Opportunityopen

Dirt Road Package R

Description

Richland County (the County) is seeking electronic bids from qualified contractors to provide clearing and grubbing, demolition, unclassified excavation, borrow excavation, sub-base, earth base and aggregate base courses, hot mix asphalt, pavement markings, signage, storm drainage piping and structures, grassing and erosion control measures located within Richland County: REQUIREMENTS Dirt Road Package R Richland County, South Carolina is soliciting electronic bids from licensed contractors, for the Dirt Road Package “R” (RC-823-B-27) as a part of the Richland County Sales Tax Transportation Improvement Program. The awarded contractor will have 365 days to substantially complete project following the Notice to Proceed. Richland County intends to award a contract to one responsive and responsible bidder. The bidder must be able to perform the services and furnish the goods necessary to meet or exceed all requirements described in this RFB. Bids received from people or entities that do not meet the solicitation requirements will be deemed non-responsive. Dirt Roads: The work consists of complete sitework and traffic control including, but not limited to: clearing and grubbing, demolition, unclassified excavation, borrow excavation, sub-base, earth base and aggregate base courses, hot mix asphalt, pavement markings, signage, storm drainage piping and structures, grassing and erosion control measures located within Richland County: George Robertson Rd N Hask Jacobs Rd Robert McKenzie Rd Smith Myers Rd Tally Adams Rd Taylor Arch Rd Net Dean Rd- SW Outfall only INTRODUCTION Project Information Richland County (the County) is seeking electronic bids from qualified contractors to provide clearing and grubbing, demolition, unclassified excavation, borrow excavation, sub-base, earth base and aggregate base courses, hot mix asphalt, pavement markings, signage, storm drainage piping and structures, grassing and erosion control measures located within Richland County: Richland County is located in the center of South Carolina and covers a total area of 756 square miles. The County surrounds the state capital city of Columbia, which is also the County seat. Established in 1785, the County has grown to become home to just over 400,000 residents, and represents a thriving business, industrial, governmental, and educational center. The County employs approximately 1765 people and operates a general fund budget in excess of $100 million dollars. The County is governed by an 11-member council, which in turn appoints an Administrator to handle daily operations and to provide professional expertise in government management. Under state law, the County is the primary governmental unit for the administration of law enforcement, justice, health, education, taxation, social service, library service, agricultural service, and the maintenance of public records. Timeline Release Project Date: November 9, 2026 Pre-Bid Meeting (Non-Mandatory): November 24, 2026, 10:00am Via Microsoft Teams https://teams.microsoft.com/meet/2471681140431315?p=uszWgy8K84ed4DMQUI Meeting ID: 247 168 114 043 131 5 Passcode: 5BQ9qn3g Question Submission Deadline: December 1, 2026, 2:00pm Response Submission Deadline: December 10, 2026, 2:00pm Procurement Contact Deramus Forrester Contract Analyst forrester.deramus@richlandcountysc.gov Pre-Bid Meeting There is a Non-Mandatory Pre-Bid Meeting scheduled for 10:00 am on Tuesday, November 24, 2026 located at Via Microsoft Teams https://teams.microsoft.com/meet/2471681140431315?p=uszWgy8K84ed4DMQUI Meeting ID: 247 168 114 043 131 5 Passcode: 5BQ9qn3g . Vendors are highly encouraged to attend the pre-bid meeting, but attendance is not required in order to submit a bid. Questions Vendors shall submit all inquiries regarding this bid via the County's eProcurement Portal, located at https://procurement.opengov.com/portal/richlandcountysc by 2:00 pm on Tuesday, December 1, 2026 . Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the county eProcurement Portal. Bidders may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. Addendum Vendors are required to register for an account via the county eProcurement Portal hosted by OpenGov. Once the bidder has completed registration, they will receive addenda notifications to their email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each bidder to periodically check the site for any addenda at https://procurement.opengov.com/portal/richlandcountysc . INSTRUCTIONS TO BIDDERS To be considered a timely filing, bids, and amendments thereto, or withdrawal requests must be submitted via OpenGov by the time advertised as the deadline for submissions. It is the vendor's sole responsibility to ensure that the bids and other documents are submitted at the time indicated in the bid document. The County will not accept liability for any incidental or consequential damages arising from or as a result of the electronic transmission of the bid submittal, addendums, or any other data hereunder. CORRECTION OF ERRORS ON THE BID TABLE: All prices shall be entered in OpenGov. Errors and corrections may be entered up until the deadline for submissions. No bid shall be altered or amended after specified time for opening. BID TABLE: Enter all information, as applicable, and your bid price in the space provided on the bid table. NOTIFICATION: The bid tabulation will be posted as soon as practicable after opening. Notification of Intent to Award/Statement of Award will be posted in OpenGov. RIGHT TO PROTEST: Any prospective bidder, offeror, or contractor, who is aggrieved in connection with the solicitation of a contract shall protest in writing to the Procurement Director within ten (10) calendar days of the date of issuance of the Invitation to Bid, Requests for Proposals or other solicitation documents, whichever is applicable, or any amendment thereto, if the amendment is at issue. Any actual bidder, offeror, or contractor, who is aggrieved in connection with the intended award or award of a contract, shall protest in writing to the procurement manager within ten (10) calendar days of the notification of intent to award or statement of award. PROTEST PROCEDURE: A protest shall be in writing, submitted to the procurement director, and shall set forth the specific grounds of the protest with enough particularity to give notice of the issues to be decided. QUESTIONS REGARDING SPECIFICATIONS AND/OR THE BIDDING PROCESS: To ensure fair consideration for all bidders, the County prohibits any type of communications to or with any department, employee, or County official during the solicitation process, except as provided on the "Invitation For Bids" of the solicitation. This includes any communications initiated by a bidder to any County Official or employee evaluating or considering the bidder, prior to the time an award decision has been made public. Communications between the bidder and the County shall be initiated by the Procurement Office or the appropriate County representative in order to obtain necessary information or clarification needed to develop a proper and accurate evaluation of the bid. Any communications initiated by a bidder concerning the submitted bid shall be grounds for disqualifying the offending bidder from consideration for award of the bid and/or any future solicitations. It will be the sole responsibility of the bidder to contact the Procurement Office prior to submitting a bid to ascertain if any amendments or addendums have been issued in order to obtain all such documentation, and to return the executed documentation with their bid. Any question concerning this document, the specifications, or the bid process must be made in writing via the County's eProcurement Portal. WORK HOURS: The normal working hours per day will be limited from 7 AM to 7 PM Monday through Friday provided sufficient daylight is available. The Contractor shall not perform work on Holidays. The following days are recognized as holidays by the owner: New Years’ Day Martin Luther King Day Presidents Day Memorial Day Independence Day Labor Day Veterans Day Thanksgiving Day Day after Thanksgiving Christmas Eve Christmas Day Day after Christmas When such recognized holidays fall on a Saturday or Sunday, the Owner may, at its discretion, declare the preceding Friday or following Monday as a holiday. In the event that the Governor of the State/Board of County Commissioners shall declare any day or days preceding or following a holiday as a holiday, the Owner may, at its discretion, also declare such day or days as holidays. GENERAL PROVISIONS BID EVALUATION Bids received will be evaluated by the Procurement Director or designee. However, based on bid total, final decision for bid award may rest with the Richland County Council. ESTIMATED QUANTITIES The Owner has endeavored to estimate the proposed quantities as accurately as possible using the latest information available for the project. Within fifteen (15) calendar days after the issuance of the Notice to Proceed, the Contractor shall provide written verification of the quantities. Failure to do so shall imply the Contractor's acceptance of the quantities. In addition, it will be the Contractor's responsibility to inform the Engineer/Inspector when any item of work (excluding lump sum items) is within 90% of the proposed quantity. To affect the increase, deletion, and/or substitution, a "no cost" or "cost" change order signed by the Contractor must be submitted to the Procurement Director by the engineer. No work shall be performed prior to approval of such change order. CONTINGENT ITEMS Construction Item(s) identified as being contingent on the "Summary of Quantities" sheets of the plans, in the column headed "Contingent" and/or listed herein are provided in the Contract for use as directed by the Engineer and shall be included as part of the proposal base bid unless otherwise specified. The quantities for these items are established for the purpose of obtaining a bid price and shall be included as part of the proposal base bid unless otherwise specified. The quantities for these contingent items may be increased or decreased without any adjustment to the Contract unit price bid or the contingent items may be deleted entirely from the Contract by the Engineer without negotiation. The Contractor will not be allowed to submit a claim against the Owner for any adjustment to the Contract unit price bid should the contingent items be increased, decreased or eliminated entirely. Payment for any contingent items used will be made on the basis of the quantities as actually measured. Materials, Construction Requirements, and Basis of Payment shall be as specified in the Specifications, Supplement to the Specifications, Interim Specifications or Addenda, Plans or Special Provisions. ABATEMENT OF WATER POLLUTION BY SEDIMENTATION The Contractor's attention is specifically directed to the fact that it is of the utmost importance during the life of this contract that control of water pollution due to sedimentation be accomplished as shown on the engineering drawings and/or in accordance with South Carolina D.H.E.C. requirements. The restrictions contained therein shall be strictly enforced and the Contractor is cautioned, therefore, to make every effort possible to comply with these regulations, and shall conduct his operations in such a manner as to keep to an absolute minimum amount of sedimentation introduced in to any stream or watercourse. CONTRACTORS OBLIGATIONS The Contractor shall and will, in good workmanlike manner, do and perform all work and furnish all supplies and materials, machinery, equipment, facilities and means, except as herein otherwise expressly specified, necessary or proper to perform and complete all the work required by this contract, within the time herein specified, in accordance with the Plans and Plan Drawings covered by this contract and any and all supplemental Plans and Drawings, and in accordance with the directions of the Engineer as given from time to time during the progress of the work. It shall furnish, erect, maintain and remove such construction plant and such temporary works as may be required. The Contractor shall observe, comply with, and be subject to all terms, conditions, requirements, and limitations of the Contract and Specifications, and shall do, carry on, and complete the entire work to the satisfaction of the Engineer and the Owner. SUPERINTENDENCE BY CONTRACTOR At the site of work, the Contractor shall employ a superintendent or foreman who shall have full authority to act for the Contractor. It is understood that such representative shall be acceptable to the Engineer. ENGINEER AUTHORITY The Engineer shall give all orders and directions contemplated under this Contract and Specifications relative to the execution of the work. The Engineer shall determine the amount, quality, acceptability, and fitness of the several kinds of work and materials which are to be paid for under the construction thereof. The Engineer's estimates and decisions shall be final and conclusive, except as herein otherwise expressly provided. In case any questions shall arise between the parties hereto relative to said Contract or Specifications, the determination or decision of the Engineer shall be a condition precedent to the right of the Contractor to receive any money or for work under Contract affected in any manner or to any extent by such question. The Engineer shall decide the meaning and intent of any portion of the Specifications and any Plan or Drawings where the same may be found obscure or be in dispute. Any differences or conflicts in regard to their work which may arise between the Contractor under this Contract and other contractors performing work for the Owner shall be adjusted and determined by the Engineer. INSPECTION AND INSPECTOR AUTHORITY The authorized representatives and agents of the Owner shall be permitted to inspect all work, materials, payrolls, records of personnel, invoices materials and other relevant data and records. Inspectors, employed by the Engineer, shall be authorized to inspect all work done and materials furnished. Such inspection may extend to all or part and to the preparation or manufacture of the materials to be used. An inspector or inspectors will be stationed on-site and will report to the Engineer as to the progress of the work and the manner in which it is being performed; also to report whenever it appears that the materials furnished and work performed by the Contractor fail to fulfill the requirements of the Specifications and Contract; and to call to the attention of the Contractor any such failure and other default; but no inspection nor any failure to inspect, at any time or place, however, shall relieve the Contractor from any obligation to perform all of the work strictly in accordance with the requirements of the Specifications. In case of dispute arising between the Contractor and any inspector as to the materials furnished or the manner of performing the work, the inspector shall have the authority to reject materials or suspend the work until the question at issue can be referred to and decided by the Engineer. The inspectors shall perform such other duties as are assigned to them. They shall not be authorized to revoke, alter, enlarge, or release any requirements of these Specifications, not to approve or accept any portion of work, not to issue instructions contrary to the Plans and Specifications. Inspectors shall in no case act as foremen to perform other duties for the Contractor, nor interfere with the management of the work by the latter. Any instructions which the inspectors may give the Contractor shall in no way be construed as binding the Engineer or the Owner in any way, nor releasing the Contractor from fulfillment of the terms of the Contract. USE OF PREMISES AND REMOVAL OF DEBRIS The Contractor expressly undertakes at its own expense: To take every precaution against injuries to persons or damage to property. To store its apparatus, materials, supplies, and equipment in such orderly fashion at the site of the work as will not unduly interfere with the progress of its work or the work of any other contractors. To place upon the work or any part thereof only such loads as are consistent with the safety of that portion of the work. To clean up frequently all refuse, rubbish, scrap materials, and debris caused by its operations, to the end that at all times the site of the work shall present a neat, orderly, and workmanlike appearance. Before final payment to remove all surplus material, false work, temporally structures, including foundations thereof, plants of any description and debris of every nature resulting from its operations, and to put the site in a neat, orderly condition. To affect all cutting, fitting or patching of its work required to same to conform to the Plans and Specifications and, except with the consent of the Engineer, not to cut or otherwise alter the work of any other contractor. PUBLIC CONVENIENCE AND SAFETY In addition to the requirements of SCDOT Standard Specifications for Highway Construction, add the following provisions: Dust control by sprinkling or the use of chemicals shall be performed by the Contractor to the satisfaction of the Engineer. The condition of the work at all times shall be such that sudden storms or prolonged rainfall will not cause such damage to property in the vicinity of the work that could in any way be attributed to the performance of the work. If, in the opinion of the Engineer, the public has been inconvenienced to a great extent, or that certain conditions provide a threat to public safety, or that work performed by the Contractor has caused damage to property in the area of the work, which has not been remedied quickly and satisfactorily, the Engineer shall have the authority to order all operations to cease until such time as such conditions are remedied to his satisfaction, and any delay caused thereby shall not be considered just cause for any extension of time in completion of the Contract. Upon refusal of the Contractor to promptly comply with this requirement, the Engineer/Owner shall have the right to perform such work as may be required, at the expense of the Contractor. In the event of temporary suspension of work, or during inclement weather, or whenever the Engineer shall direct, the Contractor will, and will cause its subcontractors to protect carefully its and their work and materials against damage or injury from the weather. If, in the opinion of the Engineer, any work or materials shall have been damaged or injured by reason of failure on the part of the Contractor or any of its subcontractors to so protect its work, such materials shall be removed and replaced at the expense of the Contractor. SUSPENSION OF WORK Should the Owner be prevented or enjoined from proceeding with work or from authorizing its prosecution either before or after its prosecution, by reason of any litigation, the Contractor shall not be entitled to make or assert claim for damage by reason of said delay, but time for completion of the work will be extended to such reasonable time as the Owner may determine will compensate for time lost by such delay with such dete1mination to be set forth in writing. CORRECTION OF WORK All work, all materials, whether incorporated in the work or not, all processes of manufacture, and all methods of construction shall be at all times and places subject to the inspection of the Engineer, who shall be the final judge of the quality and suitability of the work, materials, processes of manufacture, and methods of construction for the purposes for which they ar

Published attachments
Addenda and notices
  • Addendum #1 · 1

    A. The construction plans for Net Dean Road has been added to Addendum # 1. B. The construction plans for Net Dean Road has been added to the Revised Project Manual.

Public questions and answers
  • What does the Utility Relocation activity on Tally Adams Road entail?

    o ATT- Fiber box at intersection with Congaree Road- will need to coordinate with ATT for them to relocated fiber optic box as needed o Tri-County Electric Coop- at least one power pole and guy wire will need to be relocated. Coordinate with owner for them to move pole and guy wire o Richland County Utilities- water and sewer main on Congaree Road. Does not serve Tally Adams Rd. Water main has potential conflict that needs to be coordinated with utility company

  • Are there any plans for Net Dean Rd.?

    The plans for Net Dean Road will be posted in an addendum and the revised Project Manual.

  • The Complete Project Manual has multiple sets of plans for some of the roads. Which set is correct?

    The plan sets are duplicates. There should be no differences between them.

  • Will be this awarded to one company as a whole or can you bid on certain scopes of work only?

    Richland County intends to award a contract to one responsive and responsible bidder.

  • The Bid Form Quantities do not match the Plan Quantities entirely. Do we follow bid form quantities only? Also, the typicals do not reflect what the bid form shows. The Bid Form shows 1.5" ITC/1.5" STC Asphalt while some of the typicals show 3" STC only. The SCDOT R/W Paving Typicals show multiple structures and include pavement types that are not in the Bid Form. Can you please clarify on these items?

    Follow the Bid Form quantities.

  • Are the bids electronic or sealed?

    See 1.1 Project Information