Skip to content
← Back to search
Special NoticeClosed

Freedom Connection Natural Gas Pipeline

DEPT OF DEFENSE · W2SR ENDIST CARIBBEAN(PROVIS)

This notice is no longer open for responses. Find active opportunities

Contract Details

Solicitation number
W51DQV26Z1BHC
Notice ID
W51DQV26Z1BHC
Opportunity Type
Special Notice
Sub-Agency
DEPT OF THE ARMY
Office
W2SR ENDIST CARIBBEAN(PROVIS)
Posted Date
Wednesday, September 23, 2026
Response Deadline
Oct 8, 2026, 10:00 AM EDT
PSC Code
Y1NA
Set-Aside
No Set Aside
Place of Performance
San Juan, PR, 00918, USA
Status
Closed

Description

********************************************************************************** This amendment is to update the response date to 10:00 AM (AST) Thursday, 8 October 2026. ********************************************************************************** SOURCES SOUGHT - REQUEST FOR INFORMATION FREEDOM CONNECTION NATURAL GAS PIPELINE THIS NOTICE IS FOR MARKET RESEARCH PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL (RFP) OR INVITATION FOR BID. This announcement seeks information from industry which will be used for preliminary planning purposes. This is not a solicitation for proposals, and no contract will be awarded from this synopsis. No solicitation, specifications or drawings are available at this time. 1.0 Introduction and Purpose The U.S. Army Corps of Engineers (USACE), Latin America and Caribbean District (SAA) is conducting market research for the construction of the Freedom Connection Natural Gas Pipeline in Puerto Rico. The results of this market research will help determine the final procurement strategy. USACE-SAA is issuing this follow up Request for Information due to changes in the design, scope of work and acquisition strategy. This request is to gain knowledge of interest, capabilities, and qualifications of Small Business concerns, certified HUBZone, 8(a), Woman-Owned Small Businesses, Economically Disadvantaged Woman-Owned Small Business, Service-Disabled Veteran Owned Business or Veteran-Owned Small Business. The responses or submissions will be used for informational and planning purposes only and do not constitute a commitment by the Government. The Government will not pay for any information submitted, and respondents will not be notified of the results. Submission or responses to this request for information is not a prerequisite for any

Read full description (6,746 characters)

potential future offerings. 2.0 Background The U.S. Department of Energy (DOE) is funding the Freedom Connection Project. The objective is to enhance the resilience of Puerto Rico’s northern power grid by improving fuel infrastructure. This project involves constructing an approximately 4.2-mile, 20-inch diameter natural gas pipeline to supply the Palo Seco Power Plant from the existing San Juan liquid natural gas (LNG) terminal. SAA anticipates soliciting and awarding one (1) design-bid-build solicitation in accordance with Federal Acquisition Regulation (FAR) Parts 15 and 36. The North American Industry Classification System (NAICS) Code is 237120 - Oil and Gas Pipeline and Related Structures Construction. The small business size standard for this NAICS code is US $45 million. The estimated magnitude of construction is between $25,000,000 and $100,000,000. Anticipated award date is in the second quarter of Fiscal Year 2027. Performance Period is 365 calendar days from NTP. 3.0 Scope of Work The scope of work includes all integrated procurement, labor, equipment, and services required to construct and commission the new pipeline based on a forthcoming final engineering design. Core responsibilities include: • Materials Procurement: Procure all necessary items, including long-lead items such as 20” steel pipe, valves, fittings, and instrumentation, ensuring compliance with the final design and industry standards. • Site Work: Prepare access roads and rights-of-way, and perform site clearing, grading, and stabilization. • Pipeline Installation: Execute all installation activities, including: Trenchless methods (e.g., Horizontal Directional Drilling - HDD). Open trench cut-and-cover installation. Pre-fabrication of materials. Pipeline welding, non-destructive testing (NDT), and inspection. Application of protective external coatings. Above-grade pipeline installation, potentially requiring more than 50 feet deep concrete piles. • Facilities Construction: Build all standalone facilities, including mainline block-valve stations and pig launcher/receiver stations, including electrical and instrumentation. • Delegated Design: Manage and execute any potentially delegated design elements (e.g., temporary works, trench shoring, specialized HDD drill profiles, or structural supports), including coordination with and sealing by licensed Professional Engineers. • Testing and Commissioning: Perform hydrostatic pressure testing, leak detection, and all pre-startup commissioning protocols. • Restoration and Handover: Restore all disturbed areas and formally transfer the completed pipeline and facilities to the owner/operator. 4.0 Requested Information for Capability Statement Interested firms must submit a capability statement (limited to 10 pages) that addresses the following. Responses should be tailored to demonstrate the firm's ability to successfully manage and execute this integrated procurement and construction project. Corporate Information & Experience 1. Company Profile: Provide your firm's name, address, point of contact (POC), CAGE Code, and Unique Entity Identifier (UEI). 2. Business Category: Specify your firm's socioeconomic status (e.g., Small Business, Service-Disabled Veteran-Owned Small Business (SDVOSB), HUBZone, 8(a), Woman-Owned Small Business). 3. Bonding Capacity: Include documentation from your bonding company showing current single and aggregate performance and payment bond limits. 4. Project Experience: Interested construction firms may provide no more than three (3) example projects where the interested firm served as the prime contractor. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages and quality of performance. Example projects must be of similar size and scope. Projects similar in scope to this project include: Natural gas pipeline project of similar magnitude and complexity where your firm was responsible for both materials’ procurement and construction. Civil projects involving trenchless technologies like HDD, and work in dense urban or environmentally sensitive areas. Each project must comprise of detailed scope of the work, performance timeline, dollar value, customer name. Construction of pipelines of more than 1 mile in length including trenchless pipeline installation, including horizontal directional drilling, jack and bore, and other trenchless technologies. 5.0 Submission Instructions • Deadline: Responses must be submitted via email no later than 10:00 AM (AST), Tuesday, 24 September 2026. • Email To: Angel.J.Martinez@usace.army.mil and Meranda.R.Booth@usace.army.mil. • Format: No hardcopy or facsimile submissions will be accepted. The capability statement shall be limited to ten (10) pages. Any commercial brochures or currently existing marketing material may also be submitted.

Documents and contact

Check the official notice for attachments and access requirements ↗

Contact
Angel J. Martinez
Email
Angel.J.Martinez@usace.army.mil
Phone
(939) 348-9503

Observed opportunity history

This is the history collected by Gov Contract Finder. Times show when information was captured or a version was assembled, not when SAM.gov originally changed it. Earlier revisions may be missing.

Publications are grouped by matching evidence; revision relationships are inferred.

The original SAM.gov root publication has not been verified.

History
  1. Opportunity version

    Initial information

    Freedom Connection Natural Gas Pipeline

    Solicitation: W51DQV26Z1BHC

    Publication: ef820c00a61948cbba03afd48f419914

    Current publication

    Changed fields: AAC Code, Active, AdditionalInfoLink, ArchiveDate, ArchiveType, Award$, AwardAmount, AwardDate, AwardNumber, Awardee, BaseType, CGAC, City, ClassificationCode, CountryCode, Department/Ind.Agency, Description, FPDS Code, Industry, Link, NaicsCode, NoticeId, Office, OrganizationType, PopCity, PopCountry, PopState, PopStreetAddress, PopZip, PostedDate, PrimaryContact, ResponseDeadLine, SecondaryContact, SetASide, SetASideCode, Sol#, State, Sub-Tier, Title, Type, ZipCode, awardeeCageCode, awardeeUei, descriptionUrl, fullParentPathCode, fullParentPathName, groupingConfidence, logicalOpportunityId, naicsCodes, pointOfContact, resourceLinks, samNoticeId, samRootId, solicitationNumber, source, sourceResourceCount, sourceResourceIds

    First established information: Department/Ind.Agency, Description, Office, Sub-Tier

  2. Opportunity capture

    Initial information

    Freedom Connection Natural Gas Pipeline

    Solicitation: W51DQV26Z1BHC

    Publication: ef820c00a61948cbba03afd48f419914

    Current publication

DEPT OF DEFENSE

Posted
Oct 23, 2026
Due
Nov 20, 2026, 3:00 PM EST
Place of performance
Mather, CA
NAICS
237120
Set-aside
Small Business Set Aside - Total