State and local · OpenGov
Downtown Two- Way Conversion and Broadway Improvements
Description
The City of Aurora, IL invites you to bid on the Downtown Two-Way Conversion and Broadway Improvements project. This project shall consist of major roadway and sidewalk work along Broadway (IL 25) including a reduction of through lanes south of Galena Blvd. The project also includes the conversion of New York Street and Galena Boulevard from 1-way couplet operation to individual 2-way operation. Work includes roadway resurfacing, sidewalk reconstruction, decorative sidewalk elements, traffic signal improvements, signing, striping, landscaping, and other associated work. This project includes Business Enterprise Program (BEP) utilization requirements. Table 1 TREE REMOVAL (6 TO 15 UNITS DIAMETER) EARTH EXCAVATION REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL TRENCH BACKFILL TOPSOIL FURNISH AND PLACE, 4" SEEDING, CLASS 2A INLET FILTERS AGGREGATE SUBGRADE IMPROVEMENT 12" SUBBASE GRANULAR MATERIAL, TYPE B 4" SUBBASE GRANULAR MATERIAL, TYPE B 6" PORTLAND CEMENT CONCRETE BASE COURSE WIDENING 9" BITUMINOUS MATERIALS (TACK COAT) TEMPORARY RAMP HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N70 HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N70 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8 INCH PORTLAND CEMENT CONCRETE SIDEWALK 4 INCH PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH PORTLAND CEMENT CONCRETE SIDEWALK 7 INCH DETECTABLE WARNINGS PAVEMENT REMOVAL HOT-MIX ASPHALT SURFACE REMOVAL, 2 1/2" DRIVEWAY PAVEMENT REMOVAL CURB REMOVAL COMBINATION CURB AND GUTTER REMOVAL SIDEWALK REMOVAL CLASS D PATCHES, TYPE I, 10 INCH CLASS D PATCHES, TYPE II, 10 INCH CLASS D PATCHES, TYPE III, 10 INCH CONCRETE REMOVAL STORM SEWERS, CLASS A, TYPE 1 12" STORM SEWER REMOVAL 6" STORM SEWER REMOVAL 8" STORM SEWER REMOVAL 10" STORM SEWER REMOVAL 12" STORM SEWER REMOVAL 15" FIRE HYDRANTS TO BE RELOCATED DOMESTIC WATER SERVICE BOXES TO BE ADJUSTED PIPE UNDERDRAINS, TYPE 1, 4" CATCH BASINS, TYPE A, 4'-DIAMETER, TYPE 11 FRAME AND GRATE Table 2 ITEMS ORDERED BY ENGINEER SIGN (SPECIAL) ARTWORK ALLOWANCE ENTRANCE RESTORATION ALLOWANCE SCOPE OF WORK Specifications This work consists of making improvements to the existing streets in accordance with the attached Plans, Specifications and Special Provisions. The project includes work on IDOT ROW and will be processed under IDOT Permit 045-92304. The selected contractor must submit additional documents and bond to IDOT to secure and finalize the permit prior to commencement of construction. Located in Attachments please see: Attachment A - Aurora_045-92304_Plans Attachment B - Aurora_045-92304_Specifications Due to the funding source, there are minimum utilization requirements on this project for minority-owned business enterprises, and women-owned or persons with disabilities-owned business enterprises. See Page 129 of the attached Specifications (Attachment B) for requirements. A BEP Utilization plan is required to be submitted with each bid. Due to the funding source, there is an Illinois Works Apprenticeship Program Requirement on this project. See Page 130 of the attached Specifications (Attachment B) for requirements. GENERAL INFORMATION CITY OF AURORA, IL (Government) The City of Aurora (“City”) is a municipal corporation and unit of local government existing under the laws of the State of Illinois pursuant to the Illinois Municipal Code, 65 ILCS 5/1-1-1 et seq. (the “Code”). The City was established to provide municipal services and to promote the health, safety, and welfare of its residents and businesses within its jurisdiction. The City owns, operates, and maintains various public facilities and infrastructure, including municipal buildings, parks, and community centers located throughout Aurora, Illinois. INSTRUCTIONS TO BIDDERS SUMMARY The City of Aurora, IL invites you to bid on the Downtown Two-Way Conversion and Broadway Improvements project. This project shall consist of major roadway and sidewalk work along Broadway (IL 25) including a reduction of through lanes south of Galena Blvd. The project also includes the conversion of New York Street and Galena Boulevard from 1-way couplet operation to individual 2-way operation. Work includes roadway resurfacing, sidewalk reconstruction, decorative sidewalk elements, traffic signal improvements, signing, striping, landscaping, and other associated work. This project includes Business Enterprise Program (BEP) utilization requirements. TIMELINE Release Project Date: November 9, 2026 Question Submission Deadline: November 18, 2026, 11:00am Question Response Deadline: November 20, 2026, 4:00pm Response Submission Deadline: December 9, 2026, 11:00am Purchasing Division Definitions Award: The formal decision to select a vendor for a contract. Bid: A submitted response by a vendor in response to a bid document. Bidder: An individual, firm, or corporation formally submitting a proposal for the work contemplated, or any portion thereof, acting directly through an authorized representative. Change Order: A change to a contract or purchase order made after it has been approved by the city that alters the term of the contract, the contract price, or the obligations of the parties. Contract: A formal agreement between the City and a successful bidder outlining obligations, deliverables, timelines, and pricing. Cooperative Purchasing: When goods or services are purchased through shared contracts (mostly government entity contracts), to leverage buying power. Direct Purchase Method: The method in which, after bids are rejected or if no bids are received, the City Council by resolution may approve the work to be done by city personnel or authorize the purchase of goods or services involved to be purchased more economically on the open market without complying with the requirements of the Purchasing Division. Emergency Procurement: An expedited purchase that bypasses standard bidding due to immediate threats to public health, safety, or welfare. Encumbrance: Funds that are formally committed and set aside in the budget to pay for a specific future purchase. Evaluation Criteria: The standards and scoring factors used to assess bids or proposals. Formal Bid: For goods/services over $25,000, with well-defined requirements and structured bidder/proposal submissions. Informal Bid: For goods/services valued between $5,000 and $24,999, with well-defined requirements. Businesses are notified via web alerts. Invitation for Bid (IFB): A formal solicitation inviting vendors to submit competitive bids based strictly on price and predefined specifications. Invoice: A bill sent by a vendor/contractor/supplier for goods/services provided. Shows what was purchased, how much it costs, and payment due date. Local Bidder Preference: Policy that allows the City to give priority or scoring advantages to local businesses. Lowest Responsible Bidder: The lowest bidder whose offer best responds in quality, fitness and capacity to the requirements of the proposed work or usage. Payment Bond: The bond executed by the Vendor/Contractor and his surety guaranteeing the payment of all sums of money due for any labor, materials, apparatus, fixtures, or machinery furnished to such principal for the purpose of performing the contract work. Performance Bond: The bond executed by the Vendor/Contractor and his surety, guaranteeing complete execution of the contract. Piggybacking: An authorized purchase made by utilizing another government agency's existing, competitively awarded contract. Plans: All drawings, sketches, and detailed Plans or reproductions thereof pertaining to the construction involved. Procurement: The process by which a municipality acquires goods, services, or construction, including planning, soliciting offers, evaluating responses, awarding contracts, and managing vendor performance. Professional Services: Services that require specialized professional knowledge or expertise, such as accounting, architecture, engineering, law, medicine, surveying, or other fields defined by state law. Proposal: A bidder’s response to a solicitation that often includes technical details, methodology, pricing, and qualifications. Public Notice: Official announcement of a solicitation, typically published through OpenGov. Purchase/Procurement Card (P-card): A City issued charge card for the purchase of city-related goods/services. Purchase Order (PO): The formal authorizing document issued after an award. No work begins, or payment made, without a city-generated PO. Sent to Vendor/Contractor/Supplier. Quote: Request from vendors for pricing on goods or services or a combination thereof that may be verbal or in writing. Request for Proposals (RFP): A solicitation used when seeking a solution, goods, or service and evaluating vendors based on multiple criteria, not only price. Request for Qualifications (RFQ): A solicitation for qualifications, used especially for professional or consultative services. It does not result in a contract. Requisition: A request to create a PO for the purchase of goods/services. Stays internal. Responsible Bidder: Section 2-331(5) of the Aurora City Code requires that bidders for city contracts in excess of $25,000 must participate in active apprenticeship and training programs approved and registered with the United States Department of Labor’s Bureau of Apprenticeship and Training to be considered a responsible bidder. Scope of Work (SOW): A detailed document outlining the specific tasks, deliverables, timelines, and quality standards required from the vendor. Sole Source: A non-competitive procurement used when only one vendor can provide the required goods or services. Specification: Any description of the physical or functional characteristics, or of the nature of a supply, service or construction item. A specification may include a description of any requirement for inspecting, testing, or preparing a supply, service, or construction item for delivery. Vendor/Contractor/Supplier: A company or individual that enters into a contract with the City to provide goods or services. ACCEPTANCE OF BID PROPOSALS a. Bidders intending to respond to this solicitation must create a free account with OpenGov Procurement . Registration is required to establish a communication link with the City. The Bidder, and not the City, is solely responsible for obtaining all addenda issued for this solicitation. Addenda and other relevant information will be posted through the City’s E-Procurement System. Notifications of issued addenda will be emailed to all persons registered as following this bid. Failure of any Bidder to receive any addendum or interpretation shall not relieve the Bidder of any obligation under its submitted Bid Proposal. All addenda issued shall become part of the Contract Documents. Paper submissions will not be accepted . b. Bids will be accepted only through the City’s E-Procurement System, OpenGov, up to the date and time specified in the solicitation. The official system clock within the City’s E-Procurement System shall govern all submission deadlines. Late submissions will not be accepted under any circumstances, including technical difficulties such as internet connectivity issues. The City strongly encourages Bidders to complete submissions well in advance of the deadline. All bids must include all requested information and all required forms, certificates, affidavits, and addendum acknowledgments to be considered responsive. c. A subcontractor may not submit a Proposal or otherwise serve as the PRIME VENDOR on behalf of another entity. Responses submitted solely on behalf of a subcontractor, third-party vendor, broker, or other entity that will not be the prime vendor under the resulting Contract will not be accepted. d. Bids shall be submitted on the forms provided and must include all required information and certifications. Bids submitted in any other manner, or failing to include all required information or certifications, may be rejected as non-responsive. Bids may be modified or withdrawn prior to the bid opening deadline through the City’s E-Procurement System. Each Bid shall include the legal name of the Bidder, complete mailing address, and electronic signature of a person legally authorized to bind the Bidder. The printed or typed name of the authorized signer shall also be provided. e. The City of Aurora reserves the right to accept or reject any or all bids, in whole or in part, to accept alternate bids, and to waive any immaterial defect, technicality, informality, or irregularity in any bid received. Unless otherwise specified, the City reserves the right to hold bids for ninety (90) days following the bid opening date. By submitting a bid, the Bidder agrees to accept a Notice of Award if issued within this ninety (90) day period. The City further reserves the right to cancel this solicitation at any time without liability for any costs incurred by any Bidder in preparing or submitting a Bid Proposal. Each Bidder assumes sole responsibility for all costs associated with preparation and submission of its Bid Proposal. f. While price is an important consideration, the City will also evaluate qualifications, experience, demonstrated capacity, responsiveness to the solicitation requirements, and overall ability to successfully perform the Work. No Bid Proposal will be considered unless the Bidder provides evidence satisfactory to the City demonstrating the necessary facilities, experience, equipment, personnel, and financial resources required to perform the Work. The Bid will be awarded to the lowest responsive and responsible Bidder. In determining responsibility, the City may consider factors including, but not limited to: Prior performance history Experience on similar projects Ability to work cooperatively with the City Adequacy of equipment and staffing Ability to complete the Work within required timeframes Reliability, reputation, competency, and available resources The City and its representatives may conduct any investigation deemed necessary to evaluate a Bidder’s qualifications. The Bidder shall furnish all information requested by the City for this purpose. RECEIPT OF BID PROPOSALS Bids must be submitted electronically , up to, but no later than the designated date and time as specified via the City’s E Procurement System, OpenGov. It is the sole responsibility of the Bidder to see that their Bid Proposal is received in the proper time. Bids must be submitted electronically via the City’s E Procurement System. There will be no exceptions! WITHDRAWAL OF BID PROPOSALS Bids may be withdrawn at any time prior to the submission deadline through the City’s E-Procurement System by “un-submitting” the proposal in OpenGov. After withdrawal, the Bidder may revise and resubmit its proposal at any time prior to the submission deadline. Bidders are strongly encouraged to carefully review their submissions before final submission. Negligence on the part of the Bidder in preparing a bid shall not confer any right to withdraw or modify the bid after the submission deadline. No bid may be withdrawn after bid opening without the written approval of the Director of Purchasing. Requests for withdrawal after bid opening must be submitted in writing by an authorized representative of the Bidder. Bid Proposals received after the date and time specified for submission will not be opened or accepted. BID DEPOSIT Each Bidder shall deposit with Bid a Bid guarantee consisting of a bank draft, Bid bond, cashier’s check, or certified check drawn on a good and solvent National or State Bank and payable to the order of the City, in an amount not less than five percent (5%) of the total amount of the Bid submitted, as a guaranty that in case the Bidder’s Bid is accepted, the Bidder shall within one day after the date of such acceptance and notification thereof, deliver to the City a contract signed and executed by the Bidder, proper insurance certificates and a Performance and Payment Bond in one hundred percent (100%) of the contract sum furnished by a responsible bonding company acceptable to and written upon forms prepared or approved by the City as security for payment of labor and materials and for the faithful performance of the contract and compliance with the provisions of law relating to the payment of prevailing rate of wages. Bid Deposit MUST be uploaded electronically with submission through the City’s E Procurement System, OpenGov. Upon notification from the City, Bidder’s must deliver ORIGINAL Bid Deposit within three (3) business days. All Bid deposits will be retained by the City until a Bid award is made, at which time the Bid deposit will be promptly returned to the unsuccessful Bidders. The Bid deposit of the successful Bidder will be retained until the equipment, goods or services have been received or completed and found to be in compliance with the specifications. Performance by the Bidder shall not be considered complete, until final inspection and acceptance by the City of the Bidder’s Work. Final inspection shall occur within 30 days after the actual completion of the Work. Execution of the contract is contingent upon receipt of an acceptable Performance and Payment Bond and any required certificates of insurance. Upon failure to meet the requirements of this paragraph, the Bidder shall forfeit the amount deposited as liquidated damages and no mistakes or errors on the part of the Bidder shall excuse the Bidder or entitle him to a return of the aforementioned amount. AWARD It is the intent of the City to award the bid to the lowest responsive responsible bidder meeting specifications. Award will be based on the following factors, but not limited to (where applicable): (a) adherence to all conditions and requirements of the bid specifications; (b) price; (c) qualifications of the bidder, including past performance, financial responsibility, general reputation, experience, service capabilities, and facilities; (d) delivery or completion date; (e) product appearance, workmanship, finish, taste, feel, overall quality, and results of product testing; (f) maintenance costs and warranty provisions; and (g) repurchase or residual value. The Bidder submitting a response to this solicitation must be the PRIME VENDOR and, if awarded, shall be the entity entering into the Contract with the City of Aurora. The prime vendor shall have overall responsibility for the performance of all contractual requirements and shall serve as the City's primary point of contact throughout the term of the Contract. If the Bidder modifies limits, restricts or subjects his bid proposal to conditions that would change the requirements of the bid, this would be considered a conditional or qualified Bid Proposal and will not be accepted. The City reserves the right to delete any item listed in the bid. PRICES The price quoted for each item is the full purchase price, including delivery to destination and includes all transportation and handling charges, premiums on bonds, material or service costs and all other overhead charges of every kind and nature. Unless otherwise specified, prices shall remain firm for the duration of the purchase. Unit prices shall not include any local, state or federal taxes. In case of mistake in extension of price, unit price shall govern. DISCOUNTS Prices quoted must be net after deducting all trade and quantity discounts. Where cash discounts for prompt payment are offered, the discount period shall begin with the date of receipt of a correct invoice or receipt or final acceptance of goods, whichever is later. TAXES The City of Aurora is exempt, by law, from paying State and City Retailer’s Occupation Tax, State Service Occupation Tax, State Use Tax and Federal Excise Tax (per Illinois Revised Statutes, Chapter 120, Paragraph 44) upon City works and purchases. The City of Aurora’s Sales Tax Exemption Number is E9996-0842-07.
Published attachments
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view the updated Response Submission Deadline made by this addendum.
Addendum #2 · 2
Additional information regarding vault locations.
Public questions and answers
Could you please provide a list of Prime Contractors that are bidding this project?
The City does not provide a list of prospective bidders or prime contractors participating in the solicitation. All interested parties are encouraged to monitor the solicitation through OpenGov for official updates and information.
Could you please provide the Details Page 3/L.07 regarding the trash receptacle and any other site furnishings? There doesn't appear to be any in the project documents.
Detail Page 3/L.07 is included as Sheet 90/183 in Attachment A.
on most of your bids you can check to see who is following bid, but I do not see them on this one. Will you be listing them in the future
This has now been corrected.
I have a couple questions regarding this project. 1) Detail 1/ Sheet No. 90, Pedestrian Paver Section calls for a 5/8” sand setting bed. A MINIMUM of ¾” bedding layer is recommended and 1” is preferred. Please confirm 1” sand setting bed is acceptable. 2) Paver Schedule says the Type 1 and Type 3 pavers are Holland Premier/EL Campo finish. These are two different finishes. Are the pavers to be Holland Premier (Smooth) or IL-Campo (textured) finish, if both please clarify the use of each finish and color. 3) Detail 3 / Sheet No. 89, Pavers at light pole detail shows what appears to be 4x8 pavers cut to provide a soldier course border around the light pole, Detail one on the same sheet calls for type 2 pavers which are Unilock Mattoni 3x9.5” pavers. Please confirm Unilock Mattoni 3x9.5” pavers are to be used at all light pole areas.
1. A 5/8" sand setting bed over 4" PCC will be used as shown in the detail. 2. The Type 1 and Type 3 pavers should be 4" x 8" with an IL-Campo finish. 3. The 4" x 8" pavers are not for the light pole border. Pavers around foundations should be Type 2 pavers (3”x9.5” Mattoni Pavers)
Could you please provide clarification on the following items? • Soil Borings: Are soil borings available for this project? • Rock Excavation: If borings are not available, does the City anticipate any rock excavation, and at what depth? • Payment Method: If rock excavation is required, does the City consider this work incidental, or can the contractor submit an agreed unit price and/or force account (T&M)?
1. No soil borings are available. 2. Rock excavation is not anticipated. 3. Any required rock excavation would be paid as extra work (via AUP or T&M).
Broadway is known for vaulted sidewalks, please address the followings: 1. Procedure if vaulted sidewalk is encountered. 2. Proecdure if flowable fills is encountered and conflicts with the street light foundations. 3. Procedure if the floor of the vaulted sidewalk prohibits the required depth. 4. Procedure if broken concrete, etc is encountered prohibiting the use of an auger. 5. Locations of known vaulted sidewalks and materials used to fill these structures. 6. Procedure if the brick or concrete walls prohibit installation of conduit.
1. All known vault locations will be infilled prior to commencement of construction. If any unfilled or previously unknown vaults are encountered, the City will have a contractor on call ready to properly infill the vault (which would take about a week to complete). 2. Flowable fill was used to infill all vaults and can be bored or excavated as necessary. 3. Refer to the question 1 above. Any unfilled vaults will be addressed promptly, and while the floors of these vaults are typically ~8 feet below sidewalk, any obstructions encountered within the vault space (such as wingwalls, stairs, etc.) will be removed by the infilling contractor. 4. Any obstructions encountered would need to be excavated and removed as necessary, either by the awarded contractor as extra work or by the City’s vault infilling contractor. 5. A location map of known and recently infilled vaults will be added via addendum. CLSM (Controlled Low Strength Material)/flowable fill was used to infill. 6. Any brick or concrete walls prohibiting installation of conduit will be addressed on a case-by-case basis if encountered.
Has Aurora developed a temporary ligthing plan, materials required and staging of the project?
There is no temporary lighting plan. Work will be completed one half of the street at a time (maintain existing lighting on the east side of Broadway during Stage 1, utilize new lighting on the west side of Broadway during Stage 2). See General Note 11 on Sheet 131.
Has Aurora developed a plan addressing the long lead times of materials, with regards to the installation of the lighting, will the existing lights need to remain operational with concrete gapped until final installation?
The City is aware of long lead times for lighting equipment and believes the proposed completion date will allow sufficient time to procure equipment. Lighting will be maintained on one half of the street at a time. See General Note on Sheet 131 and the Staging Plans.
OpenGov categories
- 91115 · C.I.P., Construction/Rehabilitation, Other than Buildings
- 91117 · C.I.P., Construction, Roads
- 91164 · C.I.P., Utilities
- 91223 · Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.)
- 91327 · Construction, Highway and Road
- 91345 · Construction, Sewer and Storm Drain
- 91347 · Construction, Sidewalk and Driveway (Includes Pedestrian and Handicap Ramps)
- 91350 · Construction, Street (Major and Residential)(Includes Reconstruction)
- 91356 · Construction, Utility/Underground Projects
- 91371 · Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc)
- 91395 · Paving/Resurfacing, Highway and Road
- 91396 · Paving/Resurfacing, Street (Major and Residential)
- 92867 · Road Services, Vehicle (Includes Mobile Repair Services)
- 96861 · Pavement Marking Services (Including Removal of Markings)
- 96880 · Traffic Sign Installation and/or Removal Services
- 96882 · Traffic Signal Installation
- 96884 · Traffic Control Services (To Include Placement and Removal of Control Devices)