State and local · OpenGov
Fleet Management Video Surveillance System
Description
The contractor will furnish, install, program, and commission an expandable commercial video surveillance system . The project involves design, permitting, installation and testing of high-definition, AI-driven cameras, wireless transport links, network switching infrastructure, and a centralized recording appliance to monitor critical outdoor and transit areas of the Fleet Central Garage facility. The project will consist of two (2) phases, one in Fiscal Year (FY) 2027 and the other in FY2028. The County's Fiscal Year runs from October 1 - September 30. Funding for the FY2027 phase is currently available, and funding for the FY2028 phase is expected by October 2027. Consequently, total project completion is possible in calendar year 2027. 26-0868-ITQ Fleet Management Video Surveillance System Price of Video Surveillance System Video surveillance system as specified - Phase 1 Video surveillance system as specified - Phase 2 120 VAC Infrastructure: Continuous, unswitched 24/7 120 VAC power wiring to cameras, wireless access points, and equipment enclosures on the Locations 1, 2, 3 and 7. Network Connectivity: Corporate network connections and configuration required for the Blaze Video Server to reach the client's network or external internet. 26-0868-ITQ Fleet Management Video Surveillance System Unspecified Funds Unspecified funds not to exceed 10% of the total contract Scope of Work OBJECTIVE/JUSTIFICATION The contractor will furnish, install, program, and commission an expandable commercial video surveillance system . The project involves design, permitting, and installation of high-definition, AI-driven cameras, wireless transport links, network switching infrastructure, and a centralized recording appliance to monitor critical outdoor and transit areas of the Fleet Central Garage facility. Pinellas County Fleet Management - 9685 Ulmerton Road Largo, FL 33771 BACKGROUND Existing cameras and central infrastructure are non-functional and obsolete. REQUIREMENTS The contractor shall provide the following equipment and materials: Equipment & Material Specifications Central Infrastructure & Head-End Equipment Hanwha 32-Channel Blaze Appliance (BRB-X32101E) 30TB onboard storage/24/7 continuous mode 15 FPS BLAZE recording licenses to be included Full support for AI metadata parsing Smart Managed Gigabit Ethernet 16-Channel PoE+ Switch Rack-Mount 16-Channel Network Surge Protector Field Cameras & Peripherals Hanwha 4MP x 4-Channel Multi-directional Cameras (PNM-C16083RQZ) Features: AI-engine analytics, intelligent object detection Hanwha 13MP AI IR Panoramic Camera (PNM-A13022RV) Features: AI-engine analytics, intelligent object detection Hanwha 8MP AI IR Vandal Dome Camera (XNV-A9084R) Features: AI-engine analytics, intelligent object detection Wireless Access Points at north and east sides of Central Garage building. No specified brand, as long as fully compatible and equivalent. PoE+ Injectors NEMA Enclosure - For outdoor surveillance equipment protection Indoor Enclosure - For indoor surveillance equipment protection Camera Mounting Brackets Connectivity & Pathway Materials Network Cabling: Standard category 6 network cable as required. Paige Datacom Solutions "Game Changer" Cable: Included for all extended cable runs exceeding standard network distance specifications. PVC Conduit: Rigid conduit for physical cable protection in outdoor and covered parking environments. Detailed Execution & Location Matrix - (Reference Attachment A - Exhibit 1 ) Location 1: Pole in Surplus Area Camera Type: Hanwha 4MP x 4-Channel Multi-directional Camera (PNM-C16083RQZ) Coverage: All of Zone A - Surplus equipment storage area. Installation Method: Mounted onto the existing light pole; convert voltage to 120 VAC and provide duplex outlet inside NEMA enclosure if needed. Peripherals: 1 outdoor NEMA Enclosure, 1 Wireless Access Point, and 2 PoE+ Injectors. Cable Pathway: Enclosed in PVC conduit for outdoor protection. Location 2: N.E. Corner of Pressure Washing Canopy Camera Type: Hanwha 4MP x 4-Channel Multi-directional Camera (PNM-C16083RQZ) Coverage: All of Zone B - Northernmost surplus equipment storage area. Peripherals: 1 outdoor NEMA Enclosure, 1 Wireless Access Point and 2 PoE+ Injectors. Installation Method: Mounted onto the pressure washing canopy; ; convert voltage to 120 VAC and provide duplex outlet inside NEMA enclosure if needed. Peripherals: 1 outdoor NEMA Enclosure, 1 Wireless Access Point and 2 PoE+ Injectors. Cable Pathway: Enclosed in PVC conduit for outdoor protection. Location 3: Main Building – N.W. Corner Camera Type: Hanwha 4MP x 4-Channel Multi-directional Camera (PNM-C16083RQZ) Coverage: All of Zone C - Main lot and fuel island. Peripherals: 1 indoor NEMA Enclosure, 1 Wireless Access Point and 2 PoE+ Injectors. Installation Method: Mounted onto the building corner to provide the required coverage; convert voltage to 120 VAC and provide duplex outlet inside NEMA enclosure if needed. Cable Pathway: Network cables run "free-air" inside the interior of the main building. Location 4: Main Building-Center of North Side Camera Type: Hanwha 13MP AI IR Panoramic Camera (PNM-A13022RV) Coverage: Northwest part of Zone D - View of the North lot. Cable Pathway: Network cables run "free-air" inside the main building interior. Location 5: Main Building-N.E. Corner Camera Type: Hanwha 4MP x 4-Channel Multi-directional Camera (PNM-C16083RQZ) Coverage: Southeast part of Zone D and north part of Zone F - View of East property line. Cable Pathway: Enclosed in PVC conduit for outdoor protection. Location 6: Main Building-East Side Camera Type: Hanwha 13MP AI IR Panoramic Camera (PNM-A13022RV) Coverage: Part of Zone F - View of East lot and west side of storage building. Location 7: Storage Building-S.E. Corner Camera Type: Hanwha 4MP x 4-Channel Multi-directional Camera (PNM-C16083RQZ) Coverage: Coverage: Partial Zone F - View of intersection of South and East property lines. Installation Method: Mounted onto the building corner to provide the required coverage; convert voltage to 120 VAC and provide duplex outlet inside NEMA enclosure if needed. Peripherals: 1 NEMA Enclosure, 1 Wireless Access Points and 2 PoE+ Injectors. Cable Pathway: Enclosed in PVC conduit for outdoor protection. Location 8: Main Building-South Side, East end of Parking Cover Camera Type: Hanwha 8MP AI IR Vandal Dome Camera (XNV-A9084R) Coverage: Coverage: Eastern part of Zone G - View of East end of South property line. Location 9: Main Building-South Side, West end of Parking Cover Camera Type: Hanwha 8MP AI IR Vandal Dome Camera (XNV-A9084R) Coverage: Coverage: Center section of Zone G - View of center of South property line. Location 10: Main Building – S.W. Corner, South Side Camera Type: Hanwha 8MP AI IR Vandal Dome Camera (XNV-A9084R) Coverage: Part of Zone G - View of West end of South property line to the center. Location 11: Main Building – S.W. Corner, West Side Camera Type: Hanwha 8MP AI IR Vandal Dome Camera (XNV-A9084R) Coverage: Part of Zone E - View of the East end of the West Drive-Thru Gate. Location 12: Main Building – S.W. Corner, West Side Camera Type: Hanwha 8MP AI IR Vandal Dome Camera (XNV-A9084R) Coverage: Part of Zone E - View of the drive onto the property. Cable Pathway: Network cables run "free-air" inside the main building interior. Location 13: Main Building-West Side Camera Type: Hanwha 13MP AI IR Panoramic Camera (PNM-A13022RV) Coverage: Southern part of Zone E - View of the west lot. Professional Services The contractor is responsible for executing the following operational tasks: Installation: Mounting, leveling, positioning, and terminating all hardware. Install must include any removal of existing, non-functional cameras, head-end, cabling, and other equipment in order to install the new system and components. Programming: Software setup of the Blaze recording appliance, network switch configurations, camera parameters, and AI/ob DELIVERABLES A functional and expandable video surveillance system providing video coverage of the northwest lot and fuel island, the east property line, the north lot, and the west drive-through gate, covering the northwest corner of the main building, along with system documentation and software. Subsequent phases will add equipment as necessary to extend video surveillance to additional areas of the facility. Notice Small Business Enterprises The Board of County Commissioners recognizes that the County's growth and prosperity depend on the full participation of all its citizens and businesses and is firmly committed to the principles of equal opportunity, supplier diversity, and equity. To increase the impact of County purchases on the growth and prosperity of the Pinellas County community, Pinellas County Purchasing, in coordination with Economic Development, have implemented the Small Business Enterprise Program to increase the access and participation of regional small businesses. Pinellas County Certified Small Business Enterprises (SBEs) shall be given preference on informal quotes from $25,000 to $150,000 to the lowest responsive, responsible quoter that meets the Pinellas County SBE Program criteria at time of award, at the discretion of the Board or designated representative. On Invitation to Quote (ITQ) solicitations over $100,000, preference will be given to SBEs that submit within the first five (5) business days of the solicitation. If a responsive and responsible SBE submits a quote after the first five (5) business days, they shall receive a five percent (5%) preference above open market pricing. SBEs shall be awarded economically feasible contracts or portions of contracts. For more information on eligibility, registration, and certification, please visit Pinellas County Economic Development at www.pced.org or contact Economic Development at businesshelp@pinellas.gov . Introduction SUBMITTALS ARE ACCEPTED VIA OPENGOV 26-0868-ITQ Fleet Management Video Surveillance System ALL QUESTIONS MUST BE SUBMITTED IN OPENGOV WITHIN THE QUESTION & ANSWER SECTION THE MISSION OF PINELLAS COUNTY Pinellas County Government is committed to progressive public policy, superior public service, courteous public contact, judicious exercise of authority and sound management of public resources to meet the needs and concerns of our citizens today and tomorrow. The Purchasing Division of the Office of Management and Budget for the Pinellas County Board of County Commissioners uses OpenGov Procurement for contractor/vendor registration, and for posting, submitting and receiving bids, quotes and proposals for active solicitations. Contractors/Vendors must register with OpenGov Procurement ( https://procurement.opengov.com/signup ) to participate in active County solicitations. Should you need technical assistance with OpenGov, the following options are available: Phone: (650) 336-7167 Email: procurement-support@opengov.com Chat is available in the OpenGov application Web: https://help.procurement.opengov.com Vendor Guides: https://help.procurement.opengov.com/en/collections/1392366-vendor-guides AUTHORIZED BY: Merry Celeste, CPPO, CPPB, NIGP-CPP, CPM, FCCM Purchasing Official Procurement Contact: Michael Calhoun mcalhoun@pinellas.gov (727) 464-4123 Timeline: Release Project Date: November 4, 2026 Pinellas County Certified Small Business Enterprise Date: November 17, 2026 Proposal Submission Deadline: November 17, 2026, 3:00pm Instructions & General Conditions for Submittals INSTRUCTIONS & PROCEDURES PREPARATION OF SUBMITTAL - Submittal will be prepared in accordance with the following: Submittals must be uploaded on forms furnished, utilizing the OpenGov procurement website. Failure to comply could result in the submission being rejected. If price is factor, unit prices must be shown and where there is an error in extension of price, the unit price will govern. Alternate submittals will not be considered unless authorized by the solicitation. Proposed delivery time must be shown and any date calculations must include weekends and holidays. Contractor is advised that exceptions to any terms and conditions contained or referenced in this solicitation must be stated with specificity in its response to the solicitation. Contractor is deemed to have accepted and to be bound by the solicitation and referenced agreement terms and conditions that contractor does not take exception to in its response. The County reserves the right to modify or add terms and conditions based upon the exceptions stated by the contractor, or to declare any terms and conditions non-negotiable, as determined by the County in its sole discretion. Contractors will thoroughly examine the drawings, specifications, schedule, instructions and/or all other solicitation documents. Contractors will make all investigations necessary to thoroughly inform themselves regarding plant and facilities for delivery of material and equipment as required by the solicitation. Plea of ignorance by the contractor of conditions that exist or that may hereafter exist as a result of failure or omission on the part of the contractor to make the necessary examinations and investigations, or failure to fulfill in every detail the requirements of the solicitation documents, will not be accepted as a basis for varying the requirements of the County or the compensation to the contractor. Contractors are advised that all County solicitations are subject to all legal requirements provided for in the Purchasing Ordinance and/or State and Federal Statutes. SUBMITTAL METHOD & FORMAT Submittals must be uploaded utilizing the OpenGov procurement website ( https://procurement.opengov.com/portal/pinellasfl ). Failure to comply could result in the submittal being rejected. Submittals must be uploaded in the Vendor Questionnaire section of this solicitation. Submittals sent via email, facsimile, or delivered in-person will not be considered. The preferred format for submittal is PDF conversion from your source files (to minimize file size and maximize quality and accessibility) rather than scanning. Instructions for Providing Files in PDF Format to Pinellas County Government: How do I convert my files to PDF format? Answer- If you have a program such as Adobe Acrobat, creating a PDF of any file is a simple print function. Rather than printing to a traditional printer, the file converts to a PDF format copy of your original. Any program (such as Word, PowerPoint, Excel, etc.) can be converted this way by simply selecting the print command and choosing PDF as the printer. Should I scan everything and save as PDF? Answer- Not unless you are scanning with OCR (optical character recognition). Scanning will create unnecessarily large files because a scan is just a picture of a page rather than actual page text. Furthermore, the result of scanning is that your pages will not look nearly as “clean” or professional as simply using the print to PDF method from the program from which the file originates. Additionally, since scan pages are pictures of text, not really text, they may not be considered accessible* under Federal ADA guidelines (*unless the scans are OCR.) SUBMITTALS FROM RELATED PARTIES OR MULTIPLE SUBMITTALS RECEIVED FROM ONE CONTRACTOR Where two (2) or more related parties each upload a submittal, or multiple submittals are received from one (1) contractor, for any solicitation, such submittals will be judged non-responsive. Related parties mean contractors or the principles thereof, which have a direct or indirect ownership interest in another contractor for the same solicitation or in which a parent company or the principles thereof of one (1) contractor have a direct or indirect ownership interest in another contractor for the same solicitation. INTEGRITY OF SOLICITATION DOCUMENTS Contractors will use the original solicitation form(s) provided by the Purchasing & Risk Management Division and enter information only in the spaces where a response is requested. Contractors may use an attachment as an addendum to the solicitation form(s) if sufficient space is not available on the original form for the contractor to enter a complete response. Any modifications or alterations to the original solicitation documents by the contractor, whether intentional or otherwise, will constitute grounds for rejection of a solicitation. Any such modifications or alterations a contractor wishes to propose must be clearly stated in the contractor’s submittal response and presented in the form of an addendum to the original solicitation documents. LATE SUBMISSION OR MODIFICATIONS Submittals and modifications received after the time set for the submission will not be considered. This upholds the integrity of the process. Modifications in writing received prior to the time set for the submittal will be accepted. WITHDRAWAL OF SUBMITTAL The submittal may be withdrawn prior to the solicitation opening date. WRITTEN REQUESTS FOR INTERPRETATIONS/CLARIFICATIONS No oral interpretations will be made to any firms as to the meaning of specifications or any other contractor documents. All questions pertaining to the terms and conditions or scope of work of this solicitation must be sent in writing (electronically) to the Purchasing Division and received by the date specified in solicitation. Responses to questions may be handled as an addendum if the response would provide clarification to requirements of the solicitation. All such addenda will become part of the a ADA REQUIREMENT FOR PUBLIC NOTICES Persons with disabilities requiring reasonable accommodation to participate in this proceeding/event, should call 727-464-4062 (voice/tdd) fax 727-464-4157. LOBBYING All Contractors agree to adhere to Pinellas County Code Section 2-189, which states: Lobbying shall be prohibited on all county competitive selection processes and purchasing contract awards pursuant to this division, including, but not limited to, requests for proposals, requests for quotations, requests for qualifications, bids or the award of purchasing contracts of any type. The purpose of this prohibition is to protect the integrity of the procurement process by shielding it from undue influences prior to the contract award, or the competitive selection process is otherwise concluded. However, nothing herein shall prohibit a prospective respondent/proposer/protestor from contacting the Purchasing Department or the County Attorney's Office to address situations such as clarification and/or pose questions related to the procurement process. Lobbying of evaluation committee members, county government employees, elected/appointed officials, or advisory board members regarding requests for proposals, requests for quotations, requests for qualifications, bids, or purchasing contracts, by the respondent, any member of the respondent's staff, any agent or representative of the respondent, or any person employed by any legal entity affiliated with or representing a respondent, is strictly prohibited from the date of the advertisement, or on a date otherwise established by the Board, until either an award is final, or the competitive selection process is otherwise concluded. Any lobbying activities in violation of this section by or on behalf of a respondent/proposer shall result in the disqualification or rejection of the proposal, quotation, statement of qualification, bid or contract. For purposes of this provision, "lobbying" shall mean influencing or attempting to influence action or non-action, and/or attempting to obtain the goodwill of persons specified herein relating to the selection, ranking, or contract award in connection with any request for proposal, request for quotation, request for qualification, bid or purchasing contract through direct or indirect oral or written communication. The final award of a purchasing contract shall be the effective date of the purchasing contract. Any evaluation comm
Published attachments
Addenda and notices
Official Notice #1: Site Visit · 1
A non-mandatory site visit, led by John Neal, is scheduled for 1:00 PM on Monday, November 9 , at Pinellas County Fleet Management, 9685 Ulmerton Road, Largo, FL 33771 . Please park on the west side of the main entrance. We will meet in the parking lot prior to beginning the site visit. The sole purpose of the site visit is to provide a tour of the site(s) that will be supported by the contract. The scope of work and/or quote specifications shall not be discussed during this visit. All questions relating to this quote and the scope of work or technical specifications must be submitted in the Question & Answer section in OpenGov.
Addendum #1 · 1
Addendum No. 1. Please see what's changed and acknowledge addendum.
Official Notice #2: Site Visit · 2
A non-mandatory site visit, led by John Neal, is scheduled for 9:00 AM on Friday, November 13 , at Pinellas County Fleet Management, 9685 Ulmerton Road, Largo, FL 33771 . Please park on the west side of the main entrance. We will meet in the parking lot prior to beginning the site visit. The sole purpose of the site visit is to provide a tour of the site(s) that will be supported by the contract. The scope of work and/or quote specifications shall not be discussed during this visit. All questions relating to this quote and the scope of work or technical specifications must be submitted in the Question & Answer section in OpenGov.
Public questions and answers
Are you requesting a specific Wireless Access Point brand?
No, just one that is FULLY compatible with the requested cameras and of similar quality.
Where is the nearest County network switch relative to the intended head-end location, and will County IT provide the switch port and firewall rules?
The head-end location is likely located in the switch room, and the County will provide the switch port and firewall rules.
Is demolition/removal of the existing non-functional cameras, head-end, and cabling part of this scope? Disposal?
Removal of existing non-functional cameras and other equipment is included only to the extent necessary to install the new system and components.
If Line Item 3 is awarded, does it supersede the base-scope requirement at Locations 1, 2, 3 and 7 to convert voltage and provide a duplex outlet, or are both required?
Both are required.
Does the County require a specific storage retention (days) or recording mode (continuous vs. motion)? The spec gives 30 TB but no retention target.
County preference is for continuous mode at 15 FPS.
Is a Pinellas County competency license (Ch. 75-489) satisfied by a Florida state EC/low-voltage (EF/ES) license, or is a local registration also required?
Consult with the Pinellas County Construction Licensing Board. Experience in the field of video security is a prerequisite for a responsive quote.
Does the County provide the lift/bucket truck, or is that on the contractor?
The County will not provide tools or equipment needed to complete the project. The contractor is required to follow all applicable safety regulations.
Will Pinellas County consider a Verkada solution as an alternative to the proposed equipment?
No, as the County seeks to standardize with existing installations.
Excerpt from your Requirement : Additionally, the contractor shall be properly licensed and/or certified for asbestos removal as required under Federal, State and local laws, statutes, rules, regulations and ordinances The County shall be responsible for filing all DEP notifications and furnish a copy of the DEP notification and approval for demolition to the successful contractor. The County will furnish a copy of the asbestos survey to the successful contractor. The contractor must keep this copy on site at all times during the actual demolition. Question : when does the county anticipate conducting the asbestos Survey to determine if removal is required? CCTV System integrators do not typically hold asbestos certifications for removal and handling.
Asbestos assessment and abatement is not in the scope of this project.
Are you looking for recorded monitoring or 24/7 live/recording monitoring?
24/7 recording
The base scope at Locations 1, 2, 3 and 7 calls for converting existing voltage to 120 VAC and providing a duplex outlet in the enclosure, and Location 1 is described as an existing pole in the Surplus Area. On site, the poles in that area appear to be owned by the electric utility, not the County. Who owns the poles? If it is utility-owned, does the County have an attachment agreement that allows the camera, enclosure and wireless equipment to be mounted on it? If not, should bidders include a new pole at Location 1? Utility pole power cannot be tapped by the contractor and has no local disconnect for service. Should bidders assume that all 120 VAC at these locations comes from County panels on dedicated circuits (Line Item 3), and that the base-bid “convert voltage” requirement does not apply where no County-owned power source exists?
Until otherwise determined, include a new pole for location 1, with power provided per line item 3. If the contractor cannot tap utility pole power, it would follow the voltage conversion would not apply.
Is there existing cabling that can be reused?
No.
does PCF have authorization to hot tap power from the utility lighting circuit for LOC 1? Or does a meter need to be set ?
Neither. Include location 1 on your pricing for line item 3 on pricing schedule
Are we able to price out a substitute equivalent cable for the gamechanger cable?
Price it as a separate alternate. Qualified staff will determine equivalency.
We did not look in the Zone C area will there be any cameras in that Zone
Please review "Location 3: Main Building – N.W. Corner" in the scope of work. Zone C is covered there.
There is one pole in the Zone area we reviewed. Will the County be providing the power at the pole
No. Include location 1 on your pricing for line item 3 on pricing schedule
We’ve reviewed section C location three and cannot find a relationship for the requirement of high voltage power in the zone. Has something been amended that we’ve missed?
No, the clause identifies responsibility if the required voltage is not present at the camera mounting location.
SINCE LINE 4 IS ESSENTIALLY COVERED IN PHASE 1 PRICING AND THE COUNTY IS PROVIDING THE SWITCH AND INTERFACE WHAT IS REQUIRED AT THIS POINT
A price to cover connection if the County cannot provide the switch and interface.
This is a quick turnaround. Will the County consider extending the submission date of the bid?
Yes, please see Addendum #1
Respectfully request a due date extension to review the site walk notes and await associated RFI answers.
Yes, please see Addendum #1
Are NDAA or TAA-compliant cameras a requirement?
No.
Could you please confirm whether the existing cameras and associated cabling are to be removed as part of this project? would you like us to reuse the existing cabling, or should we install all new cabling?
Removal of existing non-functional cameras and other equipment is included only to the extent necessary to install the new system and components.
The County previously confirmed that both the base-scope electrical requirements and Line Item 3 apply. What specific 120V work is required under the base scope versus the alternate?
Labor and materials to provide 120V to cameras in locations where it is not available.
Can a Florida State-Certified Limited Energy Systems Specialty Contractor (ES license) serve as the prime contractor and subcontract the 120V electrical work to a licensed electrician? If subcontracting is permitted, must the electrical subcontractor be identified when submitting the bid, or can they be identified after award?
No.
Since 120V infrastructure is listed as a separately priced alternate (Line Item 3), can we submit bids for Phases 1 and 2 and select "No Bid" for Line Item 3?
You may select no bid for any line item that you do not want to bid on.
Is PCF open to having duke provide power to the location as a service point similar to area lighting?
Yes, although our preference is to use existing site power. All responsive quotes shall include Duke pricing for the connection and the monthly charge for the service.
OpenGov categories
- 68002 · Access Control Systems and Security Systems
- 68087 · Surveillance Cameras and Counter-surveillance Equipment and Supplies
- 83834 · Communication Security Systems
- 83883 · Telecommunication (Internet Protocol) Network Monitoring, Surveillance, Intrusion Detection Systems and Networking Products
- 84067 · Video Camera Recorders, Digital Type
- 84084 · Video and Audio Systems, Accessories and Parts (Closed Circuit TV) (Including Surveillance Type)
- 91893 · Security/Safety Consulting
- 92037 · Networking Services (Including Installation, Security, and Maintenance)
- 93984 · Television Equipment and Accessories (Including Video and Closed Circuit Equipment), Maintenance and Repair
- 99050 · Installation of Security and Alarm Equipment
- 99080 · Surveillance Services