Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Downtown Bloomington Corridor and Subarea Planning Study

Description

The City of Bloomington (the “City”) is issuing this Request for Proposal (RFP) to aid in the selection of a consultant team to assist in the development of a Downtown Bloomington Corridor and Subarea Planning Study (the “Study”). Recognizing Kirkwood Avenue’s role as the cultural heart of Bloomington and a key driver in Bloomington's destination economy, the Study will include a comprehensive Shared Street Analysis and Conceptual Design for Kirkwood Avenue as a key component of the broader downtown planning effort. The Study will also prioritize economic vitality and will include a detailed economic impact analysis. The Study will reflect the vision, goals, policies, and programs of the City’s Comprehensive Plan, Transportation Plan, Climate Action Plan, Downtown Action Plan, and SS4A Safety Action Plan, and help the City advance its goals related to economic vitality, local character, small business, housing, and mobility. The City welcomes proposals from firms of all sizes and encourages qualified local firms to apply, either independently or as part of a multidisciplinary consultant team. Interested parties must provide submittals as outlined in this document electronically by Friday, December 10, 2026 at 5:00 PM local time (ET). Project Details Important Instructions for Electronic Submittal Responses to the RFP must be submitted in pdf format on the City’s OpenGov Procurement website at https://bton.in/OpenG no later than December 20, 2026 by 5:00 PM ET. Responses which, in the judgment of the City, are in any way incomplete, inaccurate, or otherwise not in compliance with the requirements described in this RFP may be rejected. The City reserves the right to contact consultants to ask questions, request additional information, or request an interview. The City of Bloomington is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. Scope of Work or Project Details The City is seeking a consultant to assist in the development of a Downtown Bloomington Corridor and Subarea Planning Study (the “Study”). The Study will evaluate transportation, land use, economic development, public realm, and mobility opportunities within the Downtown Bloomington area as defined in the City’s Comprehensive Plan. The Study will reflect the vision, goals, policies, and programs of the City’s Comprehensive Plan, Transportation Plan, Climate Action Plan, Downtown Action Plan, and SS4A Safety Action Plan, including the goal of eliminating fatal and serious injury crashes on the City’s roadways by 2039. The adopted plans are available online at: https://bloomington.in.gov/planning/documents . The Study will consist of three major components that work together to establish a coordinated vision and implementation strategy for the future of Downtown Bloomington. By integrating land use planning, transportation planning, and community goals, the Study will help position Downtown Bloomington for long-term success by supporting residents, businesses, visitors, and future investments. Downtown Planning and Future Land Use Update: The Study will serve as an update to Chapter 4: Downtown and the Downtown portion of the Future Land Use Map of the City's Comprehensive Plan. As a subarea plan, this component should establish a coordinated vision for future land use, redevelopment, transportation, housing, public spaces, and economic development within Downtown Bloomington. The updated Chapter 4 should identify opportunities, evaluate existing conditions and development patterns, and establish goals and policy recommendations that reflect the community's vision for downtown. Downtown Transportation and Safety Recommendations: Recognizing the interconnected relationship between land use and transportation, the Study will evaluate priority corridors identified in the SS4A Safety Action Plan within the Downtown area and develop recommendations to make it easier, safer, and more pleasant to travel in the Downtown. Recommendations should explore a range of context-sensitive strategies, which may include road diets, multimodal facilities, intersection improvements, loading and deliveries, quick build projects, and other innovative approaches that improve safety and accessibility in the downtown. Kirkwood Avenue Shared Street Conceptual Design: Kirkwood Avenue serves as the cultural and commercial heart of Downtown Bloomington connecting Indiana University and Downtown Bloomington. The Study will include a Shared Street Analysis and Conceptual Design for Kirkwood Avenue between Rogers Street and Indiana Avenue as identified as recommended project SS-1 in the Transportation Plan. The City seeks to design a context-sensitive shared street concept while improving safety, accessibility, business visibility, public space, and the overall experience of the corridor. The Conceptual design should reflect the unique needs of a downtown commercial corridor, including events, parking, loading and deliveries, and accessibility needs. The design should show a path for how Kirkwood Avenue can function as a vibrant and welcoming destination. Process Goals: The process for developing the Study is critical to its success. The City envisions a collaborative process that includes meaningful engagement with residents, businesses, property owners, Indiana University, community organizations, and other downtown stakeholders. While the City has successfully used similar two-phase approaches in the past, respondents are encouraged to propose alternative processes that achieve the same objectives if they believe results can be improved. Phase One: Downtown and Corridor Analysis The purpose of this phase is to develop a shared understanding of existing conditions, identify opportunities and constraints, and establish community-supported goals to guide future recommendations. The consultant should collect, analyze, and present quantitative and qualitative information related to downtown land use, transportation, and community needs. Analysis should consider existing and future conditions, including transportation operations, safety, multimodal mobility, parking and loading, development patterns, and the relationship between land use and transportation. The City can provide available traffic counts, limited bicycle count data, crash data, and other relevant information. The City may also help collect qualitative data collection through observations, stakeholder conversations, surveys, and public engagement. Consultants are encouraged to propose additional data collection methods and analytical tools that support a comprehensive understanding of downtown conditions. This phase should identify opportunities to improve safety, accessibility, mobility, and downtown economic vitality. It shall conclude with public presentations of existing conditions, key findings, and community goals before advancing to plan development. Phase Two: Plan Development and Conceptual Design The purpose of this phase is to translate the analysis and community goals developed in Phase One into an implementable vision for Downtown Bloomington. The consultants should develop an integrated set of recommendations that advance the City’s adopted plans and support downtown land use, economic development, housing, public spaces, transportation, and community character goals. Public engagement should remain central throughout this phase. The consultant should assist the City with design charrettes, workshops, visualization exercises, and other engagement activities that allow stakeholders to meaningfully participate in shaping the future of Downtown Bloomington. Respondents are encouraged to propose creative visualization and communication techniques that help residents, businesses, and decision-makers understand potential concepts and recommendations. The consultant should anticipate presenting recommendations to City Introduction Summary Background Contact Information Timeline Evaluation Criteria Vendor Submissions Attachments

Published attachments
Public questions and answers
  • Is the "detailed economic impact analysis" mentioned in the summary expected to be a part of the Economic and Retail Assessment?

    Yes. The "detailed economic impact analysis" is to be included as part of the downtown economic and retail assessment, rather than as a separate standalone report. Consultants are welcome to use any appropriate methods within that deliverable to assess market conditions and support the study's recommendations.

  • Regarding the Kirkwood design, please confirm that the City is looking for 30% design (based in survey and considering things like above and below ground utilities) and not a conceptual or planning level / 10% design. Further, does the City have an estimated construction value in-mind?

    The City is seeking an engineering ready conceptual design for Kirkwood Ave. that establishes a clear, functional layout and evaluates physical feasibility, including curb geometry, representative cross sections, materials and furnishings, access, and some drainage considerations. Full boundary and topographic surveys are not required. Consultants should use existing City data (GIS, utility maps, etc.) to identify major utility conflicts and other geometric constraints. The desire is for a design that provides sufficient technical detail to inform future final engineering and construction documents. The City does not have a predetermined construction budget or estimated construction value for Kirkwood. Developing a planning level cost estimate based on the evaluated alternatives and preferred conceptual design is an expected deliverable.

  • Can you please clarify what you mean by 'engineering-ready conceptual (30%) design' in regards to the final deliverables for Kirkwood Avenue? As we read this the language could reflect either a conceptual product that could then be engineered at a later date, or a 30% set of engineered road plans that would meet local/ state requirements.

    The City is seeking an engineering ready conceptual design that establishes a clear, functional layout and evaluates physical feasibility, including curb geometry, representative cross sections, materials and furnishings, access, and some drainage considerations. The desire is for a design that provides sufficient technical detail to inform future final engineering and construction documents.

  • Is there a preference on whether a team is engineer or landscape architecture/ planning led?

    The City does not have a preference in regards to which discipline leads the team. Proposals will be evaluated based on the qualifications of the Project Manage and the team's overall ability to deliver the required work.

  • Can you verify the submission deadline? The dates appear to be inconsistent throughout the RFP document. Pages 1, 3, and 8 list December 10, while Pages 2 and 8 reference December 20.

    The official proposal submission deadline is December 10, 2026, at 5:00 PM ET.

Plain text

OpenGov categories

  • 90664 · Planning, Urban (Community, Regional, Area wide, and State)
  • 91892 · Urban Planning Consulting