Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Fabrication and Installation for Four (4) Transportation Vans

Description

The County of Orange, Sheriff-Coroner , (hereinafter referred to as County) is requesting competitive bids from qualified vendors (hereinafter referred to as Bidder) for Fabrication and Installation for Four (4) Transportation Vans . The County has attempted to provide all information available. It is the responsibility of each Bidder to review, evaluate, and, where necessary, request any clarification prior to submission of a bid. The awarded Contract, (hereinafter referred to as Contract) will be between the County and awarded Bidder, (hereinafter referred to as Contractor) in accordance with the model contract terms, conditions and scope of work. This is a fully electronic solicitation – only electronic bids submitted through the County’s online bidding system will be allowed; no other form of bid submittals will be accepted. Prior to submitting a bid, Bidders are advised to carefully read the instructions below, including the model contract and any solicitation attachments and/or exhibits. For assistance on uploading proposals via County’s eProcurement Portal, please contact procurement-support@opengov.com or https://help.procurement.opengov.com/en/ . All questions or requests for interpretations must be received within this solicitation's Question & Answer section as specified in the solicitation. Respondents are not to contact other County personnel with any questions or clarifications concerning this solicitation. Lighting & Siren Equipment 12" MAP LIGHT ON/OFF SWITCH (LED)- ONE IN CONSOLE 6-LED LIGHTHEAD, (RED/RED)MICROPULSE ULTRA SOLID RED LIGHTS, CAN BE SWITCH TO WHITE - LIGHTS INSTALLED IN EACH PRISON SECTIONS SQUADRON PRO BLACK FLUSH MOUNT LED AUXILIARY LIGHT POD - UNIVERSAL AMBER- FLUSH MOUNT TO FRONT BUMPER FABRICATION TO MOUNT LIGHTS FLUSH TO BUMPER CORNER LED, INLINE FLASHER, TRI-COLOR RED/BLUE/WHITE HEADLIGHTS CORNER LED, INLINE FLASHER, TRI-COLOR RED/BLUE/AMBER TAIL LIGHTS FLATLIGHTER LED SERIES VISOR LIGHT (RED/BLUE) SPEAKER W/O BRACKET KIT, UNIVERSAL BAIL BRACKET , ALL VEHICLES UNDERCOVER, 100W AIR HORN WITH REMOTE Custom Fabrication FABRICATION OF 3RD ROW CAGE SLIDER- MADE OUT OF SQUARE TUBING, LEXAN AND 16 GAUGE SHEET METAL. INCLUDING VENT HOLES & BRACKETS FABRICATION OF COVERS FOR AIR DUCTS THROUGHOUT VAN FABRICATION OF DOOR PANELS FABRICATION OF EXPANDED METAL OVER REAR WINDOWS FABRICATION OF FRONT PARTITION WITH 3/8 LEXAN COVER - DOUBLE LEXAN -RECESS CAMERA IN PARTITION FABRICATION OF LEXAN WINDOWS AND PLATES NEEDED TO INSTALL WINDOWS, LEXAN FILLER PANELS USING 3/8" LEXAN FABRICATION OF LIGHT COVERS FOR FACTORY DOME LIGHTS AND AFTER MARKET RED LIGHTS FABRICATION OF MIDDLE/ 2ND ROW PARTITION WITH 2 SWING DOORS - DOORS SHALL BE LEXAN FABRICATION OF OVERHEAD CONSOLE FOR COMMUNICATION RADIOS FABRICATION OF REAR CAGE/ DIVIDER & SHELVING. TO INCORPORATE MOUNT FOR GUN BOX AND CAMERA DVR EQUIPMENT FABRICATION OF SIDE STEPS FOR PRISONER LOADING AND UNLOADING. BOTH DRIVER AND PASSENGER SIDE. PASSENGER SIDE MUST EXTEND TO FRONT DOOR - STEP WILL HAVE YELLOW LINE ON STEP. FABRICATION OF SWING DOWN DIVIDERS IN 2ND AND 3RD ROWS FABRICATION OF UNDER SEAT PANELS TO PREVENT TAMPERING Gun Rack D T-RAIL MOUNT 1 1082E BLAC-RAC 1 SMALL #2 KEY ADUSTABLE GUN LOCK TIMER Job Materials MISC. PARTS, WIRE, IP TIES, CLAMPS, FASTENERS, RELAYS, ETC. ABS FILLER PANELS IF NEEDED Other Products ELECTRONICS BOARD WITH CARPET- 3/4 MAPLE WOOD WITH CARPET - SI E AND LOCATED IS TBD ONCE VEHICLE ARRIVES 50A CIRCUIT BREAKER (SURFACE MOUNT) SEDAN / 2020 UTILITY CIRCUIT BREAKER BRACKET FUSE BLOCK STBLADE 6 CIRC WITH GROUND STUD AND COVER 3-OUTLET 12 VOLT RECEPTACLE BACKUP ALARM 102dB(A) - STUD TERMINAL SIDE CURTAIN 2010 CHEVY EXPRESS VAN SHIPPING FOR AOI SECURE IDLE SHIPPING FOR SECURE IDLE STEEL HASP LOCK ASSEMBLY FOR REAR DOORS OF VEHICLE WIDE ANGLE TOW MIRRORS MOUNTED TO EXISTING MIRRORS COAT HANGERS FOR FRONT AND REAR OF VEHICLE. COAT HANGERS ARE MOUNTED TO CAGING FOR HANGING HANDCUFF LOCKS FASTEN SEATBELT SIGNS 1996-2021 CHEVROLET EXPRESS G/SERIES VAN/GMC SAVANNA TREMCO COVERT ANTI-THEFT SYSTEM SHIPPING FOR TREMCO Scope of Work Scope of Services - Custody “Statewide” Vans - Full Build Contractor shall provide the installation of custom-built prisoner containment cells, equipment, accessories, and related components identified in this Scope of Work. All installation and services shall be performed in accordance with the County’s Terms and Conditions and the requirements set forth herein. Parts and Equipment Vendor shall provide the following equipment to complete installation: Custody Pad locks for mock up. All radio equipment- including cables. Fasten seatbelt stickers (X5 per van) Tremco system. OCSD will provide LCD monitor, camera system and all required components. Cameras will be mounted behind first & second row partitions to view passengers. Exterior cameras will be mounted on driver and passenger front fenders. OCSD will also supply 800 MHz antenna cables (if needed). Optional fogged material in front partition. Other essential items in order to complete build Parts and Equipment - Additional Contractor shall install the following customer parts and equipment: Two (2) dual corner LED, in-line flasher, Tri-Color shall be installed in both headlights. Two (2) dual corner LED, in-line flasher, Tri-Color shall be installed in both taillights. Four (4) 6-led light head shall be installed in each prisoner sections to illuminate each prisoner compartment. Lights will only illuminate red. (To illuminate on door trigger if manufacture lights do not). One (1) 12” map light mounted in the console to provide needed light to driver and passenger and in rear of vehicle to illuminate rear gun box. Two (2) Squadron Pro Black lights will be flush mounted to the font of the bumper. These lights will be amber in color to burn through fog. Fabrication : is associated to mount fog lights. One (1) flip down visor light shall be installed on passenger side visor. One (1) secure idle will be installed to keep engine safely running with key out of ignition. One (1) rifle Blac-Rac will be installed in front partition. One (1) Adjustable gun lock timer will be installed. One (1) three outlet 12volt receptacle will be installed in driver compartment. Location to be determined. Two (2) circuit breaker will be installed to protect all electronics components. The breaker will be mounted under the vehicle hood using: Item TBD will complement the breaker One (1) fuse block will be installed to electronics board to provide power to auxiliary lighting. One (1) electronics board will be constructed of ¾ maple wood and carpeted. The board will be placed behind driver seat to hold all electronics. One (1) siren speaker will be installed behind front bumper. Item TBD will complement the siren speaker One (1) 100W Air horn speaker installed. One (1) side curtain air bag switch installed to disable curtain airbags. This product can disable multiple airbags, depending on how it is wired. One (1) back up alarm will be installed. One (1) three position 12-volt cigarette receptacle will be installed in console area for 12-volt power. One (1) Tremco covert Anti-theft system. All other equipment needed to complete the job is listed as: JOB MATERIALS . These includes zip ties, relays, nuts, bolts, etc. Install wide angle tow mirrors mounted to existing mirrors. Installation of external lock for rear back doors. Four (4) Coat hangers for front of and rear of vehicle. Coat hanger mounted to caging for hanging handcuff locks. Fasten seatbelt signs Fabrication One (1) fabrication of custom front partition with double walled 3/8 Lexan cover and 16-gauge metal. (All Lexan will have small holes drilled to provide extra air flow). This does not include window Lexan. One Camera will be recessed into front partition. One (1) fabrication of custom middle row partition with two swing outdoors made out of metal tubing, 16-gauge sheet metal and Lexan. Lexan will have ventilation holes around the perimeter or door for air flow. One (1) fabrication of custom 3 rd row cage/ divider and shelving made out of 16-gauge metal, and Lexan. Two (2) swing down dividers will be constructed to sections off 2 nd and 3 rd row seats . Doors will be constructed of round tubing and Lexan. Lexan will have ventilation holes to provide airflow. One (1) custom fabrication of under seat plates to prevent inmates accessing wires and seat removal pins. One (1) custom fabrication of rear cage/ divider & shelving will be constructed to incorporate mount for gun box and camera DVR Equipment. All windows will have custom fabrication to accommodate Lexan covers and filler panels. The two rear windows will be covered with expanded metal to for added protection. Fabrication of custom door panels will be constructed to prevent manipulation of door. . One (1) fabrication of custom passenger side step with yellow line highlight will be constructed for prisoner loading and unloading. One (1) Driver side step will be custom made. One (1) fabrication of custom overhead console will be constructed to fit department supplied radio. One (1) custom fabrication of air duct covers will be constructed out of metal throughout the van. One (1) custom fabrication of light covers for factory dome lights and aftermarket red lights will be constructed out of metal to prevent tampering. Services Contractor shall install all parts and equipment at contractor facility. Labor to install all parts and equipment . Contractor shall provide training on operation of all moving equipment if deemed necessary by technician receiving. Any additional changes made to vehicle will be subject to a fee. Camera Regulation Communications and Technology will spec and purchase the necessary AXON equipment and will provide detailed installation instructions along with the necessary equipment that will need to be installed by the vehicle upfitter (Cameras, Microphone, Antenna, Monitor, Crash Box). Under no circumstances should the Vehicle upfitter attempt to order directly from AXON or any other vendor or Video recording equipment without prior written approval from Steven Page or Rich Silva. The AXON system is proprietary and encrypted, thus making any other system incompatible with the established Sheriff’s Department standard for AXON applications. Delivery Location Each Van will be inspected and received from contractor’s facility by customer. Scope of Services - Custody “Pool” Vans- Full Build Contractor shall provide installation of custom-built prisoner containment cells and other accessories. Installation and services shall be provided in accordance with the County Terms and conditions and this Scope of Work. Parts and Equipment Vendor shall provide the following equipment to complete installation: Custody Pad locks for mock up. All radio equipment- including cables. Fasten seatbelt stickers (X5 per van) Tremco system. OCSD will provide LCD monitor, camera system and all required components. Cameras will be mounted behind first & second row partitions to view passengers. Exterior cameras will be mounted on driver and passenger front fenders. OCSD will also supply 800 MHz antenna cables (if needed). Optional fogged material in front partition. Other essential items in order to complete build Parts and Equipment - Additional Contractor shall install the following customer parts and equipment: Two (2) dual corner LED, in-line flasher, Tri-Color shall be installed in both headlights. Two (2) dual corner LED, in-line flasher, Tri-Color shall be installed in both taillights. Four (4) 6-led light head shall be installed in each prisoner sections to illuminate each prisoner compartment. Lights will only illuminate red. (To illuminate on door trigger if manufacture lights do not). One (1) 12” map light mounted in the console to provide needed light to driver and passenger and in rear of vehicle to illuminate rear gun box. Two (2) Squadron Pro Black lights will be flush mounted to the font of the bumper . These lights will be amber in color to burn through fog. Fabrication: is associated to mount fog lights. One (1) flip down visor light shall be installed on passenger side visor. One (1) secure idle will be installed to keep engine safely running with key out of ignition. One (1) rifle Blac-Rac will be installed in front partition. One (1) Adjustable gun lock timer will be installed. One (1) three outlet 12volt receptacle will be installed in driver compartment. Location to be determined. Two (2) circuit breaker will be installed to protect all electronics components. The breaker will be mounted under the vehicle hood using: Item TBD will complement the breaker One (1) fuse block will be installed to electronics board to provide power to auxiliary lighting. One (1) electronics board will be constructed of ¾ maple wood and carpeted. The board will be placed behind driver seat to hold all electronics. One (1) siren speaker will be installed behind front bumper. Item TBD will complement the siren speaker One (1) 100W Air horn speaker installed. One (1) side curtain air bag switch installed to disable curtain airbags. This product can disable multiple airbags, depending on how it is wired. One (1) back up alarm will be installed. One (1) three position 12-volt cigarette receptacle will be installed in console area for 12-volt power. One (1) Tremco covert Anti-theft system. All other equipment needed to complete the job. These includes zip ties, relays, nuts, bolts, etc. Install wide angle tow mirrors mounted to existing mirrors. Installation of external lock for rear back doors. Four (4) Coat hangers for front of and rear of vehicle. Coat hanger mounted to caging for hanging handcuff locks. Fasten seatbelt signs Fabrication One (1) fabrication of custom front partition with double walled 3/8 Lexan cover and 16-gauge metal. (All Lexan will have small holes drilled to provide extra air flow). This does not include window Lexan. One Camera will be recessed into front partition. One (1) fabrication of custom middle row partition with two swing outdoors made out of metal tubing, 16-gauge sheet metal and Lexan. Lexan will have ventilation holes around the perimeter or door for air flow. One (1) fabrication of custom 3 rd row cage made out of 16-gauge metal, and Lexan Two (2) swing down dividers will be constructed to sections off 2 nd and 3 rd row seats . Doors will be constructed of round tubing and Lexan. Lexan will have ventilation holes to provide airflow. One (1) custom fabrication of under seat plates to prevent inmates accessing wires and seat removal pins One (1) custom fabrication of rear cage/ divider & shelving will be constructed to incorporate mount for gun box and camera DVR Equipment All windows will have custom fabrication to accommodate Lexan covers and filler panels. The two rear windows will be covered with expanded metal to for added protection. Fabrication of custom door panels will be constructed to prevent manipulation of door. One (1) fabrication of custom passenger side step with yellow line highlight will be constructed for prisoner loading and unloading. One (1) Driver side step will be custom made. One (1) fabrication of custom overhead console will be constructed to fit department supplied radio. One (1) custom fabrication of air duct covers will be constructed out of metal throughout the van. One (1) custom fabrication of light covers for factory dome lights and aftermarket red lights will be constructed out of metal to prevent tampering. Services Contractor shall install all parts and equipment at contractor facility. Labor to install all parts and equipment listed. Contractor shall provide training on operation of all moving equipment if deemed necessary by technician receiving. Any additional changes made to vehicle will be subject to a fee. Camera Regulation Communications and Technology will spec and purchase the necessary AXON equipment and will provide detailed installation instructions along with the necessary equipment that will need to be installed by the vehicle upfitter (Cameras, Microphone, Antenna, Monitor, Crash Box). Under no circumstances should the Vehicle upfitter attempt to order directly from AXON or any other vendor or Video recording equipment without prior written approval from Steven Page or Rich Silva. The AXON system is proprietary and encrypted, thus making any other system incompatible with the established Sheriff’s Department standard for AXON applications. Delivery Location Each Van will be inspected and received from contractor’s facility by customer. General Information Background Our Transportation Bureau has four (4) vans that require inmate separation caging to ensure individuals are transported in accordance with their classification. Important Notice The County has attempted to provide all information available. It is the responsibility of each Bidder to review, evaluate, and, where necessary, request any clarification prior to submission of a bid. If any person contemplating submitting a bid in response to this IFB is in doubt as to the true meaning of any part of the solicitation documents attached hereto or finds discrepancies in or omissions from the specifications, they must submit a written request for clarification/interpretation to the County Deputy Procurement Agent (DPA), Mary Barreto , via the County’s online biding system. Clarification/Interpretation If clarification or interpretation of this solicitation is considered necessary by County, a written addendum shall be issued and the information will be posted on County’s online bid system. Any interpretation of, or correction to, this solicitation will be made only by addendum issued by the County DPA. All addenda will be submitted and posted on the County’s online bidding system. It is the responsibility of each Bidder to periodically check the County’s online biding system to ensure that they have received and reviewed any and all addenda to this solicitation. The County will not be responsible for any other explanations, corrections to, or interpretations of the documents, including any verbal information. All questions or requests for interpretation must be received within this solicitation's Question & Answer section by Tuesday, December 1, 2026 before 5:00 pm . Communication Bidders are not to contact other County personnel with any questions or clarifications concerning this solicitation. All questions regarding this solicitation must be submitted via the Question & Answer section of this solicitation within the County’s eProcurement Portal at: https://procurement.opengov.com/portal/ocgov . Any County response relevant to this solicitation other than through or approved by County is unauthorized and will be considered invalid. County's Deputy Procurement Agent, Mary Barreto , mbarreto@ocsheriff.gov , will provide all official communication concerning this solicitation. Bid Validity Bids will be valid for a period of 365 days after IFB closing date. Lobbyists County of Orange does not require and neither encourages or discourages the use of lobbyists or other consultants for the purpose of securing business. ORANGE COUNTY BOARD OF SUPERVISORS AND COUNTY AGENCY OFFICERS Board of Supervisors Janet Nguyen, First District Vicente Sarmiento, Second District Donald P. Wagner, Third District Doug Chaffee, Fourth District Katrina Foley, Fifth District County Agency Officers Claude Parrish, Assessor Hugh Nguyen, Clerk-Recorder Todd Spitzer, District Attorney-Public Administrator Don Barnes, Sheriff-Coroner Shari L. Freidenrich, Treasurer-Tax Collector Andrew Hamilton, Auditor-Controller General Instructions Review Before submitting a bid, Bidders shall carefully review the General Instructions and examine the solicitation contents, including the Model Contract Terms, Conditions and Scope of Work. Bidders shall include in their bid respon

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #2 · 2

    Please use the See What Changed link to view all the changes made by this addendum.

Public questions and answers
  • Can you please confirm which contractor’s license classification is required for this solicitation?

    The bidding vendor should be able to fulfill all the required work shown on the solicitation including providing the garagekeepers liability insurance that is required. The bidding vendor should also be registered with DUNS, CA Secretary of State, and SAM.

  • Can you provide a rough sketch of the internal layout of the seating / partition configuration as well as year/make/model of the vans?

    There are two Configurations (Statewide and Pool). The only differences between the two is in the rear of the vehicle. The Statewide configuration will have extra storage and a long gun safe. This reduces the 5th row seating to 1 person. Rows 2-4 are identical otherwise. See the attached pictures for reference on current upfitted vehicles.

Plain text

OpenGov categories

  • 24102101 · Cargo handling equipment
  • 24112412 · Equipment transportation case
  • 25101500 · Passenger motor vehicles
  • 25101611 · Cargo trucks
  • 25111503 · Cargo or container ships
  • 25170000 · Transportation components and systems
  • 25175100 · Transportation repair parts kits
  • 25181604 · Cargo truck body
  • 25190000 · Transportation services equipment
  • 25191500 · Air transportation support systems and equipment
  • 25191600 · Space transportation support systems and equipment
  • 41112800 · Transportation related equipment and instruments