State and local · OpenGov
Design/ Build - Industrial Wastewater Treatment Facility
Description
The Town of Queen Creek, Arizona (Town) is engaged in long-term planning to develop a treatment facility to manage both municipal and industrial wastewater. Over the last several years, the Town has been working with LG Energy Solution (LGES) to develop a new manufacturing facility and to account for anticipated population growth over the next 20 years. To better align wastewater treatment and local water resource needs, the Town is interested in developing a new, local wastewater treatment facility. The primary goal of the project is to recycle wastewater to minimize potable water consumption and reliance on groundwater. Additionally, development by the Arizona State land Department (ASLD) may include future industrial wastewater sources, providing an opportunity for process water recycling to further drive growth and reduce reliance on traditional potable water sources. This project will focus on planning elements for the Town’s treatment facility including design and eventual construction of the first phase which is inclusive of the Advanced Treatment Facility (ATF) dedicated to industrial wastewater from the LGES manufacturing facility. Solicitation Details Important Instructions for Electronic Submittal The Town is accepting electronic bid submissions. Bidders shall create a FREE account with ProcureNow by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic SOQ. RFQ Document and Attachments Please see attached RFQ 27-011 Design/Build - Industrial Wastewater Treatment Facility for project details. Items included are: RFQ 27-011 Document Instructions to Respondents Project Description Scope of Services Response Contents Evaluation Award Attachment 1 - Non- Collusion Affidavit Attachment 2 - Certification Regarding Debarment, Suspension, Proposed Debarment and Other Responsibility Matters Attachment 3 - W-9/Taxpayer ID Attachment 4 - Past Performance Reference Form Exhibit A - Draft Design/Build Contract Exhibit B - QC LG Assistance and Infrastructure Evaluation Preliminary Design Report Exhibit C - Insurance Requirements Introduction Summary Background Contact Information Timeline Evaluation Criteria Vendor Questionnaire Attachments
Published attachments
- ATTACHMENT 1 - Non-Collusion Affidavit
- ATTACHMENT 2 - Certification Regarding Debarment
- ATTACHMENT 3 - Vendor Registration Form-Taxpayer ID
- ATTACHMENT 4 - Past Performance Reference Form
- EXHIBIT A - Draft Design-Build Agreement
- EXHIBIT B - Preliminary Design Report
- EXHIBIT C - Insurance Requirements
- RFQ 27-011 Industrial Wastewater Treatment Facility
Addenda and notices
Official Notice #1: Pre-Submittal Meeting Documents · 1
Addendum #1 · 1
Addendum 1
Public questions and answers
Section II, Instruction 1.01(H) and Section 6.3(A)–(B) state that the Town will establish a shortlist of three to five respondents and may conduct interviews. In contrast, the cover notices and Section VII state that this procurement is a "one-step solicitation" where the successful respondent will be selected directly at the end of the RFQ process. Will the Town conduct interviews and shortlist firms, or will award proceed strictly based on the initial Statement of Qualifications (SOQ) submittals?
This one-step solicitation will result in award of a contract through this single, competitive solicitation process, which may consist of more than one phase of evaluation. Whether or not interviews are conducted depends upon the evaluation of the Statements of Qualifications.
Instruction 6.02 directs respondents to notify the Town of any ambiguity or error "via email only" to the contact person, whereas page 2 explicitly mandates that "Any question related to this Request for Qualifications (RFQ) shall be via the Town of Queen Creek e-Procurement Portal". Please confirm the mandatory submission method for questions.
Questions or requests for clarification should be submitted in writing via the e-procurement portal. Reference Addendum 1.
Section 5.2.6.1(3)(c) requires respondents to describe their subcontractor selection process under the 200-point section, while Section 5.2.6.5 independently lists a 25-point requirement to provide a subcontractor and supplier selection plan. Should respondents address the selection process in both locations, or should it be consolidated solely under Section 5.2.6.5?
Section 5.2.6.1(3)(c) will be deleted. Reference Addendum 1.
Section 5.2.6.4(1)(d) ends abruptly with: "The following safety records must be provided for the Design-Builder for the current and past three years:" without listing the required records or metrics. Could the Town clarify which specific safety documentation, forms, or incidence metrics are required beyond the EMR letter?
Section 5.2.6.4(1)(d) will be revised. Reference Addendum 1.
Section 5.2.6.4(1)(e) references questions to be answered ("If any of the questions below are answered in a manner that indicates that any of these unfavorable factors or events are present..."), but no specific questions are listed in that subsection. Please clarify whether this refers to subsections 5.2.6.4(1)(f)–(h) or if specific quality management questions were omitted.
Section 5.2.6.4(1)(e) will be deleted. Reference Addendum 1.
Section 5.1 excludes resumes and mandatory minimum qualification documents from the 20-page maximum limit. Section 5.2.6.4(2)(a) requires EMR safety records for Key Firms responsible for construction activities. Are Key Firm safety records excluded from the 20-page limit as an appendix, or must they be counted within the page limitation?
Safety records may be included as an appendix to the SOQ and will not be counted towards the 20-page limit.
Section 5.2.6.2 asks for projects completed in the last 10 years. We respectfully request that the Owner consider allowing relevant projects that are currently in progress, in addition to projects completed within the preceding 10 years. This modification would allow proposers to identify project experience that is most representative and applicable to the requirements of this procurement, thereby providing the Owner with a more comprehensive evaluation of the Design-Build Team’s current qualifications, capabilities, and experience on projects of similar scope and complexity.
Section 5.2.6.2 will be revised. Reference Addendum 1.
Please confirm that the "Vendor Questionnaire" is made up of Attachments 1 to 3 and whether the (Vender Registration Form & W-9) for a Design/Build team comprised of separate designer and builder firms, must each firm submit a Vendor Registration and W-9 form, or should only the firm serving as the Design/Build lead submit them?
The vendor questionnaire is comprised of the 3 Attachments, which must be completed and submitted, and also a list of questions that must be answered and items which must be acknowledged, in the procurement portal. A W9 must be submitted by the builder as the lead entity that will sign the resulting contract.
Section 5.2.6.1 titled Project Team Structure and Personnel asks "For each key person, provide the following information: a. Firm they are employed by b. Length of time with the firm c. Percentage of time to be committed to each phase of the project d. Applicable Arizona professional registration(s) e. Role within the Design-Build team." Can this information be provided within the resumes instead of within the org chart (in section 5.2.6.1)? It is provided in the summary table that goes in front of the resumes.
Information specifically requested for evaluation should be included in the statement of qualifications – not in additional reference info. in appendices.
Sections 5.2.6.1 and 5.2.6.4 both request similar information. Section 5.2.6.1 Project Team Structure and Personnel requests to provide a general description of the firm and/or team that is proposing to provide the Design-Build services, including the legal organization of the proposed team and section 5.2.6.4. Design-Builder Profile 1.a General Information requests to provide general information about the Design-Builder, such as lines of business and service offerings, locations of home and other offices, number of employees (professional and nonprofessional), years in business, and evidence of required licenses. Can the company information be combined with the Design-Builder Profile section of 5.2.6.4?
This is at the discretion of the respondent.
RFP Section 3, Project Team, states that the selected Design-Builder will work with the Town to solicit and select an Operations and Maintenance (O&M) firm. Please clarify whether the selected Design-Builder may also compete for the O&M contract, or whether it is ineligible to do so.
The selected Design-Builder may compete for the O&M contract.
RFQ Section 5.2.6.2 Relevant Project Experience: Would the Town allow inclusion of a confidential project as relevant project experience if certain required information could not be provided due to its confidential nature?
This is at the discretion of the respondent.
The Contract defines both the "Design Phase" and "Preconstruction Phase", which appear to describe the same phase of work. Please clarify the indented distinction between these phases and their respective scopes.
Changes/clarifications to the resulting contract can be considered and negotiated with the highest ranked firm as long as they are submitted in the Exceptions field of the Vendor Questionnaire.
Please clarify the expectations and requirements associated with long lead time items, including the anticipated level or design completion (60% design or PDR) prior to procurement. Additionally, please clarify the anticipated timeline, as the current 10-day requirement may not be feasible prior to site selection.
Refer to question 13.
The Contract appears to contemplate bonds, insurance, and taxes as components of the Design-Builder's fee. Please confirm whether these costs are to be intended included in the DB Fee or separately reimbursable as part of the Cost of Work. The Contract also does not appear to define what the Design-Builder's fee is applicable to. Please confirm.
Refer to question 13.
Section 5.1 permits the project schedule to be displayed on one 11" x 17" page and states that no information other than schedule information may be included on that page. May the schedule include concise callouts or annotations directly associated with scheduled activities or milestones to identify key assumptions, dependencies, decision deadlines, early-procurement requirements, and the potential impact of those items on key project milestones?
Yes. Schedule related information may be included on the schedule.
OpenGov categories
- 90900 · Building Construction Services, New (Incl. Maintenance And Repair Services)
- 90924 · Building Construction, Commercial and Institutional
- 90930 · Building Construction (Not Otherwise Classified)
- 91200 · Construction Services, General (Incl. Maintenance And Repair Services)
- 91359 · Construction and Upgrades, Wastewater Treatment Plant
- 91360 · Construction, Water System/Plants, Main and Service Line
- 96895 · Wastewater Treatment Plant, Operations, and Testing
- 96896 · Water and Wastewater Treatment Services