The California Vehicle Code requires engineering and traffic surveys be completed to support radar enforcement of prima facie speed limits for non-local streets below 65 mph and for narrow streets below 25 mph. The Town of Los Gatos needs to renew the engineering and traffic surveys supporting its speed limits to continue radar enforcement. The selected consultant shall conduct a Townwide Speed Survey and prepare an engineering evaluation and recommendations for existing speed limits on 65 Town-identified roadway segments , consisting of: 31 high-volume segments ; and 34 low-volume segments . Consultant shall review three years of accident history for each street segment. Consultant shall also drive and field check each street segment to evaluate the appropriateness of speed limits and for purpose of selecting survey location. All relevant information will be included in the report as a basis for the recommendation. Consultant shall provide field notes, full speed survey data, a summary table, and prepare a report of final recommendation. Town staff will review and sign the report of final recommendation. Tube Counts for Low-Volume Segments Radar Speed Surveys for High-Volume Segments Evaluation of Speed Reductions in Town School Zones Final Report and Recommendations Scope of Work Scope of Work A . PURPOSE The Town of Los Gatos (Town) is seeking a qualified transportation engineering firm with demonstrated experience conducting engineering and traffic surveys and establishing speed-limit recommendations in California. The selected consultant shall conduct a Townwide Speed Survey and prepare an engineering evaluation and recommendations for existing speed limits on 65 Town-identified roadway segments , consisting of: 31 high-volume segments ; and 34 low-volume segments . The consultant shall also evaluate all existing Town school zones for potential speed-limit reductions pursuant to applicable California law, including Assembly Bill 382 (AB 382). The consultant shall be responsible for conducting the professional engineering investigation, data collection, analysis, and evaluation necessary to provide the Town with defensible recommended speed limits. B. SCOPE OF SERVICES The selected consultant shall provide all professional services necessary to complete the Townwide Speed Survey, engineering and traffic evaluation, school-zone review, and final recommendations. The Town has already identified the 65 roadway segments to be evaluated: No. STREET SEGMENT MEASUREMENT 1 Andrews Street Hose 24-hour (one counter and two hoses) University Avenue to West Town Limits 2 Bella Vista Avenue Hose 24-hour (one counter and two hoses) New York Avenue to Caldwell Avenue 3 *Bicknell Road (Eastbound Direction in Monte Sereno) Radar 100 Sample minimum per location Quito Road to Montclair Road 4 *Blossom Hill Road Radar 100 Sample minimum per location Camino Del Cerro to East Town Limits 5 *Capri Drive Radar 100 Sample minimum per location Knowles Drive to North Town Limits 6 Carlton Drive Radar 100 Sample minimum per location Gateway to Town Limits 7 Carlton Drive Radar 100 Sample minimum per location Los Gatos Almaden Road to Gateway 8 Charles Street Hose 24-hour (one counter and two hoses) Bella Vista Avenue to Los Gatos Blvd 9 Cherry Blossom Lane Hose 24-hour (one counter and two hoses) Shannon Road to Blossom Hill Road 10 Cleland Avenue Hose 24-hour (one counter and two hoses) Reservoir Road to Kimble Avenue 11 College Avenue Hose 24-hour (one counter and two hoses) East Main Street to Prospect Road 12 Cypress Way Hose 24-hour (one counter and two hoses) Spring Street to End 13 Foster Road Hose 24-hour (one counter and two hoses) Johnson Avenue to End 14 Glenridge Drive Hose 24-hour (one counter and two hoses) Pennsylvania Avenue to Bachman Avenue 15 Harwood Road Hose 24-hour (one counter and two hoses) Blossom Hill Road to South End 16 Hernandez Avenue Hose 24-hour (one counter and two hoses) Glenridge Drive to West Town Limits 17 Hicks Road Hose 24-hour (one counter and two hoses) Shannon Road to North Town Limits 18 Hilow Road Hose 24-hour (one counter and two hoses) Cardinal Lane to Shannon Road 19 Jackson Street Hose 24-hour (one counter and two hoses) Oak Hill Way to Central Avenue 20 Kennedy Road Hose 24-hour (one counter and two hoses) Los Gatos Blvd to 1900 feet east of Forrester Road 21 Kennedy Road Hose 24-hour (one counter and two hoses) 1900 Feet East of Forrester Road to East Town Limits 22 Kimble Avenue Hose 24-hour (one counter and two hoses) Cleland Avenue to Prospect Avenue 23 Knowles Drive Radar 100 Sample minimum per location Pollard Road to Winchester Blvd 24 Knowles Drive Hose 24-hour (one counter and two hoses) Winchester Blvd to Dell Avenue 25 Lark Avenue Radar 100 Sample minimum per location Winchester Blvd to Los Gatos Blvd 26 Loma Alta Avenue Hose 24-hour (one counter and two hoses) Los Gatos Blvd to Cypress Way 27 Los Gatos Almaden Road Radar 100 Sample minimum per location Los Gato Blvd to East Town Limits 28 Los Gatos Blvd Radar 100 Sample minimum per location Alpine Avenue to Roberts Road East 29 Los Gatos Blvd Radar 100 Sample minimum per location Roberts Road East to North Town Limits 30 Los Gatos Saratoga Road (SR 9) Radar 100 Sample minimum per location Los Gatos Blvd to SR 17 31 East Main Street Radar 100 Sample minimum per location Hwy 17 to Alpine Avenue 32 West Main Street Radar 100 Sample minimum per location Bayview Drive to Hwy 17 33 Marchmont Drive Hose 24-hour (one counter and two hoses) Hilow Drive to East End 34 Massol Avenue Hose 24-hour (one counter and two hoses) Los Gatos-Saratoga Road to Bean Avenue 35 Montclair Road Hose 24-hour (one counter and two hoses) Quito Road to Bicknell Road 36 More Avenue Radar 100 Sample minimum per location Bicknell Road to Pollard Road 37 National Avenue Radar 100 Sample minimum per location Los Gatos Almaden Road to Samaritan Drive 38 Nino Avenue Radar 100 Sample minimum per location Los Gatos Blvd to End 39 Oka Road Hose 24-hour (one counter and two hoses) Lark Avenue to Mozart Avenue 40 Old Blossom Hill Road Hose 24-hour (one counter and two hoses) West End to East End at Blossom Hill Road 41 Pennsylvania Avenue Hose 24-hour (one counter and two hoses) Wissahickon Avenue to Bayview Drive 42 Phillips Avenue Hose 24-hour (one counter and two hoses) Cypress Way to South Kennedy Road 43 Pleasant Street E Main St/Los Gatos Blvd to New York Avenue New - Hose 24-hour (one counter and two hoses) 44 *Pollard Road (Westbound Direction in Campbell) Radar 100 Sample minimum per location West Town Limits to Elwood Drive 45 *Pollard Road (Westbound Direction in Campbell) Radar 100 Sample minimum per location Elwood Drive to Burrows Avenue 46 Pollard Road Radar 100 Sample minimum per location Burrows Avenue to Knowles Drive 47 *Quito Road Radar 100 Sample minimum per location Pollard Road to Bicknell Road 48 Reservoir Road Hose 24-hour (one counter and two hoses) Cleland Avenue to Prospect Avenue 49 South Santa Cruz Avenue Radar 100 Sample minimum per location Main Street to SR 17 Ramp 50 North Santa Cruz Radar 100 Sample minimum per location Main Street to Los Gatos-Saratoga Road 51 Shannon Road Radar 100 Sample minimum per location Los Gatos Blvd to Short Road 52 Short Road Hose 24-hour (one counter and two hoses) Shanno Instructions to Proposers Proposal documents The Project Documents, including this RFP are available via the Town’s bidding site at https://procurement.opengov.com/portal/losgatosca . The Town is not responsible for the completeness of Project Documents located through another service. Submission of Bid Proposals The Town will accept electronic proposals only, in response to this RFP submitted on or before Friday, November 27, 2026 at 5:00 pm through the bidding portal: https://procurement.opengov.com/portal/losgatosca which time the proposals will be opened electronically. Pre-Proposal Conference and Site Tour There will be no pre-proposal conference or site tour for this Request for Proposals. Prospective bidders are encouraged to perform independent site tours. Examination of Proposal Documents The submission of a proposal shall be deemed a representation and certification by the Proposer that they: Have carefully read and fully understand the information that was provided by the Town to serve as the basis for submission of this proposal. Have the capability to successfully undertake and complete the responsibilities and obligations of the proposal being submitted. Represent that all information contained in the proposal is true and correct. Did not, in any way, collude, conspire to agree, directly or indirectly, with any person, firm, corporation or other Proposer in regard to the amount, terms or conditions of this proposal. Acknowledge that the Town has the right to make any inquiry it deems appropriate to substantiate or supplement information supplied by Proposer, and Proposer hereby grants the Town permission to make these inquiries, and to provide any and all related documentation in a timely manner. Modification of Proposal No request for modification of the proposal shall be considered after its submission on grounds that Proposer was not fully informed of any fact or condition. Questions Any questions by the Proposer regarding this RFP or the project must be submitted through bidding portal https://procurement.opengov.com/portal/losgatosca and received by the Town no later than 3:00 pm on Friday, November 13, 2026 The Town shall not be responsible for nor be bound by any oral instructions, interpretations, or explanations issued by the Town or its representatives. Responses from the Town to questions by any Proposer will be communicated via addendum to all recipients of this RFP. Questions received after the date and time stated above will not be accepted and will be returned to sender/s without response. Addenda Any addenda issued by Town shall be in writing, shall be posted to the town's bidding website https://procurement.opengov.com/portal/losgatosca , shall become a part of this RFP, and shall be acknowledged and responded to by Proposer. Withdrawal of Proposal A Proposer may withdraw its proposal at any time before the expiration of the time for submission of proposals as provided in the RFP by delivering a written request for withdrawal signed by, or on behalf of, the Proposer. Required Information INFORMATION REQUIRED TO BE SUBMITTED WITH THE PROPOSAL These guidelines govern the format and content of the Proposal. The intent of the RFP is to encourage responses that clearly communicate the Proposer’s understanding of the Town’s requirements and the Proposer’s ability to meet those requirements. The proposal shall be limited to thirty (30) pages excluding resumes. The Proposal should include the following information: Cover letter describing how the Proposer can meet the needs of the Town and stating all deviations or exceptions if any. Scope of Services using information in Scope of Work as the basis for work. Hourly rates for staff assigned to the Project, Relevant experience and expertise of the firm. Identification of the project team, including the main project contact. Resumes for the project team identifying relevant experience. Other relevant information to assist the Town in its selection. Any deviations to the attached Sample Contract for Professional Services. References from other agencies where a similar service was provided. REQUIRED QUALIFICATIONS The selected firm shall be a qualified transportation engineering firm with substantial experience conducting engineering and traffic surveys and developing speed-limit recommendations for California public agencies. The firm shall demonstrate: Experience establishing, evaluating, and modifying speed limits under the California Vehicle Code and CA MUTCD; Experience conducting speed surveys on both high-volume and low-volume roadways; Experience evaluating 85th-percentile speeds and other speed statistics; Experience obtaining and evaluating collision history and roadway safety information; Experience evaluating school-zone speed limits and applicable California statutory requirements; Experience preparing engineering documentation supporting speed-limit changes for California cities, counties, or other public agencies; and A California-licensed Professional Engineer qualified in traffic engineering who will be responsible for the engineering evaluation and final recommendations. The Proposer shall have demonstrated experience within the previous five (5) years preparing traffic surveys or comparable speed-limit studies for California public agencies, including studies involving the establishment or modification of speed limits based on speed survey data, collision history, roadway characteristics, and applicable California law. Evaluation, Selection and Award Process NEGOTIATIONS Upon the Town’s final ranking of Proposals, the Proposers shall be prepared to enter into the Agreement. The Town will first begin negotiations with the top-ranked Proposer(s). If the Town and the top-ranked Proposer(s) do not reach an agreement, then the Town may negotiate with the next highest-ranked Proposer. This process will continue until the Town reaches an agreement with a Proposer(s) or terminates the procurement. The Town may begin negotiating with the next highest-ranked Proposer whenever the Town determines that doing so is in its best interest, and the Town may negotiate with more than one Proposer at the same time. The failure of the highest-ranked Proposer to comply with any of the requirements of this section shall constitute grounds for the Town to negotiate the Agreement with the next top-ranked Proposer. Upon completion of successful negotiations, the Town will notify all Proposers of the outcome and staff's proposed recommendation for Award. Evaluation, Selection and Award Process RFP responses will be evaluated and ranked according to the evaluation criteria identified below by an evaluation committee composed of Town staff. After the initial proposal evaluation, the Town may determine that additional information is needed to establish the final ranking of proposers. The semi-finalists may be contacted and asked to: Conduct a scenario-based demonstration of the equipment or service; Revise the submitted proposal for the purpose of obtaining best and final offers; and/or Provide additional information to assist the Town in determining the best value proposer. The Evaluation Committee will use all information collected to rank the ability of each Proposer to best meet the requirements of the Town. Proposals will be evaluated in two phases: Phase I based on Responsiveness (Pass/Fail) Phase II based on completeness, of proposal, qualifications of the Firm and Team, Expertise, experience and References (points) as per the Scoring Scale set forth in the evaluation criteria. Evaluation and scoring of Proposals will be based on how likely the Proposal content meets or exceeds performance requirements for this RFP. Each criterion has an assigned number of possible points and is divided into multiple sub-criteria. The sub-criteria are not equally weighted. The Proposal Narrative must respond to each sub-criterion, unless otherwise indicated. The total maximum score for the evaluation of Proposals is one hundred points (100) The proposals will be evaluated using the following interpretation guidelines: Interpretation Guidelines for Ranking Criteria Scoring Scale % of Possible Points Interpretation Explanation for Percentage Points 0% Not Responsive Response does not include or fails to address the requirements being scored. The omission(s), flaw(s), or defect(s) are significant and unacceptable. 10-30% Minimally Responsive Response minimally addresses the requirements being scored. The omission(s), flaw(s), or defect(s) are significant and unacceptable. 40-60% Inadequate Response addresses the requirements being scored, but there are one or more omissions, flaws, or defects or the requirements are addressed in such a limited way that it results in a low degree of confidence in the proposed solution. 70% Adequate Response adequately addresses the requirements being scored. Any omission(s), flaw(s), or defect(s) are inconsequential and acceptable. 75% Between Adequate and Good Response better than adequately addresses the requirements being scored. Any omission(s), flaw(s), or defect(s) are inconsequential and acceptable. 80% Good Response fully addresses the requirements being scored with a good degree of confidence in the Proposer’s response or proposed solution. No identified omission(s), flaw(s), or defect(s). Any identified weaknesses are minimal, inconsequential, and acceptable. 85% Between Good and Excellent Response fully addresses the requirements being scored with a better than good degree of confidence in the Proposer’s response or proposed solution. No identified omission(s), flaw(s), or defect(s). Any identified weaknesses are minimal, inconsequential, and acceptable. 90% Excellent Response fully addresses the requirements being scored with a high degree of confidence in the Proposer’s response or proposed solution. Proposer offers one or more enhancing features, methods or approaches exceeding basic expectations. 95% Between Excellent and Exceptional Response fully addresses the requirements being scored with a better than excellent degree of confidence in the Proposer’s response or proposed solution. Proposer offers one or more enhancing features, methods or approaches exceeding basic expectations. 100% Exceptional All requirements are addressed with the highest degree of confidence in the Proposer’s response or proposed solution. The response exceeds the requirements in providing multiple enhancing features, a creative approach, or an exceptional solution. Evaluation Criteria Agreement & Payment Agreement Type and Payment Method It is anticipated that the Agreement resulting from this RFP, if awarded, will be an Agreement for Professional Services as shown in the Sample Agreement under Attachments. The method of payment to the successful Proposer shall be for services provided based on established rates for services with a maximum “not to exceed” fee as set by the Proposer in the Proposal or as negotiated between the Proposer and the Town as being the maximum cost to perform all work. This figure shall include direct costs and overhead, such as, but not limited to, materials, delivery, transportation, communications, and any subcontracted items of work. Proposers shall be prepared to accept the terms and conditions of the Agreement, including Insurance Requirements. If a Proposer desires to take exception to the Agreement, Proposer shall provide the following information in the Cover Letter of their submittal package: Clearly identify each proposed change to the Agreement, including all relevant Attachments. Furnish the reasons for each proposed change, as well as specific recommendations for alternative language. The above factors will be taken into account in evaluating Proposals. Proposals that take exceptions to the proposed Agreement may be determined by the Town, at its sole discretion, to be unacceptable and no longer considered for award. Term of Agreement The term of this Agreement is for One (1) year period beginning January 2027 , with no option to renew the Agreement. Agreement Implementation Upon award notification and prior to final Agreement approval, the successful proposer will be required to submit: Proof of insurance compliance documentation as specified herein Documentation of all credentials necessary to legally perform the Project specified A completed W9 form and, if applicable, non-resident withholding exemption form, if not already on file with the Town Proof of a current Town of Los Gatos Business Tax Certificate The finalized Agreement will be in the form included

Published attachments
Addenda and notices
  • Addendum #1 · 1

    ADDENDUM – EXTENSION OF PROPOSAL SUBMITTAL DEADLINE The proposal submittal deadline identified in the Request for Proposals (RFP) is hereby extended from November 27, 2026, at 5:00 p.m. to November 30, 2026, at 5:00 p.m. All proposals must be received by the revised deadline. All other requirements, terms, and conditions of the RFP remain unchanged and in full force and effect.

Public questions and answers
  • Will the Town allow for the establishment of AB43 - Safety Corridors as part of its Engineering & Traffic Survey recommendations to reduce the number of speed limit increases where appropriate?

    The Town is not requesting the review of speed reductions related to AB43. The Town is only requesting the review of speed limits in school zones as allowed by AB382.

  • Will the Town allow the use of mechanical tube counters for all traffic data collection? The Bi-Directional 24 Hr Raw Tube Count Data can introduce efficiencies in the data collection cost by reducing manual radar surveys and the data can support annual crash rate calculations typically included within Engineering & Traffic Surveys.

    Tubes can be used on single lane roadways so long as it can be confirmed that free flow speed is being measured. Radar observations need to be used for multi-lane roads.

  • Would the Town be willing to extend the due date due to the Thanksgiving holiday?

    Yes, the due date will be extended to Monday November 30 at 5:00 pm.

  • For the School-Zone Speed Limit Review, would the Town like recommendations identifying needed signing, striping, roadway, or administrative changes, or should the scope also include detailed work order exhibits showing the recommended signing and striping changes?

    The recommendation should include needed sign changes and any other striping or roadway improvements recommended for the reduced speed limits, if any. No detailed work order is needed.

  • Would the Town like us to evaluate a Townwide safety corridor analysis qualifying roadway segments for additional 5 mph speed-limit reductions under AB 43?

    No, the request is only to evaluate needed speed limit reductions around school zones as allowed by AB382.

  • The scope calls for radar speed surveys at the 31 high-volume segments but does not mention ADT data collection at those locations. Does the Town have recent ADT counts for these segments, or should we include ADT counts in our data collection? We typically collect both speed and volume data for an E&TS. ADT data would also allow us to calculate collision rates and compare them with Caltrans statewide average rates for similar roadways.

    ADT counts are needed for the E&TS evaluation. Tube counts can be used for single lane roads so long as speeds are evaluated on free-flow traffic. Radar speed surveys shall be used for multi-lane roads.

  • Section 9, Question 6 of the Vendor Questionnaire requests 'expertise in biological monitoring on federally funded projects.' Can the Town confirm this is an administrative clerical error and that biological monitoring qualifications are not required for this Engineering and Traffic Survey procurement?

    This is indeed a clerical error. Item 6 should only request the submittal of "Relavant experience and expertise of the firm."

  • For the five roadway segments shared with adjacent jurisdictions (Monte Sereno and Campbell), will the Town of Los Gatos lead inter-agency coordination regarding radar enforcement consensus, or is the consultant expected to facilitate separate agency approvals and meetings?

    The Town will coordinate with Monte Sereno and Campbell.

  • Can it be assumed that any encroachment permit fees associated with the installation and removal of counting devices will be waved by the Town of Los Gatos?

    Yes, there will be no encroachment permit or fee for the installation of the tubes in the right-of-way.

  • Section 1.1.F notes presentations to Town staff and/or Town Council if requested. How many formal public hearings or council presentations should be accounted for in the base lump-sum scope?

    Assume one Town Council meeting for the bid.

  • The RFP expressly requires professional engineering services; therefore, California Civil Code §2782.8 applies. As currently written, the indemnification provision is overly broad and does not limit the Consultant's obligations to its own negligence, recklessness, or willful misconduct. Consequently, the provision could require the Consultant to assume liability and defense obligations beyond its proportionate percentage of fault, contrary to California Civil Code §2782.8. Will the Town revise Section III(E) to comply with California Civil Code §2782.8 by limiting the Consultant's indemnification and defense obligations to the extent caused by its negligence, recklessness, or willful misconduct, and ensuring that such obligations do not exceed its proportionate percentage of fault?

    We will consult with our Town Attorney on this question. If awarded the agreement, this can be changed if approved by our attorney.

  • Do the reference and subconsultant forms count toward the page limit?

    No.