Design of (2) Booster Stations and (2) 5MG Prestressed Concrete Ground Storage Tanks
Description
The Bay County Board of County Commissioners invites professional engineering firms to submit statements of qualifications to provide preliminary engineering, design, permitting, preparation of construction plans and specifications, and bidding assistance for two (2) new booster pumping stations and two (2) new 5.0-million-gallon prestressed concrete ground storage tank. Engineering services will be in accordance with the Scopes of Work attached as Attachment 4 North Bay Booster Pump Station and 5 MG Prestressed Concrete Ground Storage Tank and Attachment 6 231 Booster Pump Station and 5 MG Prestressed Concrete Ground Storage Tank. Contracts will be awarded to the two (2) responsive, responsible respondents who rank highest in the evaluation process based on the criteria specified in the Request for Qualifications Respondent Instructions. The projects’ primary purpose is to provide system resilience and redundancy during storm and emergency conditions , providing distribution system storage, sustained pressure, and disinfection capability under loss-of-supply or loss-of-power scenarios. Introduction Solicitation delivery ELECTRONIC OR SEALED PAPER SUBMISSIONS for Design of (2) Booster Stations and (2) 5MG Prestressed Concrete Ground Storage Tanks will be received by the BOARD OF COUNTY COMMISSIONERS OF BAY COUNTY, FLORIDA up until 2:00 pm on Tuesday, December 15, 2026 . Submissions will be publicly opened immediately following the deadline. ANY SUBMISSION RECEIVED AFTER THE SPECIFIED TIME WILL NOT BE CONSIDERED. Timeline Release Project Date: November 10, 2026 Question Submission Deadline: December 3, 2026, 5:00pm Response Submission Deadline: December 15, 2026, 2:00pm Procurement Contact Ken Longstreet Grant Procurement Administrator 840 West 11th Street Panama City FL 32401 purchasing@baycountyfl.gov (850) 248-8270 Project Details Project Details The Bay County Board of County Commissioners invites professional engineering firms to submit statements of qualifications to provide preliminary engineering, design, permitting, preparation of construction plans and specifications, and bidding assistance for two (2) new booster pumping stations and two (2) new 5.0-million-gallon prestressed concrete ground storage tank. Engineering services will be in accordance with the Scopes of Work attached as Attachment 4 North Bay Booster Pump Station and 5 MG Prestressed Concrete Ground Storage Tank and Attachment 6 231 Booster Pump Station and 5 MG Prestressed Concrete Ground Storage Tank. Contracts will be awarded to the two (2) responsive, responsible respondents who rank highest in the evaluation process based on the criteria specified in the Request for Qualifications Respondent Instructions. The projects’ primary purpose is to provide system resilience and redundancy during storm and emergency conditions , providing distribution system storage, sustained pressure, and disinfection capability under loss-of-supply or loss-of-power scenarios. Respondent response to the request for qualifications Solicitation Documents
Published attachments
Addenda and notices
Addendum #1 · 1
27-07 Addendum 1 Questions & Answers
Public questions and answers
On part 6 of the submittal requirements, titled, Project History, it says to include no more than 10 completed projects in the last eight (5) years. Is the time frame eight years or five years?
Your questions has been received and will be answered by addendum that will be issued at a later date.
Please clarify the tab numbering requirements, as Tab 7 appears to be omitted and the numbering proceeds directly to Tab 8. Should proposers follow the numbering as provided?
Your questions has been received and will be answered by addendum that will be issued at a later date.
There is a discrepancy between the project title in Open Gov (27-07: North Bay & Hwy 231 Booster Station and 5MG Storage Tank Designs) and the project title in the RFQ document (DESIGN OF (2) BOOSTER STATIONS AND (2) 5MG PRESTRESSED CONCRETE GROUND STORAGE TANKS). Which is correct?
Your questions has been received and will be answered by addendum that will be issued at a later date.
Since the County intends to select two firms under this RFQ, may firms team with one another in different capacities? For example, can Firm A serve as the prime consultant on one submittal and as a subconsultant to Firm B on a separate submittal, while Firm B serves as the prime on its own submittal?
Your questions has been received and will be answered by addendum that will be issued at a later date.
Will the County consider adding the following to the last paragraph of Sample Professional Services Agreement, Section 28, Duty to Pay Defense Costs and Expenses. "....Notwithstanding the foregoing, the duty to defend shall not apply to professional liability claims, however the County shall not be prohibited from seeking award of its reasonable attorney's fees and court costs to the extent a court of competent jurisdiction has fully adjudicated Consultant to have been negligent."
Your questions has been received and will be answered by addendum that will be issued at a later date.
For Tab 6 – Project History, does the County require up to 10 full project profiles/one-page project sheets, or should all project experience be provided solely in a tabular format containing the requested project information for projects completed within the past five years? or should this tab include both?
Your questions has been received and will be answered by addendum that will be issued at a later date.
Please describe what the County means by brief resumes. Does this mean half-page resumes?
Your questions has been received and will be answered by addendum that will be issued at a later date.
The RFQ states that respondents should include no more than 10 projects, with no more than one page of information per project. Item 6(a) also states that the list of recent projects equal to or larger than the advertised project may include as many projects as the firm has completed, provided they meet the stated criteria. Please confirm whether respondents may provide up to 10 detailed, one-page project descriptions containing all information requested in Items i–vii, followed by a supplemental tabular list of additional qualifying projects. If a supplemental project list is permitted, please clarify whether the additional projects are required to include all information identified in Items i–vii, or whether the table may be limited to basic project information such as Items i–iv.
Your questions has been received and will be answered by addendum that will be issued at a later date.
Does the County have an anticipated size or design capacity (MGD) for the proposed pump station that respondents should use when identifying comparable projects?
Your question has been received and will be answered by addendum that will be issued at a later date.
Is there an opportunity for us to schedule a site visit and who should we contact?
Your question has been received and will be answered by addendum that will be issued at a later date.
On the Submittal Form there's a space for Contractor's license no., which number does the County wish to be here; the DBPR license # or the State of Florida Good Standing #?
Your question has been received and will be answered by addendum that will be issued at a later date.