State and local · OpenGov
Develop Solid Waste Conversion Facility at the Atlantic County Utilities Authority
Description
The Atlantic County Utilities Authority is seeking qualifications from firms interested in developing a solid waste conversion facility at its Environmental Park in Egg Harbor Township, New Jersey. Qualified firms may be invited to submit proposals for a privately financed project involving the design, permitting, construction, operation, and maintenance of a facility capable of processing municipal solid waste and other eligible waste streams into energy or reusable resources. The project may process up to 1,000 tons per day under a service agreement and site license of up to 25 years. Traditional mass-burn incineration and technologies relying on land application will not be considered. PROJECT DESCRIPTION & SCOPE OF WORK Project Scope The ACUA is seeking projects that can process up to 100% of the MSW received by the ACUA. The ACUA is also seeking technologies that can process some or all of the Type 13 (bulky) and Type 13C (Construction) Waste received on site. Extra consideration will be given to facilities that can process vegetative waste received as well as wastewater biosolids. For historical annual tonnage amounts by waste types see Attachments A. The project must include a form of waste conversion into energy and/or other reusable resources. The ACUA is seeking long-term waste conversion solutions, with a contract duration of up to 25 years. As stated in Section 2.4, all forms of conversion technology will be considered other than incineration or technologies that rely on land application. The proposer selected pursuant to this procurement will be responsible for designing, permitting, financing, constructing, operating and maintaining the project in accordance with all applicable laws. The solid waste conversion facility must be developed in compliance with all federal, state and local codes, permit requirements, and rules and regulations applicable to construction and operation of the type of solid waste facility selected. The New Jersey Administrative Code, Title 7, Chapter 26 (N.J.A.C. 7:26) governs processing and disposal of solid waste via the Solid Waste Facility Permit. In addition, specific facility features, such as air or water discharges, are regulated by the respective agencies within NJDEP. Project Site Existing Transfer Station operations use approximately half of the tipping floor for daily operations. The ACUA will allow the use of the Transfer Station as the potential site for the waste conversion project. Depending on the proposed technology, operation, and feedstock, the ACUA may require the continued use of portions of the Transfer Station to process waste that will not be accepted by the project. The ACUA also has a Recycling Center which is currently used as a tipping floor and Transfer Station for recyclable materials. This building could potentially be available should a proposal include a material sorting facility that will be able to process both MSW and recyclable materials. Engineering floor plans of the Transfer Station and Recycling Center are included in Attachments E & F. If new construction is required, the ACUA has designated land surrounding the Transfer Station as potentially available for development of the project. See Attachment G for a map of the available property. The property currently designated for use by composting operations and recycling processing can be made available if the proposed conversion technology can accommodate the respective operation within its proposed process. Odor control is a primary concern of the ACUA. Any proposed project shall make control of fugitive odors a priority. As a result, storage of feedstock for the facility, including, but not limited to MSW and biosolids, shall be limited by both existing permit requirements and the ability to maintain stringent odor controls. The existing permit will be made available upon request. It is the ACUA’s desire to locate the project in or adjacent to the Transfer Station. Projects that are capable of processing biosolids will still be located at the ACUA’s solid waste facility, not at the wastewater facility. Project Goals The ACUA is seeking a qualified firm to develop a waste conversion project at the ACUA’s solid waste complex in Egg Harbor Twp., NJ. The ACUA reserves the right to use the information collected through this RFQ and subsequently through the RFP process to grant a site license and to execute a Service Agreement with, the Selected Proposer in order to operate a waste conversion technology that has the potential to supplement, enhance, or replace the ACUA’s existing solid waste and wastewater residuals disposal systems. The ACUA may grant a site license and execute a Service Agreement to operate a facility on ACUA property to process up to 1,000 tons per day capacity for a period of up to 25 years. The Selected Proposer shall be responsible for financing, permitting, design, construction, operation, and maintenance of the facility. It is ACUA’s intention to supplement, or largely replace, its existing solid waste landfill and wastewater incinerator with a waste conversion technology that is more efficient, sustainable, and environmentally benign. Eligible Technologies The ACUA is seeking technologies that will provide advanced sorting of incoming materials for beneficial reuse, including, but not limited to, traditional recycling, anaerobic digestion, pyrolysis, hydrothermal decomposition. Systems should include the best available control technology (BACT) controls for regulating any air emissions associated with the process. The ACUA will NOT consider technologies unless they include a robust material sorting process to separate the incoming waste into various material streams such as organics, paper/fibers, plastics, metals, etc. as a front-end measure to create various product streams for future processing. Given that solid waste and wastewater systems act as the critical infrastructure it is ACUA’s goal to add resiliency to its facilities. Additional consideration will be given to projects with the ability to operate off the grid in self-sustaining island mode, or through backup generation systems. The ACUA will not be giving consideration to traditional, or variations of, mass-burn incinerator technology. Likewise, the ACUA will not give consideration to the land application or landfilling of biosolids as an alternative technology. NOTICE TO VENDORS PLEASE TAKE NOTICE that the Atlantic County Utilities Authority (“ACUA”) will receive electronic Qualification Statements pursuant to the McEnroe Act, N.J.S.A. 13:1E-153 et seq., for: RFQ NO: 2026-RFQ-30 RFQ TITLE: Develop Solid Waste Conversion Facility at the Atlantic County Utilities Authority RFQ Issued: October 13, 2026 Questions Due: November 5, 2026, 12:00pm Proposals Due: December 9, 2026, 11:00am ACUA is seeking qualified firms or project teams to finance, permit, design, construct, operate, and maintain a solid waste conversion facility at the Howard F. Haneman Environmental Park in Egg Harbor Township, New Jersey. The proposed facility may process up to 1,000 tons per day of municipal solid waste and other eligible waste streams into energy or reusable resources under a Service Agreement of up to 25 years. Respondents must demonstrate the technical, financial, and administrative capability to undertake the project, including experience developing and operating a municipal solid waste processing facility with a capacity of at least 100 tons per day and at least one year of satisfactory commercial operation. RFQ documents are available at https://procurement.opengov.com/portal/acua . Late submissions will not be accepted. Respondents are required to comply with N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27 et seq. ATLANTIC COUNTY UTILITIES AUTHORITY MATTHEW J. DENAFO, P.E., PRESIDENT BY: OREN R. THOMAS, IV, CPM, MAS, QPA, PROCUREMENT AND CONTRACTS MANAGER DEFINITIONS Procurement Specific Definitions As used in this RFQ, the following terms shall have the meanings set forth below: “Best Available Control Technologies” (“BACT”): The most preeminent technology available for reducing or controlling emissions. “Biosolids”: The solid or semi-solid material obtained from treated wastewater. “Contract Services”: The work to be performed by the Selected Proposer pursuant to the Agreement. “County”: Atlantic County, New Jersey. “Curbside Collection”: A recycling program where recyclable materials placed into a container separate from MSW are collected from residents and businesses and transported to a designated recycling facility for processing. “Designated Solid Waste”: Material designated for collection and/or disposal by ACUA, including but not limited to the following waste categories as defined by the New Jersey Department of Environmental Protection (NJDEP), as set forth in the regulation N.J.A.C 7:262.13(g) in effect at the relevant time: “Type 10 - Municipal Waste” (household, commercial and institutional): Waste originating in the community consisting of household waste from private residences, commercial waste from wholesale, retail, or service establishments such as restaurants, stores, retail markets, theaters, hotels, and warehouses, and institutional waste material originating in schools, hospitals, research institutions, and public buildings. “Type 13 - Bulky Waste”: Large items of waste material, such as appliances and furniture. Discarded automobiles, trucks and trailers and large vehicle parts, and tires are included under this category. “Type 13C – Construction and Demolition Debris”: Waste building material and rubble resulting from construction, remodeling, repair, and demolition operations on houses, commercial buildings, pavements, and other structures. The following materials may be found in construction and demolition waste: treated and untreated wood scrap; tree parts, tree stumps, and brush; concrete, asphalt, bricks, blocks, and other masonry; plaster and wallboard; roofing materials; corrugated cardboard and miscellaneous paper; ferrous and nonferrous metal; non-asbestos building insulation; plastic scrap; dirt; carpets and padding; glass (window and door); and other miscellaneous materials; but shall not include other solid waste types. “Type 23 – Vegetative Waste”: Waste materials both recoverable and non-recoverable from farms, plant nurseries, and greenhouses that are produced by raising plants. This waste includes crop residues such as plant stalks, hulls, leaves, and tree wastes processed through a woodchipper. Also included are non-crop residues such as leaves, grass clips, tree parts, shrubbery, and garden wastes. “Type 25 – Animal and Food Processing Waste”: Processing waste materials generated in canneries, slaughterhouses, packing plants, or similar industries, including animal manure when intended for disposal and not reuse. This waste type also includes dead animals. Animal manure, when intended for reuse or composting, is to be managed with the criteria and standards developed by the Department of Agriculture as set forth in N.J.S.A. 4:9-38. “Environmental Protection Agency” (“EPA”): A federal agency of the U.S. government that sets environmental protection and enforcement standards. “Financial Guarantor”: is the person or entity that will provide a promise or assurance to the ACUA that it will unconditionally guarantee the performance of all of the obligations of the Respondent, should the Respondent ultimately be selected to execute the agreement with the ACUA. “Material Recovery Facility” (“MRF”): A facility that sorts and processes recyclables. “Major Subcontractor”: Companies that are hired by the Selected Proposer to perform specific tasks or provide services related to waste conversion operations. ACUA will identify which of these subcontractors to be considered as the Major Subcontractors in the RFP.. “McEnroe Act” - refers to the amendments to the Solid Waste Management Act, constituting Chapter 38 of the Pamphlet Laws of 1985, of the State of New Jersey and the acts amendatory thereof and supplemental thereto, codified at N.J.S.A. 13:1E-136 et seq.. “Municipal Solid Waste” (“MSW”): A waste type consisting of everyday items that are consumed and discarded which predominantly includes food wastes, containers and product packaging, and other miscellaneous inorganic wastes from residential and commercial sources. This waste is defined as Type 10 waste under NJDEP rules. “New Jersey Department of Environmental Protection” (“NJDEP”): State Department responsible for protecting and maintaining environmental quality in NJ. NJDEP sets state standards and issues permits for waste handling, processing, and disposal, air emissions, and discharges into water bodies. “Project Team” - means a group of ACUA staff and consultants who will prepare procurement documents and evaluate responses to advise the Board of Commissioners as to the recommended alternatives for solid waste management decisions. “Proposal(s)” - means the package submitted by Qualified Respondents in response to a RFP anticipated to be issued following qualification of Respondents. “Qualification Statements” - means complete responses to this RFQ submitted by the Respondents. “Qualified Respondents” - means the firms responding to the RFQ who the ACUA determines have satisfied the minimum requirements and are the most qualified pursuant to the evaluation criteria set forth in Section 5.0. “Recyclable”: Products or materials that can be collected, separated, and processed to be used as raw materials in the manufacture of new p GENERAL INFORMATION INTRODUCTION General ACUA Profile The ACUA is a New Jersey municipal utilities authority that was created pursuant to the New Jersey County and Municipal Utilities Authority Law (N.J.S.A. 40:14B-1 et seq.) in the late 1960s. Pursuant to the New Jersey Solid Waste Management Act, each county in the State must create and implement a solid waste management plan. By resolution of the Atlantic County Board of Chosen Freeholders, the ACUA was designated as the implementing agency for the County’s solid waste management plan in June 1981. Consistent with the County’s solid waste management plan, the ACUA owns and operates a solid waste management complex in Egg Harbor Township, Atlantic County, NJ, known as the Howard F. Haneman Environmental Park. The solid waste complex is home to an active landfill, a recycling center, composting site, and ancillary facilities. The ACUA’s solid waste complex is located at 6700 Delilah Road, in Egg Harbor Township, New Jersey. The ACUA operates a renewable natural gas (RNG) project at the landfill to beneficially utilize landfill gas. The complex consists of approximately 360 acres with approximately 102 acres representing the landfill footprint. The ACUA will provide the site for the Facility at the complex. The ACUA also owns and operates a regional collection fleet that serves more than 100,000 residents and businesses. The ACUA also operates a 40 million gallon-per-day wastewater treatment plant in Atlantic City, NJ, and a regional sewerage collection system that serves 14 municipalities throughout Atlantic County. The Wastewater Treatment Facility has been in operation since 1978. It is home to the Jersey-Atlantic Wind Farm, a 7.5 MW wind farm that is privately owned and from which the ACUA purchases approximately 17 million kWh per year of electricity. In addition, the facility also houses a 500-kW solar PV system. The ACUA currently incinerates residuals from the wastewater facility at an on-site incinerator owned by the ACUA. ACUA’s most recent financial statement and supplementary information for the years ended December 31, 2024, and 2023 can be found in ACUA website, under the “about” tab, in the financial information or attached to this RFQ. Existing Facilities and Waste Stream Solid Waste The ACUA’s existing solid waste facilities include a scale house, a recycling center that currently acts as a tipping floor to export single-stream recycling off-site for processing, a composting system, a Transfer Station, and a sanitary landfill. The entire park encompasses 360 acres, with a landfill footprint of over 102 acres. Waste generated in the County is collected by both ACUA and private fleets in the County and delivered to the site. MSW generated in the County is required to be delivered to the ACUA’s facilities pursuant to existing waste flow ordinances as described in more detail in the Atlantic County District Solid Waste Management Plan (February 28, 2012 Plan Amendment), which is available on the ACUA website. In addition to its legal flow control authority, the ACUA has direct control of a portion of the MSW stream through its direct collection by its own fleet. Residential curbside recycling and commercial recyclable materials are delivered to ACUA’s recycling center. The ACUA understands that many waste conversion systems include sorting and removal of recyclable materials from the solid waste stream, which may allow for MSW and recycling to be collected together. However, the ACUA DOES NOT intend to eliminate curbside recycling collection programs during the operation of this project. Any removal of recyclable materials from the MSW stream will be done as a supplement to the existing recycling program, not as a replacement. The ACUA will consider proposals that request to incorporate the processing of the existing single-stream material through a MRF system that is incorporated with the proposed project. The ACUA’s landfill currently has permitted capacity through 2028. ACUA’s landfill footprint is within 10,000 feet of runways at the Atlantic City International Airport. Due to this proximity, the ACUA is unable to landfill MSW during daylight hours because of the risk of attracting avian wildlife that may provide unsafe conditions for air traffic. Therefore, all MSW disposed of at the ACUA’s facilities is first unloaded at the Transfer Station. ACUA staff then loads MSW onto transfer trailers and begins landfilling waste one (1) hour after sundown. Proposers must take all airport restrictions into consideration when submitting their Proposals. In 2025 ACUA received 216,911 tons of MSW. In addition to MSW, the ACUA received 90,118 tons of Construction & Demolition Waste (Type 13C) and 28,084 tons of Bulky Waste (Type 13). An additional 30,197 tons of Yard Waste was composted at the ACUA in 2025. For more information on ACUA historical tonnage data see Attachment A. The ACUA’s last waste characterization study of MSW received was conducted in 2024. This study is included in Attachment B. The ACUA will be performing a new multi-season waste characterization study in 2024. The ACUA has developed a Renewable Natural Gas (RNG) project on-site. The RNG project treats gas from the ACUA’s landfill to acceptable standards to be injected into the South Jersey Gas distribution pipelines. This project became operational in October 2024 and is anticipated to be available for future project connections. Specifications for interconnection to the South Jersey Gas distribution system can be found in Attachment C. Based on the ACUA’s experience in attempting to permit various waste conversion technologies, the ACUA considers the generation of biogas converted into RNG as a simpler permit pathway than technologies that will combust waste-derived biogas into electricity on site. This should be considered when evaluating permitting requirements and capabilities
Published attachments
- Historical Tonnages Data
- Waste Characterization Study 2024
- Specification for SJG Interconnection
- Sludge Composition Study
- Transfer Station Floor Plan
- Recycling Center Floor Plan
- Enviro Park Overview
- 2024-ACUA-Final-Audit-Report
- Develop_Solid_Waste_Conversion_Facility_at_the_Atlantic_County_Utilities_Authority.pdf
Public questions and answers
Could the Authority please provide a list of all vendors who have downloaded the RFQ?
No.
OpenGov categories
- 237990 · Other Heavy and Civil Engineering Construction
- 541330 · Engineering Services
- 562213 · Solid Waste Combustors and Incinerators
- 562219 · Other Nonhazardous Waste Treatment and Disposal
- 562920 · Materials Recovery Facilities