DEP SRF Harbor Road WRF Expansion, Phase 3 - Reclaimed Water Ground Storage Tank

Description

The Project includes the following Work 1.25 MG prestressed concrete ground storage tank SCADA system integration into City’s existing SCADA system Yard piping and site improvements See attached plans and specifications for details. Lump Sump Bid Price Scope of Work Scope of Work The Project includes the following Work 1.25 MG prestressed concrete ground storage tank SCADA system integration into City’s existing SCADA system Yard piping and site improvements. See attached plans and specifications for details. Notice of Request for Proposals Proposers will submit sealed Electronic Responses for Bid # 2026-09 - DEP SRF Harbor Road WRF Expansion, Phase 3 - Reclaimed Water Ground Storage Tank via the City e-Procurement Portal https://procurement.opengov.com/portal/greencovesprings. All submissions are due by 2:00 pm , Thursday, December 3, 2026 . Proposals shall comply with the conditions, instructions, specifications and terms as described herein. Proposals are expected to fully inform themselves of the requirements of the specifications. Failure to do so is at the Proposer’s risk. Proposers will not secure relief on the plea of error or misunderstanding. Propsoers agree by submitting a proposal, to the acceptance of all terms, conditions and specifications of this RFP. Proposals are valid for a period of 60 calendar days after date of opening. The City reserves the right to require the successful proposer to execute an agreement incorporating all documentation, and which contains standard provisions for default, bid security, attorney fees, termination, remedies, jurisdiction and other conditions deemed legally appropriate by the City. It is the desire of the City to enter into an agreement to complete this singular project. The City reserves the right to accept or reject any or all proposals as a whole, or any part thereof, waive any or all irregularities, and award the RFP to the responsible proposal determined to represent the City’s best interests. Any persons wishing their proposal to be considered is responsible for making certain that their proposal is received via the City e-Procurement Portal https://procurement.opengov.com/portal/greencovesprings . No oral, telegraphic, paper, facsimile, or telephonic proposals or modifications will be considered. THE CITY OF GREEN COVE SPRINGS IS AN EQUAL OPPORTUNITY EMPLOYER Procedures Questions & Additional Information Bidders shall submit all inquiries regarding this bid via the City e-Procurement Portal, located at https://procurement.opengov.com/portal/greencovesprings . Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the City e-Procurement Portal. Bidders may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. Responses All responses must be presented in the same order as specified in this Proposal. Supporting material may be provided; however, the City’s decision will primarily be based upon a comparison of the information specifically requested. The City reserves the right to accept or reject any and/or all Proposals, and to waive any minor irregularities and technicalities. There is no obligation on the part of the City to award the contract to the lowest proposer and the City reserves the right to award the contract to the lowest responsible proposer submitting a responsible proposal with a resulting negotiated agreement that is most advantageous and in the best interest of the City. The City shall be the sole judge of the Proposal and the resulting negotiated agreement that is in its best interest and its decision shall be final. All applicable laws and regulations of the State of Florida and ordinances and regulations of the City of Green Cove Springs will apply to any resulting agreement. There is no expressed or implied obligation for the City of Green Cove Springs to reimburse responding firms for any expenses incurred in preparing proposals in response to this request. Inquiries and Interpretations Responses to inquiries which directly affect an interpretation or change to this RFP will be issued in writing by addendum. All information regarding this RFP shall be placed on the e-Procurement Portal, located at https://procurement.opengov.com/portal/greencovesprings. Requests for interpretation or changes to this RFP must be received via the City e-Procurement Portal, located at https://procurement.opengov.com/portal/greencovesprings . All such addenda issued by the City prior to the last date that submittals are required to be received shall be considered part of the RFP, and the Respondent shall be required to consider and acknowledge receipt of such in its response. It is the obligation of the Respondent to make sure that it has received all addenda prior to submission of its response. Addenda Notification: Bidders are required to register for an account via the City e-Procurement Portal hosted by OpenGov. Once the bidder has completed registration, they will receive addenda notifications to their email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each bidder to periodically check the site for any addenda at https://procurement.opengov.com/portal/greencovesprings . Only those responses to inquiries, which are made by formal written addenda, shall be binding. Oral and other interpretations or clarifications will be without legal effect and shall not be binding on the City. The Respondent must acknowledge receipt of all addenda in its response, failure to do so will deem the proposal non-respondent. Selection Process Subject to the City's right to reject bids, and if the bid is reasonably the lowest responsive and responsible, recommendation for award to bidder will be made to the City Council. A contract will only be entered into with responsible bidders, qualified by experience and financial ability to do the work and/or supply service or materials. Bid Security / Bond Bidders must submit a Bid Bond (5% of the amount of their bid) with their bid as bid security. The security may be in the form of bid bond, cashier’s check, or certified check, made payable to the City of Green Cove Springs. Time of Completion Bidder agrees that time is of the essence in connection with performance, delivery, and/or the services of this contract. The construction timeline for this project is 330 days for substantial completion and 360 days for final completion. Payment and Performance Bond Bidders are advised that payment and performance bonds with a surety acceptable to the City shall be provided to the City upon receipt of a signed contract or purchase order for faithful delivery or performance of items or services as stated in this Bid Invitation. Performance bonds shall include provisions for the City's delay or liquidated damages. The successful Bidder shall furnish within ten (10) consecutive calendar days after written notice of award, a Payment and Performance Bond in an amount equal to one hundred percent (100%) of the total amount of the contract. Additional Requirements Term "Owner" The term “Owner” where used in these documents, refers to the City of Green Cove Springs. Date and Receipt of RFP The City e-Procurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. The City of Green Cove Springs, FL strongly recommends completing your response well ahead of the deadline. Withdrawal of RFP The proposing firm may withdraw their sealed proposal prior to the scheduled receipt date and time by selecting the "unsubmit proposal" option on the City's e-procurement portal. After being opened, the RFP will be valid for 60 calendar days and may not be withdrawn during that time. Contract Award The City reserves the right to accept or reject any or all Proposals, to waive irregularities and technicalities, and to request resubmission or additional information. The City reserves the right to award the contract to the most responsible and responsive proposing firm, resulting in an agreement, which is most advantageous to and in the best interest of the City of Green Cove Springs. The City shall be the sole judge of the Proposals and the resulting agreement that is in the best interests, and the City of Green Cove Springs’ decision shall be final. Contract Documents The contract entered by the City of Green Cove Springs and the Lead Team firm shall consist of this Request for Proposals, any addendum issued including the City’s Standard Addendum to all City Contracts and Agreements document, the submitted proposal by the contractor, any approved change orders issued, all of which shall be referred to collectively as the Contract Documents. Public Records Law Pursuant to Section 119.0701, Florida Statutes, if the Contractor is acting on behalf of the City as provided under this Agreement, the Contractor shall: Keep and maintain public records required by the City in order to perform the services provided under this Agreement. Upon request from the City’s Custodian of Public Records, provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in Chapter 119, Florida Statutes, or as otherwise provided by law. Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed, except as authorized by law, for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the City. Upon completion or termination of this Agreement, transfer, at no cost, to the City all public records in possession of the Contractor or keep and maintain public records required by the City to perform the service. If the Contractor transfers all public records to the City upon completion or termination of the Agreement, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion or termination of the Agreement, the Contractor shall meet all applicable requirements for retaining public records under Florida law. All records stored electronically must be provided to the City, upon request from the City’s Custodian of Public Records, in a format that is compatible with the information technology systems of the City. All requests for public records relating to this Agreement shall be directed to the City’s Custodian of Public Records. The Contractor shall not respond directly to public records requests unless specifically authorized by the City. Failure by the Contractor to comply with the requirements of this section shall constitute a breach of this Agreement and may result in termination of the Agreement and any other remedies available under Florida law. The Contractor acknowledges that it may be subject to penalties under Section 119.10, Florida Statutes, for knowingly violating public records requirements applicable to contractors acting on behalf of a public agency. Questions regarding the application of Chapter 119, Florida Statues, to the contractor's duty to provide public records relating to this contract, should be directed to: City Clerk City of Green Cove Springs 321 Walnut Street Green Cove Springs, Florida 32043 Phone: (904) 297-7047 Email: ewest@greencovesprings.com Termination for Convenience The City of Green Cove Springs shall have the right to terminate at the City’s convenience, with or without cause, any Contract resulting from this RFP by specifying the date of termination in a written notice. In this event, the firm shall be entitled to just and equitable compensation for any satisfactory work completed. All work produced shall become the property of the City of Green Cove Springs. Indemnification Requirement The City shall require the following or similar indemnification paragraphs to be made part of the contract(s) as entered into with the successful proposer(s): To the extent allowed by Section 725.08, Florida Statutes, the Consultant shall indemnify and hold harmless the City and its officers and employees from liabilities, damages, losses, and costs, including, but not limited to, reasonable attorneys' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Consultant and other persons employed or utilized by the Consultant in the performance of the Agreement. Proof of Insurance and Worker's Compensation The successful Proposer selected for the project will be required to procure and maintain during the life of the Contract with the City of Green Cove Springs, Florida insurance of the type and in the minimum amounts listed below: a. Commercial General Liability 1. General Aggregate $1,000,000 2. Products and Completed Operations Aggregate $1,000,000 3. Personal and Advertising Injury $1,000,000 4. Each Occurrence $1,000,000 5. Fire Damage (any one fire) $ 50,000 6. Medical Expense (any one person) $ 5,000 b. Automobile Liability 1. Any Automobile-Combined bodily injury/property damage, with minimum limits for all additional coverage $1,000,000 as required by Florida law c. Workers Compensation/Employers Liability 1. Workers Compensation statutory limits 2. Employers Liability a. Each Accident $ 100,000 b. Disease-Policy $ 500,000 c. Disease-Each Employee $ 100,000 d. Professional Liability 1. When required by contract-per occurrence $1,000,000 Insurance shall be written by an insurer holding a current certificate of authority pursuant to Chapter 624, Florida Statutes. Prior to commencing any work on the contract, certificates of insurance, approved by the City, evidencing the maintenance of said insurance shall be furnished to the City. The certificates shall provide that no material alteration or cancellation, including expiration and non-renewal, shall be effective until fifteen (15) days after receipt of written notice by the City. All coverages shall name the City as "additional insured". Receipt of certificates or other documents of insurance or policies or copies of policies by the City, or by any of its representatives, which indicate less coverage than required will not constitute a waiver of the successful proposer(s)’ obligation to fulfill the insurance requirements herein. Vendor Submission Price Proposal

Published attachments
Addenda and notices
Public questions and answers
  • Would wastewater collection and transmission facilities experience qualify the requirements?

    Thank you for reaching out, collection/transmission projects would not qualify for the required experience.

  • Please confirm whether the City of Green Cove Springs maintains an approved or prequalified System Contractor/Supplier (SCS) list for the Harbor Road WWTF control system. If an approved list exists, please provide the current list and advise whether ITG Technologies may submit qualifications for consideration as an approved system integrator for this project. Additionally, please confirm whether Advanced Automation Products, Inc. is required as the existing system integrator, or if an approved equivalent SCS may perform the PLC/SCADA integration specified under Section 16900.

    ITG is an acceptable integrator and would be considered an equivalent SCS.

  • We noticed the Contract Document lists differ. Agreement 7.01.A.4 (Specs p.30) lists the Supplementary Conditions as Sections 00800 and 00810; there is no 00810 in the manual, and Section 00820 FDEP SRF Supplementary Conditions (which ITB Articles 23-25 rely on) is not listed. RFQ Additional Requirements 5 (RFQ p.10) defines the contract as the RFP, addenda, Standard Addendum and proposal. Insurance also differs: RFQ p.12 calls for CGL $1M general aggregate with no umbrella, while SC-6.03.H and J (Specs pp.136-137) call for $2M general aggregate and a $2M umbrella; GC 6.04.A refers to builder's risk terms in the Supplementary Conditions, but none are given. Bond delivery is 10 calendar days after notice of award in the RFQ (p.9) and 15 days in ITB 8.02 and 20.01 (Specs pp.14, 18). Please confirm that Section 00820 is a Contract Document, which list of Contract Documents governs, which insurance limits and builder's risk terms apply, and the bond delivery period.

    Article 7.01 (Section 520) will be updated to reference Section 00800 and 00820. Insurance requirements are outlined in Section 00800. Builder's Risk is not required. Bond delivery shall be within 15 days. Section 00820 is clearly part of the bidding documents.

  • ITB Article 25 (Specs p.19) is titled Build America, Buy America, but the text refers to American Iron and Steel. Section 00820 Article 17 and Appendix D (Specs pp.151, 162), and the DBE good-faith steps in Article 10 (Specs p.148), apply only to Federal Cap Grant projects, and the documents do not say whether this is one. Sections 02741, 15060, 15090, 15100 and 15140 call for BABA certificates. We understand AIS applies. Please confirm whether this is a Federal Cap Grant project, and whether BABA and the Article 10 DBE requirements apply.

    We will update the Build America, Buy America reference for Article 25. This is a Federal Cap grant project. DBE, AIS and BABA apply as outlined in the FDEP Supplementary Conditions.

  • D9.4 Detail 2 and Detail A show PVC sleeves for float switches and an ultrasonic level indicator, "see electrical drawings." E5.1, I5.2 and Section 16900 show only LE/LIT 901-2, LS 903-2 and LS 904-2. The pressure manifold on D9.2 Detail B shows an insulated plastic enclosure (Dekorra 302-GT-C3 or equal) with 3/4" 304 SS pipe and valves, while 16900 2.01.N and 2.02.A call for a NEMA 12/3R aluminum or stainless enclosure, a 1.5" Sch 40 SS header and 316 SS 1/2" ball valves. E5.1 labels PS 904-2 as HWL; I5.2 and 16900 show LS 904-2 as LWL. Please clarify whether float switches and an ultrasonic level indicator are in the scope, which manifold and enclosure governs, and confirm LS 904-2 is the low water level switch.

    Detail A/D9.1/D9.4 will be clarified. E5.1 and I5.2 illustrate the tank monitoring requirements. Detail B/D9.1/D9.2 illustrates the appropriate configuration and components. The system includes two level (pressure) switches, pressure transducer, pressure gauge, and associated piping, valves, etc.

  • The 20" fill and supply lines are shown as PVC (C7.1, D9.1, I5.2). Section 15060 2.01.B.3 gives AWWA C905 but no pressure class or DR, and 15060 3.05.B does not list a test pressure for reclaimed water lines. Also, Please Confirm that all Encased Piping Beneath the Tank Shall Be Ductile Iron. Pipe support material also differs: G2 General Note A.6 calls for 316 SS straps and fasteners, 15090 2.02.B for galvanized steel, and 15140 for 304 SS. Please provide the C905 pressure class/DR, the reclaimed water test pressure, the In and Under Piping Material, and clarify the pipe support material.

    C905 pipe shall be DR 18. Supply piping to the tank shall be tested to 100 psig. Suction piping shall be tested to 50 psig. DI piping for under tank encased sections. 304 SS for pipe support materials.

  • Please confirm that Telephone Poles, Connex's, Trailers and other Misc. Items will be removed from the work area before work begins. Contractors can't be responsible for moving items that don't belong to us, we will also need sufficient laydown and storage onsite. Please indicate potential laydown and storage areas available to the contractor.

    The City will work with the awarded contractor to provide reasonable logistical areas for construction of the project.

  • Two wage decisions are included: FL20260109 Heavy and FL20260200 Building, both Clay County, Mod 1, 05/18/2026 (Specs pp.165-173). Please confirm which decision applies to this work, or how the work is to be split between them.

    An addendum will be issued on 11/23/26 clarifying the wage decisions and the various rates.

  • For the prestressed tank: (1) Section 13205 1.03.D and 2.02.B call for ASCE 7-10, while Sheet G2 General Structural Note B.1 calls for the 2023 FBC and ASCE 7-22. (2) Section 03310 2.01.C.4 and C.5 require crystalline waterproofing and shrinkage-compensating admixtures in all cast-in-place liquid-containing structures; Section 13205 does not mention them. (3) The level indicator board on D9.2 Detail A is calibrated to 28'-2", while D2.1 shows 33.25 ft SWD and D9.4 shows tank full at EL 54.25 over floor EL 21.00. (4) The 13205 1.06 tank warranty runs 5 years from date of acceptance, while 01740 1.03.A starts warranties at Substantial Completion. Please clarify the design code edition, whether the 03310 admixtures apply to the tank floor, dome and shotcrete, the level indicator range, and the warranty start date.

    Sheet G-2 is correct. Spec 13205 will be clarified in Addendum 1. Section 03310 does not apply to the ground storage tank. The plan details will be clarified in Addendum 1. Warranty criteria will be clarified in Addendum 1.

  • The D15.1 Typical Trench Detail allows native A-2-4/A-2-6 above the haunch at 90% and 95% (T-180), while Section 02300 2.01.A limits fill to A-3 or A-2-4 with less than 10% fines and 3.07.C requires 98% in utility trenches. For the tank pad, C6.1 Structure Pad Note 4 calls for 8" lifts, while 02300 3.07.B calls for 6" or 12" lifts depending on proximity to structures and groundwater. Please clarify which trench backfill and lift requirements govern.

    The typical trench detail is for work outside of the tank addressing virgin soil conditions and where existing material can be placed back in the trench. 6" lifts required.

  • The two geotechnical reports in Section 02210 do not include a boring within the Tank No. 2 footprint. The April 2018 report (UES No. 1559525) covers the earlier plant expansion and existing Tank No. 1, and the July 2020 report (UES No. 1785907) covers Ground Storage Tank No. 3 at the Harbor Road Water Treatment Facility. Section 02210 3.02 and 13205 1.04.F require the confirmation borings and final foundation design after award, and ITB 5.04.E states bidders are not required to perform subsurface testing. Bids will therefore must be based on the design information shown in the Contract Documents. We are basing our bid on the following: subgrade preparation, fill, compaction and overexcavation per the Sheet C6.1 Structure Pad Preparation Notes and Section 02300 3.04, 3.06 and 3.07; and the 2,000 psf design soil bearing value on Sheet G2 as the allowable bearing for Tank No. 2 at its full operating level (33.25 ft SWD per Sheet D2.1). Please confirm that is the correct basis. Please also confirm that if the post-award confirmation borings show conditions that require work beyond that basis, such as additional overexcavation, ground improvement, preloading, or a foundation system other than the membrane floor in Section 13205 2.04, it will be treated as a differing subsurface condition under GC 5.04 and the Contract Price and Times adjusted. Finally, please clarify the allowable total and differential settlement for the tank and the design groundwater elevation for uplift under

    The Drawings and Specification Section 02210 summarizes the bidding basis. Coordinate with the tank manufacturer on total and differential settlement criteria.

  • Sheets C7.1 and D9.1 show 20″ PVC piping for the tank fill and withdrawal lines without identifying the DR. Please confirm the required DR and pressure class for the proposed 20″ PVC piping.

    Addendum 1 will clarify. PVC DR 18 is required.

  • Drawing sheet D9.2 references “modular seal units”. This is an obsolete design now. Please confirm through-wall pipe shall be Type 316 stainless steel. Waterstop rings on wall-pipes shall be Type 316 stainless steel.

    Addendum 1 will clarify the wall penetration requirement. 316 SS is required with waterstop ring.

  • Geotechnical report from July 22, 2020, reuse ground storage tank #2 foundation section, has calculated settlement values off a much smaller tank with an assumed bearing pressure of 1,000 psf. Geotechnical report from April 30, 2018, reclaimed water storage tank foundation section, has calculated settlement values with an assumed bearing pressure of 1,800 psf. The current tank size requires a minimum bearing pressure of 2,300 psf. Please provide differential and total settlement values based off a 2,300 psf bearing pressure.

    See Response 11.

  • Geotechnical report from April 30, 2018, table three states the estimated settlement for the Reclaim Water Storage Tank is 6-7 inches, please note the total uniform settlement cannot exceed 6 inches, please confirm the tank foundation will be able to meet these requirements.

    See Response 11. Additional borings are required at the proposed tank to confirm conditions. Tank manufacturer shall coordinate with the GC and geotechnical engineer on final criteria.

  • Geotechnical report from April 30, 2018, table 7A states the groundwater level should be assumed at the ground surface for design purposes. Specification 13205 section 2.04.C mentions a minimum floor thickness of 8” where floor is designed to resist uplift forces. Please clarify the design groundwater elevation including the seasonal high ground water elevation and whether the tank shall be designed to withstand hydrostatic uplift while empty.

    See Response 15.

  • Drawing sheet D9.2 calls for an aluminum silt stop. Please note that internal tank accessories located within the submerged environment are typically required to be constructed of stainless steel or fiberglass to ensure long-term corrosion resistance. Please confirm whether the intended design is a fiberglass silt stop or a stainless steel silt stop in lieu of aluminum.

    Addendum 1 will clarify SS requirements.

  • Specification 13205, part1.05 (Quality Assurance), references tank accessories including aerators, baffle walls, and baffle wall supports. These items do not appear to be shown on the contract drawings. Please clarify whether these accessories are required as part of the project scope. If so, please provide the applicable drawings, details, specifications, and design requirements necessary for pricing and construction.

    Addendum 1 will clarify requirements. Correct, aerator and baffle not part of this scope of work.

  • Please revise 09910 Paintings and Coatings, D. GST Interior Concrete Surfaces (GST 2): 1. Surface Preparation: to include a surfacer at a minimum 1/8” on the entire underside of the cast-in-place dome and to the interior wall and floor as needed to fill all voids and bugholes.

    we'll address in Addendum 1.

  • Specification 03310, Section 2.04.4, requires waterproofing admixtures in all concrete mix designs for liquid-containing structures. Since the prestressed concrete tank is specified to receive an interior coating system and no waterproofing admixture requirements are identified within the prestressed concrete tank specification section, please confirm that this requirement does not apply to the prestressed concrete tank. If waterproofing admixtures are required, please identify the approved product(s), dosage rates, and application requirements to be incorporated into the design and pricing.

    Correct, requirement does not apply to prestressed tank. It is our standard concrete spec for treatment facilities.

  • To ensure a more competitive bid, I would kindly like to request a two-week bid extension.

    Bid date remains as advertised.

  • Will Davis-Bacon wages apply to this project?

    Yes

  • Specification 13205, part 2.01. allows for an “Or Approved Equal” wire-wrapped concrete tank with a specified core wall type. Please confirm that only manufacturers constructing tanks in accordance with AWWA D110 Type II and meeting all specified qualifications are eligible to bid.

    Correct. Section 2.01 will be clarified in Addendum 1.

  • Please confirm the manufacturer, software package, and current version of the City's existing wastewater SCADA/HMI system that the GST-2 improvements are required to integrate with under Section 16900. Please also confirm whether any specific software licensing or certified integrator requirements apply.

    The existing system utilizes an Eaton XC300 Series PLC utilizing the Visual Designer software package. HMIs utilized the Eaton XV300 Series. The City has license, and any certification requirements are listed in Specification Section 16900.

Plain text

OpenGov categories

  • 89000 · Water Supply, Groundwater, Sewage Treatment, And Related Equipment (Not For Air Conditioning, Steam Boiler, Or Laboratory Reagent Water)
  • 91063 · Public Utilities: Water, Sewer and Gas Maintenance and Repair
  • 91300 · Construction Services, Heavy (Incl. Maintenance And Repair Services)
  • 91356 · Construction, Utility/Underground Projects
  • 93691 · Water Supply and Sewage Treatment Equipment Maintenance and Repair
  • 96185 · Utility Services, Water