DEPT OF DEFENSE
- Posted
- Oct 29, 2026
- Due
- Nov 12, 2026, 5:00 PM EST
- NAICS
- 517111
- Set-aside
- Small Business Set Aside - Total
The Naval Air Warfare Center Weapons Division (NAWCWD) has developed and intends to field a modular, organic capability consisting of commercial-off-the-shelf (COTS) components integrated into custom hardware for the MH-60R Seahawk helicopter. The Government has established a viable system baseline, however, a standardized, repeatable, and supportable production, deployment, and sustainment process is not yet developed. With an initial operational capability target of Q1 FY2028, the program's small scope makes traditional, large-scale support and depot-level sustainment models highly cost-prohibitive. The current ad-hoc model lacks a process with defined material flow, supply-chain management, quality control, and software deployment process. Consequently, ongoing assembly and support practices require excessive time and specialized personnel that a small team cannot realistically maintain. Furthermore, the existing packaging is not optimized for rapid global air transport, and the chassis design needs human factors optimization for installation and removal in shipboard and austere environments. As a result, these cumulative limitations reduce overall operational availability, increase the burden on forward-deployed personnel, and raise long-term lifecycle costs. This delays the Navy's critical ability to rapidly produce, transport, install, and sustain this capability worldwide. Desired Outcomes & Constraints (Submissions may be for one or all requirements) 1. ?Process Design: Production Process: An operational, production-representative process capable of producing a defined pilot lot using controlled material, assembly, programming, inspection, test, configuration-management, packaging, and acceptance processes that is executable by a small team. Deployment Process: A lightweight, practical support process that enables a small team to provision and deploy the capability with minimal specialized infrastructure. Sustainment Process: A lightweight, practical support process that enables a small team to support, maintain, repair, reconfigure, and reconstitute the capability with minimal specialized infrastructure. 2. Packaging Plan: A rugged, efficient, and reusable packaging plan compatible with Joint Modular Intermodal Containers, Pelican cases, or comparable solutions that enable rapid global air transport and protect the system and associated components during storage, shipment, and operational movement. 3. Human Factors Optimization. The project seeks modified chassis, mounts, and installation/removal processes that reduce the time, tools, personnel, and specialized equipment required to install and uninstall the system in shipboard and austere field environments. Questions: Questions should be submitted to jennifer.a.felton.civ@us.navy.mil via email no later than 1600 EST (4:00 PM Eastern Standard Time) by November 09, 2026. Submission Guidelines, Evaluation, and Eligibility Requirements: Refer to BAA N6893625S0001 (https://sam.gov/workspace/contract/opp/54d124889d3f423fa900e43c4b041026/view) posted on SAM.gov for submission guidelines and evaluation. While the BAA is an open announcement, the Government is requesting responses for this problem by 1600 EST (4:00 PM Eastern Standard Time) December 01, 2026. Required Submission Changes: When submitting the response, the cover page must specifically reference N6893625S0001-0001 to be considered.
No attachments were published with this notice.
jennifer felton
Primary contact
ELIZABETH SCHLICK
Secondary contact
This is the history collected by Gov Contract Finder. Times show when information was captured or a version was assembled, not when SAM.gov originally changed it. Earlier revisions may be missing.
Publications are grouped by matching evidence; revision relationships are inferred.
The original SAM.gov root publication has not been verified.
Opportunity version
Initial information
Electric Modernization Upgrade
Solicitation: BAA-N6893625S0001-0001
Publication: 3b8c3c3c3a2640a6a0d8992a6a36f523
Current publication
Changed fields: Description
First established information: Description
Opportunity version
New opportunity observed
Electric Modernization Upgrade
Solicitation: BAA-N6893625S0001-0001
Publication: 3b8c3c3c3a2640a6a0d8992a6a36f523
Current publication
Changed fields: AAC Code, Active, AdditionalInfoLink, ArchiveDate, ArchiveType, Award$, AwardAmount, AwardDate, AwardNumber, Awardee, BaseType, CGAC, City, ClassificationCode, CountryCode, Department/Ind.Agency, FPDS Code, Industry, Link, NaicsCode, NoticeId, Office, OrganizationType, PostedDate, PrimaryContact, ResponseDeadLine, SecondaryContact, SetASide, SetASideCode, Sol#, State, Sub-Tier, Title, Type, ZipCode, awardeeCageCode, awardeeUei, descriptionUrl, fullParentPathCode, fullParentPathName, groupingConfidence, logicalOpportunityId, naicsCodes, pointOfContact, resourceLinks, samNoticeId, samRootId, solicitationNumber, source, sourceResourceCount, sourceResourceIds
Opportunity capture
Initial information
Electric Modernization Upgrade
Solicitation: BAA-N6893625S0001-0001
Publication: 3b8c3c3c3a2640a6a0d8992a6a36f523
Current publication
DEPT OF DEFENSE
ENERGY, DEPARTMENT OF
DEPT OF DEFENSE
DEPT OF DEFENSE
DEPT OF DEFENSE