Fire Flow Testing Services
Description
The Washington Suburban Sanitary Commission, MD (the "WSSC"), is soliciting sealed responses for Fire Flow Testing Services. Responses are to be submitted via WSSC's eProcurement Portal via https://procurement.opengov.com/portal/wsscwater PRIOR TO 2PM on November 30, 2026 . Late responses will not be accepted. The purpose of the Fire Flow Testing Program is to evaluate the hydraulic performance of the water distribution system by measuring available static pressure, residual pressure, and flow rates at designated test locations. The testing results will be used by WSSC Water to assess the flow-producing capacity of the water distribution system, support engineering analyses, verify system performance, assist in planning future infrastructure improvements, and provide fire flow information to internal departments and external stakeholders, as authorized by WSSC Water. The Contractor shall be responsible for planning, coordinating, and performing fire flow testing activities, collecting and validating field data, documenting testing results, and submitting complete reports in accordance with the requirements of this Contract. All work shall be performed in a manner that maintains the integrity of the water distribution system, minimizes disruption to customers and traffic, and complies with all applicable WSSC Water standards, safety requirements, and industry best practices. SCOPE OF WORK SCOPE OF WORK The Contractor must provide all assigned fire flow testing services, including performing all labor and furnishing all materials, tools, equipment, and instruments through successful execution completion of the Contract. The Work must be identified and defined herein. Hydrant Selection, Mapping and Scheduling WSSC must assign the fire hydrant testing locations by providing a list of preferred assets to the Contractor prior to the Work commencing. The Contractor must work with WSSC to prioritize the fire flow testing location(s) based on need when scheduling testing The Contractor must select the Flow as well as Static and Residual hydrants anticipated to be used during the fire flow testing. The Contractor must develop a location map by annotating a GIS map with the intended Flow Hydrant and Static and Residual Hydrant. The location map must include an ADC Map Page, Grid Number, 200-ft Sheet number, and Street Address including City and County. The Contractor must submit the location map for review three (3) business days prior to testing a recommended testing location layout. The Contractor must receive approval of all planned testing locations prior to on-site investigation The Contractor must avoid selecting hydrants outside of the right-of-way (ROW) and on private property. If the Contractor intends to select a hydrant outside of the ROW and/or on private property, the Contractor must submit for and receive approval in writing from the property owner via a right-of-entry prior to utilizing the hydrant(s). The Contractor must not select any fire hydrant(s) owned and maintained by organizations other than WSSC Water while planning Fire Flow test locations. Fire Flow Lead Valve and Hydrant Location and Inspection Location of Valves and Hydrants The Contractor must locate any valve(s) and hydrant(s) associated with a selected fire flow location. The Contractor must use visual inspection and markings, locator devices, and review of available documentation methods to search for and locate these appurtenances. The Contractor must search for all valve(s) and hydrant(s) for a minimum of fifteen (15) minutes per asset. In the event of a failed valve and/or hydrant location, the Contract Manager must review the failed inspection report and confirm the valves and hydrants were not able to be located prior to remittance of payment In the event a valve cannot be located, the Contractor must provide a data report with the intended valve information and identify that the valve was not located. The report must contain information regarding the valve location search attempt, including date, start time and end time, method and equipment used, and the suspected reason for failure In the event a hydrant cannot be located, the Contractor must provide a data report with the intended hydrant information and identify that the hydrant was not located. The report must contain information regarding the hydrant location search attempt, including date, start time and end time, method and equipment used, and the suspected reason for failure. In the event the planned hydrant testing asset condition or location prevents the Contractor from performing the fire flow test, the Contractor must coordinate with the Contract Manager an alternative fire flow test configuration including the reasoning for the change request prior to commencing the reconfigured fire flow test. Any additional assets required to perform the reconfigured fire flow test must be approved by the Contract Manager. Inspection of Valves and Hydrants The Contractor must perform an assessment of all lead valves and fire hydrants associated with each planned fire flow test location once the asset has been located. The Contractor must immediately report any valves or fire hydrants that are damaged, broken, inoperable, or in any way become defective during the fire flow testing to WSSC ’s Contract Manager. The Contractor must immediately report any dangerous infrastructure situation that can pose a public safety hazard to the WSSC Contract Manager at any phase of the fire flow process, including but not limited to locating, inspection, or testing. Lead Valve Inspection The Contractor must perform an inspection and operation of the lead valve prior to conducting the fire flow test. The inspection report must include timing of inspection, identified valve information, condition assessment, operation, other observations, and recommendations for the assets The Contractor must capture and provide a report with the following data for each successful valve inspection location: Valve location (GPS X-Y coordinates and GUID, 200-ft sheet, and local street address, city, and county) Valve full asset ID (ex. VV01D01001) Valve type (ex. Gate, Not Geared) Valve size in inches Start and finish date and time of the inspection Depth of valve and/or operating nut Valve condition (“operable”, “inoperable”, “not located”, or “other” with a brief description) Operation number of turns Operation torque information Operation close direction (counterclockwise or clockwise) Operational status (functional or nonfunctional) Identify if the valve was vacuumed or pumped Identify if the valve was successfully exercised Identify possible presence of leaks (“definite”, “possible”, or “none”) Additional applicable observations, operational discrepancies, data errors, valve discrepancies, or other comments as necessary Identify if replacement is recommended, including any specific details to support the recommendation The Contractor must submit the reports in accordance with the reporting section of this Contract. Hydrant Inspection The Contractor must perform an inspection and operation of the hydrant prior to conducting the fire flow test. The inspection report must include timing of inspection, crew information, identified hydrant information, port information, nozzle information, condition assessm SCHEDULE AND UPDATES Schedule Within three (3) business days after issuance of the Notice to Proceed (NTP), the Contractor's Project Manager shall prepare and submit a proposed project schedule to the Contract Manager for review and acceptance. At a minimum, the project schedule shall include: Assigned asset identification (Asset IDs) Proposed fire flow testing locations Anticipated testing sequence Estimated start and completion dates Proposed crew sizes Major project milestones Anticipated completion dates for all Contract Work The Contractor shall perform the Work in accordance with the accepted project schedule. If the Contractor anticipates delays or revisions to the schedule, the Contractor shall notify the Contract Manager immediately and submit a revised schedule for review. Acceptance of the project schedule by the Contract Manager shall not relieve the Contractor of its responsibility to complete the Work within the Contract requirements. Weekly Progress Meetings The Contractor shall participate in weekly project meetings or conference calls as directed by the Contract Manager throughout the duration of the Contract. The Contractor's Project Manager, or an authorized representative with decision-making authority, shall attend all scheduled meetings. The Contract Manager shall determine the meeting frequency, date, time, location, and meeting format. Meeting frequency may be adjusted throughout the Contract based on project needs. Weekly progress meetings shall include, at a minimum: Work completed during the previous reporting period Work scheduled for the upcoming reporting period Schedule status Safety concerns Outstanding action items Issues requiring Commission review or decision Potential project risks or delays Proposed corrective actions, if applicable Weekly Schedule Updates The Contractor shall submit a two (2) week look-ahead schedule to the Contract Manager no later than the close of business (COB) on the last working day of each week. At a minimum, the look-ahead schedule shall identify: Daily work activities Planned testing locations Asset IDs Assigned personnel and crew sizes Required equipment Traffic control requirements Required permits Any anticipated resource constraints Other activities necessary to complete the Work The Contractor shall notify the Contract Manager of any changes to the approved weekly schedule prior to the commencement of the affected Work. Revised schedules shall identify the reason for the change and any anticipated impacts to the overall project schedule. KICK-OFF MEETING WSSC'S Contract Manager must schedule a kick-off meeting with the Contractor to discuss the scope overview, critical milestones, communication plan, roles and responsibilities, safety requirements, documentation expectations, and the Contract Document(s). The Contractor’s Project Manager must attend the kick-off meeting as well as other pertinent Contractor representatives i.e. superintendent, foreman, testing crew members, and any major subcontractors. The Kick-off meeting will be held at least three (3) business days prior to any initiation of Work. PRE-CONSTRUCTION SUBMITTALS Prior to the commencement of any field activities, the Contractor shall submit all required pre-construction submittals to the Contract Manager for review and acceptance. No field work shall begin until the Contract Manager has reviewed and accepted all required submittals. At a minimum, the Contractor shall submit the following: Quality Assurance/Quality Control (QA/QC) Plan Equipment List Equipment Manufacturer Certifications Equipment Calibration Certifications Any additional documentation requested by the Contract Manager necessary to perform the Work. The Contractor shall attend a kick-off meeting with the Contract Manager and other Commission representatives, as required, prior to the start of field activities. The purpose of the meeting shall be to review the Contract requirements, project schedule, communication procedures, safety requirements, reporting requirements, and other administrative or technical matters necessary for successful performance of the Work. Quality Assurance/Quality Control (QA/QC) Plan The Contractor shall prepare and submit a comprehensive Quality Assurance/Quality Control (QA/QC) Plan for review and acceptance by the Contract Manager prior to performing any field Work. At a minimum, the QA/QC Plan shall include: A description of all anticipated work activities. Project objectives and quality objectives. Inspection and acceptance criteria for each work activity. Applicable industry standards, specifications, and quality requirements. Work procedures and process steps. Equipment operating procedures. Required tools, testing equipment, and instrumentation. Personnel qualifications, licenses, certifications, and training requirements. Data collection and documentation procedures. Quality control inspection procedures. Procedures for identifying, documenting, correcting, and preventing deficiencies. Report review and verification procedures. The Contractor shall implement the approved QA/QC Plan throughout the duration of the Contract and shall update the plan whenever significant changes to the Work or project procedures occur. Equipment List Prior to the commencement of Work, the Contractor shall prepare and submit a complete inventory of all equipment, tools, vehicles, testing devices, and other resources proposed for use during performance of the Contract. At a minimum, the equipment list shall include: Equipment description. Manufacturer. Model number. Serial number, where applicable. Intended use. Manufacturer certifications. Current calibration certificates, where applicable. Equipment requiring certification or calibration shall maintain current certification throughout the Contract period. Copies of updated certifications shall be provided to the Contract Manager upon request. The equipment list shall include, at a minimum, all equipment necessary to perform the Work, including but not limited to: Pressure gauges Pitot gauges Flow test kits Hydrant testing equipment Water diffusers Discharge hoses Diverters Valves Dechlorination equipment Dechlorination tablets or chemicals GPS equipment Survey or locating equipment Traffic control devices The Contractor shall maintain the equipment list throughout the Contract and update the list whenever equipment is added, removed, or replaced. Contractor Vehicles All Contractor vehicles utilized in the performance of the Work shall display the Contractor's company name and a current business telephone number in a clearly visible manner on both sides of each vehicle. Vehicle identification shall remain visible and legible throughout the duration of the Contract. Equipment Failure The Contractor shall immediately remove from service any defective, damaged, or improperly calibrated equipment and replace such equipment with properly functioning equipment at no additional cost to WSSC Water. Calibration All pressure gauges, pitot gauges, flow meters, and other measuring devices shall be calibrated in accordance with the manufacturer's recommendations or at least annually, whichever is more stringent. Calibration certificates shall be available for review by the Contract Man ager at any time during the Contract. CONTRACT TERM The Agreement must be for a period of one (1) year base term from the date of Agreement execution date above. The Agreement may be extended for an additional four (4) one-year option terms at the sole option and discretion of WSSC. COMMUNITY COORDINATION Community Notification The Contractor shall support WSSC Water's community outreach efforts by providing public notifications as directed by the Contract Manager prior to performing fire flow testing, hydrant flushing, or other activities that may affect customers, traffic, or public access. Notification requirements shall be determined by the Contract Manager based on the scope, location, and anticipated impact of the Work. At a minimum, the Contractor may be required to provide: Hydrant flushing or fire flow testing notification signs at designated hydrant locations on the day of testing. Door hangers distributed to affected customers a minimum of two (2) calendar days prior to the scheduled Work. Community notification letters. Press releases or public notices. Electronic notification materials. Business notifications. Traffic impact notifications. Any other public notification or outreach materials requested by the Contract Manager. The Contractor shall distribute all notifications in accordance with the schedule established by the Contract Manager and shall maintain documentation verifying completion of the notification activities. Documentation When directed by the Contract Manager, the Contractor shall provide documentation demonstrating completion of the required community notifications. Documentation may include, but is not limited to: Distribution logs. Door hanger distribution maps. Photographs of posted notification signs. Copies of notification letters. Dates and times of notification activities. Other documentation requested by the Contract Manager. Coordination The Contractor shall immediately notify the Contract Manager of any customer complaints, public inquiries, access issues, or other community concerns encountered during the performance of the Work. The Contractor shall not issue public statements, respond to media inquiries, or distribute public information on behalf of WSSC Water without prior authorization from the Contract Manager. SOFTWARE WSCC Water Provided Software The Contractor shall obtain, maintain, and utilize all Commission-provided software systems required for the performance of the Work. The Contractor shall be responsible for obtaining all necessary user access, completing required training, and entering, maintaining, and retrieving project information as directed by the Contract Manager. There shall be no additional cost to WSSC Water for software access, training, or use. Computerized Maintenance Management System (CMMS) The Contractor shall obtain authorized access to WSSC Water's Computerized Maintenance Management System (CMMS) prior to performing Work requiring the use of the system. The Contractor shall: Complete all required CMMS training prior to accessing the system. Retrieve work assignments, asset information, and other project data from CMMS as directed by the Contract Manager. Enter all required inspection, testing, reporting, and completion information into CMMS accurately and in a timely manner. Maintain the accuracy and completeness of all information entered into the system. Notify the Contract Manager immediately of any system access issues or data discrepancies that may affect performance of the Work. Other Software The Contractor shall obtain authorized access to all Commission-provided software applications required to perform the Work. At a minimum, these systems may include, but are not limited to: Enterprise Geographic Information System (EGIS) e-Builder (Trimble Unity Construct and Maintain) WSSC Water Supplier Portal WSSC Water Compliance System Any additional Commission-approved software identified during the Contract The Contractor shall: Complete all required training prior to using each software application. Retrieve and input project information as directed by the Contract Manager. Maintain current user credentials and access throughout the Contract period. Ensure all electronic records entered into Commission systems are accurate, complete, and submitted within the required timeframes. Comply with all Commission information technology, cybersecurity, data security, and confidentiality requirements while using Commission-provided software. The Contractor shall provide all computer hardware, internet connectivity, mobile devices, and other resources necessary to access and utilize Commission-provided software unless otherwise specified by WSSC Water. System Availability The Contractor shall promptly notify the Contract Manager of any software outages or technical issues that prevent the timely completion of the Work System outages shall not relieve the Contractor of its responsibility to complete required documentation once system access is restored. Data Ownership All electronic data, reports, photographs, GIS information, inspection records, and other information entered into Commission-provided software shall become the property of WSSC Water User Accounts The Contractor shall immediately notify the Contract Manager when pe
Published attachments
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum. Update submission date: Bids Submission date changed from November 25, 2026, to November 30, 2026
Addendum #2 · 2
Please use the See What Changed link to view all the changes made by this addendum. Question submission date changed from November 09, 2026, to November 12, 2026, 2:00 PM.
Addendum #3 · 3
Pre Bid meeting (Nov 9, 2026) - Attendance sheet and Pre-Bid Meeting presentation
Public questions and answers
Who is designing the tests?
Thank you for your question. WSSC will provide the list of hydrants to be tested after award and the assumed quantities are listed on the line-item prices. All testing locations and coordination will be initiated by the Contractor. Please see additional information in the scope.
Are failed flow tests still billable?
Thank you for your question. Yes, this would be indicated on your required report submission. Any line item can be paid once all appropriate documentation has been provided and confirmed by WSSC Water.
Are hydrants and valves that can’t be operated still billable?
Thank you for your question. Yes, this would be indicated on your required report submission. Any line item can be paid once all appropriate documentation has been provided and confirmed by WSSC Water.
If they are not billable, how do we get paid for failed tests or valve and hydrants that can’t be operated? How many tests failed last time? How many assessments were done and not billable?
Thank you for your question. This question appears to be a follow-on to question #3. These are billable as identified in response to question #3. This solicitation stands on its own, and any previous contract information is not available at this time.
Who is providing the door hangers to customers?
Thank you for your question. The Contractor must fill out the door hangs, and WSSC will provide the door hangers to the Contractor for distribution. The Contractor is responsible for distribution to affected customers a minimum of two (2) calendar days prior to the scheduled Work or as required by the Contract Manager.
Is there a MBE/WBE requirement?
No, this project does not have a MBE/WBE requirement. It has a 5.00% Bid Price Preference. Please refer to section 9. Minority Business Enterprise (MBE) and Small Local Business Enterprise (SLBE) Programs, 9.5 Bid Price Preference.
When can this work be done (months of the year), when does it need to be completed by?
Thank you for your question. As identified in Scope of Work section 8.12, fire flow testing will be suspended while WSSC Water is under emergency mandate due to Winter season work. This typically is in affect from mid-November till March. WSSC will issue guidance once the season commences.
Do the inspections have to take place before the flow tests, or at the same time?
Thank you for your question. The inspections must occur prior to the fire flow testing. The Contractor is responsible for managing their time appropriately on-site.
Is it possible to obtain this certification without having worked for the WSSC?
Thank you for your question. The D-1 operator license is a Maryland State license. The license is issued by the MDE Board of Waterworks and Waste System Operators.
Do the lead valves need to be exercised as part of the lead valve inspection?
Thank you for your question. Yes. The Contractor must perform an inspection and operation of the lead valve prior to conducting the fire flow test, as identified in the scope.