The City of Anaheim (" Anaheim " or " City ") Public Utilities Department (" APU ") seeks proposals from interested respondents (" Respondent(s) ") to procure double-sided padmount solid-dielectric insulated switchgear with integrated automation as replacements for its 12 kV live-front, air-insulated padmounted switchgear. The dead-front and encapsulated features of the new solid-dielectric insulated switches with integrated automation are expected to improve crew safety, reliability and operational flexibility. This Request for Proposals (" RFP ") is expected to result in a proof-of-concept for additional anticipated purchases for replacing existing and installing new such switchgear at Anaheim. The selected Respondent(s) will be responsible for providing the Goods and Services described in the Scope of Work and Specifications Section and in any Attachments hereto (collectively, " Deliverables” ). After selecting a successful Respondent, the City will issue a Purchase Order, contract, or agreement form that substantially conforms to the terms and conditions outlined in this RFP, including, but not limited to, Anaheim's standard insurance and indemnity provisions appropriate for the Deliverables contemplated herein. Any resulting agreement between the City and the successful respondent will take effect upon mutual execution after Anaheim secures all necessary approvals as required under its procurement policies, rules, and the Anaheim Municipal Code . SCOPE OF WORK Goods The selected Respondent (or “ Supplier ”) shall provide the switchgear, including the integrated automation cabinet, in accordance with the applicable stock code requirements and quantities specified below, within the requested delivery timelines. At Anaheim’s request, the selected Supplier shall prioritize delivery of three (3) initial units for each awarded stock code to facilitate expedited testing, evaluation, and approval by Anaheim of the equipment and its associated production shop drawings, specifications and other applicable technical details. During the evaluation period, the Supplier shall make commercially reasonable efforts to preserve production scheduling continuity and material availability necessary to meet agreed delivery timelines for subsequent units following approval. As such, production of the remaining units shall not commence until written authorization to proceed is provided by Anaheim after completion of testing and evaluation. If, following its testing and evaluation, Anaheim determines that the equipment is not suitable for Anaheim’s system, Anaheim may elect not to proceed with the remaining units, and the parties will discuss in good faith any reasonable, documented costs the Supplier incurred with Anaheim’s prior written concurrence. This will be Anaheim's first purchase of this type of switchgear solution, and this requirement is related to R&D for a rollout of retrofits. Anaheim appreciates the selected Supplier's attention to this priority as we embark on a new partnership. E498240M - PDSD-9 with integrated automation cabinet Description: Pad-Mounted, Dead-Front, 15 kV, 95 kV BIL, Double-Sided Configuration of Two Ways of 600 A Three-Phase Gang-Operated, Solid Dielectric Insulated, Vacuum Fault Interrupters, and Two Sets of Three-Phase 200 A Solid Dielectric Insulated Vacuum Fault Interrupters with Single-Phase Operation, per City of Anaheim Specification E-153. The two 600 A ways are operated from the front, and the two sets of 200 A ways are operated from the back. All 600 A ways are automated. Switch fits the 6' × 9'-6" pad detailed in CU 1600-1A and the 5' × 10'-6" pad detailed in CU 1600-3J. Furnished with integrated automation cabinet mountable on either side of the switchgear, or up to 50 feet away to accommodate site access. Quantity Required: 15 Target delivery of initial 3 units (if requested by Anaheim): May 2027 Estimated delivery of all 15 units: August 2027 E498245M - PDSD-10 with integrated automation cabinet Description: Pad-Mounted, Dead-Front, 15 kV, 95 kV BIL, Double-Sided Configuration of Four Ways of 600 A Three-Phase Gang-Operated, Solid Dielectric Insulated, Vacuum Fault Interrupters, per City of Anaheim Specification E-153. Two sets of terminations are operated from the front, and two sets are operated from the back. All 600 A ways are automated. Switch fits the 6' × 9'-6" pad detailed in CU 1600-1A and the 5' × 10'-6" pad detailed in CU 1600-3J. Furnished with integrated automation cabinet mountable on either side of the switchgear, or up to 50 feet away to accommodate site access. Quantity Required: 15 Target delivery of initial 3 units (if requested by Anaheim): May 2027 Estimated delivery of all 15 units: August 2027 Automation cabinet : For remote operation, the switchgear assembly shall be equipped with: A 304 stainless steel weatherproof integrated automation cabinet with provisions to be mounted on either side of the switch cabinet or stand-alone, depending on installation site constraints. The automation cabinet shall be furnished with a 3-point latching mechanism and accommodate APU’s standard padlock, and equipped with a Schweitzer Engineering Laboratories (SEL) 487E relay for both PDSD-9 and PDSD-10, SEL’s RTAC interface and associated control wiring, Landis+Gyr (or other APU-approved solution) mesh radio communication for backup control capability, and provisions for APU-installed Cisco networking equipment, fiber optics, and Ethernet cable routing. Each 600-amp way of the switch shall be equipped with a linked motor operator or magnetic actuator connected to the control cabinet with a 15-foot control cable. Internal line to ground voltage sensors on each phase, with 0-6 volt output and a submersible connector to automation cabinet. Internal current transformer on each phase, with an internal CT shorting scheme or board to prevent accidental damage caused by an open CT secondary, and a submersible connector to automation cabinet. General Specifications Goods must comply with all applicable federal, state, and local regulations and must meet the following specifications required by APU’s Electric Division: All specifications for this procurement are outlined in Attachment A . The proposed Goods shall meet or exceed the applicable specifications. Substitutions Where this Section or Attachment A specifies a manufacturer model, component or configuration as required, only those exact items will be considered responsive to this RFP. Where the RFP allows an APU-approved solution, Respondents shall clearly identify the proposed alternate solution and provide sufficient technical information for Anaheim to evaluate compliance and compatibility. If any covered material is deemed to be non-compliant, Anaheim may reject such material, and the selected Supplier shall, at its sole cost: (i) remove and replace the non-compliant material(s), and (ii) cover all associated costs, including, but not limited to, labor, delay, and reinstallation. No extension of time or additional compensation shall be granted for such replacement. Production & Delivery Schedule Build to order (“ BTO ”) or make to order (“ MTO ”) refers to Goods that are not manufactured until a confirmed order is received. The selected Supplier shall provide Anaheim with a preliminary production and delivery schedule, including milestone activities and the estimated number of days or weeks required to complete each. Prior to ordering materials or beginning production, the selected Supplier must obtain concurrence from Anaheim’s Representative. The selected Supplier shall also provide regular schedule updates and promptly notify Anaheim’s representative as the milestones approach or if any delays occur. Delivery and offloading of Goods shall occur within 21 calendar days following completion of manufacturing, unless an alternative timeline is approved by Anaheim’s Representative in writing. Proposed lead times shall reflect the Respondent's realistic, good-faith schedule. Anaheim intends to incorporate the selected Supplier's proposed lead times into the Purchase Order as committed delivery dates. Anaheim recognizes that manufacturing schedules can change, and the Supplier shall notify Anaheim promptly of any anticipated delay so the parties can work together on a revised schedule. If delivery is delayed more than eight (8) weeks beyond the committed date for reasons within the Supplier's control, and the parties are unable to agree on a revised schedule, Anaheim may cancel the undelivered units without further obligation for those units. Delays caused by Anaheim, including Anaheim's testing and evaluation period, and events beyond the Supplier's reasonable control are excluded from this period. This provision does not limit Anaheim's other rights under the Purchase Order or applicable law. EVALUATION CRITERIA Evaluation of proposals will be based on a fair, impartial, and competitive selection process in which the evaluation of proposals will not be limited to price alone. Anaheim will appoint a review board of qualified evaluators to assess submitted proposals based on the criteria below. The review board will assign scores and may interview the highest-ranked Respondents to further assess their qualifications and approach. The evaluation will be conducted in two phases. Phase 1 will evaluate technical fit for each stock code. Phase 2 will evaluate pricing and lead time for each stock code for which the Respondent qualifies based on the results of Phase 1. Respondents may proceed to Phase 2 for any stock code that passes Phase 1. Each stock code will be evaluated independently. A Respondent may qualify for an award for either or both stock codes, and failure to qualify for one stock code will not disqualify the Respondent from consideration for the other. Award recommendations will be based on the evaluation results for each individual stock code, in accordance with the criteria set forth in this solicitation. Following the evaluation, Anaheim will initiate negotiations with the highest-ranked Respondent for each stock code, which may include a best-and-final offer. If negotiations are successful, Anaheim will recommend an award to its approving bodies. If unsuccessful, Anaheim may, at its sole discretion, negotiate with the next highest-ranked Respondent. Proposals may be deemed non-responsive and rejected if they fail to comply with RFP requirements, do not meet minimum content and quality standards, or do not provide references (if required). GENERAL TERMS AND CONDITIONS By submitting a proposal, Respondents agree to these General Terms and Conditions except to the extent that they explicitly state any exceptions in the Respondent Questionnaire Section . Right to Accept, Reject, or Cancel Anaheim may, in its sole discretion, accept or reject any or all proposals, in whole or in part, for any reason and without explanation. Anaheim reserves the right to cancel this RFP at any time, enter into agreements with one or more Respondents, or procure Deliverables through other means. Anaheim may also issue a new request for proposal that supersedes and replaces this RFP. Disqualification for Conflict of Interest or Non-Responsiveness Anaheim reserves the right to disqualify any Respondent due to a real or apparent conflict of interest or indication of collusion or for a Respondent’s failure to submit a responsive proposal, as determined in Anaheim’s sole discretion. No Legal Recourse By submitting a proposal, Respondents waive any legal claims against Anaheim, its officials, officers, employees, and agents arising solely from Anaheim’s decision to not award their proposal or to make an award to another Respondent. Proposal Guarantee Respondents agree that their proposals, including pricing, shall be considered firm and irrevocable until any Purchase Order, agreement, or contract under this RFP becomes effective. If a Respondent is unable to hold its proposal firm beyond a certain time, the proposal must clearly identify the limitation. Proposal Costs Anaheim shall not be responsible for any costs incurred in the preparation, submission, or follow-up of a proposal, including agreement negotiations, regardless of the outcome. All such costs remain the sole responsibility of the Respondent. Ownership and Public Disclosure of Proposals All proposals become the property of Anaheim and may be subject to disclosure under the California Public Records Act (Gov. Code, § 7920.000 et seq.). Respondents must clearly label any distinct portions of their proposal considered to be trade secrets or proprietary (e.g., “Trade Secret” or “Confidential”), which Anaheim will endeavor to handle appropriately. However, Anaheim shall not be liable for disclosure of any materials that are required to be disclosed by law. Blanket or ambiguous confidentiality claims will not be honored. Due Diligence and Assumption of Risk By submitting a proposal, Respondents certify that they have carefully considered the nature, requirements, and quantities of Deliverables to be performed; the effect of all RFP conditions and requirements; and all local factors and/or difficulties affecting performance. Respondents further certify that they have included in the proposal all costs necessary to complete the Deliverables and that they assume all risks related to conditions differing from their expectations. No claim for additional compensation will be allowed based upon a lack of knowledge of any RFP conditions or requirements. RFP Errors or Omissions If a Respondent identifies a material error or omission in this RFP before the Proposal Submission Deadline, they must immediately notify Anaheim in writing and request clarification. If a Respondent fails to notify Anaheim despite having knowledge of the error/omission, Respondent shall assume all risks associated with any unreported discrepancies. Requests for Additional Information Anaheim may request supplementary information, best-and-final offers, or fee reconsiderations from one or more Respondents as needed to evaluate proposals. Waiver and Corrections Anaheim may waive or correct immaterial or inadvertent defects, irregularities, or technical errors in a proposal or the RFP process, including during agreement negotiations. Legal Compliance Respondents shall comply with all applicable federal, state, and local laws, codes, regulations, and ordinances, including, but not limited to, those promulgated by CAL/OSHA, FED/OSHA, and the City of Anaheim. Respondents shall also comply with the Immigration Reform and Control Act of 1986, as amended, including verification of the employment eligibility of all personnel performing work in Anaheim. In addition, Respondents shall comply with all applicable provisions of the California Workers’ Compensation laws. Prevailing Wages If applicable, Respondents must comply with California prevailing wage laws and pay workers wages compliant with determinations by the California Department of Industrial Relations, pursuant to the California Labor Code. Taxpayer Identification Respondents must have a valid Taxpayer Identification Number (“ TIN ”) and maintain it for the duration of the term. No payments will be made without a valid TIN. Business Licensing and Registration For the duration of any agreement, the successful Respondent must maintain (1) an active registration with the California Secretary of State and (2) an active Anaheim business license under Title 3 of the Anaheim Municipal Code. No registration or license is required to submit a proposal. (For additional information regarding the applicability of Anaheim’s business licenses, contact the Business License Division at 714-765-5194.) Anaheim’s Logos Respondents may not use, reprint, or manipulate Anaheim or APU’s logos, emblems, or seals for any purpose, including in the preparation of any proposal documents or in any display on Respondents’ websites or marketing materials, without Anaheim’s prior written approval. Required Insurance Some procurements may require bonding and/or insurance. Specific requirements will be stated in the applicable Purchase Order, contract, or agreement. In the event bonding is required, bonds shall be submitted in a form acceptable to Anaheim (samples may be included in the solicitation documents). Checks or letters of credit will not be accepted in lieu of bonding. Without limiting Anaheim’s right to indemnification, it is agreed that the selected Respondent shall secure, prior to commencing, any activities under the Purchase Order, contract or agreement, and maintain, during the entire term thereof. When work will be performed on Anaheim property, Anaheim’s standard minimum insurance requirements (shown below) will apply, unless otherwise indicated in the bid specifications. Commercial General Liability Insurance, including coverage for Premises and Operations, Contractual Liability, Personal Injury Liability, Products/Completed Operations Liability, as well as Independent Contractor’s Liability where appropriate, in an amount not less than $2,000,000 per occurrence, $4,000,000 annual aggregate, written on an occurrence form. Such insurance shall be written on a primary basis but may include a deductible or self-insured retention of more than $10,000 per occurrence, provided that such deductible or self-insured retention is disclosed to Anaheim, in writing, at the inception of the Purchase Order, contract, or agreement. Comprehensive Automobile Liability Coverage, including—as applicable—owned, non-owned, and hired autos, in an amount not less than $2,000,000 per occurrence, combined single limit, as required by California law. Workers’ Compensation Insurance as required by California law and Employers Liability Insurance in an amount not less than $1,000,000. A Waiver of subrogation is required for Workers’ Compensation coverage. The selected Respondent is responsible for the payment/satisfaction of any applicable deductible or self-insured retention. It is agreed that any insurance maintained by the selected Respondent pursuant to this RFP shall be primary to, and not contribute with, any insurance or self-insurance maintained by the City of Anaheim. Coverage Minimum Limits Commercial General Liability $2,000,000 occurrence $4,000,000 aggregate Automobile Liability including coverage for owned, non-owned and hired vehicles $2,000,000 combined single limit per occurrence Workers’ Compensation Statutory Employers’ Liability Insurance $1,000,000 per occurrence Anaheim’s Risk Manager is authorized to amend the requirements set forth herein in the event that such amendment is in Anaheim’s best interest. The selected Respondent shall agree that this insurance shall not be voluntarily cancelled or limited in scope or coverage by the selected Respondent until after thirty (30) days prior written notice has been given to the City Clerk, City of Anaheim, 200 S. Anaheim Blvd., Anaheim, CA 92805. This does not apply to cancellation for non-payment of premium, which requires notice of not less than ten (10) days. Anaheim, its officers, agents, employees, representatives and City- designated volunteers are added as additional insured as respects the acts, omissions, operations and activities of, or on behalf of, the named insured, in regard to products supplied to, or work or services performed for, or related to, the City of Anaheim. Insurance certificates should state: City of Anaheim Attn: Purchasing Division 200 S. Anaheim Blvd. Suite 620 Anaheim, CA 92805 Insurance certificates should be emailed to Insurance@anaheim.net Prior to commencing any work, the selected Contractor shall deliver to Anaheim insurance certificates confirming the
Published attachments
Addenda and notices
Addendum #1 · 1
Question 6: Usable Pad Dimensions (CU 1600-3J) Company G&W Question Please confirm the total usable pad dimensions for CU 1600-3J. Response Cable opening size, as depicted on next page, is 61”x60”, with an overall pad width of 75.5” - see the Addendum for attachment of CU1600-3J for additional details.
Addendum #2 · 2
Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
If bidder is to provide control power, can Anaheim provide the nominal system voltage and connection? For example, 12.47kV connected 7200V phase to ground.
For control power, APU uses 12.47 kV connected phase-to-ground, which is 7200V across the terminals of the PT.
Hello, We would like to request for an extension on the due date for this bid to December 17, 2026 to allow enough time to prepare our proposal. Thank you!
Upon review of the technical questions submitted, the City will grant an extension to all bidders with a due date of December 17, 2026.
Is the SEL RTAC to be included? The SEL 487E and ethernet switch can both connect directly to radio and/or fiber.
If SEL-487E is used with direct connections for DNP3 radio and Ethernet/Fiber, then then the RTAC is not needed.
The request for proposal states "Target delivery of initial 3 units (if requested by Anaheim)" for both E498240M & E498245M. When will bidder(s) be aware of exact initial quantity? Is the initial quantity confirmed to be 3 units?
After bid evaluations are complete and PO awards are scheduled.
Please confirm total usable pad dimensions for CU 1600-3J.
Cable opening size, as depicted on next page, is 61”x60”, with an overall pad width of 75.5” - see the Addendum for attachment of CU1600-3J for additional details.
OpenGov categories
- 28500 · Electrical Equipment And Supplies (Except Cable And Wire)
- 28564 · Motor Controllers, Contactors, Push Button Stations, Relays, Safety Switches, Starters, Coils and Brushes
- 28567 · Power Systems Switchgears and Related Accessories