Etnies Skatepark Improvement Project (25P03)
Description
Etnies Skatepark Improvement Project (25P03) Professional Design Services for the Etnies Skatepark Improvement Project (25P03) The City is seeking proposals from qualified consultant teams to provide Professional Design Services for the Etnies Skatepark Improvements (25P03) . The Prime Consultant may be either a civil engineering firm or a skatepark design firm and shall provide a team with demonstrated experience in public skatepark design, municipal civil engineering, and public art. The Consultant shall build upon the preliminary concept designs and develop a single final concept that addresses the needs of the community and City. No additional public outreach is anticipated. The Project generally includes renovation of selected existing skatepark areas and features, construction of a new concrete pump track on the eastern portion of the site, public art design and integration, and associated site improvements identified in the preliminary concepts. The completed Project is intended to accommodate all wheel nonmotorized use, provide additional opportunities for beginner and intermediate users, retain opportunities for advanced users, and maintain the facility as one of the largest public skateparks in California. Renovations to the existing skatepark building that supports facility operations are being designed under a separate contract and will require coordination with this Project. ETNIES SKATEPARK IMPROVEMENTS Project Management and Coordination Existing Conditions, Survey, Utility Investigation, and Potholing Geotechnical Investigation Environmental Review and Documentation Drainage, Water Quality, and Project Permitting Final Concept Design 60% Plans, Specifications, and Estimate 90% Plans, Specifications, and Estimate Final Bid Ready PS&E and Renderings Bidding Support Construction Support Record Drawings CONSULTANT HOURLY RATES Position 1 Position 2 Position 3 Position 4 Position 5 Position 6 Position 7 Position 8 Position 9 Position 10 Scope of Work Etnies Skatepark Improvements The Consultant shall assemble a qualified team and provide the services necessary to prepare a complete, coordinated, permit ready, bid ready, and constructible design. The Consultant shall review the preliminary concept designs, available record drawings, and site conditions; conduct field reconnaissance; and include any additional services reasonably necessary to complete the Project. The Consultant shall build upon the City provided preliminary concept designs, develop one final concept for City approval, and prepare a single coordinated construction package unless otherwise authorized by the City. No additional public outreach is anticipated. The Lead Skatepark Designer shall remain actively involved through final concept design, PS&E, bidding, and construction support. The Public Art Lead shall develop the public art design and coordinate its incorporation into the construction documents. Anticipated design services include: Project management, coordination, scheduling, and quality control. Records research, field reconnaissance, topographic survey, utility investigation, potholing, and geotechnical investigation. Environmental review, drainage and water quality analysis, utility coordination, and permitting assistance. Final concept design and City approval before proceeding with plans, specifications, and estimates. 60%, 90%, and final bid ready plans, specifications, and estimates. Bidding support, Construction Support Services, final renderings, and record drawings. The desired skateable area and related site improvements shown in the preliminary concepts are anticipated to include: A new all wheel pump track. Street Lane and Street Plaza improvements. Removal and replacement of the existing Cradle with an island feature. Mini Bowl, Clover Bowl, and Flow Bowl improvements. Drainage improvements. Site amenity improvements and public art design and integration. Modification or replacement of the existing monument sign to reflect the approved facility name and branding. Accessibility improvements. GENERAL DESIGN REQUIREMENTS The Consultant shall provide a complete, coordinated interdisciplinary design that complies with applicable federal, state, and local requirements; City standards; adopted building and accessibility codes; and applicable Low Impact Development and water quality requirements. Improvements shall be durable, low maintenance, and suitable for a heavily used public facility. The Consultant shall evaluate accessibility throughout the Project limits, including accessible routes and path of travel improvements affected by the work. The design shall also address safe circulation, construction access and staging, protection of improvements to remain, and construction phasing to maintain operation of the facility to the greatest extent practicable. The existing time capsule shown on the City provided record drawings will be affected by the Project. The Consultant may rely on the location shown in the record drawings for design purposes and shall coordinate with the City and include the plans, details, specifications, and other requirements necessary for its protection, temporary removal, relocation, and reinstallation. The time capsule shall not be opened unless directed by the City. Design of the existing building, site lighting, electrical, and public address system improvements is being performed under a separate contract and is not included in this Scope of Work. The Consultant shall coordinate with the building improvement consultant to avoid conflicts. Electrical design shall be included only when required for drainage, utility relocations, monument signage or impacts resulting from this Project. TASK 1 — PROJECT MANAGEMENT AND COORDINATION The Consultant shall be responsible for the overall management, coordination, schedule, budget, and quality of the work performed by the Consultant and its subconsultants. The Project Manager shall serve as the City’s primary point of contact and coordinate with City staff, Community Services, the concurrent building improvement consultant, utility owners, affected agencies, and other parties necessary to complete the Project. Project management shall include: One project kickoff meeting and monthly progress meetings with City staff through design. Meeting agendas, minutes, and action item tracking. A Critical Path Method schedule identifying tasks, durations, dependencies, submittals, City review periods, permits and approvals, and major milestones. The schedule shall be updated monthly and when significant changes occur. Monthly progress reports submitted with invoices summarizing work completed, upcoming activities, outstanding decisions, schedule status, and budget status. Coordination among all disciplines and subconsultants to identify and resolve conflicts before each formal submittal. Documented internal quality assurance and quality control before each formal submittal. The Consultant shall identify its assumptions for meetings, site visits, coordination, and other project management activities in its proposal and resource allocation table. TASK 2 – EXISTING CONDITIONS, SURVEY, UTILITY INVESTIGATION, AND POTHOLING The Consultant shall review available record drawings, concept materials, prior reports, utility records, survey information, and other City provided documents. The Consultant shall conduct site reconnaissance and field verification sufficient to identify existing conditions that may affect design or construction. The Consultant shall prepare a topographic survey and base map covering the existing skatepark, proposed pump track area, affected accessible routes and paths of travel, anticipated grading and drainage areas, utility connections or relocations, construction access and staging areas, and other limits necessary to complete the design. A boundary survey is not anticipated to be required. The survey and base map shall include, as applicable: Horizontal and vertical control, benchmarks, Introduction Summary Background Contact Information Timeline The following timeline shows the anticipated schedule for the RFP. The City expects, but does not guarantee, that the contract award will be made by the City Council on the date indicated below. All schedules and timelines are subject to related and required approvals. General Information GENERAL REQUIREMENTS The City of Lake Forest ("City") seeks proposals ("Proposals") from qualified firms ("Respondents") for Etnies Skatepark Improvement Project (25P03) . Responses must conform with the requirements of this Request for Proposal ("RFP"). The City reserves the right to waive any irregularity in any proposal or to reject any proposal which does not comply with this RFP. Modifications to the RFP, including, but not limited to the scope of work, can be made only by written addendum issued by the City. Selection of the proposer will be made solely by the City on criteria determined by the City. The successful Respondent will be required to enter into an Agreement (incorporated herein as Attachment A) which will include the requirements of this RFP as well as other requirements. By submitting a Proposal, the Respondent agrees to all of the terms of the RFP and Agreement. The City reserves the right to reject any proposal(s) exceptions or changes to the Agreement or Request for Proposal. The services are expected to be completed within three years from contract award. The City anticipates awarding a contract with an initial term of January 20, 2027 to January 19, 2030 . The City will have the option, at its sole discretion, to extend the agreement for up to two (2) additional one year terms. If the parties are unable to reach an agreement, the City, at its sole discretion, will not move forward with the renewal option and shall re-procure the work. PROJECT DESCRIPTION Project Description The City is seeking Professional Design Services for the Etnies Skatepark Improvements (25P03) Project. PRE-PROPOSAL MEETING No Pre-Proposal Meeting There will be no pre-proposal meeting for this RFP. REQUESTS FOR CLARIFICATIONS All questions, requests for interpretations or clarifications, either administrative or technical must be requested via the City's eProcurement Q&A feature. All written questions will be answered in writing and conveyed to all interested firms. Oral statements regarding this RFP by any persons should be considered unverified information unless confirmed in writing. To ensure a response, questions must be received before 3:00 pm on Wednesday, November 18, 2026 . SCOPE OF REQUIRED SERVICES Scope of Work A detailed Scope of Work is provided under the Scope of Work section. The Respondent will be expected to fulfill, at a minimum, the services and technical requirements described in the Scope of Work . Upon final selection, the Scope of Work may be modified and refined during negotiations with the City. RFP - Proposal Requirements PROPOSAL CONTENT Respondent's Proposal shall be clear, accurate, and comprehensive. Excessive or irrelevant materials will not be favorably received. The content and sequence of the information contained in each copy of the proposal shall be as follows: Summary Sheet Include a fully-completed copy of the Summary Sheet included with this RFP (To be completed as part of the Vendor Questionnaire). Table of Contents Include a clear identification of the material by section and by page number. Letter of Transmittal Identify Respondent's legal name and contact information, including corporate office and local office address, telephone number, fax number, web site address, and e-mail address. Summarize key elements of the proposal. The letter must stipulate that the cost proposal will remain valid for a period of at least 180 days. The letter shall be signed by an individual or individuals authorized to execute legal documents on behalf of the Respondent. Key Personnel Identify the names, qualifications, availability, experience, and applicable professional licenses of the key personnel assigned to the Project. At a minimum, identify the Project Manager, QA/QC Lead, Civil Engineering Lead, Lead Skatepark Designer, Public Art Lead, and key subconsultant personnel. For each discipline requiring professional licensure, identify the California licensed professional responsible for the work and for signing and sealing the applicable construction documents. Include a resume for each key person. Provide an organization chart showing each firm’s role and the responsibilities of key personnel. Describe the Lead Skatepark Designer’s involvement throughout final concept design, PS&E, bidding, and construction support. Respondent shall also identify a Management Contact (Representative authorized to sign an agreement for your firm) and a Project Manager (person responsible for day-to-day management of the project). The successful Respondent may only change the Management Contact, Project Manager, and other supporting key personnel with prior written permission from the City. Project Management/Schedule Provide a project management work plan, including a detailed task breakdown and a separate Critical Path Method (CPM) schedule for services that you believe are appropriate per the Scope of Work. Describe how the Prime Consultant will coordinate the Project Manager, Civil Engineering Lead, Lead Skatepark Designer, Public Art Lead, other disciplines, and subconsultants. Identify features, skills and/or services which distinguish your firm and make it the better choice for the City. Provide an allocation of resources identifying the proposed staff and hours assigned to each task. An example of an Allocation of Resources is provided below. A proposer may customize the resource allocation accordingly. Scope of Work Provide a detailed scope of services addressing each task in the Scope of Work described in this RFP. Proposals must address all items set forth in Scope of Work section. Clearly identify assumptions and exclusions under the applicable task. Additional scope of work, which, in your opinion, should be included must be clearly identified. Optional scope of work, if presented, should be clearly identified and included at the end of the scope of work and cost proposal. Experience and Qualifications List of Representative Projects - For each project, provide the project name, location, owner, brief description, construction cost, completion date and status, firm and key personnel roles, and owner contact. Include photographs for each representative project. Qualifications of Prime Consultant and Key Personnel Prime Consultant and Project Manager: Provide a minimum of three (3) public skatepark design projects. At least two (2) must have been constructed within the last five (5) years. For those two (2) projects, the Prime Consultant must have served as the prime consultant or lead skatepark design firm, or the Prime Consultant's proposed Project Manager must have served as the project manager. The Prime Consultant may not rely solely on a subconsultant to meet this requirement. Lead Skatepark Designer: Provide a minimum of three (3) public concrete skatepark projects for which the proposed lead skatepark designer personally led the design. At least two (2) must have been constructed within the last five (5) years. Civil Engineering Lead: The proposed Civil Engineering Lead shall be a California licensed Civil Engineer. Provide a minimum of three (3) municipal site improvement projects completed within the last five (5) years that collectively include grading, drainage, accessibility, and utility design. At least two (2) of the projects shall involve a public park or recreation facility. Skatepark experience is preferred. Public Art Lead: Provide a minimum of three (3) completed exterior public art projects designed or led by the proposed Public Art Lead in parks or other public spaces. If applicable, the same skatepark projects may be used to demonstrate the experience of the Prime Consultant, Project Manager, and Lead Skatepark Designer. Current City Contracts - Identify all previous and current contracts with the City of Lake Forest. Include a contact name, description of services, and dates of services performed. Terminated Contracts - List all public agencies, excluding the City of Lake Forest, for which contracts were terminated in the last three (3) years. Include the organization, contact name, telephone number and brief explanation of the reason for termination. Certificate of Proposal Include a completed copy of the Certificate of Proposal included with this RFP (to be completed as part of the Vendor Questionnaire). Cost Proposal Include a detailed cost proposal for each task on a time and materials, not to exceed basis. Identify the proposed staff, hours, hourly rates, and extended costs for each task. Include proposed hourly rate schedules for the Respondent and each subconsultant. Separately identif SUBMITTAL INSTRUCTIONS Proposals must be received via the City's eProcurement Portal at https://procurement.opengov.com/portal/lakeforestca no later than 3:00 pm on Friday, December 4, 2026 . Evaluation Details Evaluation Criteria A Selection Committee comprised of City staff will evaluate and rank the proposals. Proposals will be evaluated according to the Evaluation Phases. Respondent Presentations/Interviews The City may, at its discretion, invite a shortlist of Respondents to participate in a panel interview to be held at the City. To be considered for an interview, a Respondent must receive an average score of 60 points (60%) or higher on the qualitative proposal portion of the evaluation. The City may require that Respondents prepare a presentation as part of the interview. No Respondent shall be entitled to or otherwise guaranteed an interview. Contract Award If awarded, the contract will be awarded on the basis of the evaluation criteria set forth herein. The City reserves the right to reject all proposals and to contract for services in the manner that most benefits the City including awarding more than one contract if desired. Protests In order to be considered, a protest must satisfy the following requirements: Protests based on the content of the RFP shall be submitted to the City Representative no later than ten (10) calendar days prior to the scheduled proposal submittal deadline. If necessary, the proposal submittal deadline may be extended pending a resolution of the protest. Any respondent protesting the recommended award on any ground not based upon the content of the request for proposals must file a protest with the City within three (3) calendar days after the issuance of a notice of recommendation for award. Any protest shall contain a full and complete written statement specifying in detail the grounds of the protest and the facts supporting the protest. The procedure and time limits set forth in this section are mandatory and are the sole and exclusive remedy in the event of a protest of this procurement. Failure to comply with these protest procedures shall constitute a failure to exhaust administrative remedies and a waiver of any right to further pursue the protest, including filing a Government Code Claim or legal proceedings. Evaluation Phases EVALUATION PROCEDURES Selection Committee Proposals submitted will be evaluated by a Selection Committee, appointed by the City Manager. Review of Proposals The Selection Committee will use a weighted point formula during the review process to individually score Project Proposals, as outlined in the “Project Proposal Evaluation Criteria” and the Evaluation Phases below. The Selection Committee will then be convened to review and discuss these evaluations and combine the individual scores to arrive at an average composite Project Proposal score for each firm. Firms that do not meet “Mandatory Elements” listed below will be eliminated from further consideration. After th
Published attachments
Addenda and notices
Addendum #1 · 1
Addendum No. 1 To: All Perspective Proposers Subject: Addendum to the Request for Proposal for Etnies Skatepark Improvement Project (25P03) Proposal Due Date: December 4, 2026 Today’s Date: November 6, 2026 NOTICE TO ALL PROSPECTIVE PROPOSERS You are hereby notified of the following changes and/or additions to the Request for Proposal for the above mentioned project. Such changes and/or additions are hereby made a part of the Request for Proposal and shall take precedence over anything to the contrary therein. REVISIONS 1. Revision to Section 1.1, Summary In Section 1.1, delete the following sentence: “The Prime Consultant may be either a civil engineering firm or a skatepark design firm and shall provide a team with demonstrated experience in public skatepark design, municipal civil engineering, and public art.” Replace it with: “The Prime Consultant may be any qualified consultant firm and shall provide a team that meets the minimum experience, personnel, and licensing requirements of this RFP, including demonstrated experience in public skatepark design, municipal civil engineering, and public art.” 2. Revision to Section 3.1 – Proposal Content, Item 7.2, Qualifications of Prime Consultant and Key Personnel Under the first bullet, Prime Consultant and Project Manager, delete the following: “At least two (2) must have been constructed within the last five (5) years. For those two (2) projects," Replace it with: “At least one (1) must have been constructed within the last five (5) years. For that project,” All other RFP requirements remain unchanged. [END OF ADDENDUM NO.1]
Public questions and answers
Would the City consider an asphalt-surfaced pump track as an alternative to the concrete pump track specified in the RFP, provided a fully compliant concrete option is also included in the proposal? If so, would the City prefer the asphalt alternative to be submitted as a separate bid option, including a cost comparison addressing initial construction costs, long-term maintenance, and overall lifecycle value?
The RFP is for professional design services. The selected Consultant may evaluate concrete, asphalt, and other appropriate pump track construction options during final concept design. The City will select the preferred option before proceeding with PS&E. Respondents are not required to include a separate asphalt option or cost comparison in their proposals.
Is Action Sports Design allowed bid on this project?
No. Section 1.2, Background, of the current RFP states that the consultant that prepared the preliminary concept designs is not eligible to participate in the subsequent design or construction phases of the Project. This restriction is consistent with the prior RFP for the preliminary concept design, which stated, “The consultant selected for this process will be precluded from proposing on subsequent design and construction phases for this project.”
Will involvement in this portion of the design prohibit any of the team members (especially the skatepark consultant) from being allowed to bid the construction?
Participation in the design will not preclude the Consultant or its subconsultants from providing the bidding and construction support services included under Task 10. However, firms participating on the design team will not be eligible to bid on or perform the physical construction work as a contractor or subcontractor.