Skip to content
← Back to search
Sources SoughtActive

F16_Aircraft_Noun_Trailing_Edge_NSN_1560_01_725_3383_PN_202312284-20

DEPT OF DEFENSE · F3YCCF 448 SCMW

Contract Details

Solicitation number
F16_Aircraft_Noun_Trailing_Edge_NSN_1560_01_725_3383_PN_202312284-20
Notice ID
F16_Aircraft_Noun_Trailing_Edge_NSN_1560_01_725_3383_PN_202312284-20
Opportunity Type
Sources Sought
Sub-Agency
DEPT OF THE AIR FORCE
Office
F3YCCF 448 SCMW
Posted Date
Thursday, March 13, 2025
Response Deadline
Dec 1, 2026, 12:00 AM EST
Set-Aside
Full & Open Competition
Place of Performance
0, OK, 73145, USA
Status
Active

Description

1. JUSTIFICATION FOR ESTABLISHING A QUALIFICATION REQUIREMENT a. Criticality: Production of this Trailing Edge, Aircraft requires engineering source approval by the engineering support activity 416 SCMS/GUEAA in order to maintain the quality of the part. Failure to procure this Trailing Edge, Aircraft from a fully qualified source can result in structural or functional deficiencies that will degrade the mission capability of the F-16 Aircraft. b. Complexity, Manufacturing Processes, and/or Material Considerations: Inadequate control of characteristics associated with machining and processing of this Trailing Edge, Aircraft can result in product structural or durability degradation. Close tolerance matching of components is required. Special care and attention is required for surface finish, assembly, and sealing of this Trailing Edge, Aircraft to assure compliance with specified acceptance test requirements. c. Form, Fit, Function, and Interface: The qualification requirements specified herein are necessary to verify the structural and/or functional integrity and/or fit, form, and interface of the Trailing Edge, Aircraft being procured. 2. REASON WHY QUALIFICATION REQUIREMENT MUST BE DEMONSTRATED PRIOR TO ANY CONTRACT AWARD a. Completion of the specified pre-contract award qualification requirements are necessary to assure the government that the offeror is capable of producing the Trailing Edge, Aircraft in compliance with the applicable technical specification/data within the schedule and economic constraints of our contracts. There are significant technical and schedule risks which can only be minimized by a completion of the requirements prior to contract award. b. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will

Read full description (2,118 characters)

be incurred by the potential offering party to become qualified: $4000. c. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 180 days. This is based on complexity of the Trailing Edge, Aircraft and other factors.

Documents and contact

Check the official notice for attachments and access requirements ↗

Contact
Tracey Beringer
Email
tracey.beringer@us.af.mil
Phone
777-2211
Loadingchange history…
Loadingrelated notices…