Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

E-RATE CATEGORY 1

Description

McKinney Independent School District (McKinney ISD, MISD, or the District) is soliciting proposals from qualified vendors to provide E-Rate eligible Category 1 services including self-provisioned and leased network, wide area network transport, and internet access to support of the District’s technology infrastructure and connectivity needs. This Request for Proposal (RFP) seeks proposers who can provide reliable, scalable, and cost-effective network connectivity that meets the technical specifications, performance requirements, and E-Rate program guidelines described in this document. SCOPE & SPECIFICATIONS PURPOSE McKinney Independent School District (McKinney ISD, MISD, or the District) is soliciting proposals from qualified proposers to provide E-Rate eligible Category 1 services including self-provisioned and leased network, wide area network transport, and internet access to support the District’s technology infrastructure and connectivity needs. This Request for Proposal (RFP) seeks proposers who can provide reliable, scalable, and cost-effective network connectivity that meets the technical specifications, performance requirements, and E-Rate program guidelines described in this document. The selected proposer must meet all requirements of this RFP, including all applicable laws. If you fail to meet these requirements, your proposal may be rejected, or your contract may be terminated. GENERAL REQUIREMENTS All provisions of this Request for Proposal (RFP), including the Scope of Services, Technical Specifications, Contract Terms, General and Special Conditions, and required appendices, apply to all specified services and deliverables. Proposers are responsible for reviewing the entire RFP package and verifying that all requirements, specifications, and instructions are fully understood prior to submitting a proposal. Any discrepancies, ambiguities, conflicts, or omissions identified within the RFP documents shall be submitted in writing to the District’s designated representative for clarification. Submit requests for clarification of discrepancies or conflicts by Friday, November 6, 2026 , 10:00 am . This allows the District time to issue an addendum if needed. All responses will be provided by written addendum and shared with all prospective proposers. If discrepancies or conflicts are found after the proposal due date, report them to the District's representative immediately. Do not begin work or provide services until the District has formally resolved the issue. If a discrepancy or conflict between RFP sections is identified before the proposal due date but after the clarification request deadline, proposers must prepare proposals using the highest applicable performance standard, capacity, and service level for the affected component, unless otherwise directed by the District. SCOPE OF WORK McKinney ISD is soliciting proposals from qualified proposers to provide E-Rate eligible Category 1 services including self-provisioned and leased network, wide area network transport, and internet access that ensure reliable, secure, and high-performance connectivity for all District facilities. Services must meet all technical specifications, service requirements, and E-Rate program rules outlined in this Request for Proposal (RFP). Service Levels and Support The proposer shall provide: 24/7 network monitoring and technical support A dedicated call center and designated contact methods for outage reporting Proactive notification of outages, maintenance, and service disruptions Service Level Agreements (SLAs) addressing uptime, latency, and response times Implementation and Delivery All proposed services must be fully installed, tested, and operational by July 1, 2027, the start of E-Rate Funding Year 2027. The District will not incur special construction costs before E-Rate funding approval. Any special construction or one-time charges must be clearly identified and separated from recurring E-Rate eligible services. Compliance and Funding Requirements All services shall comply with applicable FCC and USAC E-Rate Category 1 requirements. The proposer shall: Maintain a valid SPIN / 498 ID. File required FCC Forms (473 and 474) Clearly distinguish E-Rate eligible and ineligible costs. Acknowledge that contract award and implementation are contingent upon receipt of E-Rate funding. Flexibility for District Changes The District reserves the right to add or remove locations, adjust bandwidth, or modify service requirements during the contract term, in line with the pricing and conditions in this RFP. Service Requirements: There are 3 separate requests for Category 1 services. Each request will be evaluated separately as follows: Self-Provisioned and Leased Network Wide Area Network Only Transport Internet Access SERVICE REQUEST 1: SELF-PROVISIONED AND LEASED NETWORK General Scope McKinney Independent School District, hereafter referred to as Applicant, is seeking multiple options for proposals to extend their infrastructure for data transport point-to-point services and, when required, network electronics necessary to light the circuit and maintenance and operations of the network, between the locations listed in the Section 6.1.1. Pricing Spreadsheet. Self-Provisioned network and Leased Dark Fiber solutions must include costs for the network equipment and network maintenance as separately identifiable costs, if proposed. For all other services provided over third-party networks, a turn-key solution with all expected costs are required . New services are planned to begin on July 1, 2027, which represents the start of the E-Rate funding year. Scope of Services Wide Area Network Applicant requires a minimum of 10 Gbps Wide Area Network (WAN) Transport connections between the Applicant’s Internet hub site and the locations listed in the Section 6.1.1. Pricing Spreadsheet . Proposers are requested to submit proposals for incremental bandwidths 10 Gbps, 20 Gbps, and 40 Gbps. To be considered, proposer must include all listed locations. All proposed solutions must be within the specified bandwidth range to be eligible for consideration. In addition to the specified minimum and maximum bandwidths, Proposers are encouraged to propose various bandwidth options within this range. Refer to the Section 6.1.1. Pricing Spreadsheet for the requested service levels. If the bandwidths listed are not available, Proposers should include their closest comparable service level for consideration. Submissions meeting any of the three (3) criteria will be disqualified. Solution does NOT propose at least the minimum bandwidth. Solution does NOT propose bandwidth dedicated to the applicant but instead, the bandwidth is dependent on the number of other customers on the network or some other factor that does not, generally, guarantee the minimum bandwidth as a committed information rate (CIR). Solution includes caps on data usage or slows speeds based on data usage or other factors. All solutions must terminate service or infrastructure at the demarcation point within the building, generally, the MDF. Solutions that only bring service to the property line but not to the demarcation point will be disqualified. The agreement must terminate service at an MDF designated by the Applicant. The Proposer should specify the exact demarcation setup included in the base fees, such as wall-mounted CPE and CAT6a handoff, rack mount patch panel, etc. Proposers must accept responsibility for site delivery, construction, permitting, pathway, and right-of-way costs required to deliver service. Proposal Options Applicant is seeking multiple options for consideration. Respondents may propose one, all, or any number of options. All respondents must be capable of providing telecommunication services under the Universal Service Support Mechanism, be a registered service provider with USAC, and have a USAC issued 498 ID (formerly Service Provider Identification Number-SPIN). Option 1 - Services Provided Over Third-Party Networks (SPOTPN): SPOTPN is defined as broadband service delivered over a service provider or other third party-owned network. This service option is designed to represent all technology neutral third-party transport mediums including Leased Lit Fiber, Leased Dark Fiber, and all other non-fiber options. Option 2 - Self-Provisioned Network Construction: This service option is for the build-out of an applicant-owned wide area network to the designated locations and includes all eligible special construction charges. Maintenance and Operations costs and network electronics costs should be priced separately from special construction charges for Self-Provisioned network. Option 3 - C1 Network Maintenance for Leased Dark Fiber or Self-Provisioned Network: This service option is for maintenance and operations for Leased Dark OUTSIDE PLANT INSTALLATION SPECIFICATIONS Material Requirements Material will comply with those standards as established by UL or NEMA and shall be commercial grade. All materials will be new and free from defects. Selected contractor and its subcontractors will provide all material management to ensure that the project remains on track according to the project milestones, All due caution will be exercised in transporting and off-loading all materials to prevent any damage during shipping or placement. Any damage to any materials after their initial receipt and inspection by the respondent will be the sole responsibility of the respondent, who will replace such damaged hand holes at no additional expense to the Applicant. If a buried proposal, conduit shall comply with applicable code and industry standards for underground telecommunications infrastructure. EMT (Electrical Metallic Tubing) proposals must be multi-duct with at least three innerducts. EMT fitting shall be gland or set screw type, and each conduit shall be equipped with a graduated pull tape or rope. If a buried proposal, unless specified by right-of-way owner, crossings will be two conduits, PVC-Sch 40 or better. If a buried proposal, the exact requirements for location and type of conduit within the building shall be verified with building owner. If a buried proposal, all Hand Holes shall be approved, 45,000 lb. load rated CDR or comparable enclosures on roadways and railways, and pedestrian rated hand holes for non-roadways and railways. If a buried proposal, large-radius sweeps shall be provided where required for offset or change in direction of conduit. Bend radius rating of the cable must be adhered to for all conduit bends, pull boxes, and hand holes. Fiber can be single-mode or multi-mode with the following specifications: If Single Mode: TU‐T G.652.C/D compliant Maximum Attenuation @ 1310nm: 0.34 dB/km Maximum Attenuation @ 1385nm: 0.31 dB/km Maximum Attenuation @ 1550nm: 0.22 dB/km If Multimode: OM3 (50/125) *Laser Optimized* 1500/-/500 MHz·km Connector types should be LC unless otherwise specified by the Applicant. Any warranties associated with the fiber and any other outside plant materials must revert to the Applicant as the owner upon completion of construction SPECIFICATIONS Survey Comply with all ordinances and regulations. Where required, secure permits before placing or excavating on private property, crossing streams, pushing pipe or boring under streets and railways. Pre-survey shall be done prior to each job. If a buried proposal, respondent will locate underground lines of third parties in cable route area Permits and Traffic Control The respondent must adhere to all applicable laws, rules and requirements and must apply for permits to place infrastructure per specification per county or city ordinance applicable to where the infrastructure is being placed. All traffic control, in accordance with local, state, county, or permitting agency laws, regulations, and requirements, will be the respondent’s responsibility. The respondent’s construction schedule will take into consideration sufficient time for the development and approval of a traffic control plan. Tracer Wire Installation If a buried proposal, tracer wire shall be placed with all conduit installed unless armored or traceable cable is used. The respondent will provide the tracer wire and shall install, splice and test (for continuity) the tracer wire. If the tracer wire is broken during installation, the wire should be repaired and tested for continuity after repair. If a buried proposal, for multi-duct installation, install a 5/8” X 8” copper clad ground rod in the hand-hole located on public right–of-way. Place a #12 insulated copper locate wire from the ground rod to the fiber optic termination room or to the outside of the building directly below the pull box and terminate on one side of an insulated indoor/outdoor terminal block to the master ground bar in the fiber optic termination room or place a ground rod on the outside of the building. Locate block in an accessible location. This is for “locate purposes only,” not for grounding purposes. Note on as-built where ground is placed and tag located wire as “locate wire.” Depth of Burial (If a buried proposal) Except where otherwise specified, the cable shall be placed to a minimum depth of 36” along roadways and 24” on private property. Greater cable depth will be required at the follow locations: Where cable route crosses roads, the cable shall be placed at a minimum depth of 48” below the pavement or 36” below the parallel drainage ditch, whichever is greater, unless the controlling authority required additional depth, in which case the greatest depth will be maintained. Where cable crosses existing sub-surface pipes, cables, or other structures: at foreign object crossings, the cable will be placed to maintain a minimum of 12” clearance from the object or the minimum clearance required by the object’s owner, whichever is greater. Highway, Railroad, and Other Bored Crossings (If a buried proposal) All crossings of state or federal highways and railroads right-of-way shall be made by boring and placing a pipe casing. The cable shall be placed through the pipe casing. Country road and other roadways shall be bored, trenched, or plowed as approved by the appropriate local authority. All work performed on public right-of-way or railroad right-of-way shall be done in accordance with requirements and regulations of the authority having jurisdiction there under. Respondent shall give all notices and comply with all laws, ordinances, rules and regulations bearing on the conduct of the Work as drawn. Where the cable route crosses railroad right-of-way, the cable shall be placed at a minimum depth of 60” below the railroad surface or 36” below the parallel drainage ditch, whichever is greater, unless the controlling authority req QUALIFICATION OF CONTRACTORS Proposers responding to this RFP must demonstrate the qualifications, experience, and capacity required to deliver the specified services. The District will evaluate each proposer to ensure the selected provider meets all technical, operational, and compliance requirements. Minimum Qualifications To be considered, proposers must meet the following minimum qualifications: Business Experience Demonstrated experience providing leased lit fiber WAN or Internet services, preferably in K-12 public school environments. At least three years of experience delivering comparable services of similar scope and complexity. E-Rate Eligibility and Compliance Possession of a valid FCC Service Provider Identification Number (SPIN / 498 ID). Demonstrated knowledge of, and compliance with, FCC and USAC E-Rate Category 1 program requirements. Ability to file and support FCC Forms 473 (SPAC) and 474 (SPI). Technical Capability Ability to design, implement, and support scalable WAN and Internet solutions that meet all RFP specifications. Capability to support required bandwidth tiers, latency requirements, and service levels. Experience supporting VoIP, video, and multicast services. Operational Capacity Sufficient personnel, equipment, and resources to deliver and support services at all District locations. Ability to provide 24/7 network monitoring and technical support with established escalation procedures. Financial Stability Demonstrated financial stability to support long-term contract obligations. The District reserves the right to request financial statements or other documentation to verify financial capacity. Past Performance and References Proven record of satisfactory performance on similar contracts. Provide at least three references, preferably from K-12 public school districts or comparable public entities, for services performed within the past three years. Primary Proposer Responsibility If a proposal includes subcontractors or partners, the proposer must identify one primary proposer responsible for all aspects of contract performance, compliance, and service delivery. Legal and Regulatory Compliance Compliance with all applicable federal, state, and local laws, rules, and regulations. Ability to enter into a contract with the District under the terms and conditions outlined in this RFP. SUBSTITUTIONS: Substitutions and Approved Equals Proposers are responsible for ensuring that all proposed equipment, services, and components meet or exceed the specifications and requirements in this RFP. All requests for substitutions or proposed “equal” equipment or services must be submitted in writing and approved by the District before the proposal due date. Substitutions will be considered only if the proposer demonstrates that the alternative is functionally and technically equivalent to, or exceeds, the specified requirements. Proposers proposing an alternate but equal brand, model, service, or solution must submit a written substitution request to the District’s designated representative at least ten (10) calendar days before the proposal due date. The request must include sufficient technical detail for the District to evaluate equivalency. If a substitution is approved, the District will issue a written addendum, which will become part of the RFP documents. If no substitutions are approved in writing before the proposal due date, only the equipment, services, and specifications identified in this RFP will be permitted. Any costs, delays, reconfiguration, or additional expenses resulting from deviations from the specified equipment, service type, or installation location are the sole responsibility of the proposer or proposer and will not result in additional cost to the District. WORKMANSHIP AND QUALITY ASSURANCE: Unless otherwise specified or noted, all equipment shall be new, of the best quality, perfect and without flaws or defects. All equipment shall be delivered to the site in an undamaged condition and shall remain new and in perfect working order through the District's acceptance. All custom fabricated equipment supplied is free from defects in materials and workmanship and will be guaranteed for a period of at least (2) two years. All manufacturers’ equipment carries at least a one-year parts/labor warranty; compressors will be warranted for an additional four years (parts only). No warranties will be applied to any existing equipment. The contractor shall turn over to the maintenance manager or authorized District representative any and all warranty documentation pertaining to newly installed equipment or parts. A “no charge” statement of work shall be submitted to the District on all warranty repairs detailing the diagnosed cause and parts replaced. COMPLIANCE, CODE REGULATIONS AND STANDARDS: The proposer must comply with all applicable federal, state, and local laws, codes, and regulations related to the provision, installation, operation, and maintenance of telecommunications, network, and Internet services. All work and

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Addendum Reason: This Addendum is issued to correct information and provide additional clarification to all prospective proposers regarding RFP2026-10-653 E-Rate Category 1. Included in this Addendum are the following: Attachment A: Questions and Answers Report – The District has received questions regarding the solicitation. The attached Questions and Answers Report contains the questions received and the District’s official responses. The attached Questions and Answers Report is hereby incorporated into and made a part of the solicitation. Respondents are responsible for reviewing the Questions and Answers Report and considering the information provided in preparing their proposals. Updated Evaluation Criterion "References" – Revised language to indicate how the District intends to evaluate References provided by Respondents. Extended Response Deadline – Extended response deadline by one (1) week. Added Public Opening Location – The public opening location has been added. Proposers must acknowledge receipt and acceptance of the Addendum before submitting their proposal. All terms and conditions of the original RFP remain unchanged unless specifically modified by this or subsequent addenda. Please use the See What Changed link to view all the changes made by this addendum.

Public questions and answers
  • Could you please advise where we should upload the required, supporting, and exceptions/redlines documents? The portal does not show a designated section for these submissions.

    Once you have started your draft submission the upload will appear in the section provided for the requested documentation. Upload areas will not be available in preview mode.

  • Regarding the ability to negotiate, does the portal automatically remove a vendor from consideration if ‘No’ is selected?

    No. Selecting "No" on a question does not automatically remove a proposer from consideration in the OpenGov portal. The District will review and evaluate all proposals in accordance with the solicitation requirements, applicable federal, state, and local laws and regulations, and any requirements associated with applicable funding source(s).

Plain text

OpenGov categories

  • 43000000 · Information Technology Broadcasting and Telecommunications
  • 81112100 · Internet services