Skip to content
← Back to search

State and local · OpenGov

Opportunityclosed

EVA DELL BARRIER ACCESS GATES

Description

Eva Dell Park Barrier Access Gate Project The City of Victorville is soliciting competitive bids from qualified and appropriately licensed contractors for the fabrication and installation of four (4) steel barrier access gates at Eva Dell Park in Victorville, California. The project includes one (1) 31-foot gate, one (1) 35-foot gate, and two (2) 37-foot gates, all to be yellow in color. All gates shall be constructed using Schedule 40 steel pipe and include the necessary structural framing, support posts, hinges, locking hardware, hold-open mechanisms, concrete footings, and associated installation work. The project will be funded through the Community Development Block Grant (CDBG) program and is subject to applicable federal, state, and local public works requirements, adhere to prevailing wage rates under the Davis-Bacon Act or the California state prevailing wage law, whichever is higher, including fringe benefits as set forth in the applicable wage determination, Department of Industrial Relations (DIR) registration, certified payroll reporting, and applicable federal labor compliance provisions. Contractors shall provide itemized pricing for each gate, inclusive of all labor, materials, equipment, fabrication, and installation costs necessary to deliver a complete and operational gate system. SCOPE OF WORK Eva Dell Park – Barrier Access Gate Installation Project The City of Victorville is seeking a qualified contractor to furnish all labor, materials, equipment, tools, and incidentals necessary to fabricate and install four (4) steel barrier access gates at designated locations within Eva Dell Park. All gates shall be fabricated using Schedule 40 steel pipe, with appropriately sized structural components to support the overall weight and intended operation of each gate. The work shall include all necessary support posts, hinges, locking hardware, hold-open provisions, concrete footings, and installation. Gate Locations and Dimensions The project includes the following four (4) barrier access gates: Bid Item Gate Description Quantity 1 31-foot-wide barrier access gate 1 2 35-foot-wide barrier access gate 1 3 37-foot-wide barrier access gate 1 4 37-foot-wide barrier access gate 1 All dimensions are approximate and shall be verified by the contractor during the mandatory pre-bid walkthrough and prior to fabrication. Scope of Work Requirements The contractor shall: Field-verify all gate locations, measurements, existing conditions, and installation requirements. Fabricate and install four (4) Schedule 40 steel barrier gates, including necessary structural framing and bracing. Provide appropriate gate configurations and installation methods based on existing site conditions and available clearances, subject to City approval. Furnish and install all necessary support posts, hinges, stops, locking hardware, and associated components. Furnish and install back/hold-open posts for each gate to securely maintain the gates in their open positions. Construct concrete footings for all gate support and hold-open posts, including necessary excavation, forming, reinforcement, concrete placement, and backfill. Perform all necessary welding, connections, adjustments, and alignment. Account for existing site conditions, including parking areas, irrigation systems, landscaping, pedestrian access, and other surrounding improvements. Test each gate to ensure proper operation, alignment, secure closure, and hold-open functionality. Remove all construction debris and restore areas disturbed by installation activities. Specifications Min. 6” Galvanized Steel SCH. 40 Posts for 35’ & 37’ Gates Min. 4” Galvanized Steel SCH 40. Posts for 31’ Gates Min. 1 and 7/8” Galvanized Steel SCH. 40 for Structural Components Site Conditions and Installation Considerations The City anticipates that certain gate locations may require customized installation approaches due to existing parking configurations, irrigation systems, landscaping, underground utilities, pavement, and other site constraints. Contractors shall evaluate these conditions during the mandatory pre-bid walkthrough and incorporate reasonable installation requirements into their proposed pricing. Final gate configurations, support post locations, swing directions, and installation methods shall be coordinated with and approved by the City prior to fabrication. Any identified conflicts, unusual site conditions, or proposed deviations from the scope shall be brought to the City's attention during the solicitation period for clarification. Contractor Assumptions and Responsibilities For bidding purposes, contractors shall assume the following: Gates may require custom fabrication and installation based on verified site conditions. Gate dimensions provided are approximate and subject to field verification. Gate configurations and support post placement may vary by location. Existing irrigation, landscaping, parking areas, and surrounding improvements shall be protected to the extent feasible. Minor adjustments to installation methods necessary to accommodate conditions identified during the walkthrough shall be included in the bid. Any anticipated utility relocation, significant pavement reconstruction, or substantial modifications to existing infrastructure shall be identified during the solicitation period for City review. The contractor shall provide all labor, equipment, materials, excavation, concrete, hardware, delivery, and installation necessary for a complete and functional gate system. All work shall comply with applicable building, safety, accessibility, and public works requirements. CDBG Funding and Labor Compliance This project is funded through the Community Development Block Grant (CDBG) program and is subject to applicable federal, state, and local public works requirements. The contractor and all applicable subcontractors shall comply with: California prevailing wage requirements and applicable federal Davis-Bacon labor standards. Department of Industrial Relations (DIR) public works contractor registration requirements. Applicable certified payroll reporting requirements, including weekly federal certified payroll reporting and California DIR submissions. Applicable federal CDBG labor standards, contract provisions, and reporting requirements. Required California contractor licensing, insurance, bonding, and other applicable public works regulations. Required insurance requirements from the City of Victorville. All costs associated with these requirements shall be included in the contractor's bid. Bid Pricing and Project Completion Contractors shall provide a separate lump-sum price for each of the four (4) gates. Contractor is responsible for appropriate permits. Each price shall include all labor, materials, equipment, fabrication, transportation, excavation, concrete footings, hardware, installation, prevailing wage compliance, cleanup, and associated incidentals. The contractor shall coordinate installation scheduling with the City and complete all work in accordance with the agreed project schedule. Upon completion, all gates shall be fully operational, properly aligned, and accepted by the City following final inspection. INTRODUCTION Summary Background Contact Information Timeline NOTICE INVITING BIDS PROJECT TITLE AND SUMMARY: The City of Victorville is requesting quotes from qualified and appropriately licensed contractors for the fabrication and installation of four (4) steel barrier access gates at Eva Dell Park in Victorville, California. BID SUBMISSION: The City of Victorville (“City”) will accept sealed bids for the above-referenced Project via the City's eProcurement Portal until 3:00 pm PST on Thursday, December 3, 2026 , at which time the bids will be publicly opened and the bids received will be available for viewing. Contract Documents pertaining to this Project solicitation are available at the City’s eProcurement Portal. Only those who download Contract Documents from the portal will be included in a plan holders/followers list and may receive notices such as revisions to the plans or addenda. MANDATORY PRE-BID MEETING: A MANDATORY pre-bid meeting and job walk has been scheduled for all prospective bidders. The meeting will be held on Tuesday, November 10, 2026 , at 9:00 am PST at Eval Dell Park, 15788 1st Street, Victorville, CA 92392. Mandatory Site Job walk to follow. Prospective bidders are encouraged to address questions, problems, and other issues regarding this project. In no event shall failure to inspect the site constitute grounds for a claim after contract award. A bid received from a Contractor who is not represented by a duly authorized agent at the pre-bid meeting and job walk shall be considered non-responsive and rejected from further contract award consideration. The participant agrees that they are attending the job walk and assumes responsibility for their safety. BID GUARANTY AND BONDS: Bid Proposal submission must include all the Required Bid Documents and Proposal Forms and be accompanied by a certified or cashier’s check, or by a corporate surety bond (Bidder’s Bond) on the form included therein. Such check or Bidder’s Bond is the Bidder’s guarantee that he/she/it shall, if an award is made in accordance with the terms of his/her/its Bid Proposal, promptly secure the insurance and endorsements, Faithful Performance and Payment Bonds and Guarantee required by the Contract Documents and execute a Contract for the work on the required forms (see sample Construction Agreement attached). Said check or bidder’s bond shall accompany and be enclosed in the same envelope with the Bid Proposal. Said Bidder’s Bond shall be in an amount not less than ten percent (10%) of the total amount of the Bid Proposal payable to The City of Victorville (City) , as a guarantee that the bidder, if its bid is accepted, will promptly execute the Agreement. The bidder shall guarantee the total bid price from the date of the bid opening. Please scan and upload a copy of your bid bond/cashier's check as part of your bid submission. In addition, Bidders are required to either HAND DELIVER OR MAIL the original bid guarantee. Bid guarantee must be “POSTMARKED” within (48) forty-eight hours after the bid submission due date. The bid guarantee must be hand delivered or mailed to the following address: City of Victorville 14343 Civic Drive Victorville, CA 92392 Attn: Finance Dept./Purchasing Division Please have the Bidder Name, Project Number and Title listed clearly on the outside of the envelope. The Faithful Performance and Payment Bonds shall be for amounts not less than one hundred percent (100%) of the total amount of the Bid Proposal price named in the Contract. Bonds shall be issued by responsible corporate sureties, licensed, and authorized to issue surety bonds in California. The City reserves the right to reject any bond if, in the opinion of the Department Director, the Surety’s acknowledgement is not in the form included in the Contract Documents or in another form substantially as prescribed by law. The successful Bidder shall also execute a Guarantee Form to warranty the work done and material provided for the period of one (1) year to ensure the Contractor repairs or replaces any defective or faulty work or materials. DIR REGISTRATION;COMPLIANCE MONITORING: Pursuant to Labor Code Section 1771.1, the City may not accept a Bid Proposal from or enter into a Contract with any Bidder, without proof that the Bidder and its prospective subcontractors are registered with the DIR to perform public work pursuant to Labor Code Section 1725.5, subject to limited legal exceptions. This project is subject to compliance monitoring and enforcement by the DIR and the submission of electronic certified payroll records to the California Labor Commissioner in the manner set forth in Labor Code Section 1771.4. Exceptions to the registration requirement: The contractor registration requirement does not apply to contractors working solely on public works projects awarded prior to April 1, 2015. Some exceptions allow contractors to bid on federally funded projects or submit joint venture bids without first being registered, as long as the contractors that are parties to the joint venture and the joint venture are registered at the time the contract is awarded. Contractors who work exclusively on small public works projects are not required to register as a public works contractor or file electronic certified payroll reports for those projects. Contractors are still required to maintain certified payroll records on a continuous basis, and provide them to the Labor Commissioner’s Office upon request. Additionally, awarding agencies are not required to submit the notice of contract award through DIR Public Works website services on projects that fall within the small project exemption. The small project exemption applies for all public works projects that do not exceed: $25,000 for new construction, alteration, installation, demolition or repair $15,000 for maintenance FEDERAL FUNDING: This is funded by Community Development Block Grant (CDBG). Prevailing Hourly Wages shall apply to and be paid by all contractors and subcontractors performing work on this project. Contractor must adhere to the prevailing wage rate for their classification under the Davis-Bacon Act or the California state prevailing wage law, whichever is higher, including fringe benefits as set forth in the applicable wage determination. IN-USE OFF-ROAD DIESEL-FUELED FLEET CERTIFICATE OF REPORTED COMPLIANCE: Valid CARB Certificates of Reported Compliance as described in California Code of Regulations, Title 13, Section 2449(n) for fleets of vehicles subject to 13 CCR section 2449 are required for this Project. INSTRUCTIONS TO BIDDERS BID SUBMISSION The City's eProcurement Portal Clock is the official timekeeper for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as a poor internet connection. The City of Victorville strongly recommends completing your response well ahead of the deadline. Bidders take full responsibility for the City's receipt of its bid. Project Documents pertaining to this Project solicitation are available at the City’s eProcurement Portal, https://procurement.opengov.com/portal/victorvilleca . Only those who download Contract Documents from the portal will be included in a plan holders/followers list and may receive notices such as revisions to the plans or addenda. SUBMISSION DOCUMENTS: All portions of the proposal forms contained in Section 6 Bid Proposal Form - Submission Certification checklist contained in this bid package must be completed to include signed addenda (if any) before the bid is submitted. Failure to do so may result in the bid being rejected as non-responsive. CONTRACT DOCUMENTS: Bidders may download the Contract Documents associated with this Project from the City's eProcurement Portal. Those registered will be included in a plan holders (followers) list and may receive notices such as delta revisions to the plans or addenda. PROJECT QUESTIONS AND ADDENDA: Bidders shall submit all inquiries regarding this bid via the City’s e-Procurement Portal, located at https://procurement.opengov.com/portal/victorvilleca . Please note the advertised deadline for submitting inquiries is on Thursday, November 19, 2026 , 2:00 pm PST. All answers to inquiries will be posted on the City’s e-Procurement Portal. As a registered bidder, you will also receive addenda notifications to your email by clicking “Follow” on this project. Oral explanation or instructions given before the award of a Contract will not be binding. Any information given a prospective Bidder concerning solicitation will be furnished promptly to all prospective Bidders as an addendum to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective Bidders. PLEASE NOTE: Oral explanation or instructions, or written explanations given by personnel other than purchasing staff are not valid and will not be binding. BEGINNING OF WORK AND TIME OF COMPLETION The Contractor shall begin work by the date specified in the City's Notice to Proceed informing him/her that the contract has been awarded and shall diligently prosecute the work so that all the work shall be completed before the expiration of 20 days CALENDAR DAYS, including the specified starting date. LIQUIDATED DAMAGES The Contractor shall pay the City the sum of $ 200.00 per day for each and every calendar day delay in finishing the work as outlined in the Scope in excess of the Twenty (20) CALENDAR DAYS specified below as Liquidated Damages. The City withholds liquidated damages before the accrual date if the anticipated liquidated damages may exceed the value of the remaining work. CONTRACTOR'S LICENSE: The successful bidder and/or specified subcontractor(s) must possess a valid California Contractor’s License C-13 Contractor , at the time of the award of this contract, to complete the work as described. The Contractor and/or subcontractor shall obtain all required permits and licenses prior to commencing work and shall submit the work in progress to periodic inspection by the appropriate Inspector of the City and shall honor all correction notices issued by same. All contacts, regarding inspections, shall be made to the appropriate department within the City. PREVAILING WAGE: Payment of State Wages Required when Higher . Payment of State prevailing wage rates, when higher than Federal Davis-Bacon prevailing rates, are required whenever federally funded or assisted projects are controlled or carried out by California awarding bodies of any sort. The City of Victorville is considered a California awarding body. Therefore, the higher of State Prevailing Wage and Federal Davis-Bacon Wage rates shall apply to and be paid by all Contractors and subcontractors performing work on this Project. Federal – The general Federal prevailing rate of wages, as determined by the Secretary of Labor are included as part of the attachments of the Contract Documents (General Federal Wage Decision); provided, that if there is any difference between the State or Federal wage rate for any given craft or mechanic needed to execute the work, it shall be mandatory upon the Contractor and any subcontractor to pay the higher of the two rates. The General Federal Wage Decision that is in effect on the date of the bid opening, as long as the Contract is awarded within ninety (90) days of said date, locks in that Federal Wage Decision for the entire duration of the Project. If the contract is not awarded within such ninety (90) day period, the date of the execution of the Contract would be the date used in determining the applicable Federal Wage Decision. Revisions to the General Federal Wage Decision, up to fourteen (14) calendar days before bid opening, shall be identified by the issuance of addenda, and the final Contract between the City of Victorville and the contractor will physically include the applicable General Federal Wage Decision as revised by addenda, if any such addenda have been issued. Both the prime contractor and all subcontractors are required to pay their laborers and mechanics employed under this contract a wage not less than the highest wage applicable for their work classification, as specified in the Federal General Wage Decision that can be downloaded from http://www.access.gpo.gov/davisbacon/ . State – In accordance with the provisions of California Labor Code Sections 1720, 1770-1776, 1810, 1813, and 1815, as amended, the Director of the Department of Industrial Relations has determined the general prevailing

Published attachments
Addenda and notices
  • Official Notice #1: PROJECT CANCELLED · 1

    Good Evening, After reviewing the project with our Building staff, it has been decided to cancel this project at this time. Staff does anticipate going back out to bid at a later date. Thank you all for your interest in this project.

  • Addendum #1 · 1

    Project Cancelled

Public questions and answers
  • Is there a set of drawings for this project?

    Good morning, No, there are no drawings for this project.

  • Other than Gate Locations and Dimensions four (4) barrier access gates. Is a Detail Drawing Available?

    Good morning, No, there are no drawings for this project.

Plain text

OpenGov categories

  • 12041 · Gates, Safety, Marine
  • 33013 · Fencing, Chain Link (Including Fabric, Gates, Panels, Posts and Fittings)
  • 93637 · Gates, Electric (Card Reader, etc.) Maintenance and Repair
  • 95108 · F & OI Fences
  • 98815 · Fence Installation, Maintenance and Repair