State and local · OpenGov
Facility Condition Assessment and Asset Management Solution
Description
The County of San Mateo (County) is soliciting competitive proposals from qualified firms to deliver a turnkey Facility Condition Assessment (FCA), compile a unified Master Equipment Register (MER), deploy an enterprise-grade cloud Facility Condition Information System (FCIS), and implement bi-directional integration with the County’s Computerized Maintenance Management System (CMMS) IBM Maximo Application Suite SaaS. This solicitation is structured into two distinct operational phases: PHASE 1 (BASE SCOPE) : Complete on-site baseline Facility Condition Assessments across approximately 100 facilities (~4.5 million gross square feet across 75 sites) following ASTM E2018-24 standards. Perform discrete equipment nameplate inventories and install durable 2D physical barcode tags for maintainable mechanical, electrical, plumbing, conveyance, and life-safety systems. Compile and validate a unified Master Equipment Register (MER) that establishes an identical data baseline between IBM Maximo and the FCIS. Provide, configure, and host a SaaS-based FCIS platform delivering real-time Facility Condition Index (FCI) calculations, multi-year capital renewal modeling, and localized RSMeans-based cost estimating. Format, validate, and batch-load the complete Master Equipment Register directly into the County’s IBM Maximo Application Suite environment, and establish automated synchronization between Maximo and the FCIS. PHASE 2 (OPTIONAL/ADD-ALTERNATIVE SCOPE): Develop standard, manufacturer-aligned Preventive Maintenance (PM) Job Plans, task check-sheets, and recommended service frequencies, pre-formatted for direct batch upload into Maximo Job Plans and PM Master applications. Part A: Phase 1 - Engineering Assessment & Inventory Services (Turnkey) Baseline Facility Condition Assessment (ASTM E2018-24, UniFormat II Level 3) - General Government Facilities (Zones 1 & 3) (ASTM E2018-24, UniFormat II Level 3) - Healthcare & Critical Facilities (Zone 2) Maintainable Equipment Inventory, Nameplate Data Capture, Physical 2D Barcode Tagging & Master Equipment Register Compilation Add/Alternate Unit Rate: Additional Equipment Tagging & Master Register Capture (Beyond 12,000 base count) Part B: Phase 1 - FCIS Software SaaS Subscription (5-year TCO) Year 1 FCIS Software Subscription & Support Year 2 FCIS Software Subscription & Support Year 3 FCIS Software Subscription & Support Year 4 FCIS Software Subscription & Support Year 5 FCIS Software Subscription & Support Part C: Phase 1 - Software Implementation, Maximo Integration & Training Turnkey Implementation, Data Migration, Maximo Integration & Training: All professional services to configure the software, migrate historical data, load the Master Equipment Register into Maximo, establish the Maximo/FCIS connection, and train County staff Part D: Phase 2 (Optional/Add-Alternate Scope) Preventative Maintenance (PM) Job Plans Maximo-Ready PM Job Plan Procedure Libraries, Task Check-Sheets & Service Frequencies across inventoried assess classes Detailed Scope of Work Phase 1 - Base Scope: Facility Condition Assessment A. Governing Assessment Standards & Asset Components The Contractor shall perform physical walk-through condition surveys in accordance with ASTM E2018-24 ( Standard Guide for Property Condition Assessments: Baseline Property Condition Assessment Process ) across all scoped facilities. The assessment is an engineering capital planning survey; certified code enforcement audits, destructive testing, physical measurements of door opening forces, cross-slope calculations with digital smart levels, and formal Certified Access Specialist (CASp) surveys are not required. Visual accessibility reviews are limited strictly to ASTM E2018-24 baseline visual screening of conspicuous physical barriers. The Contractor shall evaluate physical condition, record observable deficiencies, assess Remaining Useful Life (RUL), and determine capital replacement costs across the following building systems and assemblies: Substructure: Standard foundations, slab-on-grade, structural basement walls, sumps, and drainage. Shell & Building Envelope: Superstructure framing, exterior wall finishes, masonry, curtain walls, structural glazing, exterior doors, roofing assemblies (coverings, flashings, copings, drains), skylights, and downspouts. Interiors: Fixed Interior fixed partitions, doors, frames, architectural hardware, interior stairs, and high-wear finishes (flooring, ceilings, wall coatings). Health, Fire & Life Safety Systems: Emergency egress lighting, illuminated exit signage, stairwells/enclosures, and egress doors/hardware. Disabled Accessibility (ADA & Title 24): Exterior/interior paths of travel, accessible parking, curb ramps, entrances, doors, public service counters, drinking fountains, and restrooms. Conveyance Systems: Passenger elevators, freight elevators, accessibility lifts, hydraulic power units, traction hoists, machine room controllers, and cab finishes. Plumbing Systems: Domestic water distribution, water heaters, backflow preventers, sanitary waste/vent piping, sumps, grease traps, rainwater systems, and plumbing fixtures. HVAC Systems: Boilers, chillers, cooling towers, air handlers (AHUs), rooftop packaged units (RTUs), exhaust fans, hydronic pumps, distribution piping, ductwork, terminal units, and building automation/control systems. Fire Protection Systems: Wet/dry fire sprinkler systems, fire risers, fire pumps, backflow assemblies, and main fire alarm panels/devices. Electrical Systems: Main electrical service, switchgear, transformers, switchboards, panelboards, motor control centers (MCCs), emergency generators, automatic transfer switches (ATS), UPS systems, and interior lighting. Security & Access Control Systems: Head-end panels, CCTV cameras, access control hardware (card readers, strikes, mag-locks), and duress/panic systems. Sallyports, Gates & Barriers: Overhead security coiling doors, interlocking sallyport gates, motorized perimeter gates/operators, and barrier bollards. Site Hardscape & Utilities (Within 50 ft): Walkways, parking lots, paving, accessible ramps, site drainage/catch basins, site lighting, and perimeter fencing. B. Classification Standards, Naming Taxonomy & UniFormat Hierarchy All building elements, assemblies, and deficiencies must be classified using the ASTM Uniformat II Classification for Building Elements. Vendor must submit the unified County-wide asset naming convention and UniFormat crosswalk within 30 days of Notice to Proceed (NTP) for County’s review and approval. Field data collection cannot commence until the County signs off on the naming convention. Architectural, structural, roofing, and site elements shall be logged at UniFormat Level 3 (Component Assembly Level, e.g., Roof Coverings). Maintainable equipment shall be classified at UniFormat Level 4 (Discrete Sub-Element Level, e.g., Boilers) and cross-walked to the County’s Maximo Asset Classification hierarchy. Asset Naming Convention: The Contractor shall deliver a standardized County-wide Asset Hierarchy & Nomenclature Standard Operating Procedure (SOP) within thirty (30) calendar days of Notice to Proceed (NTP) for County review and approval. The SOP must standardize asset naming syntax: Example: [Facility Code]-[Floor]-[Discipline/Type]-[Sequential Number]. On-site field data collection shall not commence until the County signs off on this SOP. C. Deficiency Logging For every observed deficiency, the Contractor shall record: Unique deficiency identifier. UniFormat II classification code and spatial location (Site, Building, Floor, Room #). High Resolution color photograph(s), clearly documenting the deficiency, tagged with building ID, asset barcode, and capture date. Probable cause (e.g., normal wear, deferred maintenance, design defect, excessive operational stress, etc.) and operational impact on facility function. Expected Useful Life (EUL), Remaining Useful Life (RUL), and estimated replacement year. Recommended corrective action (Repair, Refurbish, Full Replacement). Impact of the deficiency on the building and portfolio FCI scores. Assigned deficiency priority category: Priority 1 (Currently Critical / Immediate): Life safety hazards, active water infiltration, structural compromise, severe regulatory/ADA non-compliance, or immediate failure risk to mission-critical infrastructure. Priority 2 (Potentially Critical - Years 1–2): Deteriorated components that have exceeded their useful life and risk cascading damage to adjacent systems if not remediated quickly. Priority 3 (Necessary / Non-Critical - Years 3–5): Normal wear-and-tear components approaching the end of useful life, requiring scheduled capital renewal. Priority 4 (Long-Term Capital Renewal - Years 6–10): Components functioning satisfactorily that will reach end-of-life within the 10-year capital forecast window. All deficiency corrections and asset Current Replacement Values (CRV) must be benchmarked against localized, annually updated construction cost databases (RSMeans or equivalent indu Phase 1 - Base Scope: Maintainable Equipment Inventory, Barcoding & Master Equipment (MER) Physical Equipment Data Capture A. Physical Asset Verification & Nameplate Data Capture Assessors shall enter all mechanical rooms, electrical substations, central boiler/chiller plants, basements, penthouses, and rooftops to physically inspect, barcode, and document maintainable infrastructure. For each tagged unit, the Contractor shall record: Physical Asset Tag Number: Scanned directly from the newly affixed barcode. Classification Codes: UniFormat II Level 4, OmniClass, and Maximo Asset Class. Location Hierarchy: County Campus/Complex, Building Name, Building Number, Floor, Room Number (matching posted room signage or architectural floor plans), and specific spatial description – GIS mapping preferred. Manufacturer Nameplate Data: Equipment manufacturer, complete model number, serial number, date of manufacture (when stamped), and electrical ratings (voltage, phase, amperage). Engineering Design Specifications: Capacities appropriate to asset class (e.g., cooling tonnage, motor horsepower, heating output in BTU/hr or MBH, airflow in CFM, kW rating, pump GPM, working pressure). Environmental Compliance Data: Refrigerant type (e.g., R-410A, R-134a, R-22) and full refrigerant charge weight in pounds (to support EPA Section 608 compliance tracking). Observed Physical Condition Rating: Rated on a standardized 5-point scale: New (5): Excellent condition, recently installed, under warranty. Good (4): Functional, normal aging, well maintained. Average/Fair (3): Normal wear, minor operational defects, approaching useful life. Poor (2): Heavily deteriorated, high repair frequency, past useful life. Failed (1): Inoperable, obsolete, unsafe, immediate replacement required. B. Equipment Inventory Inclusions & Exclusions: To maintain project focus and eliminate low-value data capture, physical inventory and barcoding shall adhere to the following boundaries: General Facilities (Zones 1 & 3): Threshold: Discrete inventory and tagging apply to central plant, primary distribution, and maintainable MEP and conveyance assets with a motor rating of = 5HP or an estimated replacement value of = $5,000. Sample Inclusions: Boilers, chillers, cooling towers, plate heat exchangers, central air handling units (AHUs), rooftop packaged units (RTUs), hydronic pumps ( = 5HP), variable frequency drives (VFDs), motor control centers (MCCs), main switchgear, transformers, main distribution switchboards, emergency generators, automatic transfer switches (ATS), central UPS systems, central BAS panels/controllers, passenger/freight elevators, vertical accessibility platform lifts, hydraulic elevator power units, primary fire pumps, jockey pumps, backflow assemblies, and main Fire Alarm Control Panels (FACPs). Explicit Exclusions: Individual variable air volume (VAV) terminal boxes, terminal duct reheat coils, in-line booster/exhaust fans, control valves, actuators, space thermostats, room temperature sensors, window AC units, inline circulation pumps ( ), secondary lighting and appliance branch panels, individual plumbing fixtures, point-of-use water heaters, portable fire extinguishers, and fire alarm initiating devices (smoke detectors, heat sensors, pull stations, horn/strobes). Healthcare & Clinical Facilities (Zone 2 – San Mateo Health & Hospital System): In addition to all major equipment included under Zones 1 and 3, the Contractor must inventory, barcode, and document all regulatory, life-safety, and clinical environment infrastructure, regardless of horsepower or monetary value, to support Joint Commission, CDPH, and Title 22 compliance. Mandatory Additions: Fire/smoke dampers, life-safety exhaust fans, airborne infection isolation (AII) room pressurization systems, HEPA filtration units, medical gas master manifolds, medical vacuum pumps, medical air compressors, medical gas zone valve boxes, emergency power branch panels (Life Safety, Critical, and Equipment branches), emergency eyewash/shower stations, and critical thermostatic mixing valves. C. Hardware Barcode Tag Specifications Tag Construction: Anodized aluminum or metal-photopolymer asset tags with high-contrast, machine-readable 2D DataMatrix / QR codes and human-readable text. Tags must be impervious to moisture, motor oil, hydraulic fluids, cleaning solvents, UV exposure, and operating temperatures up to 300°F. Fastening: Industrial high-bond acrylic adhesive on smooth surfaces; mechanical fasteners (stainless steel pop-rivets or aircraft wire) on rough, unpainted, high-heat, or vibrating equipment surfaces. Tag Numbering Syntax: The asset tagging sequence must be pre-approved in writing by the County to maintain compatibility with IBM Maximo asset syntax. D. Master Equipment Register (MER) Compilation & Maximo Data Ingestion Unified Baseline Database: The Contractor shall compile a single, validated Master Equipment Register establishing an identical asset baseline across both IBM Maximo and the FCIS platform. The database must reconcile, cross-reference, and clean legacy records from the historical 2018 AME database and current Maximo active tables. Contractor Responsibility for Data Ingestion: The Contractor—not County staff—is solely responsible for formatting, validating, and loading the complete Master Equipment Register directly into the County’s IBM Maximo Application Suite production environment. Data Upload Method: The Contractor shall load all asset and location records into the County’s IBM Maximo system using standard Maximo import tools or supported APIs. Direct backend database edits are not permitted. Data Quality & Pre-Upload Verification: Before loading the data into Maximo, the Contractor must verify that: Every asset is linked to an approved building, floor, and room location. All standard required fields (asset ID, description, serial number, manufacturer, model, and status) are complete with no missing values. Barcode numbers match the physical tags installed in the field with no duplicate entries. Each asset is clearly Phase 1 Base Scope: Facility Condition Information System (FCIS) Software & Integration Core Software Platform Modules The proposed FCIS Solution must be a commercially proven, cloud-hosted SaaS platform delivering the following core functional modules: Dynamic Facility Condition Index (FCI) Calculation: Automated, real-time recalculation of FCI across individual assets, building systems, specific buildings, operational zones, and the entire portfolio. System must support standard industry rating benchmarks (e.g., Good: FCI ; Fair: FCI ; Poor: FCI ; Critical: FCI ) Multi-Constraint Capital Planning & Scenario Modeling: Multi-variable modeling allowing capital planners to evaluate budget scenarios against portfolio condition outcomes over 5-, 10-, and 30-year planning horizons. Capabilities must include "what-if" funding comparisons, risk-versus-cost trade-offs, and automated project bundling (grouping deficiencies by trade, geographic location, or building occupancy to optimize contracting efficiencies). Turnkey 5-Year Capital Improvement Plan (CIP): The platform must be delivered pre-populated with an executive-ready 5-Year Capital Facilities Program (covering fiscal years 2027 through 2032) prioritizing deferred maintenance backlog, critical life-safety renewals, and County electrification/decarbonization initiatives. Data Ownership & Exportability: The County retains sole, unencumbered ownership of all data, condition models, deficiency records, photos, and customized reports. Authorized County staff must be able to export raw data tables on-demand in open formats (CSV, Excel, JSON, SQL) without vendor intervention or supplementary charges. Executive Dashboards & Role-Based Security: Interactive graphical dashboards tailored for the Board of Supervisors, executive leadership, and operational managers. Configurable role-based permissions must manage viewing and editing rights across departments IBM Maximo Application Suite Integration Architecture The FCIS platform must support an automated, bi-directional data exchange with County’s CMMS platform - IBM Maximo Application Suite. Maximo serves as the system of record for operational asset management, while the FCIS serves as the planning engine for capital modeling. Operational Data Sync (Maximo FCIS): An automated scheduled data feed passing closed work orders, internal maintenance labor/material costs, condition modifications, and operational status changes from Maximo into the FCIS to adjust equipment degradation curves. Capital Closeout Sync (FCIS Maximo): Upon completion and administrative sign-off of a capital project within the FCIS, the system must transmit structured project turnover data back into Maximo to: Transition the legacy asset record to Decommissioned / Retired status. Create or commission the replacement asset record , capturing the new manufacturer, model number, serial number, install date, in-service date, and warranty expiration. Proposals offering only a one-way export from Maximo to the FCIS without automated project renewal return into Maximo will be deemed technically non-responsive . Phase 2 Optional Scope: Preventive Maintenance (PM) Job Plans Deliverable At the sole discretion of the County and subject to available funding, the Contractor shall develop and deliver standardized, manufacturer-recommended Preventive Maintenance (PM) procedures for all equipment classes cataloged in the Master Equipment Register: Job Plan Specifications: Step-by-step task check-sheets defining standard maintenance procedures across required service intervals (Monthly, Quarterly, Semi-Annual, Annual). Procedures must detail estimated craft labor hours, required technician skill levels, safety lockout/tagout (LOTO) requirements, and task steps aligned with manufacturer specifications and industry benchmarks (ASHRAE, RSMeans). Maximo-Ready Ingestion Delivery: PM task libraries must be delivered electronically, pre-structured for batch-loading into Maximo JOBPLAN and PLUSCPM application tables, linked directly to the asset classifications established in Phase 1. Additional Requirements Onsite condition assessments may require additional equipment for roof access. Contractor is responsible for furnishing a ladder or lift for roof access, as applicable. All personnel who will be on-site must pass a background check. Selected firm is expected to identify and immediately report to the County components or situations that are considered urgent (endangering life and/or property). Introduction, Overview and Schedule The County of San Mateo (the “County” or “SMC”) covers most of the San Francisco Peninsula. The region covers 744 mi and is home to nearly 800,000 residents and 20 incorporated cities.
Published attachments
- Standard_Contract_Template_-_Over_$200K_DRAFT
- Maximo_SMMC_Locations_Sample Report
- 260505_Master_Facility_list_FCIS
- FCIS_COB2_Sample Report
- FCIS_SMMC_Sample Report
- Maximo_COB2_Assets_Sample Report
- Maximo_COB2_Locations_Sample Report
- Maximo_SMMC_Assets_Sample Report
- Facility_Condition_Assessment_and_Asset_Management_Solution.pdf
Public questions and answers
Section 7.4 requires proposers to submit any requested exceptions to the County's standard contract by the November 20, 2026 deadline; however, we could not identify a designated location in the OpenGov portal for submitting contract exceptions. Please clarify where and how contract exceptions should be submitted, including whether they should submitted through the portal's Questions & Answers feature or submitted separately to the County's procurement contact. Additionally, please confirm the November 20, 2026, 2:00 p.m. deadline.
Please email the Procurement contact directly with contract exceptions. Contract exceptions will be reviewed by the County Attorney.
OpenGov categories
- 95805 · Asset Management Services