Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

CR 667 (Cohawkin Road) and CR 673 (Cedar Road) Intersection Improvements in Gloucester County

Description

FY 2027 Gloucester County County Local Concept Development Intersection Study for CR 667 (Cohawkin Road) and CR 673 (Cedar Road) Intersection Improvements in Gloucester County . The Delaware Valley Regional Planning Commission (DVRPC) on behalf of Gloucester County, New Jersey is seeking consultant support for the preparation of a Local Concept Development (LCD) study being advanced through its Local Capital Project Delivery (LCPD) Program. This program is consistent with the Project Delivery Process (PDP) implemented by the New Jersey Department of Transportation (NJDOT). Through this Request for Proposals (RFP), DVRPC is seeking to engage one (1) qualified consulting firm to provide professional consulting services to Gloucester County for conducting an LCD study for necessary Intersection Improvements to Cohawkin Road (CR 667) and Cedar Road (CR 673), in the Townships of Mantua and East Greenwich, Gloucester County. The existing intersection configuration is a ‘Y’ intersection, with a stop condition only on Cedar Road (CR673). The available line of sight for motorists entering the intersection from Cohawkin Road does not meet minimum design standards, creating a safety concern. Vehicle conflicts also exist at this intersection. Cars traveling north on Cohawkin Road frequently make the left turn onto Cedar Road in an unsafe manner, turning directly in front of active southbound traffic without stopping. The consultant shall evaluate the existing intersection configuration, roadway geometry, line of sight, and general traffic operations to identify all opportunities of safety improvement at the intersection. In addition to evaluating potential geometric improvements at intersection, the consultant shall address the existing drainage deficiencies along Cohawkin Road, particularly near and through the intersection with Heritage Road where it connects Cedar Road with Cohawkin Road at the northern limits of the project area. The three houses at the southwest corner of the Cohawkin Road and Heritage Road intersection experience flooding during periods of intense rainstorms. The drainage area includes fields south of the intersection (on both sides of Cohawkin Road). Runoff from these fields drain into an existing undersized system which ultimately discharges to the pond located at the corner of Cedar Road and Heritage Road (northwest corner of the project). The consultant shall evaluate the existing drainage system to minimize localized flooding of the adjacent residential properties. The study shall include evaluation of the existing drainage system including capacity, condition, drainage areas, drainage patterns and identification of any additional factors contributing to the observed flooding. The consultant shall identify appropriate alternatives to address the existing deficiencies and improve stormwater management within the project area. Scope of Work and Deliverables The Consultant shall be responsible for achieving the following major deliverables: 1) conducting an LCD study of CR 667 (Cohawkin Road) and CR 673 (Cedar Road) Intersection Improvements in Gloucester County , and 2) producing a Concept Development Report for the study. The study shall be developed in coordination with DVRPC and Gloucester County , the Project Sponsor, and reviewed by NJDOT Bureau of Local Aid (NJDOT-LA), Bureau of Environmental Program Resources (NJDOT-BEPR). LCD Phase For the LCD Phase, DVRPC will be responsible for administering the Consultant contract for professional services. However, the Consultant work for this study will be co-managed by both DVRPC and Project Sponsor. Collectively, DVRPC, Project Sponsor, Consultant, and NJDOT Local will hereafter be referred to as the Project Team. The LCD Phase shall involve developing a well-defined and justified Purpose and Need Statement focusing on the primary transportation needs to be addressed, which will 1) support the advancement of the project to the LPE Phase, or 2) will lead to a No-Build Alternative resulting in the termination of the project. i) LCD Study The LCD study shall include: 1) community outreach; 2) data collection; 3) development of a reasonable number of prudent and feasible conceptual alternatives; 4) development of a Purpose and Need Statement; 5) selection of a Preliminary Preferred Alternative (PPA); 6) determination of the National Environmental Policy Act (NEPA) classification; and 7) preparation of numerous reports including the a) Concept Development Report and b) Preliminary Engineering Scope Statement. These alternatives and the PPA shall be analyzed at a “planning level effort.” Throughout this process, the project must comply with Federal Highway Administration (FHWA) and NJDOT requirements/regulations, including American Association of State Highway and Transportation Officials (AASHTO), Manual on Uniform Traffic Control Devices (MUTCD) standards and railroad engineering standards and guidelines. ii) Concept Development Report (CDR) The Consultant shall prepare and submit a Concept Development Report to the Interagency Review Committee for their review and approval. The report will incorporate all documentation prepared under the LCD Phase and be organized in the manner further identified in Task 5 below. Project Tasks Overview For the overall project, below is a list of the generic tasks with an approximate percentage of the entire contract for each task. These tasks and percentages may be considered as a starting point for configuring tasks and corresponding resources, but it is encouraged that proposal submissions include tasks and percentages deemed most appropriate to effectively and efficiently accomplish the stated goals of the project, produce quality deliverables and to consult the NJDOT Concept Development Activity Descriptions . Note that although these tasks are presented below in sequential order, the Consultant might find it beneficial to conduct work on different tasks in parallel, and may need to conduct work in a different order than presented below. Unless otherwise specified, five (5) color hard copies (double-sided as appropriate) shall be required for all final technical memoranda and reports produced for this project. All deliverables must be submitted first in draft form for review and then revised based on comments received from the Project Team. Following revisions, final documents shall be submitted. Final documents, responding to comments shall be completed within two weeks of receiving comments. All interim final project deliverables shall also be submitted in electronic format, as specified by Project Sponsor. Memoranda and reports shall be submitted to Project Sponsor in both PDF format (to allow easy printing of additional copies) and editable format (i.e. Microsoft Word for text, Microsoft Excel for graphs and tables, or Microsoft PowerPoint for graphics, as applicable). The deliverables shall include the raw data files for the graphics and the Consultant shall provide a clear indication of the location of data underlying any graphics so that DVRPC staff is able to reproduce or modify graphics as needed. All final GIS data shall be projected horizontally in NAD83 New Jersey State Plane Feet and vertically in NADV 88 and submitted to DVRPC and Project Sponsor. CAD drawings should be similarly projected and submitted in AutoCAD DWG format to Project Sponsor. Traffic counts taken for the project should be submitted to DVRPC. All electronic data files produced must be documented consistently. When submitting separate proposals and budget cost proposals, the budget cost proposals should be detailed for each task. The Consultant shall conduct all of the following tasks outlined in the scope of work unless otherwise specified. Project Task Details i) Task 1: Project Management (15%) This task of the work shall include performing project management duties and responsibilities necessary to advance the project through the LCD phase, in accordance with the NJDOT’s Capital Project Delivery Guide for Concept Development. Capital Project Delivery Guide The LPDG (an interactive flowchart) is available on the NJDOT CD website LPDG Flowchart . Work efforts associated with this task shall include budgeting, scheduling, reporting, meetings, coordination, and reviews. The Consultant shall establish an effective means of coordinating and reporting its activities with the Project Sponsor throughout the course of the project to ensure an expeditious exchange of information. A detailed project schedule shall be submitted at the kick-off meeting for review and approval, and reviewed regularly during the course of the study. The Consultant’s project manager shall be responsible for the preparation of meeting agendas, including handouts and/or electronic slideshow presentations if applicable, and minutes. Project Sponsor and DVRPC shall be informed a minimum of one week prior to all meetings with outside agencies, state and local government officials, and/or groups so that personnel may attend, as desired. (1) Reporting and Invoicing Reporting and invoicing requirements shall be in accordance with the terms of DVRPC’s standard contract agreement. The Consultant shall be responsible for preparing and submitting monthly progress reports and quarterly progress schedules to DVRPC indicating percent of work complete that corresponds to the reporting period of the monthly invoice. The progress reports shall include: 1) all active and completed tasks; 2) indicate the percent of work complete (total and by task); 3) work and submittals completed in the last month and expected to be performed in the next billing period; 4) meetings actions/decisions required by DVRPC; and 5) the status of the schedule and budget. (2) Project Controls The Consultant shall be responsible for implementing and managing the following project controls: Preparation and filing of all project correspondences, memorandums, meeting minutes, transmittals, etc., in both hard and electronic media; Developing and maintaining a project schedule for the project duration which shall identify all project milestones; and Monthly invoicing/progress reports. For the project schedule, task durations shall be shown in numbers of weeks. An updated project schedule shall be distributed to the Project Team on a quarterly basis. The Consultant shall identify and provide justification for deviations from the standing project schedule or budget. (3) Meetings and Coordination The Consultant shall be responsible for coordinating all project meetings, and prepare and distribute all meeting agendas, including handouts if applicable, and meeting minutes. All design related and decision-making actions shall be noted in the Design Communication Report (DCR), as further described below. The number of meetings will vary by project and shall be reflected in the Consultant’s technical proposal, for review and approval by the Project Team. These meetings may include the following: Local officials’ meetings; Status meetings; Biweekly or Monthly conference calls; In person meetings as needed (assume one every two months); Stakeholders meetings with Regulatory Agencies, Interest Groups, etc. (anticipated 2 meetings); Public meetings with local town Councils and Commissions; and NJDOT SME (Subject Matter Expert) meetings. (4) Interagency Review Meetings The Interagency Review Committee (IRC) is comprised of representatives from DVRPC, NJDOT NJDOT-LA, NJDOT-BEPR, NJDOT-Railroad Engineering, FHWA, and Subject Matter Experts (SMEs) to determine whether or not the project’s purpose and need has been fully justified and documented. An IRC meeting will be scheduled by NJDOT-LA at the conclusion of the study. The Consultant and Project Sponsor will be required to make a PowerPoint presentation with appropriate handouts before the IRC. The Consultant shall coordinate with DVRPC and NJDOT-LA with IRC regarding the meeting agenda topics and objectives. The Consultant should anticipate one IRC meeting. (5) Major Deliverables for Task 1 The major deliverables for Task 1 are listed below and should be included in a detailed project schedule to be submitted at the kick-off meeting for DVRPC’s and the Project Sponsor’s review and approval. The project schedule shall contain: Interim project schedule updates provided on a quarterly basis; Once a month conference calls with the Project Team; Once every two months in person meetings with the Project Team; Anticipate three local officials’ meetings; One SME meeting; One IRC meeting; Meeting agendas (including necessary handouts/presentations) and minutes, including written summaries of all project management meetings; Monthly progress reports, corresponding to the invoices; and A final progress report and invoice with release clause, to be submitted within 30 days from the close of the project. ii) Task 2: Public Outreach (15%) (1) Public Action Plan (PAP) The Consultant shall develop a Public Action Plan (PAP) which will include strategies for communicating project information to stakeholders and the Public to solicit project feedback. The PAP should explain how it will reach out to disadvantaged communities to receive their feedback. The PAP should be relevant to the project and developed in consultation with the Project Team and other appropriate parties. This plan should investigate alternate means of outreach to effectively solicit input from all users. The 6 purpose of the plan is to solicit public involvement, as early as possible, within the LCD phase and to continue throughout LPE, FD, and CON, although the selected Consultant will only be responsible for implementing the PAP during the LCD phase of work. The PAP shall include Introduction Summary Background Contact Information Timeline Project Background Serving the Greater Philadelphia area since 1965, DVRPC works to foster regional collaboration in creating and maintaining a livable, sustainable, and economically competitive region covering our nine counties: Bucks, Chester, Delaware, Montgomery, and Philadelphia counties in Pennsylvania, and Burlington, Camden, Gloucester, and Mercer counties in New Jersey. These nine counties together comprise over 3,800 square miles with land use that varies from the dense urban core of Center City Philadelphia to the open rural areas of the New Jersey Pinelands. DVRPC staff works with municipal, city, county, and state representatives and many other partners to improve transportation, promote smart growth, protect the environment, and build the economy. DVRPC is the federally designated Metropolitan Planning Organization (MPO) for the greater Philadelphia region. DVRPC sponsors and conducts studies, assists member planning agencies and provides a forum for interagency cooperation and public input into funding decisions. DVRPC was formed by an Interstate Compact through legislation passed by the Pennsylvania Legislature in 1965, as reenacted and amended in 1967, and by the New Jersey Legislature in a series of conforming acts passed between 1966 and 1974, which vests DVRPC with sovereign immunity. DVRPC LONG RANGE GOALS DVRPC assists its member counties and cities in carrying out specific transportation planning activities that help advance the goals, objectives, principles, policies, plans, and projects as set forth in Connections 2050 Plan for Greater Philadelphia (Plan). The Plan identifies principles that govern DVRPC’s approach to regional transportation planning, including giving the highest funding priority to maintaining and repairing existing infrastructure and system preservation. As stated in the Plan, DVRPC long-range goals are to: Support the economic vitality of the metropolitan area, especially by enabling global competitiveness, productivity, and efficiency Increase the safety of the transportation system for all motorized and nonmotorized users Increase the ability of the transportation system to support homeland security and to safeguard the personal security of all motorized and nonmotorized users Increase accessibility and mobility of people and freight Protect and enhance the environment, promote energy conservation, improve quality of life, and promote consistency between transportation improvements and state and local planned growth and economic development patterns Enhance the integration and connectivity of the system, across and between modes, for people and freight Promote efficient system management and operation Emphasize the preservation of the existing system DVRPC’s LCPD Program strives to ensure that these goals are met starting with its LCD Phase, which identifies proposed projects for further development and implementation. The major objective of the LCD Phase is to identify and compare reasonable alternatives and strategies that address the requirements of the initial stages of the PDP. The LCD Phase will provide the information necessary to determine whether the project can successfully be advanced through the Local Preliminary Engineering (LPE), Final Design (FD), and Construction (CON) Phases. Moreover, the LCD Phase provides the framework for advancing the project to the LPE Phase, the next phase of the PDP. For its New Jersey counties, DVRPC’s LCPD parallels that of NJDOT, about which more information may be found at: http://www.state.nj.us/transportation/capital/pd/phase.shtm As a part of its LCPD Program, DVRPC is seeking to study the alternatives to address safety and operational deficiencies at the identified intersection locations. Through this RFP, DVRPC is seeking to engage one (1) firm to provide professional consultant services for a LCD intersection study of the CR 667 (Cohawkin Road) and CR 673 (Cedar Road) Intersection Improvements in Gloucester County , in the Township/City of Mantua & East Greenwich Township , New Jersey. RFP Submission Information The Consultant shall submit the following RFP proposal documents (Technical Proposal and Administrative "Cost" Proposal) in PDF format, as indicated below. Technical Proposal Submissions The Technical Proposal must be submitted via the OpenGov portal. Administrative (Cost) Proposal Submissions The Administrative (Cost) Proposal must be submitted separately via the the OpenGov portal. The Administrative (Cost) Proposal shall remain separate and sealed until such time as the qualitative evaluation of all technical proposals is completed. In accordance with the Brooks Act, cost is not a factor of evaluation. Both the Technical and Administrative Proposal submissions are due no later than 12:30 pm EDT, Thursday, December 10, 2026 . Technical and Administrative Proposals submitted after the submission deadline or that are non-responsive to any of the requirements of this RFP may be deemed disqualified and will therefore be ineligible for award. DVRPC assumes no responsibility for delays causing any proposal submission to be received after the above-referenced due dates and times. The Respondent bears all costs related to the preparation and submittal of its Proposal. DVRPC reserves the right to award all or only part of the solicitation, and the right to cancel the solicitation and make no award. RFP Proposal Requirements Evaluation Phases Negotiations for award of the contract will be with the top-ranked firm after the conclusion of the evaluation committee process. DVRPC reserves the right to award in part or as a whole. DVRPC may reject all proposals. DVRPC further reserves the right to negotiate cost and scope elements with the top-ranked firm. An evaluation committee consisting of representatives from DVRPC and our planning partners will evaluate each responsive and responsible proposal and recommend an awardee to the DVRPC Board pursuant to the results of the evaluation committee process. Criteria have been established to guide the evaluation of each responsive and responsible proposal. Th

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #2 · 2

    Please use the See What Changed link to view all the changes made by this addendum.

Plain text