Fire Alarm engineering for Lewis County

Description

Lewis County is seeking a qualified engineering firm to provide comprehensive design and engineering services for several upcoming capital projects. The selected firm will be responsible for developing bid‑ready documents, construction specifications, and supporting materials needed to procure contractors and execute work across multiple County‑owned facilities. Current anticipated project locations include: • IT Building • Historic Courthouse • Health Building • Lewis County Jail *Additional facilities as projects may be identified The scope of work may include site assessments, systems evaluation, architectural and mechanical considerations, detailed engineering drawings, permitting support, and coordination with County staff to ensure each project is fully prepared for competitive bidding. The intent of this RFQ is to establish a partnership with an engineering firm capable of delivering clear, accurate, and complete bid documents that support efficient procurement and successful construction outcomes across a variety of building types. The selected firm will be asked to provide various services, including but not limited to, the following: identify the current system types, including their manufacturers and installation dates review device coverage, layout and overall system condition to determine remaining useful life assess code compliance examine integration capabilities with existing building systems, such as HVAC, access control and elevator controls provide recommendations outlining whether / how each system should be repaired, upgraded or fully replaced to meet current operational and safety requirements Introduction Summary Background Contact Information Timeline Project Details Important Instructions for Electronic Submittal Lewis County , Capital Infrastructure , is accepting electronic proposal submissions. All proposals must be submitted through the OpenGov platform. Consultants may create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic proposal. Project Details As part of this project, the selected firm will perform comprehensive on‑site evaluations of the existing fire alarm systems at each facility. This assessment will include identifying the current system type, manufacturer, and installation date, along with reviewing device coverage, layout, and overall system condition to determine remaining useful life. The evaluation will also assess code compliance with current NFPA 72, IBC, and IFC standards and examine integration capabilities with existing building systems such as HVAC, access control, and elevator controls. In addition, the firm will review available documentation and records to verify system history and maintenance information. Based on these findings, the firm will provide a recommended scope of work outlining whether each system should be repaired, upgraded, or fully replaced to meet current operational and safety requirements. Scope of Service Based on evaluation findings and County direction, the firm shall develop: Construction drawings including: floor plans with device locations, riser diagrams, panel locations and wiring pathways, notification appliance circuit layouts, and standpipe/sprinkler supervisory connections where applicable Technical specifications including approved manufacturer and model specifications, device quantities and performance criteria, wiring and conduit requirements, sequence of operations, and integration requirements with County-preferred systems Bid-ready documents including Division 28 specifications, supplementary conditions, equipment schedules, installation details, and points list with programming requirements The firm may be asked to provide: pre-bid conferences and site visits, bid evaluation support, submittal review, RFI responses, construction observation, commissioning observation, final acceptance testing witness, and record drawing preparation. The firm shall provide plans stamped by a licensed electrical engineer familiar with Washington State fire alarm requirements, coordinate with local fire marshal and building official plan review, respond to plan review comments, and provide final approved record drawings. Applicant and Application Requirements Professional Licensing Licensed electrical engineer on staff or under contract, registered in Washington State. Ability to provide engineer-stamped drawings for permit submittal. Fire Alarm Design Credentials NICET certification for design personnel: Level III or IV in Fire Alarm Systems preferred; Level II minimum for primary designer. Demonstrated experience with addressable fire alarm systems and familiarity with voice evacuation/emergency communication systems where required by code. Relevant Experience Minimum five (5) years of fire alarm design experience. Minimum three (3) projects of similar scale and complexity completed within the last five (5) years. Experience with public agency clients preferred. Experience with historic buildings, healthcare occupancies, and detention/correctional facilities strongly preferred. Local Knowledge Familiarity with Washington State building and fire codes. Experience working with Lewis County, Chehalis, or Centralia building/fire officials preferred. Understanding of WSEC integration requirements. Submission Requirements Firm qualifications including history, size, organizational structure, relevant project experience, resumes of key personnel, proof of professional licensing and NICET certifications, explanation of approach to existing system evaluation, and description of quality control processes. Provide three (3) client references from public agency projects completed within the last five years, including project name, scope, contract value, and client contact information. Confirm availability to begin work within 30 days of selection and describe current workload and capacity for multiple phased projects. Right to Amend Capital Infrastructure reserves the right to amend terms of this "Request for Qualifications" (RFQ) to circulate various addenda, or to withdraw the RFQ at any time, regardless of how much time and effort consultants have spent on their responses. Equal Opportunity Interested firms should submit a statement of qualifications stating your ability and availability to complete this work in accordance with this notice. Lewis County is an equal opportunity and affirmative action employer. Disadvantaged, minority, women-owned and veteran-owned firms are encouraged to submit statements. Americans with Disabilities Act (ADA) Information Lewis County, in accordance with Section 504 of the Rehabilitation Act (Section 504) and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. This material can be made available in an alternate format by emailing Matt Patana at matt.patana@lewiscountywa.gov or calling (360) 219-5134 Non-Discrimination (Lewis County Funds) The Contractor or any employee, agent or representative of the Contractor or any subcontractor shall not discriminate against any person in the performance of this contract in the performance of any of its obligations hereunder on the basis of race, color, creed, ethnicity, religion, national origin, age, sex, marital status, veteran or military status, sexual orientation or the presence of any disability. Implementation of this provision shall be consistent with Section 49.60.400 of the Revised Code of Washington. The Contractor must comply with the American with Disabilities Act of 1990, Public Law 101-336, including but not limited to protection to individuals with disabilities in the areas of employment, public accommodations, state and local government services, and telecommunications. Decision Making Process Proposals for this funding will be reviewed by a selection committee of not less than 3 County Employees. Written proposals will be evaluated for completeness and eligibility. A short-list of Candidates will be required to provide an oral presentation to the selection-committee. The selection committee will score proposals according to the criteria and percentage value identified in the Evaluation Criteria. The selection committee, in its discretion, may further define these criteria and implement and allocate value within these percentages. Final contract award recommendations may consider both written and oral elements. All recommendations will be shared with the Board of County Commissioners (BOCC). All final award decisions will be made by the BOCC. Lewis County, in its sole judgment, reserves the right to determine which proposals best meet the County’s needs. The County retains the right to reject any or all proposals or to waive formalities with or without cause. Lewis County will evaluate qualifications based on the following weighted criteria: Firm Qualifications 20% NICET certifications, licensed engineer availability, relevant project experience, quality control processes Responsiveness and Capacity 20% Ability to meet multiple project schedules, availability within 30 days, current workload, staffing for phased work Historical experience 10% Experience with Buildings that are historical or otherwise compare to the Historic Courthouse Jail experience 10% Experience with Jails or similar structures, with similar requirements. Compliance and Documentation 20% Strong record of regulatory compliance and timely permitting Blueprint Design/ Specification 20% Design documents and specifications that provide a high level of clarity and simplicity yet remain comprehensive and sufficiently detailed. Awarding of Contract The County will negotiate scope, schedule, and a fair and reasonable fee with the top-ranked firm, formally terminate if it cannot agree, and then go to the next firm. The Board of County Commissioners will decide the final award. Evaluation Phases Attachments Vendor Submissions

Published attachments
Addenda and notices
  • Official Notice #1: extending the deadlines associated with the RFQ · 1

    The Lewis County Board of County Commissioners approved Resolution 26-402 on Oct. 6, 2026, to issue a request for qualifications (RFQ) from qualified firms for a comprehensive on‑site evaluation of its existing fire alarm systems ; and wishes to extend the deadlines associated with the RFQ.

Public questions and answers
  • If a consultant participates as part of an engineering team responding to this solicitation, will they still be eligible to bid as part of a construction team?

    Thanks for the question, the simple answer is no. Below is the reasoning for why. A consultant who helps prepare, evaluate, or influence the engineering or design documents for a solicitation is usually not allowed to bid on the construction phase of the same project. This is because it creates what is called an organizational conflict of interest (OCI). Why: Unfair competitive advantage The consultant may have insider knowledge about design intent, project constraints, or evaluation criteria. Impartiality concerns The consultant could (even unintentionally) design the project in ways that favor their own construction team. Liability and oversight separation The engineering team is supposed to oversee construction objectively. If they also bid construction, that separation is compromised.

  • The RFQ asks proposers to “confirm availability to begin work within 30 days of selection and describe current workload and capacity for multiple phased projects.” What is the anticipated date of selection and what are the anticipated schedules for the proposed projects at the IT Building, Historic Courthouse, Health Building, and Jail?

    I would anticipate selecting a contractor by January 1, 2027

  • Is a summary table acceptable as proof of licensing and NICET certification, or are copies of the certificates required? - If it's the latter, does this count towards the 10-page limit?

    A summary table would be fine.

  • Is the IT Building a standalone structure? If so, what is its address?

    The IT building is connected by a wall, the address 185 NW Chehalis Ave. Chehalis Wa.

  • What is the anticipated budget for design services and for construction, if known?

    The County has not yet anticipated a budget for design services and for construction.

  • Does "Blueprint Design/Specification" mean sample drawings and specifications are expected, and do they count toward the 10 page limit?

    I think this would be an example. This would not count toward the 10-page limit.

  • If the submitter is a licensed PE with direct experience designing fire alarm systems in detention, court, and healthcare facilities, will a NICET certified team member still be required?

    “NICET certification was listed as a preferred qualification for design personnel. A licensed Professional Engineer with documented experience designing fire alarm systems in detention, and court facilities will be considered acceptable in meeting the intent of the requirement. NICET certification is not strictly required if the proposer can demonstrate equivalent or superior competency.” The County wants to establish that the firm selected has field awareness because these buildings are not new construction, they will need to be creative in these spaces.

  • Are there known facility access, security clearance, escort, scheduling, or operational requirements at any of the identified facilities, particularly the Jail, that the consultant team should consider when planning the existing-system assessments?

    The County will do background checks and if escorts are needed, they will be provided. Most spaces will only require an escort to help clarify or to unlock restricted areas.

  • Does the County intend to negotiate fees and issue separate notices to proceed for assessment, design, and construction-phase services? If there is a single agreement, will scope and fee be adjusted after the assessment based on the number of buildings and the recommended work?

    The County does intend to negotiate fees and issue separate notices. Several buildings are expected to move forward. Once a firm is selected, we will work collaboratively to define the scope of work, determine which building projects are ready to proceed, and identify any projects that may need to pause due to budget constraints or other limiting factors.

  • The RFQ identifies the IT Building, Historic Courthouse, Health Building, and Lewis County Jail and "other county facilities as identified". Will these facilities be identified and added after award of the contract and during fee negotiations?

    Several buildings are expected to move forward. Once a firm is selected, we will work collaboratively to define the scope of work, determine which building projects are ready to proceed, and identify any projects that may need to pause due to budget constraints or other limiting factors.

  • Does the County expect an historic architect or preservation specialist to be part of the consultant team?

    No, but the Capital Infrastructure Specialist or his designee will review and work with the architect to ensure that the end product preserves the building and will meet requirements.

  • Does the County have an existing preservation consultant or historic architect with which the team will coordinate?

    No, but the Capital Infrastructure Specialist or his designee will review and work with the architect to ensure that the end product preserves the building and will meet requirements. If the County or the architect feels that further consultation is necessary, the County may choose to consult a preservation authority.

  • What historic review or approval is required for fire alarm alterations (DAHP, a local preservation commission, Section 106, or Governor’s Executive Order 21-02)? Is the consultant expected to prepare and submit the review documentation for historic reviews/approvals?

    The County has several projects underway through DAHP for the Historic Courthouse. While the fire alarm systems are not included in those projects, they will be eligible to be used as match. For that reason, the County will submit plans to DAHP for review. The County has already been in communication with DAHP regarding the fire alarm system updates and does not anticipate any major concerns.

  • What security requirements apply to consultant and subconsultant staff (background checks, escorts, badging, equipment restrictions)?

    Each representative from the firm will be required to pass a background check. Escorts will be provided as needed for access to restricted areas, and badges will be issued accordingly. Equipment restrictions will be reasonable, but will ultimately be subject to the expectations and security requirements of the jail.

  • Will the County provide architectural backgrounds in ACAD or REVIT, or should the successful design firm include field survey, or CAD/BIM support to create them?

    At this time, the County does not maintain architectural backgrounds in ACAD or Revit. Some of our buildings will not have digitized blueprints, but this will be a building by building and a case by case basis. The successful design firm should plan to provide any necessary field verification, surveying, and CAD/BIM support needed to create accurate backgrounds for the project.

  • What existing documentation is available for each facility in PDF/paper/ACAD/REVIT (architectural plans, fire alarm as-builts, fire alarm device lists, fire alarm programming files, fire alarm O&M manuals), MEP drawings, door control drawings (Jail/Courthouse), and architectural life safety drawings?

    At this time, the County does not maintain architectural backgrounds in ACAD or Revit. Some of our buildings will not have digitized blueprints, but this will be a building by building and a case by case basis. The successful design firm should plan to provide any necessary field verification, surveying, and CAD/BIM support needed to create accurate backgrounds for the project.

  • Are hazardous materials surveys (asbestos, lead paint) available for the older buildings? Does the County expect a hazmat consultant on our team, or will the County provide that service, or is it not expected to be needed?

    Some of the buildings have already been surveyed and or abated. The County will not expect the firm to provide this.

  • Are specialized fire extinguishing systems currently installed in the IT building or elsewhere, e.g., Halon, FM-200, NOVEC 1230, or other specialty system?

    The Jail is currently the only building that will be part of the FA project that has a Fire extinguisher system. It is water, no Halon. Nothing in the IT Building.

  • Does the County intend fully engineered, stamped design drawings with the contractor preparing shop drawings and the permit submittal, or will the design team prepare and submit the permit application.

    I believe that the design team will have all of the permit ready information, whether the county applies, or the design team, or the contractor.

  • Does the County have existing preservation documents (Historic Structure Report, character-defining feature inventory, prior DAHP correspondence) and any restrictions on device placement, surface conduit, or penetrations?

    None that I am aware of, but we will likely lean into what has been done previously and ask the DAHP for guidance.

  • Are existing ITM records available (NFPA 72 inspection and test reports, deficiency lists, central station reports), and who is the incumbent inspection and service provider that will be provided to the successful design firm by the County?

    Pioneer Fire & Security, Inc. was the last and incumbent fire system testing vendor. Knight Fire, Inc. is our incumbent fire sprinkler systems inspector at Jail and Juvenile Court. Alarm.com via Access Security, Inc. serves as our central station. Outside of Alarm.com reports, I’m not sure we’d have “reporting” available for these older systems unless they are just asking for vendor testing and inspection reports? We could reach out for those if you think it’s important. We have not selected a company going forward for executing the future FA work.

  • Is there a target schedule for award, notice to proceed, and completion for each phase?

    Lewis County would hope to have something in place by January 1, but hope to move faster if possible...At the speed of government.