State and local · OpenGov
Cured in Place Pipe Lining Services
Description
The County of Wayne, NY is soliciting sealed responses for Cured in Place Pipe Lining Services . Responses are due , on or before 1:00 pm prevailing time on Wednesday, January 6, 2027 . Late responses will not be accepted. Cured in Place Pipe Lining Services Mobilization To Any Point Within Wayne County (Directed By Owner) – Fixed Price Service Lateral Connection By Remote – Fixed price Repair Protruding Lateral Connections – Fixed Price Temporary Bypass Pumping 6”-12” Dia. – Fixed Price Temporary Bypass Pumping 15” – 24” Dia. – Fixed Price Temporary Bypass Pumping 27” -36” Dia. – Fixed Price Temporary Bypass Pumping 42” – 60” Dia. – Fixed Price Temporary Bypass Pumping 72” – 96” Dia. – Fixed Price 4”&5” Dia. CIPP Lateral (Full Section Rehab) 4”&5” Dia. CIPP (Full Section Rehab) 6” Dia. CIPP Lateral (Full Section Rehab) 6” Dia. CIPP (Full Section Rehab) 8” Dia. CIPP (Full Section Rehab) 10” Dia. CIPP (Full Section Rehab) 12” Dia. CIPP (Full Section Rehab) 15” Dia. CIPP (Full Section Rehab) 18” Dia. CIPP (Full Section Rehab) 24” Dia. CIPP (Full Section Rehab) 30” Dia. CIPP (Full Section Rehab) 36” Dia. CIPP (Full Section Rehab) 42” Dia. CIPP (Full Section Rehab) 48” Dia. CIPP (Full Section Rehab) 54” Dia. CIPP (Full Section Rehab) 60” Dia. CIPP (Full Section Rehab) 72” Dia. CIPP (Full Section Rehab) 84” Dia. CIPP (Full Section Rehab) 96” Dia. CIPP (Full Section Rehab) 4”&5” Dia. CIPP (Spot Rehab) – First 5 Foot Section 6” Dia. CIPP (Spot Rehab) – First 5 Foot Section 8” Dia. CIPP (Spot Rehab) – First 5 Foot Section 10” Dia. CIPP (Spot Rehab) – First 5 Foot Section 12” Dia. CIPP (Spot Rehab) – First 5 Foot Section 15” Dia. CIPP (Spot Rehab) – First 5 Foot Section 18” Dia. CIPP (Spot Rehab) – First 5 Foot Section 24” Dia. CIPP (Spot Rehab) – First 5 Foot Section 30” Dia. CIPP (Spot Rehab) – First 5 Foot Section 36” Dia. CIPP (Spot Rehab) – First 5 Foot Section 42” Dia. CIPP (Spot Rehab) – First 5 Foot Section 54” Dia. CIPP (Spot Rehab) – First 5 Foot Section 60” Dia. CIPP (Spot Rehab) – First 5 Foot Section Project Details / Scope of Work Description Rehabilitate culvert and storm drain pipe in accordance with these specifications, the contract documents, and as directed by the Public Works Superintendent, or his designee. General Specifications All specification sections noted herein shall refer to the latest revision and/or edition of the NYS DOT specifications for construction and materials. All bidders shall submit with this proposal, a copy of a letter or Certificate of Acceptance which would indicate acceptance by the NYS DOT. The contract prices shall be firm for the duration of the contract. Prevailing Wage Rates are to be used for calculating labor costs. Wayne County has provided a PRC# within this bid to obtain current rates in determining the cost of labor associated with Cured In Place Pipe Lining. Cured In Place Pipe Lining for this contract will only involve Storm Sewer Rehabilitation only. No sanitary systems are anticipated. Wayne County Public Works is to provide Maintenance & Protection of Traffic while the Contractor is on site between the hours of 6AM and 4PM Monday – Thursday, April to September. 7:30AM – 3PM Monday-Friday, September to April. Wayne County Public Works to provide staging and overnight parking areas for Contractor. Wayne County Public Works to provide a water source for the Contractor. Cleaning & Inspection (Host Pipe) The Contractor shall clean the host pipe by means of jetting with forced water, digging or flushing. The Contractor shall protect all inlet and outlet of streams, creeks and drainage channels by placing inlet and outlet protection. The Contractor shall use a CCTV sewer camera to visually inspect the host pipe before and after installation. If there are any imperfections within the host pipe, the use of mechanical cutting robots and hydro jetting the pipe interior down to its original diameter. Any lateral connections shall be defined, mapped and reinstated after the liner has been placed and cured. The Contractor in some cases may need to set up Bypass pumping. If so required, the Contractor shall protect the hose from traffic and construction equipment. The bypass shall not interfere with the CIPP installation process. Any excessive heavy cleaning for larger diameter culverts pipes will be on an as needed basis and approved by the County prior to start of work. The payment shall be made the price per cubic yard of debris removed. The County will supply the Contractor with a dump site for all pipe cleaning debris. Wayne County Public Works will clean out inlet and outlet end of pipe prior to Contractor arriving on site. These areas will be defined in a pre-construction site meeting. Lining with Cured in Place Pipe (CIPP) Liner The CIPP manufacturer’s / installer’s name shall appear on the NYS Department of Transportation’s Approved List of Materials and Equipment, Rehabilitation of Culverts and Storm Drains section. The CIPP contractor shall provide the Supt of Public Works or his designee a report with design details and calculations for determining the minimum required thickness of the cured-in-place-pipe (CIPP) liner, the minimum internal pressure required to hold the wetted liner tight against the host pipe, and the maximum allowable internal pressure so as not to damage the wetted liner. All design calculations shall assume a fully deteriorated invert host pipe, unless determined to be in tact after initial cleaning and inspection. Liner shall be flexible enough to fit irregular pipe sections and able to negotiate pipe bends. The felt liner must be refrigerated prior to installation to prevent premature curing. The CIPP liner shall be a resin-saturated, epoxy-impregnated polyester or wool felt tube that is pulled or inverted into damaged underground storm sewer pipe and cured (using heat, steam, Ultra Violet or ambient conditions) to form a seamless, joint-free interior pipe. Liner’s surface must be coated with a plastic material compatible with the proposed resin. All liners containing styrene based resins require the use of a pre liner, to be inserted into the existing pipe before insertion of the CIPP liner. In addition to the pre liner, single or double sided liners may be specified in the contract plans, depending on the environmental setting of a particular application. A thermoset resin and catalyst or an epoxy resin and hardener system, compatible with the proposed inversion system shall be used. If indicated in the contract documents, a resin containing less than five percent volatile organic compounds (VOCs) with less than 0.1 percent hazardous air pollutants (HAPs) and less than 0.1 percent of water quality pollutants as listed in 6 NYCRR Parts 700-705 shall be supplied. If the resin type (styrene or non-styrene) is not specified on the plans, the installer has the option to select the resin type. Proposed resin shall be compatible with the proposed inversion process. Installation. A cured-in-place-pipe (CIPP) liner may be installed into the host pipe by hydrostatic head, air pressure inversion, or the pulled in process. Do not exceed the manufacturer recommended maximum pressure to the liner felt fiber during the inversion process. Hydrostatic Head. The standpipe height must be sufficient to maintain at least the minimum required pressure between the CIPP liner and the existing (host) pipe. The lower end of the liner must extend beyond the outlet end whenever possible. Where changes in elevation may create excessive stresses on the liner felt, the use of bulkheads may be necessary. Alternative installation methods using a hydrostatic head will be subject to approval by the County Superintendent of Public Works. Air Pressure. The liner may be inverted using air pressure to extend it to the termination point. The air pressure needs to be adjusted and sustained to a level capable of holding the liner against the host pipe regardless of the curing method proposed to be used. If utilizing the pull through method, a winch cable shall be threaded through the host pipe, hooked to the leading edge of the wet liner, and used to slide the liner smoothly into place over the target area. Care should be taken not to damaged the liner pipe Notice Notice to Contractors (Physical Responses Only) Notice is hereby given that the County of Wayne is conducting a Request for Bids for Cured in Place Pipe Lining Services Sealed responses may be submitted physically or by mail in a sealed envelope clearly identified and filed with the Superintendent of Public Works, 7227 Route 31, Lyons, New York 14489, 26 Church Street, Lyons, New York 14489, on or before 1:00 pm prevailing time on Wednesday, January 6, 2027 An electronic copy of proposal forms, specifications, and plans can be obtained from the County’s eProcurement Portal: https://procurement.opengov.com/portal/co-wayne-ny-us or by requesting them directly from the Purchasing Department Office located at 16 William Street, Lyons, NY by email request to purchasing@co.wayne.ny.us (Telephone: 315-946-7675) The County of Wayne (hereinafter “County”) shall not be held responsible for the completeness or accuracy of any proposal documents received by a contractor that was not directly issued to that contractor by the Purchasing Department. Any contractor submitting a proposal based on incomplete or inaccurate information resulting from documentation received from any third party shall not have cause for relief from award or completion of a contract in accordance with the official documents on file with the Clerk of the Board of Supervisors. It is HIGHLY suggested that all contractors interested in participating in this proposal contact the Purchasing Department directly at the above address or telephone number to ensure they have received the most accurate and up-to-date material concerning this contract. The County does not offer or supply anyone the list of people who have obtained a copy of these proposal specifications or cost estimates for the project prior to the opening of the proposals. NO EXCEPTIONS ARE MADE TO THIS POLICY. the County Reserves the right to reject any or all responses Submission Method / Receipt of Proposals Physical/ Hardcopy Submission Sealed bids will be received by the Superintendent of Public Works at 7227 State Route 31, Lyons, New York 14489 until the date and time listed in the advertisement, and at that time all bids will be publicly opened and read aloud. Any bid received after the specified time will be returned to the Bidder unopened. Bidders shall indicate on the outside of their sealed bid the following information: Cured in Place Pipe Lining Services Solicitation # BB27010 1:00 pm , Wednesday, January 6, 2027 Offerors/Proposers Name Hardcopy responses do not require the submission of the entire solicitation documents. Only the required forms General Information / Instructions to Bidders & Offerors Definitions A “Bid” as a complete and properly signed proposal to sell and deliver to the County the services as described in the specifications, submitted in accordance with the Instruction to Bidders. A “Bidder”, “Offeror”, or “Contractor/Vendor” is a person or entity who submits a bid. “Contract Documents” shall consist of Notice to Bidders, Instruction to Bidders, Scope of Work and Specifications, Wayne County Bid Proposal, Non-Collusion Bidding Certification, Certification regarding Debarment/Suspension/responsibility, Certification of Compliance with the Iran Divestment Act, Certificate Regarding Lobbying, and any documents regarding Insurance as outlined in the Insurance section. Superintendent Kevin Rooney is the Superintendent of the Wayne County Department of Public Works, 7227 Route 31, Lyons, New York 14489, Tel # 315-946-5600. Bidder's Representations By making a Bid, the Bidder represents and warrants to the County that: The Bidder is able to enter into an Agreement to perform the services listed; The Bidder has carefully examined the Contract Documents; The Bidder fully understands the intent and purpose of the Contract Documents; and The bid is based upon the terms and conditions set forth in the Contract Documents without exception. Interpretation or Correction of Contract Documents No oral interpretation will be made to any Bidder as to the meaning of the Contract Documents or any part thereof. Any request for such an interpretation shall be made in writing and submitted to the Purchasing Department at least four (4) days prior to the date set for the receipt of Bids. Any interpretation made to a Bidder will be in the form of a written Addendum, and when issued, will be on file at the Clerk of the Board of Supervisors. In addition, all Addenda will be sent to each person recorded as having received a copy of the Bid Documents, but it shall be the Bidder's responsibility to inquire prior to submitting a Bid as to the Addenda issued. All such Addenda shall become part of the Contract Documents, and each Bidder shall be bound by such Addenda, whether or not received by the Bidder. Sales Tax Exemption The County is exempt from payment of sales and compensating use taxes under the Tax Law of the State of New York. Bidders shall not include sales or use taxes in their Bid price. Preparation and Execution of Bids; Non-Collusion Bidding Certification Bids must be submitted on the Bid Form included in the Contract Documents and prepared in the following manner: Bidder assumes all costs of preparation of the proposal and any presentations necessary to the proposal process. The County is not liable for any costs incurred in the preparation of this proposal and in any other subsequent proposals or presentations. All blank spaces on the Bid Form shall be filled in legibly, in ink or typewritten. If both words and figures are requested, the written words shall be binding on the Bidder. In the event of an error in the total of the Bid, the Bid shall be the total of all items in written words. Erasures and alterations must be initialed by the signer of the Bid. The Bidder shall not make any changes in the wording of the Bid Form or make any stipulations or qualify the Bid in any manner. The Bidder shall note the receipt of Addenda in the spaces provided on the bid Form by entering the number and the date of each Addendum. If no Addenda have been received, insert the word “NONE”. Failure to acknowledge Addenda shall be sufficient cause for rejection of the Bid. The Bid must be signed by the person legally authorized to bind the Bidder to a contract. The name of the person signing the Bid must be typed or printed below the signature. The Non-Collusion Bidding Certification required by Section 103-d of the General Municipal Law must be submitted with each Bid. The Proof of Insurance, consisting of an insurance certificate or letter of intent showing insurability in accordance with the requirements indicated in the Standard Insurance Provisions, must be submitted with each Bid. An executed Debarment Certification must be submitted with each Bid. An executed Certification Regarding Lobbying must be submitted with each Bid. An executed Certification of Compliance with the Iran Divestment Act must be submitted with each Bid. Modification or Withdrawal of Bids A Bid may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time before the scheduled time for opening of Bids. A Bid may not be modified, withdrawn, or canceled for a period of forty-five (45) days after the date of the Bid opening; thereafter, a Bidder may withdraw his Bid only by a written notice of withdrawal submitted in advance of the bid award. Bidder's Qualifications The County may make such investigations as deemed necessary to determine the responsibility of any Bidder to perform the work, and any Bidder shall furnish to the County the information, samples, and data required by the County. The County reserves the right to reject any Bid if the evidence submitted by or the investigation of any such Bidder fails to satisfy the County that any such Bidder is responsible, or qualified to carry out the obligations of the Contractor to complete the work as contemplated therein. The following shall be considered the minimum requirements to qualify for Bidding: Be an established business, registered to do business in the State of New York Maintain in direct employment experienced and trained personnel. Maintain and be familiar with the requirements of all applicable codes and regulating bodies. Must submit Certificates of Insurance and copies of endorsement forms, meeting requirements of the County of Wayne’s minimum insurance standards, a copy of which is included in the Bidding Documents Consideration of Bids; Acceptance of Bid The County shall have the right to reject any and all Bids; to reject a Bid not accompanied by the required Bid security (If applicable) or by other data required by the Contract Documents; to reject a bid which is in any way incomplete or irregular; and to waive any informality in a Bid. The County shall have the right to award any combination of Bid and Alternative to determine the total bid amount Bid prices shall remain firm for a period of 45 days after the bid opening date. The acceptance of a Bid by resolution of the Board of Supervisors shall bind the successful Bidder to comply with the terms and conditions of the Contract Documents. Non-Collusion Bidding Affidavit must be complete, signed, and submitted with the Bid. The selected Contractor must agree to conditions incorporated into the standard contract used by Wayne County, subject to approval of the County Attorney. The selected Contractor will enter into a contract with the County for performance of the work specified in the bid. All work obviously necessary for the completion of the contract shall be included in the Contractor’s Bid. The Agreement will be governed by the laws of New York State. The Contractor shall comply with all applicable laws, including those regarding labor, discrimination, and equal employment opportunity. Method of Award A contract, if awarded, will be to the lowest responsive/responsible bidder(s) in part or in whole who meet(s) all the terms of the Bid Specifications. The County reserves the right to award contracts to multiple vendors as a result of this bid. All vendors awarded a contract will be notified. This allows the County to access materials and services closest to the project location, reducing taxpayer costs, and provides additional vendor availability for urgent or emergency services. If multiple awards are made, the County shall first contact the vendor bidding the lowest price based on their requirements and location for each project or order. If the low bidder cannot perform the service or provide the material for any reason or within a reasonable time frame, the County may then contact the next lowest bidder awarded a contract. The County guarantees no minimum or maximum purchases as a result of award of this bid. Additionally, the County reserves the right to purchase any goods or services included as a part of this bid through any means legally available to it at any time. Quantities The annual usage quantities indicated in the specifications (if any) represent the estimated total requirements for the contract term. These totals are estimates only and should not be constructed to represent either maximum or minimum amounts to be purchased during the contract term. The County will determine the final quantities based on its maintenance and construction requirements. Additional Specifications All references to the New York State Specifications refer to the Department of Transportation Specifications of May 1, 2026, along with the latest revisions,
Published attachments
Public questions and answers
Is a bid bond required? Are payment and performance bonds required?
No Bonds are required
OpenGov categories
- 15010 · Construction Materials (Not Otherwise Classified)
- 65951 · Lining, Pipe (Cement, Epoxy, etc.)
- 75000 · Road And Highway Building Materials (Not Asphaltic)