FMA Swift Grants Demolition, Contract 41

Description

It is the intention of these specifications to outline the services and requirements for performing demolition and site-restoration on a dwelling in the Township of Wayne, New Jersey purchased in conjunction with FMA Swift Grants. Technical Specifications SCOPE OF WORK 1. The Township of Wayne currently owns the following properties located within the Township of Wayne and Pompton Lakes, County of Passaic, New Jersey, known and designated as: Street - Program - Block - Lot WAYNE 63 Ryerson Avenue, Wayne - FMA Swift Grants - 849 - 1 287 Boulevard Drive, Wayne - FMA Swift Grants - 1591 - 1 349 Riverlawn Drive, Wayne - FMA Swift Grants - 209 - 52 96 Kent Avenue, Wayne, NJ - FMA Swift Grants - 874 - 6 69 River Road, Wayne, NJ - FMA Swift Grants - 818 - 3 C0035 45 Fayette Avenue, Wayne, NJ 07470 - FMA Swift Grants - 725 - 42 118 Fayette Avenue, Wayne, NJ 07470 - FMA Swift Grants - 721 - 19 138 Fayette Avenue, Wayne, NJ 07470 - FMA Swift Grants - 721 - 15 POMPTON LAKES 517 Poplar Avenue, Pompton Lakes - FMA Swift Grants - 9512 - 10 1411 Madison Place, Pompton Lakes - FMA Swift Grants - 9522 - 4 This bid requires the demolition and proper disposal of the dwelling unit(s) and associated sheds, complete with footings and or slabs/basements/crawl spaces, closing of all wells, pumping and filling of all septic systems, cesspools, pools, removal and testing of aboveground and/or underground storage tanks, and disconnecting of all utilities. This bid also requires grading and seeding of the property where the structures were located to meet the natural contour of the surrounding of land and to protect from potential erosion. 2. Bidders must be registered with the System for Award Management (SAM) and active at the time of the bid opening. Awarded bidder must maintain SAM through the termination of the contract. Free registration available at https://www.sam.gov/ 3. The work covered under this contract shall meet the requirements as prescribed by municipal, county, state, and federal regulations pertaining to demolition projects similar to this one. 4. The Contractor shall be solely responsible for ensuring that all work done in furtherance of this contract is in accordance with applicable federal, state, county, and municipal regulations. 5. Successful Bidder must file for demolition permits with the Township within five (5) Working Days of execution of contract with Township. Notice to Proceed will be issued for each individual property for the Demolition of said property, once the Township issues the permit for demolition. Demolition work on the individual property must be completed no later than forty-five (45) Working Days following the issuance of the Notice to Proceed. Working Days shall be defined as Monday through Friday from 7:00 A.M. to 6:00 P.M. and Saturdays from 9:00 A.M. to 6:00 P.M., Sundays and holidays excepted. Extension of the forty-five (45) Working Days demolition time frame may be granted by written request to the Designated Project Manager. Extensions shall only be granted for reasons beyond the control of the Contractor such as extreme inclement weather or other reasons deemed beyond the control of the Contractor by the Township. If an extension is granted, and the contractor does not meet the extension, a financial penalty can be required from the date of the original deadline. 6. Any questions pertaining to the project, including but not limited to the scope of work and contractor responsibilities, shall be delivered in writing to the DPM no later than 12:00 PM (noon) on the date specified in the Project Schedule. 7. All additional work such as site restoration, submission of Contractor’s inventory and submission and approval of Contractor’s Final Report shall be completed no later than ten (10) Working Days following completion of the demolition portion of work. 8. Any contractor accumulating two (2) “unsatisfactory service” notices in a sixty (60) day period may be dismissed within ten (10) days of receipt of a contract cancellation notice from the Township of Wayne. 9. Pre-demolition notice to adjoining property owners shall be given by the awarded Contractor. The Contractor shall be responsible to inform the Township of Wayne Point of Contact at least one (1) week, i.e. 7 calendar days, prior to the approximate start date of the demolition work. 10. Contractor shall coordinate all pre-demolition business within five (5) Working Days of Notice of Award. 11. The Contractor shall check in each day with the Wayne Police Department to inform them what houses your crew will be working on that day. This is necessary to ensure that all sites are secure at all times. 12. The Contractor shall confirm whether or not there is any (UST) under ground storage tanks. If there is confirmed to be a UST the Contractor shall remove from the ground before the demolition of the structure. On the day of removal of an UST the Contractor shall secure an inspection personnel to be present before, during, and after any UST is lifted as witness to the removal. 13. Contractor shall provide weekly written status updates with the Township’s DPM. 14. Contractor shall provide a list of designated Project Foreman prior to the Notice to Proceed. A Project Foreman shall be on site during all hours of operation at the worksite. 15. There shall be no dragging of equipment on roadways. Proper moving devices (i.e. Rollers, treads, etc.) must be utilized at all times to avoid any and all damage or scaring to roadways. Any damage to the roadway, tressels, bridge, etc. shall be the responsibility of the Contractor to repair under the direction of the Township Engineering Division. 16. Contract prices for demolition shall be held for the entire length of this project. No price escalation shall be charged or will be entertained by the Township. GENERAL The Contractor shall be responsible for the following: 1. Provide a written schedule of work, including pre-demolition work, post demolition responsibilities, and a verified start date for each aspect of the project. Said plans shall be approved by the DPM prior to commencing work; 2. Conduct any necessary inspections, tests and investigations, and undertake all other activities that are prerequisite to completing the work comprising this Contract; 3. Obtaining any and all demolition and other permits, licenses, and approvals that are required for execution of the work by any municipal, state, county and federal authority having jurisdiction over the work. Copies shall be submitted to the DPM prior to demolition. Demolition shall begin within five (5) Working Days of obtaining all necessary approvals; 4. Conducting all work required by federal, state, county, and municipal regulations to prepare the Buildings for demolition; 5. Demolishing and removing all Buildings in accordance with federal, state, county, and municipal law and regulation; 6. Off-site disposal of all building-related materials resulting from removal and demolition activities in accordance with federal, state, county, and municipal law and regulation; 7. Restoring the affected areas following demolition; and 8. Performing of all other work necessary to fully complete the foregoing work. 9. If noted on the Bid Proposal page, sidewalk slabs should be removed on a per property basis. GOVERNMENTAL PERMITS, APPROVALS AND LICENSES 1. The Contractor shall obtain, pay for and comply with any and all permits and approvals required by federal, state, county and municipal authorities to complete all required work. 2. Fees for permits issued by the Township shall be waived. 3. Any and all licensing that is necessary to complete the work shall be the Contractor’s responsibility. A copy of all appropriate licenses shall be submitted to the DPM prior to the start of work. 4. It shall be the responsibility of the contractor to schedule mark outs of all utilities. Scheduling of all mark outs can be scheduled by calling 811 or 1-800-272-1000. 5. Regarding the two properties located in Pompton Lakes, the Contractor must cap the water and sewer at the main (in the street) and must have it inspected before closing it up by the Pompton Lakes Municipal Utilities Authority, (973) 839-3044. CERTIFICATION OF INSPECTION OF PROPERTY As a recipient of Federally-funded hazard mitigation assistance under the Hazard Mitigation Grant Program, as authorized by 42 U.S.C. §5170c / Pre-Disaster Mitigation Program, as authorized by 42 U.S.C. §5133 / Flood Mitigation Assistance Program, as authorized by 42 U.S.C. §4104c / Severe Repetitive Loss, as authorized by 42 U.S.C. §4102a, Wayne Township agreed to the following conditions: 1. For any demolitions that occur between 1 April and 30 September, the contractor must conduct an inspection of the dwelling to ensure that bats are not present. The contractor shall be required to notify the Township immediately who will then will notify FEMA and the USFWS immediately for further guidance submit the Inspection Certification of Bats to the DPM before demolition work may begin. The Inspection Certification of Bats form can be found in the attachments section. 2. If bats are encountered before or during demolition, the contractor(s) will to notify the Township immediately who will then will notify FEMA and the USFWS immediately for further guidance submit the Inspection Certification of Bats to the DPM before demolition work may begin FEMA and the USFWS immediately for further guidance. Removal of trees 3” DBH (diameter at breast height) will not occur between 1 April and 30 September unless an inspection of the dwelling to ensure that bats are not present concludes. 3. Applicants/contractor(s) will retain and avoid impacting potential roost trees, including live or dead trees and snags equal or greater than 3 inches DBH that have exfoliating bark, cracks, crevices, or cavities. 4. Where possible, and not a safety hazard, dead or dying trees will be left standing. Trees will be clearly demarcated to be protected vs. cut to ensure that contractors do not accidentally remove more trees than anticipated. EXISTING CONDITIONS & ANALYTICAL TESTING 1. The Township has contracted with an independent vendor to conduct the required Phase I analytical investigations for asbestos and lead-based paint. For specific asbestos and lead remediation requirements for these properties, refer to the Attachments section. Please inspect the site thoroughly as part of the bid preparation. If ACM is present, the Contractor shall furnish the permit for removal as well as provide all equipment, labor, and material necessary to remove, handle, and dispose of all ACM. All ACM work, including disposal, must be conducted in accordance with all applicable local, State, and Federal regulations, including those of the New Jersey Department of Labor and Workforce Development (NJDOLWD), the NJDEP, the Environmental Protection Agency (EPA), the National Emission Standards for Hazard Air Pollutants (NESHAP), and the Occupational Safety and Health Administration (OSHA) prior to demolition of any structure. If ACM is present in accordance with the report, the bidder shall include all anticipated costs associated with required asbestos abatement. Bidders shall be required to provide name and license of contractor or subcontractor that shall be used for abatement where asbestos is found (either through report provided or if found prior to demolition but not included in asbestos report). Bidders shall provide, via the Vendor Questionnaire, the asbestos abatement license and explanation of process contractor or subcontractor follows for asbestos notification and/or required permitting, asbestos removal, handling, and transportation. Failure to submit a valid asbestos license shall result in rejection of bid. 2. The Township has contracted to use Ground Penetrating Radar (GPR) and locate anomalies like underground (UST) storage tanks on the sites as an example. The methods used at this site have been used successfully to find anomalies, however, there can be no guarantee that all targets are identified. Site conditions can prevent instruments from detecting targets. This is particularly true with reinforced concrete, asphalt paving, wet soils, urban fill and above-ground obstructions. If UST is present in accordance with the report, the bidder shall include all anticipated costs associated with required removal including permitting if required, inspection at time of removal, and proper removal with all required documentation. The contractor shall remove from the ground before the demolition of the structure. On the day of removal of an UST the Contractor shall secure an inspection personnel to be present before, during, and after any UST is lifted as witness to the removal. UNFORESEEN CIRCUMSTANCES The included reports are a guide, and may not be able to anticipate all situations in which ACM may be present. If ACM is discovered in a home for which the report indicated there was no presence or if the materials are found in excess of that identified in the report, you must immediately cease work and contact the DPM for further direction. If ACM is present and the report indicated, there was no asbestos, or if asbestos is found in excess of the reports, the abatement of all newly found ACM shall be guided by the bidders’ submission under the Unforeseen Circumstances Proposal. Line Item - Description - Unit of Measure 1 IF PREVIOUSLY UNIDENTIFIED ASBESTOS FOUND - ABATE (ROOFING) SQUARE FOOT 2 IF PREVIOUSLY UNIDENTIFIED ASBESTOS FOUND - ABATE (FLASHING) SQUARE FOOT 3 IF PREVIOUSLY UNIDENTIFIED ASBESTOS FOUND - ABATE (SIDING) SQUARE FOOT 4 IF PREVIOUSLY UNIDENTIFIED ASBESTOS FOUND - ABATE (CEILING) SQUARE FOOT 5 IF PREVIOUSLY UNIDENTIFIED ASBESTOS FOUND - ABATE (WALL) SQUARE FOOT 6 IF PREVIOUSLY UNIDENTIFIED ASBESTOS FOUND - ABATE (FLOOR) SQUARE FOOT REMOVAL AND DISPOSAL ACTIVITIES 1. General Removal and Disposal Requirements: a. The Contractor is responsible for undertaking any and all actions that are required by law to ensure the safe removal, handling, and disposal of all building-related materials actually contained in the Buildings, whether or not specifically identified in these Specifications. As used in these Specifications, “building-related materials” shall refer to all materials to be removed from the Buildings prior to demolition and all debris resulting from the Contractor’s removal and demolition activities, including without limitation any other solid waste or hazardous waste contained within the Buildings. b. The Contractor will be responsible as the generator for the proper handling and off-site disposal of any and all building-related materials in accordance with all applicable federal, state, county and municipal regulations governing same. c. The burning of any building-related materials is strictly prohibited. d. If there is any question as to whether a specific item or object is of interest or value to the Township, the Contractor must contact the Township’s DPM about same. 2. Requirements for Pest Extermination: a. The Contractor must have all vacant structures baited for rodents. The Contractor must supply written verification of the rodent baiting to the Township of Wayne Building Department and Point of Contact. 3. Removal of Existing Driveway Aprons: a. Driveway aprons to be removed shall be saw cut at the joint between the apron and the drop curb so that the apron can be removed without damaging the drop curb. Any damaged drop curb shall be replaced at no cost to the Township. b. The driveway apron and subsurface bedding shall be removed and replaced with a minimum of 4” to 6” of topsoil with seed and hay placed as restoration. WELL AND SEPTIC LINES 1. The contractor shall locate all well and septic tanks. 2. Contractor shall provide a scaled diagram of each property to include the structural footprint showing the location of the well and septic lines leading to and from the structure, or to and from other properties. 3. Before demolition and remediation a report shall be delivered to the DPM to include the final status of each well and septic including any capping, plugging or relocation of lines. 4. Septic Systems shall be closed in accordance with State Regulations. Septic Tanks and absorption fields shall be located by the Contractor. Tanks indicated for removal shall be pumped and the waste properly disposed and proper documentation of pumping and disposal are required. 5. Concrete tanks shall be left in place and filled with clean fill to pre-existing grade. 6. Steel, or any other material, tanks shall be removed from the ground and the area filled with clean fill to pre-existing grade. Any pipes encountered during excavation shall be removed. 7. All septic system closures shall be subject to inspection and approval of the Township of Wayne Health Official or her designee. Inspection reports must be submitted and filed with the DPM. 8. Dwellings are assumed to have concrete septic tanks. If the contractor finds a condition that differs, they shall inform the DPM as soon as possible. 9. Some dwellings are on private wells. Some wells may serve several water lines. On properties with no well present, the line shall be capped at the subject property line. 10. Wells designated for closure shall be the contractor’s responsibility and all work, including the abandonment of wells, shall comply with applicable State Regulations by a licensed well drilling company. If conditions are different from that shown on the plans, the contractor shall notify the project manager prior to any work on that well. DEMOLITION WORK 1. The demolition work under this Contract shall consist of the complete razing of all Buildings, which shall include but not be limited to the following: a. Removal of all concrete foundations, slabs and exterior foundation walls, other walls, partition walls, columns, piers, beams, or other projections, basement floors, and all footings; b. Removal of all piping, boilers, or other fixtures, and all wood, furniture, rubbish, or other debris from the interior of the Buildings and their basements; c. Removal of all pavement on the property including but not limited to private sidewalks, driveways and pavers, with the exception of river retaining walls and municipal sidewalks unless otherwise directed by the Project Manager; and d. Removal of all additional structures (ie: sheds) and foundations for such structures on the property; and e. Removal of all fencing on the property unless otherwise directed by the Project Manager; and f. Removal of all Aboveground/Underground Storage Tanks (USTs); Contamination Outside Scope of Contract. g. In the event that the Contractor discovers a previously unidentified UST or other environmental contamination outside any Building, the Contractor shall notify the DPM in writing immediately. All subsequent work must be approved in writing by the DPM. h. The Contractor will not be responsible for addressing any UST or other environmental contamination outside the property line that may be present. 2. The Contractor shall protect all existing equipment, pavements, tracks, poles, pipes, utilities, etc., which are not included in the aforementioned scope of work. The Contractor shall provide all shoring, bracing, tarps, temporary partitions, barricades, and/or other safety devices deemed necessary for the protection of the public and existing facilities. 3. During execution of all work including the demolition, the Contractor will be required to maintain and protect existing vegetation on the Property. No vegetation may be removed unless the Contractor receives prior written approval from the Township. 4. Utility Lines – The Contractor shall contact the Township of Wayne Division of Water and Sewer and the appropriate electric and gas utility, Cablevision (if Cablevision wires are visible), te

Plain text