Pinellas County, Florida (“County”) seeks to engage a qualified design-build team to develop and implement a resilient, multi-source microgrid system at the Solid Waste Disposal Complex in St. Petersburg, Florida. The microgrid will integrate power from the existing Waste-to-Energy (WTE) facility, a new floating solar array, and electric utility services to provide electricity to county facilities, enhance reliability, operational continuity, and sustainability across the site. The County intends to select and enter into a contract with the proposer whose proposal is determined in the sole judgment of the County to be in the best interest of the County. To be eligible to enter into the Service Agreement with the County, such Proposer must continue to meet all of the Minimum Qualifications Criteria contained in this Request for Qualifications (RFQ) from the date the Statement of Qualifications is submitted until the day the Service Agreement is signed by the County. The RFQ requests Statements of Qualifications (SOQs) from qualified companies (“Proposers”). The qualified Proposers who respond will be evaluated in accordance with the procedures and criteria set forth in this RFQ. Introduction Summary Background Contact Information Timeline Evaluation Phases Vendor Submissions Attachments
Published attachments
Addenda and notices
Official Notice #1: Site Visit Sign-in Sheet · 1
Site Visit Sign-in Sheet
Addendum #1 · 1
Addendum No. 1
Addendum #2 · 2
Addendum No. 2
Public questions and answers
Please confirm the complete order of precedence among the RFQ, Design Build Agreement, Design Criteria Package, specifications, drawings, addenda, and other Contract Documents. In the event of inconsistencies between the Design Criteria Package and Sample Agreement, please identify which document governs.
Please refer to Addendum No. 1
Please confirm whether the terms and conditions contained in the Sample Agreement are subject to negotiation with the highest ranked respondent during contract negotiations pursuant to the CCNA selection process. If any provisions are considered non-negotiable, please identify those provisions.
Please refer to Addendum No. 1
Please confirm whether Phase 2 will be contracted as a Guaranteed Maximum Price (GMP) or a fixed Lump Sum Price. Please confirm whether the County intends to revise the Sample Agreement and Lump Sum Amendment, accordingly, including provisions addressing contingency, allowances, savings, and reconciliation of actual costs.
Please refer to Addendum No. 1
For equipment or materials purchased directly by the County, please clarify responsibility for vendor selection, purchase orders, payment, transportation, storage, inspection, warranties, defective equipment, schedule impacts, escalation, commissioning, startup, and integration into the completed microgrid. Please also confirm whether the Design Builder will be entitled to compensation for procurement management, engineering, handling, installation, integration, commissioning, warranty coordination, and schedule impacts associated with Owner-purchased equipment.
Please refer to Addendum No. 1
Where equipment is procured directly by the County, please confirm whether the Design Builder will be responsible for the performance, warranty, or fitness for purpose of the equipment itself, or whether the Design Builder's responsibility will be limited to its design, installation, integration, and commissioning obligations associated with such equipment.
Please refer to Addendum No. 1
Regarding existing site conditions, please confirm whether the Design Builder will be entitled to an adjustment in contract price and/or contract time for concealed or subsurface conditions that could not reasonably have been identified through the investigations authorized during Phase 1, including undocumented utilities, landfill-related subsurface conditions, unidentified existing infrastructure, contaminated materials, unsuitable soils, or other latent conditions not disclosed in the Contract Documents.
Please refer to Addendum No. 1
The Design Criteria Package indicates that a GMP will be developed upon completion of Design Development, while the Sample Agreement calls for submission of the Lump Sum Price within 45 days after the Construction Drawings reach 50% completion. Please confirm the required design milestone at which the Phase 2 construction price will be established and contractually committed.
Please refer to Addendum No. 1
Please confirm whether the County will permit the selected Design-Builder and County to negotiate Phase 2 as a firm Lump Sum Design-Build price, based upon the mutually agreed scope, design documents, schedule, assumptions, clarifications, exclusions, allowances, and risk allocation developed during Phase 1. If so, please confirm: a. Whether completion of the agreed Phase 1 design and investigation activities will establish the scope and existing condition baseline upon which the Lump Sum Price is developed. b. Whether the Phase 2 Lump Sum may incorporate appropriate pricing for project specific site management, design management, procurement, bonds, insurance, commissioning, warranty obligations, escalation, allowances, contingencies, etc. for the Design Builder to assume the agreed Phase 2 delivery risk. c. Whether the 5% profit limitation applies to the development of the negotiated Lump Sum price, rather than requiring continued cost-plus/open-book reconciliation of Phase 2 costs after the Lump Sum has been established. d. Once the Lump Sum, scope, assumptions, exclusions, schedule, and risk allocation are mutually agreed, whether the Design Builder will retain savings and bear overruns associated with performing the agreed scope, except for authorized owner changes and other contractually recognized adjustments.
Please refer to Addendum No. 1
Please clarify whether the 5% limitation applies solely to the Design Builder's profit/fee, or whether it is intended to include all encompassing project costs. Please also clarify how the 5% limitation will be applied to subcontracted work, changes, allowances, and owner-requested Change Orders.
Please refer to Addendum No. 1
Given the current procurement schedule, with questions due Friday, November 20, and proposals due December 1, would the County consider extending the proposal submission deadline? The current schedule, combined with the Thanksgiving holiday, provides proposers with a limited number of business days to review the County’s responses to questions, evaluate any clarifications or additional requirements, and incorporate that information into their proposals. Extending the submission deadline would allow proposers sufficient time to fully address the County’s responses and prepare comprehensive, competitive proposals that best meet the County’s objectives.
Please refer to Addendum No. 1
Given the upcoming holiday, would Pinellas County consider a one-week extension to the December 1 proposal deadline?
Please refer to Addendum No. 1
Based on direction of RFI 8, the Design Criteria Package requires draft design documents to be submitted to the County's Risk Management department and insurance provider (FM Global) for review and assessment prior to establishment of the GMP, with recommendations incorporated into the final design and GMP. Please confirm that requirements arising from Pinellas County and all associated parties’ reviews after establishment of the Phase 2 price per RFI 8, which were not reasonably identifiable at the time the price was established, will constitute an appropriate basis for adjustment to Contract Price and/or Contract Time.
Please refer to Addendum No. 1
DCP Section 3.1.2.2 requires interior and exterior LED lighting and controls for the new switchgear building. Please confirm whether these fixtures will be selected and procured by the Design-Builder, included in a prefabricated building supplier’s package, or purchased separately by the County. Are there County-standard fixtures, approved manufacturers, or additional lighting requirements that suppliers must follow?
Please refer to Addendum No. 1
DCP Section 3.1.2.1 references replacement of streetlighting on Duke poles that must be removed. Please clarify whether replacement luminaires, poles, and lighting controls are included in the Design-Builder’s scope or will be furnished by Duke Energy or the County.
Please refer to Addendum No. 1
For the Volume of Work Previously Awarded by the County criterion, please confirm that the evaluation period includes the two previous completed County fiscal years and the current fiscal year through the evaluation date. Additionally, please confirm whether this criterion is evaluated solely for the prime proposer or includes proposed subconsultants and subcontractors.
Please refer to Addendum No. 1
Please clarify the division of responsibilities between the floating PV supplier and the selected design-builder regarding the PV inverter system and associated electrical infrastructure, as referenced in Design Criteria Package Section 3.1.2.3 and the previously issued response to Question 14.
Please refer to Addendum No. 1
We echo the request for the County to please consider extending the proposal submission deadline. We agree that extending the submission deadline would provide necessary time for bidders to prepare proposals that demonstrate their ability to meet the County’s objectives.
Please refer to Addendum No. 1
Sample Agreement Section 5.A states "700 consecutive calendar months." Please confirm the intended contract duration.
The sample agreement was provided for example only. The County has not determined the intended contract duration. The Contract duration will be determined in the negotiation of the final agreement.
DCP Section 3.1.2.3 requires the PV inverter system to be housed in a building meeting the switchgear building standard, while Figure 1 shows an inverter pad. Please confirm which approach is intended, and whether an existing structure near the pond may be considered.
Those limits are confirmed by the Risk Management Department.
OpenGov categories
- 90668 · Power Generation, Transmission, Distribution - Architectural
- 90692 · Utilities (Gas, Steam, Electric) - Architectural
- 91185 · Special Trade Constructon, Power Plant
- 91221 · Construction, Energy Related (All Types)
- 91341 · Construction, Power Line (Includes Installation, Maintenance, and Repair)
- 91438 · Electrical
- 92517 · Civil Engineering
- 92531 · Electrical Engineering (Incl. Cogeneration Design Services)
- 92532 · Electronic Engineering
- 92539 · Fire Protection Engineering
- 92544 · General Construction: Management, Scheduling, Cost Estimation - Engineering
- 92546 · Geotechnical Engineering
- 92567 · Mechanical Engineering
- 92578 · Power Generation, Transmission, Distribution - Engineering
- 92588 · Structural Engineering
- 94610 · Accounting and Billing Services (Including Payroll Services, 3rd Party Reimbursement for Medicare, Medicaid, Private Insurance, etc)
- 95877 · Project Management Services
- 96183 · Utility Services, Electric