Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Employee Satisfaction Survey

Description

The City of Norfolk (the "City") is seeking a consultant (the "Contractor") to provide employee engagement surveying, organizational assessment and benchmarking, as well as consulting services to translate survey and assessment findings into measurable organizational improvements. For full solicitation details, download RFP documents under the "Attachments" section of this posting. Project Details Employee Satisfaction Survey The City of Norfolk (the "City") is seeking a consultant (the "Contractor") to provide employee engagement surveying, organizational assessment and benchmarking, as well as consulting services to translate survey and assessment findings into measurable organizational improvements. For full solicitation details download all the attached documents. Introduction Summary Background Contact Information Timeline Vendor Submissions Attachments Evaluation Criteria

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Addendum#1 - Download for full details. 1.revised Q&A and submission due dates 2. Revisions to RFP document to include order of submittal requirements and adjustments to contract term.

  • Addendum #2 · 2

    Please use the See What Changed link to view all the changes made by this addendum.

Public questions and answers
  • Should pricing be uploaded as a separate file from the technical proposal, or entered in an OpenGov price table?

    The pricing should be submitted under the proposal and may be submitted as a separate document as the Offeror chooses. There is not an OpenGov price table. Please see submittal requirements.

  • Should pricing include one in-person findings presentation per survey administration, or additional on-site presentations, workshops, or visits? (Section I, Survey Results, p. 6; Section IV.VI, pp. 21-22.)

    This is up to the Offerors pricing model. Please see pricing submittal requirements.

  • For offerors required to obtain Virginia SCC authorization, must authorization be complete at proposal submission, or may it be completed before award? (Cover page, p. 1; Section II.J, p. 9; Attachment F, p. 31.)

    SCC authorization must be completed prior to contract execution and implementation. SCC authorization can take time to complete, and delays may result in using a different vendor.

  • Attachment H (IT requirements) is cited in Section I but is not attached. Please post it. Recent City solicitations (for example 11218-0-2027 and 11128-0-2027) use a technology requirements matrix that makes StateRAMP capability mandatory and FedRAMP capability preferred, and lets a vendor that is not yet certified disclose its plan and timeframe. Does that matrix apply to this RFP? If so, does a contractor-operated survey application hosted in the contiguous United States on cloud infrastructure that holds StateRAMP (now GovRAMP) and FedRAMP authorizations, with FIPS 140-2 encryption, a third-party penetration test before launch and a disclosed plan for the application's own StateRAMP status, meet the requirement?

    Please see Attachment H.

  • Attachment H (Department of Information Technology cybersecurity requirements) is referenced on page 6 but was not among the posted documents we could access. Could the City post it? Also, does the City permit the contractor to use AI-assisted tools (for example, large-language-model drafting and analysis software) for literature review, drafting and analysis, provided no identifiable employee data is entered into any external AI tool without the City's written approval and all output is reviewed by the contractor?

    AI must be in line with City AI requirements which will be uploaded as an additional attachment.

  • The City's recent technology matrix includes a requirement that money paid during a technology implementation be held in escrow until the project is complete. Please confirm that this does not apply to this contract and that the milestone invoicing and 30-day payment terms in Section I (Invoices and Payment) govern.

    This is not a technology project. Please review the scope of work and payment structure outlined in the solicitation.

  • The 2019 IT standards call for a third-party risk assessment, vulnerability scan and penetration test before a public-facing application goes live. Will the City accept reports from an independent firm the contractor selects, delivered before the survey launches? Does City IT also need to review the system itself before launch, and if so, how much time should offerors allow in the schedule?

    City IT supplies the file of employee contacts. This is delivered to the vendor upon assurance to IT Security that the vendor has sufficient safeguards in place to protect employee information (PPI)

  • The City's recent technology matrix requires single sign-on with the City's Active Directory, RSA and Microsoft Entra, with City-managed multi-factor authentication. For City staff who administer the survey or view results, please confirm the same applies here and that the City will register the survey system as an application in its identity tenant. Survey respondents would not sign in with their identity.

    Under this proposal, City staff are not administering the survey. Survey results provided by the vendor to the city are managed through the city's OneDrive with department leadership provided results for their department. One Drive access would involve RSA and other city managed security.

  • Does "organizational assessment" in the project summary mean work beyond the survey and its supplementary interviews or focus groups?

    "Organizational assessment" is limited to insight used by the vendor to describe strategies each department might use to address survey findings.

  • The OpenGov confirmations include a "Bid Form," but no bid form is attached. Does the itemized pricing in Tab VI satisfy it?

    There is no bid form. The City has requested offerors submit pricing proposals based on the scope of work, using the format specified in the solicitation’s submittal requirements.

  • Section IV.D lists Tab VII as Exceptions, but the detailed list makes Tab VII the Contracting and Employment Outreach Plan and Tab VIII Exceptions. Which order should offerors follow? Is the Outreach Plan required or optional?

    The order of sections will be corrected in the document; however, the order should be: VII Contracting VIII Exceptions IX Attachments X Appendix. Outreach plan is not evaluated but is encouraged.

  • Is the in-person presentation one session? Should offerors price an in-person kickoff?

    Pricing and structure is up to Offerors to propose.

  • Will City personnel distribute and collect paper surveys, or should the contractor include all printing, distribution, return handling, and data entry in its price?

    City staff will not distribute and collect paper surveys. All costs related to paper surveys should be factored into Offeror's pricing proposal.

  • Are non-English versions needed? If so, which languages?

    Non-english versions are not needed.

  • Will City staff distribute and collect paper surveys at work sites, or should offerors price on-site administration sessions and prepaid return mail?

    City staff will not distribute and collect paper surveys. Offeror should factor costs into pricing proposal.

  • Does the City hold a survey platform license the contractor may use?

    No.

  • Pricing format: Is there a required pricing form or rate schedule, or should the consultant present its own priced structure?

    Each Offeror should present their own pricing structure. Please review submittal requirements for more details.

  • What are the City's historical survey response rates and target response rate for this administration?

    2025 response rate was 59%. Target response is 75% across all employee groups. increasing field employee response has been a challenge.

  • What languages must the survey and employee communications support?

    English

  • Is the City able to share its anticipated budget or range and the prior employee survey contract value and scope? (Section IV.VI, Pricing, pp. 21-22.)

    2025 base survey was approx. $32,340.

  • Does the City hold rights permitting the selected contractor to reuse and revise the prior survey questions? Please identify any licensing restrictions or question sets that must be retained. (Section I.B, p. 3; Survey Development, p. 4; Data Collection, p. 5.)

    No.

  • Are external national or public-sector benchmarks required, or is comparison with prior City results sufficient? Will the City provide prior CPS HR reports, de-identified datasets, and codebooks for trend analysis? (Section I.B-C, p. 3.)

    National benchmarks are not required.

  • What consulting or pulse-survey services, if any, are expected between administrations? (Section I.B, p. 3; Section III, Term, p. 13; Section IV.VI, pp. 21-22.)

    None.

  • Does the City require independently authored statistical analyses for every department, and does it have a preferred statistical method or reporting framework?

    Each department should receive a statistical analysis report specific to its employees. There is no preferred statistical method or framework. It is left up to the vendor's best judgment how to analyze and present the findings.

  • Section IV.D lists nine tabs with Exceptions as VII, while the section descriptions add a Contracting and Employment Outreach Plan as VII. Please confirm the tab order.

    see revised RFP docs and Addendum #1

  • Should the Contracting and Employment Outreach Plan appear as a separate section, as stated on page 22, despite its omission from the section outline on page 19?

    yes. corrections to the document will be made and reuploaded

  • Does the requirement for distribution within 7–10 days of April 5, 2027, mean April 12–15, or does the City intend a window around April 5?

    Ideally, the city would like the survey distributed by April 12th to ensure adequate response levels during the month of April

  • Should the total price cover the full five-year term, or should pricing be structured around individual survey administrations and associated services?

    The pricing structure is up to individual offerors. It must include all components listed under the submittal requirements with the six year term in mind. Please note addendum #1 shows the term changes to account for the timing of biennial surveys

  • For an offeror organized as a limited liability company in another state that will perform the work remotely and travel to Norfolk once for the presentation, does the City require registration with the Virginia State Corporation Commission before award? If not, is completing Attachment F Part B with that explanation, and entering 'None' for the SCC number on the cover page, acceptable?

    The contractor must be registered with the SCC to do business in Virginia.

  • If an offeror is a newly formed firm without prior comparable client projects, may it still submit a responsive proposal with fewer than three references, and will the proposal be evaluated on the remaining criteria?

    All elements of each proposal will be evaluated; however, having less than three references, as-is required by the submittal requirements may result in lower scoring and may be seen as unresponsive. To offer a competitive proposal, please submit three to five references that can speak to your work.

  • Fielding timeline: What fielding window and results-delivery date does the City expect, and are there Council or budget-cycle dates the results must meet?

    Offerors must propose their own timeline with the understanding that distribution of survey must be within 7-10 days of April 5, 2027

  • Thank you for providing the approximate cost of the 2025 base survey ($32,340). Given the additional services outlined in this RFP, including paper survey administration, department-specific reports and recommendations, and in-person presentations, has the City established a budget or anticipated funding range for the 2027 engagement?

    The City's current budget for this purchase will not be disclosed at this time.

  • Our software is hosted in the United States, and all project data would be stored in U.S.-based facilities. The team we propose for this project has experience working with other Virginia municipalities and includes consultants based in Canada. Could you confirm whether the RFP permits Canada-based consultants to work on the project under this arrangement?

    The City permits Canada based consultants as long as the work can be completed according to the scope of work and in compliance with local, state, and federal laws.

  • Does the City require a Norfolk business license for a contractor with no physical presence in Norfolk that performs the services remotely?

    The City will not require a Norfolk business license for outside contractors. However, must be organized as a stock or nonstock corporation, limited liability company, business trust, or limited partnership or registered as a registered limited liability partnership and is authorized to transact business in the Commonwealth as a domestic or foreign business entity as is required by Title 13.1 or Title 50 or as otherwise required by law.

  • How many departments are expected to receive individual two-to-four-page reports? Are these intended to be separately authored research summaries, or can structured, automatically generated reports with department-specific analysis and recommendations satisfy the requirement?

    While there are 40 departments, those with less than ten employees are typically combined into one executive report, leading to 27 separate reports. Department specific analysis and recommendations is sufficient.

  • How many full survey administrations are anticipated over the five-year contract, and should the all-inclusive price cover all of them?

    The pricing structure is up to individual offerors. It must include all components listed under the submittal requirements with the six-year term in mind. Please note addendum #1 shows the term changes to account for the timing of biennial surveys.

  • Will the City provide prior survey results, survey instruments, and response data to support trend analysis? Are there specific historical measures that must remain comparable?

    None of have been identified at this time

  • Approximately how many employees require paper surveys or lack individual email access, which survey languages are needed, and will the City provide shared devices or kiosks and assist with paper distribution and collection? (Section I.C, p. 4; Survey Execution, p. 5.)

    Approximately 400 employees will need paper surveys. Some of this group may access via their phone app, depending upon ease of use of such an app

  • How many departments and other organizational units require separate reports, and are there required subgroup breakdowns or minimum reporting thresholds to protect confidentiality? (Section I, Survey Execution and Survey Results, pp. 5-6.)

    While there are 40 departments, those with less than ten employees are combined into one executive report, leading to 27 separate reports.

  • May the in-person presentation of findings be combined with a virtual option for leaders who cannot attend, and is one in-person presentation sufficient?

    This will be discussed during negotiations.

  • What historical survey instruments and results will be available for trend analysis and benchmarking?

    Historical trends may be discussed during oral presentations or after award.

  • Given the City's clarification that it does not hold rights to reuse or revise the prior survey questions, please identify what historical survey information will be made available to the selected Contractor, including aggregate results, de-identified datasets, construct definitions, scoring methodologies, and departmental reports. Will the City accept a newly developed, research-based survey instrument that measures comparable organizational constructs without reproducing proprietary questions from the previous survey?

    The city welcomes new research-based survey instruments but must be in line with the scope of work. The City may discuss historical data at oral presentations or upon award, whichever is deemed appropriate by the evaluators and end-users.

  • For non-exempt employees, does the City require the survey to be completed during paid work hours?

    Offerors should provide us with a proposal that addresses response challenges to include non-exempt employee responses.

  • Please give headcount by department, the number of departments that need a 2 to 4 page report, and an estimate of employees without regular computer access.

    Total current headcount for those employees to be surveyed is 4,163. Departments with less than 10 employees will be combined, leading to a total of 27 reports.

  • Will the City share the prior survey instrument and results so trend items can be kept and compared?

    The City may choose to share prior survey instrument and results later in the process or upon award.

  • The solicitation requests references for projects comparable in size, scope, and complexity. Will the City consider relevant organizational research, employee engagement, survey development, statistical analysis, and organizational assessment experience performed by proposed key personnel during prior professional engagements, including experience gained before joining the Offeror? Additionally, may Offerors demonstrate comparable qualifications through a combination of projects that collectively establish the required research, survey administration, organizational assessment, and enterprise-scale delivery capabilities?

    Yes.

  • As In Earth Consulting LLC is currently a Texas-based entity not yet registered in Virginia, can the City confirm that full registration as a foreign business entity with the Virginia State Corporation Commission is not required at the time of proposal submission, and that winning offerors are permitted to complete this registration post-award prior to contract execution?

    Winning offerors may complete registration with the SCC prior to contract execution; however, registration may take a few days to a few weeks. Delays may result in the City opting to award a vendor who is already registered with the VSCC.

  • Section I (Scope of Services, Item 6, page 5) notes that hard copies may need to be distributed to employees with limited computer access. Approximately what percentage or headcount of the 4,000+ employees require paper surveys, and will the City assist with internal physical distribution and collection points across municipal departments?

    Approximately 400 employees will need hard copies. City will not assist with distribution and collection of paper surveys.

  • Who is the incumbent vendor currently providing these biennial employee satisfaction survey and assessment services, and what was the total contract value or historical cost paid for the most recent preceding contract?

    incumbent is CPS HR. In 2025 base survey was $32,340.

  • Will the winning contractor be expected to maintain exact longitudinal question items from previous biennial surveys to preserve multi-year trend analysis, or will there be flexibility to update and re-validate the core question constructs?

    No. Updated and revised questions may be considered. City shall review and approve before questions are included in the survey to be distributed.

Plain text

OpenGov categories

  • 91865 · Human Relations Consulting