State and local · OpenGov
Fleet Maintenance Facility Spray Foam Insulation Replacement
Description
The City of Clearwater is soliciting sealed bids from qualified Contractor(s) to replace the Fleet Maintenance Facility spray foam insulat ion. Contractor(s) shall provide all labor, equipment, materials, transportation, fuel, supervision, insurance, and all related items necessary to complete the required services as specified herein . DETAILED SPECIFICATIONS The following specifications establish the scope of work, minimum technical requirements, contractor qualifications, and performance standards for the Fleet Maintenance Facility Spray Foam Insulation Replacement project. Contractor(s) shall furnish all labor, materials, equipment, supervision, and incidental services necessary to complete the work in accordance with the requirements of this solicitation. Introduction The City of Clearwater (City) is a coastal community on Florida's West Coast and the third-largest city in the Tampa Bay area with a population of approximately 118,327 residents. Clearwater Beach, a renowned international destination in Pinellas County, attracts millions of tourists annually and most recently received the prestigious TripAdvisor Traveler’s Choice Award for 2024. It consistently ranks among the top vacation spots in both national and international publications, offering year-round attractions such as pristine "sugar sand" beaches, diverse dining options, and venues like the Philadelphia Phillies Spring Training and Clearwater Threshers Minor League Baseball. The acclaimed Clearwater Marine Aquarium, nationally recognized for its innovative work in marine rescue, rehabilitation, and release, remains a major draw for visitors. The City of Clearwater is committed to advancing sustainability through eco-friendly initiatives that enhance our economy, safeguard our environment, and fortify our community. Background The objective of this project is to provide specialized facility maintenance and rehabilitation services to restore the thermal performance, energy efficiency, durability, and service life of the existing Fleet Maintenance Facility's insulation system through the removal of deteriorated insulation and the application of a replacement closed-cell spray polyurethane foam (SPF) insulation system and compatible protective coating while maintaining continuous Fleet Maintenance operations. Scope of Work Section 1 – Scope of Work General The Contractor shall furnish all labor, supervision, materials, equipment, tools, transportation, temporary facilities, containment systems, access equipment, permits (where required), waste disposal, cleanup, and incidental services necessary to perform the work described in this Scope of Work. The Contractor shall perform all work in accordance with this Scope of Work to provide specialized facility maintenance and rehabilitation services for the existing Fleet Maintenance Facility. All work shall comply with applicable federal, state, and local regulations, manufacturer recommendations, and recognized industry best practices. The work shall be performed in a manner that maintains Fleet Maintenance operations throughout the performance of the work while minimizing disruption to City personnel, vehicles, equipment, and facility operations. Existing Insulation Removal The Contractor shall remove the existing K-13 spray-applied insulation material from all designated work areas identified by the City. Removal activities shall include, but are not to be limited to: Remove deteriorated existing K-13 spray-applied insulation from the designated work areas to prepare the existing facility for replacement of closed-cell spray polyurethane foam (SPF) insulation system Collection and containment of removed material. Transportation and lawful disposal of removed material. Protection of adjacent building components during removal operations. Daily cleanup of work areas. All removed materials shall be handled, transported, and disposed of in accordance with all applicable federal, state, and local regulations. Surface Preparation Prior to installation of the new insulation system, the Contractor shall inspect all designated substrates to verify they are suitable for installation. The Contractor shall ensure all surfaces are: Clean. Dry. Structurally sound. Free of dust. Free of loose materials. Free of oil, grease, or contaminants that could affect adhesion. The Contractor shall prepare all surfaces in accordance with the insulation manufacturer's published installation requirements. Adjacent building components, equipment, finishes, and other surfaces shall be protected from overspray, dust, debris, and damage throughout the performance of work. Spray Polyurethane Foam (SPF) Insulation System The Contractor shall furnish and install a complete closed-cell Spray Polyurethane Foam (SPF) insulation system to restore the thermal performance, energy efficiency, durability, and service life of the existing Fleet Maintenance Facility insulation system. The replacement insulation system shall be installed only within the designated work areas identified by the City and shall comply with the minimum technical requirements established in Section 3 – Technical Performance Requirements. The Contractor shall: Furnish all materials, equipment, and accessories necessary to provide a complete and functional insulation system. Install the insulation system in accordance with the manufacturer's published installation requirements. Ensure the completed insulation system provides continuous, uniform coverage free of voids, gaps, overspray, or other defects that could adversely affect long-term performance. Coordinate the work to maintain Fleet Maintenance operations and minimize disruption to City personnel, fleet vehicles, equipment, and facility operations. Protect adjacent building components, equipment, utilities, and finished surfaces throughout the performance of the work. Protective Coating System Following installation of the replacement SPF insulation system, the Contractor shall furnish and apply a compatible protective coating system in accordance with the requirements of Section 3 – Technical Performance Requirements. The protective coating system shall provide the required fire protection, durability, and finish necessary to support the long-term performance of the insulation system. The Contractor shall: Apply all coatings in accordance with the manufacturer's published installation requirements. Verify compatibility between the insulation system and protective coating system. Protect adjacent building components and finishes from overspray or damage. Provide a uniform finished appearance acceptable to the General Services Department. Cleanup and Restoration The Contractor shall maintain the work area in a clean and orderly condition throughout the performance of the work. Project-generated debris, waste materials, unused products, temporary protection, and equipment shall be removed on a regular basis to maintain a safe working environment and minimize disruption to Fleet Maintenance operations. Upon completion of the work, the Contractor shall remove all temporary protection, equipment, debris, and waste materials and restore the work area to a clean condition acceptable to the General Services Department. Existing Conditions The Contractor shall verify existing field conditions before beginning work. Should concealed, deteriorated, or unforeseen conditions be encountered that may affect the work, the Contractor shall immediately notify the City Project Coordinator before proceeding. The Contractor shall not perform work outside the limits of this Scope of Work without written authorization from the General Services Department. Contractor Site Verification Prior to submitting a bid, the Contractor shall visit the project site and become familiar with existing conditions, site access, work limitations, and operational requirements associated with performing maintenance and rehabilitation services within an occupied municipal facility. Submission of a bid shall constitute acknowledgment that the Contractor has become familiar with the site conditions and has included all labor, materials, equipment, and incidental services necessary to perform the work described in this Scope of Work. Section 2 – Operational Requirements Coordination The Contract Minimum Qualifications A. Minimum Qualifications. To be considered responsive, Contractor(s) must meet the following minimum qualifications: Contractor(s) shall be properly licensed in the State of Florida to perform the work specified in this solicitation and shall maintain all required licenses throughout the term of the Contract. Contractor(s) shall submit evidence of all required licenses with their bid. Contractor(s) shall have a minimum of five (5) years of documented experience installing commercial closed-cell spray polyurethane foam (SPF) insulation systems. Contractor(s) shall demonstrate experience successfully completing projects involving the installation of closed-cell SPF insulation systems in occupied commercial, industrial, or municipal facilities. Personnel performing the installation of the SPF insulation system shall be trained and certified by the manufacturer of the proposed spray polyurethane foam system. Documentation demonstrating compliance shall be submitted with the bid. Contractor(s) shall provide the references required under subsection B below. B. References. Contractor(s) shall provide a minimum of three (3) references demonstrating successful completion of projects of similar size, scope, and complexity within the five (5) years immediately preceding the bid due date. References should demonstrate the Contractor(s) experience performing commercial closed-cell spray polyurethane foam insulation work in commercial, industrial, or municipal facilities. Bond Requirements A. Bid Bond. Each bid shall be accompanied by a Bid Bond in an amount equal to ten percent (10%) of the Contractor(s) total bid price. The Bid Bond shall be issued by a surety authorized to transact surety insurance in the State of Florida and shall be payable to the City of Clearwater. The Bid Bond shall guarantee that the Contractor(s) will not withdraw its bid during the period specified for bid acceptance and, if awarded the Contract, will execute the Contract and furnish the required Performance and Payment Bonds within the time specified by the City. Failure to do so may result in forfeiture of the Bid Bond. B. Performance and Payment Bonds. The successful Contractor(s) shall furnish a Performance Bond and a Payment Bond, each in the amount of 100% of the contract price, issued by a surety company meeting the requirements specified in the solicitation, within ten (10) calendar days of notification of award. Failure of the successful Contractor(s) to furnish the required bonds within the time specified by the City may constitute grounds for withdrawal of the award and award to the next responsive and responsible Contractor(s), as determined by the City. NOTICE Monday, October 26, 2026 NOTICE IS HEREBY GIVEN that sealed bids will be received by the City of Clearwater (City) until 10:00 am , Local Time, on Wednesday, December 2, 2026 to provide: The City of Clearwater is soliciting sealed bids from qualified Contractor(s) to replace the Fleet Maintenance Facility spray foam insulat ion. Contractor(s) shall provide all labor, equipment, materials, transportation, fuel, supervision, insurance, and all related items necessary to complete the required services as specified herein . Bids must be in accordance with the provisions, specifications and instructions set forth herein and will be received by the Procurement Division until the above noted time, when they will be publicly acknowledged and accepted. Bid packets, any attachments and addenda are available for download at: https://procurement.opengov.com/portal/myclearwater/projects/320122 . Please read the entire solicitation package and submit the bid in accordance with the instructions. This document (less this invitation and the instructions) and any required response documents, attachments, and submissions will constitute the bid. General, Process, or Technical Questions concerning this solicitation shall be submitted through the City's e-Procurement Portal located at: https://procurement.opengov.com/portal/myclearwater/projects/320122 . All answers to inquiries will be posted on the City’s e-Procurement Portal. Bidders may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. This Invitation to Bid is issued by: Robert Rosenstein, CPM, CPPB, CPPO, FCCM Procurement Division Manager robert.rosenstein@myclearwater.com INSTRUCTIONS Vendor Questions All questions regarding the contents of this solicitation, and solicitation process (including requests for ADA accommodations), shall be submitted through the City's e-Procurement Portal, located at https://procurement.opengov.com/portal/myclearwater . Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the City’s e-Procurement Portal. Bidders may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. Addenda/Clarifications Any changes to the specifications will be in the form of an addendum. Vendors are required to register for an account via the City’s e-Procurement Portal hosted by OpenGov. Once the bidder has completed registration, they will receive addenda notifications to their email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each bidder to periodically check the site for any addenda at https://procurement.opengov.com/portal/myclearwater . The City cannot be held responsible if a vendor fails to receive any addenda issued. The City shall not be responsible for any oral changes to these specifications made by any employees or officer of the City. Failure to acknowledge receipt of an addendum may result in disqualification of a bid. Vendor Conference/Site Visit There is a MANDATORY Vendor Conference/Site Visit at 9:00 am on Friday, November 6, 2026 at 1900 Grand Ave., Clearwater, FL 33765 . Attendance is mandatory as a condition of submitting a bid. The conference/site visit provides interested parties an opportunity to discuss the City's needs, inspect the site and ask questions. During any site visit you must fully acquaint yourself with the conditions as they exist and the character of the operations to be conducted under the resulting contract. Due Date & Time for Submission and Opening Date: Wednesday, December 2, 2026 Time: 10:00 am The City will open all bids properly and timely submitted and will record the names and other information specified by law and rule. All bids become the property of the City and will not be returned except in the case of a late submission. Respondent names, as read at the bid opening, will be posted on the City website. Once a notice of intent to award is posted or 30 days from day of opening elapses, whichever occurs earlier, bids are available for inspection by contacting the Procurement Division. Bid Firm Time Bids shall remain firm and unaltered after opening for 90 days. The City may accept the bid, subject to successful contract negotiations, at any time during this time. Bid Security Each bid shall be accompanied by a Bid Bond in an amount equal to ten percent (10%) of the Contractor(s)' Total Bid Price. The Bid Bond shall be issued by a surety company authorized to transact surety insurance in the State of Florida and shall be payable to the City of Clearwater. The Bid Bond shall guarantee that the Contractor(s) will not withdraw its bid during the specified bid acceptance period and, if awarded the Contract, will execute the Contract and furnish the required Performance and Payment Bonds within the timeframe established by the City. Failure of the successful Contractor(s) to execute the Contract or furnish the required Performance and Payment Bonds within the specified timeframe may result in forfeiture of the Bid Bond. The Bid Bond shall be submitted with the bid in accordance with the City's approved bid security submission procedures. Performance Security The Contractor, simultaneously with the execution of the Contract, will be required to furnish a performance security in the amount of 100% of awarded Contract price . The security may be submitted in one-year increments and in any one of the following forms: an executed surety bond issued by a firm licensed and registered to transact such business with the State of Florida; cash; certified check, cashier's check or money order payable to the City of Clearwater (personal and company checks are not acceptable); certificate of deposit or any other form of deposit issued by a financial institution and acceptable to the City. If the Contractor fails or refuses to fully comply with the terms and conditions of the contract, the City shall have the right to use all or such part of said security as may be necessary to reimburse the City for loss sustained by reason of such breach. The balance of said security, if any, will be returned to Contractor upon the expiration or termination of the contract. Bid Submittals It is recommended that bids are submitted electronically through the City's e-Procurement Portal located at https://procurement.opengov.com/portal/myclearwater . By way of the e-Procurement Portal, responses will be locked and digitally encrypted until the submission deadline passes. E-mail or fax submissions will not be accepted. No responsibility will attach to the City of Clearwater, its employees or agents for premature opening of a bid that is not properly addressed and identified. Late Bids The bidder assumes responsibility for having the bid delivered on time at the place specified. All bids received after the date and time specified shall not be considered and will be returned unopened to the bidder. The bidder assumes the risk of any delay in the mail or in handling of the mail by employees of the City of Clearwater, or any private courier, regardless whether sent by mail or by means of personal delivery. It shall not be sufficient to show that you mailed or commenced delivery before the due date and time. All times are Clearwater, Florida local times. The bidder agrees to accept the time stamp in the City’s Procurement Office as the official time. Lobbying; Lobbying No-Contact Period; Questions Regarding Solicitation From the time a competitive solicitation is posted until such time as the contract is awarded by the city or the solicitation is cancelled, all bidders, offerors, respondents, including their employees, representatives, and other individuals acting on their behalf, shall be prohibited from lobbying city officers, city employees, and evaluation committee members. Violation of this section may result in rejection/disqualification from award of the contract arising out of the competitive solicitation. All questions regarding the competitive solicitation must be submitted through the City's e-Procurement Portal, who will respond in writing and post such response to ensure that all respondents receive the same information during the No-Contact Period. The penalty for violating the No-Contact Period may include suspension or debarment. Commencement of Work If bidder begins any billable work prior to the City’s final approval and execution of the contract, bidder does so at its own risk. Responsibility to Read and Understand Failure to read, examine and understand the solicitation will not excuse any failure to comply with the requirements of the solicitation or any resulting contract, nor shall such failure be a basis for claiming additional
Published attachments
Public questions and answers
References: Section 5.4 – Minimum Qualifications; Section 3.3 – Subcontracting Mizrahi Construction LLC is interested in submitting a bid for the above-referenced project. We understand that Section 5.4 requires a minimum of five (5) years of documented experience installing commercial closed-cell spray polyurethane foam (SPF) insulation systems, along with three (3) similar project references and manufacturer-trained and certified installers. We would like to clarify whether these qualification requirements may be satisfied through a specialized SPF subcontractor rather than the prime contractor. Under this proposed arrangement, Mizrahi Construction LLC would serve as the prime contractor, responsible for overall project management, coordination, scheduling, supervision, and contractual obligations. The SPF installation would be performed by a qualified subcontractor with at least five (5) years of documented commercial SPF installation experience, appropriate manufacturer certifications, and the required similar project references. Please clarify the following: Would the City accept the specialized SPF subcontractor's documented experience, project references, and manufacturer certifications to satisfy the minimum qualifications established under Section 5.4, even if Mizrahi Construction LLC, as the prime contractor, does not independently meet the five-year SPF installation experience requirement? If acceptable, should the subcontractor's qualifications, references, licens
The City seeks to see these requirements be met by the respondent and not by a subcontractor of the respondent.
May the minimum qualifications in Section 5.4, five years of commercial closed-cell SPF experience, occupied-facility experience, manufacturer certification of installation personnel, and references, be satisfied through the bidder's named installation subcontractor, with the subcontractor's documentation submitted with the bid?
Please see the answer to No. 1 above.