for County review.
Section 2.12 Safety, Health, and Security. Since architects are not responsible for site safety, can this entire section be struck?
This can be negotiated after award. Responders should list any exceptions or requests in their response for County review.
Section 2.13. Could we please ask that “…rendered its services…” be replaced with “permitted its drawings” in two places? The code may change after the drawings are permitted, and typically the authority having jurisdiction will allow the project to be constructed per the code under which the project was reviewed.
This can be negotiated after award. Responders should list any exceptions or requests in their response for County review.
Section 8.1 concerns the Safety, Health, and Security of the job site. Since architects are not responsible for site safety, can this entire section be struck?
This can be negotiated after award. Responders should list any exceptions or requests in their response for County review.
Section 8.27 requires the contractor to “defend” the County from any and all claims. Professional liability insurance used by design professionals does not cover “defend”. Can this word be struck from this section?
This can be negotiated after award. Responders should list any exceptions or requests in their response for County review.
Section 8.33 requires the responder to “defend, on behalf of the County and suit brought against the County”. Again, professional liability does not cover “defend”. We would like to suggest striking the above statement and replacing it with “compensate the County for reasonable attorney’s fees…”.
This can be negotiated after award. Responders should list any exceptions or requests in their response for County review.
We would like to respectfully request that the following requirement be struck: “Workmanship shall be first quality in every respect. All measures necessary to ensure a first-class job shall be taken.”. This language is not applicable to professional services.
This can be negotiated after award. Responders should list any exceptions or requests in their response for County review.
Section 8.42 requires an asbestos management plan. This is outside of the architect’s services and is the responsibility of the GC. We would like to as that this entire section be struck.
This can be negotiated after award. Responders should list any exceptions or requests in their response for County review.
Have any MEP engineers been involved with the overall maintenance of the existing buildings since they've been in service?
The County has 3rd party vendor services for chillers annually.
OpenGov categories
- 90607 · Architect Services, Professional