State and local · OpenGov
Firefighter Personal Escape Safety System & Training Services
Description
The City of Pittsburgh Office of Management and Budget, on behalf of the Bureau of Fire, is soliciting proposals from qualified firms for Firefighter Personal Escape Safety Systems & Training Services. The City is seeking responsible proposals to provide both equipment and training in the use of Firefighter Personal Escape Systems. YEAR 1 - Firefighter Personal Escape System CORE EVO NFPA Descent Device 7.5 with 8" Lanyard - PN#1108-2010.108 30 Feet of APEX 7.5MM Personal Escape Rope - (Attachment must be a knot system - sewn terminations will not be accepted.) PN#1107-1800.009 TALON R Escape Anchor Hook PN#1108-3001 Ball Pull Strap PN#1105.0047 Multi Purpose Leg Strap PN#CMUS 1101-0090.02 Slim Pocket Pouch - PN#1102-3002.30 (POUCH MUST INCLUDE DRAIN HOLES INCORPORATED INTO THE HARDWARE POCKET) Lakota Belt PN#1101-0006.1 (Waist Size 28-50) Lakota Belt PN#1101-0006.2 (Waist Size 52-66) Carabiner PN#1108-2011.3 YEAR 1 Replacement Components - Firefighter Escape System Replacement APEX 7.5MM Personal Escape Rope - Price per Spool Replacement Slim Pocket Pouch - PN#1102-3002.30 (POUCH MUST INCLUDE DRAIN HOLES INCORPORATED INTO THE HARDWARE POCKET) Replacement Ball Pull Strap PN#1105.0047 Replacement TALON R Escape Anchor Hook PN#1108-3001 Replacement Talon R Escape Anchor Hook - (TIP ONLY) PN#1108-3001.3 Replacement M2E8 - 8" Lanyard PN#1105-0056.08 Lakota Belt PN#1101-0006.1 (Waist Size 28-50) Lakota Belt PN#1101-0006.2 (Waist Size 52-66) Carabiner PN#1108-2011.3 CORE EVO NFPA Descent Device 7.5 with 8" Lanyard - PN#1108-2010.108 YEAR 1 - Training Personal Escape System Use Training and Care/Inspection Training - On-Site Pittsburgh, Pennsylvania - Train the Trainer for Twenty (20) Instructors Personal Escape System Training - On-Site Pittsburgh Pennsylvania - End User Training requires manufacturer representative to support Escape System Implementation - Cost per Eight (8) hour day. Personal Escape System Training - On-Site Pittsburgh, Pennsylvania - Repair/Component Replacement - Training for (6) Repair Personnel. YEAR 2 - Firefighter Personal Escape System CORE EVO NFPA Descent Device 7.5 with 8" Lanyard - PN#1108-2010.108 30 Feet of APEX 7.5MM Personal Escape Rope - (Attachment must be a knot system - sewn terminations will not be accepted.) PN#1107-1800.009 TALON R Escape Anchor Hook PN#1108-3001 Ball Pull Strap PN#1105.0047 Multi Purpose Leg Strap PN#CMUS 1101-0090.02 Slim Pocket Pouch - PN#1102-3002.30 (POUCH MUST INCLUDE DRAIN HOLES INCORPORATED INTO THE HARDWARE POCKET) Lakota Belt PN#1101-0006.1 (Waist Size 28-50) Lakota Belt PN#1101-0006.2 (Waist Size 52-66) Carabiner PN#1108-2011.3 YEAR 2 Replacement Components - Firefighter Escape System Replacement APEX 7.5MM Personal Escape Rope - Price per Spool Replacement Slim Pocket Pouch - PN#1102-3002.30 (POUCH MUST INCLUDE DRAIN HOLES INCORPORATED INTO THE HARDWARE POCKET) Replacement Ball Pull Strap PN#1105.0047 Replacement TALON R Escape Anchor Hook PN#1108-3001 Replacement Talon R Escape Anchor Hook - (TIP ONLY) PN#1108-3001.3 Replacement M2E8 - 8" Lanyard PN#1105-0056.08 Lakota Belt PN#1101-0006.1 (Waist Size 28-50) Lakota Belt PN#1101-0006.2 (Waist Size 52-66) Carabiner PN#1108-2011.3 CORE EVO NFPA Descent Device 7.5 with 8" Lanyard - PN#1108-2010.108 YEAR 2 - Training Personal Escape System Use Training and Care/Inspection Training - On-Site Pittsburgh, Pennsylvania - Train the Trainer for Twenty (20) Instructors Personal Escape System Training - On-Site Pittsburgh Pennsylvania - End User Training requires manufacturer representative to support Escape System Implementation - Cost per Eight (8) hour day. Personal Escape System Training - On-Site Pittsburgh, Pennsylvania - Repair/Component Replacement - Training for (6) Repair Personnel. YEAR 3 - Firefighter Personal Escape System CORE EVO NFPA Descent Device 7.5 with 8" Lanyard - PN#1108-2010.108 30 Feet of APEX 7.5MM Personal Escape Rope - (Attachment must be a knot system - sewn terminations will not be accepted.) PN#1107-1800.009 TALON R Escape Anchor Hook PN#1108-3001 Ball Pull Strap PN#1105.0047 Multi Purpose Leg Strap PN#CMUS 1101-0090.02 Slim Pocket Pouch - PN#1102-3002.30 (POUCH MUST INCLUDE DRAIN HOLES INCORPORATED INTO THE HARDWARE POCKET) Lakota Belt PN#1101-0006.1 (Waist Size 28-50) Lakota Belt PN#1101-0006.2 (Waist Size 52-66) Carabiner PN#1108-2011.3 YEAR 3 Replacement Components - Firefighter Escape System Replacement APEX 7.5MM Personal Escape Rope - Price per Spool Replacement Slim Pocket Pouch - PN#1102-3002.30 (POUCH MUST INCLUDE DRAIN HOLES INCORPORATED INTO THE HARDWARE POCKET) Replacement Ball Pull Strap PN#1105.0047 Replacement TALON R Escape Anchor Hook PN#1108-3001 Replacement Talon R Escape Anchor Hook - (TIP ONLY) PN#1108-3001.3 Replacement M2E8 - 8" Lanyard PN#1105-0056.08 Lakota Belt PN#1101-0006.1 (Waist Size 28-50) Lakota Belt PN#1101-0006.2 (Waist Size 52-66) Carabiner PN#1108-2011.3 CORE EVO NFPA Descent Device 7.5 with 8" Lanyard - PN#1108-2010.108 YEAR 3 - Training Personal Escape System Use Training and Care/Inspection Training - On-Site Pittsburgh, Pennsylvania - Train the Trainer for Twenty (20) Instructors Personal Escape System Training - On-Site Pittsburgh Pennsylvania - End User Training requires manufacturer representative to support Escape System Implementation - Cost per Eight (8) hour day. Personal Escape System Training - On-Site Pittsburgh, Pennsylvania - Repair/Component Replacement - Training for (6) Repair Personnel. YEAR 4 - Firefighter Personal Escape System CORE EVO NFPA Descent Device 7.5 with 8" Lanyard - PN#1108-2010.108 30 Feet of APEX 7.5MM Personal Escape Rope - (Attachment must be a knot system - sewn terminations will not be accepted.) PN#1107-1800.009 TALON R Escape Anchor Hook PN#1108-3001 Ball Pull Strap PN#1105.0047 Multi Purpose Leg Strap PN#CMUS 1101-0090.02 Slim Pocket Pouch - PN#1102-3002.30 (POUCH MUST INCLUDE DRAIN HOLES INCORPORATED INTO THE HARDWARE POCKET) Lakota Belt PN#1101-0006.1 (Waist Size 28-50) Lakota Belt PN#1101-0006.2 (Waist Size 52-66) Carabiner PN#1108-2011.3 YEAR 4 Replacement Components - Firefighter Escape System Replacement APEX 7.5MM Personal Escape Rope - Price per Spool Replacement Slim Pocket Pouch - PN#1102-3002.30 (POUCH MUST INCLUDE DRAIN HOLES INCORPORATED INTO THE HARDWARE POCKET) Replacement Ball Pull Strap PN#1105.0047 Replacement TALON R Escape Anchor Hook PN#1108-3001 Replacement Talon R Escape Anchor Hook - (TIP ONLY) PN#1108-3001.3 Replacement M2E8 - 8" Lanyard PN#1105-0056.08 Lakota Belt PN#1101-0006.1 (Waist Size 28-50) Lakota Belt PN#1101-0006.2 (Waist Size 52-66) Carabiner PN#1108-2011.3 CORE EVO NFPA Descent Device 7.5 with 8" Lanyard - PN#1108-2010.108 YEAR 4 - Training Personal Escape System Use Training and Care/Inspection Training - On-Site Pittsburgh, Pennsylvania - Train the Trainer for Twenty (20) Instructors Personal Escape System Training - On-Site Pittsburgh Pennsylvania - End User Training requires manufacturer representative to support Escape System Implementation - Cost per Eight (8) hour day. Personal Escape System Training - On-Site Pittsburgh, Pennsylvania - Repair/Component Replacement - Training for (6) Repair Personnel. Scope of Work Firefighter Personal Escape Safety System (PES) The Pittsburgh Bureau of Fire seeks a multiple year contract of no less than four (4) years for the purchase of Firefighter Personal Escape Systems. The Pittsburgh Bureau of Fire - Personal Protective Equipment Working Group has conducted a thorough assessment and evaluation and has selected a system to meet the needs of the Bureau. Each system shall include the following components. The system Manufacturer must be Fire Innovations: CORE EVO NFPA Descent Device 7.5 with 8" Lanyard - PN#1108-2010.108 30 Feet of APEX 7.5MM Personal Escape Rope - (Attachment must be a knot system - sewn terminations will not be accepted.) PN#1107-1800.009 TALON R Escape Anchor Hook PN#1108-3001 Ball Pull Strap PN#1105.0047 Multi Purpose Leg Strap PN#CMUS 1101-0090.02 Slim Pocket Pouch - PN#1102-3002.30 ( POUCH MUST INCLUDE DRAIN HOLES INCORPORATED INTO THE HARDWARE POCKET ) Lakota Belt PN#1101-0006.1 (Waist Size 28-50) OR #1101-0006.2 (Waist Size 52-66) Carabiner PN#1108-2011.3 Each system must include an individualized serial numbering system and date of manufacture integrated into the system components. Specifically any soft good (Rope/Webbing) that must be replaced at no greater than 10year interval. Personal Escape System Replacement Components Replacement APEX 7.5MM Personal Escape Rope - Price per Spool Replacement Slim Pocket Pouch - PN#1102-3002.30 ( POUCH MUST INCLUDE DRAIN HOLES INCORPORATED INTO THE HARDWARE POCKET ) Replacement Ball Pull Strap PN#1105.0047 Replacement TALON R Escape Anchor Hook PN#1108-3001 Replacement Talon R Escape Anchor Hook - (TIP ONLY) PN#1108-3001.3 Replacement M2E8 - 8" Lanyard PN#1105-0056.08 Lakota Belt PN#1101-0006.1 (Waist Size 28-50) Lakota Belt PN#1101-0006.2 (Waist Size 52-66) Carabiner PN#1108-2011.3 CORE EVO NFPA Descent Device 7.5 with 8" Lanyard - PN#1108-2010.108 Training Personal Escape System Use Training and Care/Inspection Training - On-Site Pittsburgh, Pennsylvania - Train the Trainer for Twenty (20) Instructors Personal Escape System Training - On-Site Pittsburgh Pennsylvania - End User Training requires manufacturer representative to support Escape System Implementation - Cost per Eight (8) hour day. Personal Escape System Training - On-Site Pittsburgh, Pennsylvania - Repair/Component Replacement - Training for (6) Repair Personnel. Each submission must include a detailed course description of each course which includes the hours of instruction, the facility requirements to support the course, proposed student-to-instructor ratio, and all expenses for the delivery of the course. Proposals are required to submit Instructor Biography/Qualifications with each proposal. Intended Contract Term The City intends to enter into a four-year (4) contract for Firefighter Personal Escape Safety System & Training Services. Introduction Summary Background Contact Information Timeline The following represents the tentative schedule for this project. Any change in the scheduled dates for the Pre Proposal Conference (if applicable), Deadline for Submission of Written Questions, or Proposal Submission Deadline will be advertised in the form of an addendum to this RFP. The schedule for the evaluation process and other future dates may be adjusted without notice. Instructions to Bidders Submittal Requirements All proposals must be submitted electronically. No proposal shall be accepted in person, by U.S. Mail, by private courier service, via oral or email communication, telephone or fax transmission. Respondents are required to provide one (1) electronic copy of their proposal in either MS Word or PDF by the submission deadline. If additional hard copies are requested, the proposal should be bound or contained in a loose leaf binder. Document pages shall be 8-1/2 inches by 11 inches in size or folded to such a size. Use section dividers, tabbed in accordance with this Section as specified below. All proposals will need to be provided electronically so the following format will apply for the electronic submittal through the Beacon website. Additional Submission Considerations Late proposals will not be accepted or considered. Respondents should allow enough time to register company on the City's e-Procurement Portal, search the solicitation they wish to respond to and complete the submission process online before the deadline. The City of Pittsburgh shall not be responsible for proposals delivered to a person or location other than that specified herein. All submittals, whether selected or rejected, shall become the property of the City of Pittsburgh and will not be returned. All costs associated with proposal preparation shall be borne by the applicant. Proposal Format Requirements Response Format All submitted responses shall follow the formatting below, and all proposals will need to be provided electronically through the City's e-Procurement Portal. Each numbered section is to be uploaded as a separate file. If hard copies of submissions are required, each numbered section shall be a removable tab. Document pages shall be 8-1/2 inches by 11 inches in size or folded to such a size. Response to Scope Firm’s Qualifications, Experience and References Describe the firm and provide a statement of the firm’s qualifications for providing the scope of services. Identify the services which would be completed by your firm’s staff and those that would be provided by sub-consultants, if any. Identify any sub-consultants you proposed to utilize to supplement your firm’s staff. Provide a summary of the firm’s experience in providing these or similar services. Provide a minimum of three references for related projects, including dates, contact person, phone number, email, and a brief description of the project or scope of work. Qualifications of Project Team Provide a brief summary of the qualifications and experience of each team member assigned to this project, including length of service with the firm and resume/bio, and the qualifications /experience of any sub-consultant staff on your project team. Project Approach and Plan Provide a detailed discussion of your firm’s approach to the successful completion of the scope of services outlined in this RFP. Include thorough discussions of methodologies you believe are essential to accomplishing this project or completing the scope of services. Include a proposed work schedule to accomplish all of the required tasks within the desired timeline. Identify the staff roles who would be assigned to each major task, including sub-consultants. Cost Proposal Provide a total cost proposal for all services to be delivered, and a breakdown of costs delineated by major phase and/or deliverable as described in your project plan. Include a schedule of hourly rates for all proposed staff and the amount of time each person will be devoted to this project. Define any reimbursable expenses (e.g., travel) requested to be paid by the City. Note: If travel expenses are included, the rate assumptions generally should not exceed the United States General Services Administration (GSA) rates for Pittsburgh. PLEASE NOTE: The City does not agree to late fees, penalties, interest, attorney’s fees or other contingent liability. In no event shall the City be liable for special, indirect, incidental, reliance, lost profits or other business interest damages. Demonstration of Good Faith Effort Include statements of assurance regarding the following requirements detailed in the Equal Opportunity section of this solicitation: Solicit certified MBE/WBE/Veteran-Owned companies for various service categories where opportunities exist to subcontract within their company’s business model. Complete MWDBEVOSB Commitment Form to document good faith effort. Please provide scope of services to be delivered by each subcontractor. If a subcontractor is not chosen, a justification is required describing why services could not be rendered by a sub-contractor. Provide email documentation of solicitation correspondence with MBE/WBE/Veteran-Owned companies. Failure to include all of the elements specified may be cause for rejection. Additional information may be provided, but should be succinct and relevant to the goals of this RFP. Excessive information will not be considered favorably. Evaluation Phases Selection Procedure Your Proposal will be evaluated by a Proposal Committee comprised of the Director or other supervisor of the Using Department, one or more members of the Director’s staff, at least one member of the Office of Management & Budget and any other department representatives as deemed necessary. Submittals will be reviewed for responsiveness, and responsive submittals will further be screened by a selection committee in accordance with the criteria listed below. The firm(s) submitting the highest rated proposal may be invited for interviews. Equal Opportunity Review Commission Terms MWE/DBE The City of Pittsburgh is committed to the ideal of providing all citizens an equal opportunity to participate in City and its Authorities' contracting opportunities. It is therefore the City's goal to encourage increased participation of women and minority groups in all City contracts. The City requires that all respondents demonstrate good faith efforts to obtain the participation of Minority-Owned Business Enterprises (MBE's) and Women-Owned Business Enterprises (WBE's) in work to be performed under City contracts. The levels of MBE and WBE participation will be monitored by the City of Pittsburghs Equal Opportunity Review Commission (EORC). In order to ensure that there are opportunities for historically disadvantaged minority groups and women to participate on Covered Contracts, and consistent with the City's current equal employment opportunity practice and goals, the EORC will review contracts to include an evaluation of a developer/contractors employment of minority groups and women, encourage goals of eighteen (18) percent and seven (7) percent respectively. Veteran-Owned and LGBTQIA+ Small Business Goals It is also the City's goal to encourage participation by veteran-owned and LGBTQIA+ small businesses in all contracts. The City of Pittsburgh shall have an annual goal of not less than five (5) percent participation by veteran-owned small businesses and not less than three (3) percent participation by LGBTQIA+ businesses in all contracts. The participation goal shall apply to the overall dollar amount expended with respect to the contracts. The City requires that all respondents demonstrate good faith efforts to obtain the participation of veteran-owned small business in work to be performed under City contracts. The levels of participation will be monitored by the City of Pittsburgh’s EORC. Good Faith Commitment In order to demonstrate good faith commitment to these goals, all respondents are required to complete and submit with their bids the attached MWDBE/Veteran-Owned/LGBTQIA+ Solicitation and Commitment Form (which details the efforts made by the respondents to obtain such participation). Failure to submit a properly completed form along with documentation of Good Faith Commitment may result in rejection of the bid. Participants are encouraged to contact the Equal Opportunity Review Commission at 412-255-8804 to assist further. For further information, including definitions and additional requirements, please see Chapter 177A (Sections 177A.01 et. seq.) of the City Code and Section 161.40 of the City Code. Award and Contract Award After the City has received all Proposals and conducted its initial Evaluation, described above, the Proposal Committee may invite one or more Respondents to a follow-up interview to further discuss their Proposal(s). The Proposal Committee may decide to accept the Proposal of one or more Respondents. It may decide to reject all proposals. Once a Proposal is accepted, the contract negotiation process will commence. This RFP and your response to it, in the form of your entire Proposal, will become part of the Contract. If a real or apparent conflict should arise between this RFP/Proposal and other language contained in the final Contract, the language of the final Contract shall control. Contracting Process Successful Respondents will be required to enter into a Contract with the City of Pittsburgh, contingent upon the approval of City Council. This Contract will be directed and managed by the issuing department and the Office of Management & Budget. Work cannot commence on the Scope of the RFP until it a contract is fully executed. The City cannot process invoices nor approve payments until this Contract has been fully executed by the Respondent and all required City signatories, including the issuing depar
Published attachments
Addenda and notices
Addendum #1 · 1
Added Equal Opportunity Review Commission form and question into vendor questionnaire #3 as it was previously omitted. Please use the See What Changed link to view all the changes made by this addendum.
Official Notice #1: Pre-Proposal Meeting Powerpoint Slides · 1
Uploaded pre-proposal meeting powerpoint slides
OpenGov categories
- 46000000 · Defense and Law Enforcement and Security and Safety Equipment and Supplies
- 46190000 · Fire protection
- 46191600 · Fire fighting equipment
- 46191609 · Fire escape equipment
- 46200000 · Defense and law enforcement and security and safety training equipment