Freight Grade Separation Planning Studies Program Services

Description

H-GAC is seeking a Contractor who can provide traditional and innovative solutions to improve safety and reduce delays near at-grade rail crossings. Scope of Work Overview The H-GAC region faces significant challenges regarding safety and efficiency, with roughly 1,200 at-grade public crossings grouped around freight corridors, ports, and historic urban neighborhoods. Blocked crossings pose safety hazards and delays for daily commuters, pedestrians, and cyclists. Past initiatives, such as the Houston-Beaumont Freight Rail Study, have emphasized the urgent need for infrastructure upgrades, particularly recommending grade separation solutions that can significantly improve safety and streamline freight rail movement. With the enactment of funding sources such as the Infrastructure Investment and Jobs Act (IIJA) and Senate Bill 1555 by the Texas Legislature, there is an opportunity to address long-standing conflicts between rail infrastructure and other transportation modes within our system. Goals and Objectives H-GAC is launching the strategic Freight Grade Separation Planning Studies Program Services to support the development of crossing solutions through planning-level feasibility studies. The Grade Separation Feasibility Plans will lay the groundwork for transformative improvements that ensure safer, faster, and more reliable transportation in our region. The feasibility plans are intended to aid in the following: Regional coverage of rail and road grade separation studies that lead to the identification of regional needs Continue study recommendations through the pipeline for the next phase in the project development Competition for additional funding opportunities Regional Transportation Plan (RTP) (project development process). Transportation Improvement Program (TIP) (project selection process). Statewide and Federal grant programs. Local funding opportunities. Methodology and Approach Program Overview and Project Selection The Freight Grade Separation Planning Studies Program will support feasibility studies for individual rail crossings and groups of consecutive crossings, collectively referred to as rail corridors. Local government partners will submit project applications through a separate, concurrent process for H-GAC review and approval. H-GAC will determine which projects are approved and assigned to the Contractor based on program needs, available funding, and project priorities. Study complexity will vary by location and may include: Rural areas: Primarily agricultural areas with relatively simple rail crossing conditions. Suburban locations: Areas with growing traffic volumes, schools, and existing communities. Dense urban areas: Areas with industrial freight hubs, multiple rail lines, and environmentally sensitive areas. Each study must evaluate potential grade separation solutions and identify appropriate short-, medium-, and long-term implementation timelines. Contractor Responsibilities H-GAC intends to award one contract to a qualified prime Contractor to manage and perform the assigned feasibility studies. The Contractor will provide centralized program management, consistent study methodologies, stakeholder and railroad coordination, quality control, and standardized data and deliverables across assigned projects. The Contractor may use subcontractors but remains responsible for all contract performance, deliverables, and subcontractor management. Proposals must include a project management plan, Gantt chart, and subcontractor tasks and deliverables. H-GAC may assign up to ten study locations and/or corridors during the contract term, subject to funding, program needs, and Contractor capacity. No minimum number of assignments or expenditure is guaranteed. Required Study Tasks The Contractor will perform the applicable study tasks for each project approved and assigned by H-GAC. The following tasks establish the requirements for individual rail crossing and rail corridor feasibility studies. In addition to Tasks 1 and 2, the applicable tasks will vary according to the assigned study type. Task 1 - Project Management Project Management Plan Develop a Project Management Plan (PMP) for H-GAC's review and approval within thirty (30) days of contract execution, covering all deliverables. The PMP must describe the overall approach and methodology for completing the deliverables identified in this scope. The PMP will identify work organization, responsibilities, coordination, communication procedures, memorandum and report formats, graphic production standards, quality control procedures, and project schedule. The PMP is a living document and is updated as needed during project development. Quality Assurance/Quality Control (QA/QC): The PMP will include a QA/QC Plan that addresses the processes and procedures to ensure quality assurance and quality control. Ensure that all deliverables are reviewed and approved by H-GAC prior to distribution. A QA/QC plan, along with any supporting materials (e.g., checklists), will be prepared and submitted to H-GAC with the PMP. A signed copy of the completed QA/QC checklist will be submitted with each technical memo, report, or similar document. Project Meetings The Contractor and H-GAC will hold a kick-off meeting to discuss the PMP, project scope, project schedule, standards/templates, branding/marketing requirements, methodologies, and unique data constraints, invoicing requirements, etc. Coordination meetings with the Contractor team and H-GAC staff will be held at regular intervals, as established in the contract, to review progress and management. These meetings will be supplemented by meetings scheduled as needed by either the Contractor(s) or H-GAC. The Contractor will produce detailed meeting summaries and send them to H-GAC for review and recording within 10 business days of the meeting. Invoicing Submit, during the progress of work, a task-specific invoice to the H-GAC project manager on the fifth (5th) day of the month for all work done or expenses incurred during the previous month. In addition, a task-specific invoice by the tenth (10th) day of each month for work done or expenses incurred during the previous month (Templates provided by H-GAC). Submit the H-GAC billing template for all billings, identified as Monthly Financial Report, and/or other type of invoice acceptable to H-GAC. Invoices arriving after the 10th day of the month will be processed for payment on the fifth day of the succeeding month. Submit detailed records that will convey the actual time devoted and the costs incurred. Submit the following support documentation with each invoice: Personnel (timesheets), Equipment, Travel, Contract Services, and Other (marketing/public relations, etc.). If unable to provide expenses by calendar month, H-GAC will be provided with a detailed explanation of why this is not possible. Submit a final invoice within 60 days after work completion. The final invoice payment will be released pending receipt and acceptance of all deliverables as specified in the Scope of Work. Invoices submitted after this time will not be honored unless prior arrangements are made and approved in writing by H-GAC. Progress Reports Submit monthly progress reports to H-GAC. This report will outline task-specific work accomplished during the previous work period or since the last progress report for the Contractor's work under this Contract. These reports will include, but not be limited to: A brief description of work accomplished for each task. The percentage of completion of the overall work project and each task. Changes in the estimated value (budget) of each work task. Problems/delays encountered or anticipated, and remedial actions taken. Any remedial actions taken by H-GAC or Contractor. Meeting minutes covering the invoice period; and The anticipated work activities for the following work period. Upon completion of the Tasks, or in some cases the Scope of Work, the Contractor will submit all materials specified as deliverables in the Scope of Work. In addition, furnish H-GAC with all computer files about the study not previously transmitted and belonging to H-GAC. Project activities will be conducted as detailed within the PMP. Progress reports, invoices, and updated project schedules must be submitted to H-GAC’s Project Manager. Sub-contractor(s) Management The Contractor is solely responsible for the performance, coordination, and quality control of all subcontractors. Prepare and execute contracts for all subcontractor(s) for this Plan. Monitor the activities of Subcontractor(s) staff and ensure adherence to schedules, as well as review and recommend approval of subcontractor(s) invoices. Task 1 Deliverables Project Management Plan (PMP) within 30 days of NTP (Word, PDF) Monthly invoices, sent for review by the 5th of each month, but due by the 10th of each month Monthly progress reports Project schedule updated as needed Copy of subconsultant contracts within 30 days of execution Project Team Meeting summaries, within 10 business days of meeting Task 2 - External Coordination and Public Involovement Public Involvement Plan Draft a Public Involvement Plan (PIP) in alignment with H-GAC’s Public Participation Plan (PPP), with review and approval by H-GAC staff. In addition, develop the study's strategy for regular meetings with the facility owners and the project sponsor. Public involvement is an important component of this plan and encourages innovative approaches that best meet the needs of the community for which this planning effort serves. External Agency Coordination Meet with all relevant external agencies to receive guidance and feedback on the direction of the Railroad Grade Separation Feasibility Studies. These meetings will help identify, analyze, and prioritize key issues. Work in coordination with H-GAC staff to establish meeting dates and locations, secure meeting facilities, provide facilitation services, and provide technical advice regarding coordination of data, meetings, or other information needed to conduct the feasibility studies with project local government, as well as state and private partners (i.e., Union Pacific and TxDOT). Four (4) coordination meetings per study location are anticipated during various stages of the Railroad Grade Separation Feasibility Studies: The Kick-Off meeting to discuss the scope of the study Needs and purpose meeting to lay out the basis for determining project goals and objectives Review and feedback of potential concepts Wrap-Up Document Meeting to determine document adequacy for the future. Meet with H-GAC to develop a meeting agenda and presentation prior to each meeting. Prepare final materials based on comments received from HGAC and compile final meeting notes. Provide H-GAC with editable copies of all content in a digital format, such as a USB drive or file-sharing platform. Public Meetings Public Meetings a maximum of two (2) meetings per study location will be held at locations within or adjacent to the study area(s) at key milestones during the study. Meeting dates, places, and times will be approved by H-GAC prior to the contractor finalizing the details. The responsibilities for H-GAC Communications, H-GAC Transportation, and the Contractor are detailed below: H-GAC Communications Assist the contractor in the development of a marketing strategy for external communications and outreach, including time review guidance. Develop and post notices for Public Meetings to H-GAC-controlled media sources and assist the contractor in postings in non-HGAC-controlled media. Notices can include: Legal notices Newspaper advertisements Social media posts Fliers (e.g., Digital and print) Community calendars Invite public meeting attendees via direct notice such as H-GAC Board members or other H-GAC partners, elected officials, and other area representatives within the assigned study area. Managing media inquiries and relations Develop complementary marketing and promotional material, if requested by H-GAC project manager. This can include: Fliers Handouts Social media graphics Email templates to send direct invites. Proof and edit all external-facing messaging. Provide support to the project team in hosting public meetings, where needed. Assist in ensuring external-facing material meets language and accessibility requirements. Provide photos, graphics, and other elements to assist with and guide the structure and layout of the final report/deliverables. Provide support for translation services, when needed. H-GAC Transportation Act as primary facilitator between H-GAC Communication and the contractor Assist in the procurement of project-specific mailing lists that target businesses, places of worship, local residents, etc. Assist with coordination with the local sponsor and Contractor. Assist with all meetings required in this scope. Duplicate all documents for each meeting, as required. Final approval of all materials Contractor Develop a Public Involvement Plan, incorporating H-GAC marketing strategy where appropriate. Work with the local sponsor to secure facilities for all meetings. Provide a team with effective communication skills that can coordinate needed meetings via, but not limited to, email, phone, and flyer distribution. Provide a team member with effective communication and presentation skills to engage a wide variety of audiences and facilitate meetings. Prepare meeting agendas, presentations, meeting materials, sign-in sheets, displays, handouts, comment cards, surveys, and meeting summaries. Provide appropriate staffing for translation services in partnership with H-GAC Communications, where services may not be readily accessible (i.e., American Sign language, etc.). Procurement of project-specific mailing lists that target businesses, places of worship, local residents, etc. The Contractor will provide meeting materials to H-GAC at an established interval prior to all public meetings. H-GAC will review and approve all materials 1 week prior to meetings. If a press or media release is needed, materials are required to be reviewed 3 weeks in advance of releasing materials. H-GAC will print handout materials for all meetings. Create a report design and look that best reflects the community, in partnership with HGAC Communications, photos, graphics, etc. Develop any needed marketing and promotional material. H-GAC will review and approve all materials 2 weeks prior to deployment. This can include: Fliers Handouts Social media graphics Email templates to send direct invites. Task 2 Deliverables Public Involvement Plan (PIP) within 45 days of NTP Kick-Off Meeting Agenda, Presentation, and Notes Need and Purpose Meeting Agenda, Presentation, and Notes Alternatives Screening Meeting Agenda, Presentation, and Notes Wrap-Up Meeting Agenda, Presentation, and Notes Public Meeting Agenda, presentation materials, displays, handouts, comment cards Public meeting summary report(s) Feasibility Studies for Individual At-Grade Railroad Crossing Task 3 - Existing Conditions Analysis and Data Collection Work with the local right of way owner to provide a thorough assessment of existing site conditions, railroad operations, traffic conditions, and safety conditions affecting the rail crossing. If coordination is not possible and data cannot be obtained, propose and use alternative methods to obtain information, pending approval of the method by the H-GAC PM and the local sponsor. Traditional best practices regarding data collection, analysis, and reporting are anticipated. If non-traditional approaches are proposed, provide details for H-GAC approval in advance. Innovation will be encouraged. Data Collection Work with H-GAC to identify and collect necessary data to evaluate the existing and future conditions at the selected railroad crossings. Coordinate with H-GAC for data requests at the kickoff meeting. The Contractor may rely on traditional data sources, such as the Texas Department of Transportation and the Federal Railroad Administration, as well as locally collected data. If innovative sources are to be used, the data source must be submitted and approved by H-GAC. H-GAC will provide data that the MPO has access to. Site Conditions Conduct a comprehensive analysis of the current site conditions at the selected rail crossing location. This review must cover roadway features, intersection details, multimodal facilities, and existing land uses to establish a clear understanding of the specific context around the crossing. Additionally, mobility impacts, including delays, congestion, and roadway performance, will be factored into the analysis. Traffic Operations Develop a methodology to assess traffic conditions at the intersection. The methodology must include collecting and analyzing traffic data to understand operations at the crossing. The analysis must consider both the current and projected design years to ensure the project can handle forecasted traffic volumes. Operations that will be reviewed include the following: Traffic signal operations Traffic flow, i.e., AADT, truck counts, Incident management, i.e., emergency management and accident response Intelligent Transportation Systems (ITS) (if applicable) Safety Conditions Analyze safety conditions to identify issues and recommend measures to enhance safety at the rail crossing. The safety analysis must focus on the rail crossing intersection but can also look at the roadway as a whole within at least two hundred fifty feet (250 ft), or whichever distance is applicable based on actual field conditions to inform the analysis. The analysis will include crash rates and frequencies, as well as geometric issues such as sight distances and skewed geometry. A review of regulatory policies must also be included in the analysis to understand normal driving conditions. Safety conditions at the rail crossing intersection must include blocked crossing data and warning device issues. Stakeholder Input Provide stakeholders with information on the project's background. All information for Task 3 Existing Conditions Analysis and Data Collection must be included in this meeting with stakeholders to provide feedback to the project team and ensure the recommendations reflect technical realities, community priories, and operational needs. Task 3 Deliverables Technical memo briefly describing methodologies proposed for the existing conditions analysis and data collection process (Word, PDF) Raw files of original materials Existing conditions report (Word, PDF) Stakeholder meeting agenda, presentation, and notes Task 4 - Railroad Data Collection and Field Reconnaissance Conduct a comprehensive analysis of the current railroad operations that interact with the at-grade crossing. This analysis must detail any information on train volumes, directions, lengths, speeds, and yard operations that may affect the crossing. Work with H-GAC to identify and collect any data necessary to evaluate existing and future conditions covering the following railroad data: Data, if available, from the State, locality, or railroad owner, such as existing concepts, right-of-way maps, existing draft cross sections, railroad operation simulations, and existing special provisions (such as regulations for transporting goods). Documents for existing and proposed development by the railroad operator. Utility plans and documents from appropriate municipalities, utility owners, and agencies within the railroad ROW. Conduct field reconnaissance and collect data, including a photographic record of notable existing features Task 4 Deliverables Raw files with original materials from field reconnaissance Report detailing findings for collected data and field reconnaissance List of documents and data needed to complete analysis (Word, PDF or Excel) Task 5 - Preliminary Concepts Alternative Analysis Develop up to two (2) planning-level conceptual options for each study location. These options must include a variety of

Published attachments
Addenda and notices
  • Addendum #1 · 1

    The closing date submission deadline has been extended to December 17, 2026 @ 12PM CT

Public questions and answers
  • Please confirm which certifications are required for this proposal, as Section 9. DBE Goal references a 26% DBE Goal, though TxDOT's DBE Interim Final Rule has a current pause in place that delisted all Texas DBE firms from the TUCP directory pending reevaluation. How will this goal be applied/measured during the evaluation process and are subconsultants required to be DBE-certified? Also, please confirm whether Small and Minority Businesses, Women's Business Enterprises, and Labor Surplus Area Firms certifications (listed under Section 10.2.4) will satisfy the 26% DBE requirement.

    DBE certification is not a scored criterion. Please refer to the applicable funding source in Section 10.2 DBE Supplemental Guidance.

  • Since the files are being uploaded separately, do we still need to include a table of contents, or have electronic dividers/tabs that accompany each separate file?

    A table of contents is not required; please upload each file separately to its designated section.

  • Please clarify how much of the projected $500,000 in funding will be allocated to Individual At-Grade Railroad Crossings vs At-Grade Corridor Railroad Crossings. What is the estimated budget per crossing?

    H-GAC anticipates implementing up to five individual at-grade railroad crossing studies not to exceed $500,000 during the first phase of funding. The remaining Individual At-Grade Railroad Crossing Studies and the At-Grade Corridor Railroad Crossing Study will be implemented in future phases of the program as funding becomes available.

  • In Sections 3.9 Task 6 and 3.15 Task 12, both titled “Rough order of magnitude (planning level) Benefit-Cost Analysis (BCA),” it is mentioned that REMI software will be used to analyze the benefits portion of the Benefit-Cost Analysis. The contractor currently has the PROSERIS/ REMI PI+ software. Is the contractor required to have its own license to REMI TranSight software? If so, will the Transportation Economic Development Impact System (TREDIS) be an acceptable alternative?

    The selected consultant will be working in tandem with the H-GAC DAR team members. H-GAC currently utilizes REMI for economic impact analysis and does not maintain a TREDIS license. Consultants may propose methodologies and tools they deem appropriate; however, any analysis provided must be compatible with REMI to address the project's needs and deliverables.

  • In Sections 3.9 Task 6 and 3.15 Task 12, both titled “Rough order of magnitude (planning level) Benefit-Cost Analysis (BCA),” please clarify whether the contractor is being asked to develop the full Benefit-Cost Analysis or just compile the inputs for the Benefits portion of the BCA in cooperation with the H-GAC DAR team.

    The selected consultant will be responsible for compiling the inputs required for the planning-level Benefit-Cost Analysis (BCA). H-GAC will use these inputs to conduct the BCA. Further details regarding the roles and responsibilities for the benefit-cost analysis, including the use of consultant-provided inputs and H-GAC support, will be refined during scope development and negotiated with the selected consultant.

  • For the required submission uploads, item 10.1.3. Experience/Capabilities states to "Provide information on the firm’s services experience on projects of similar type, size, function, and complexity. Describe five (5) projects, in order of most relevant to least relevant, which demonstrate the firm's capabilities to perform the project at hand." May we include representative projects from subconsultants as part of the five projects?

    Yes. Representative projects completed by subconsultants may be included among the five projects, provided the proposal clearly identifies the role of each team member on the referenced projects.

  • On pages 15 and 19 of the RFP, it states: “Conduct a detailed planning-level Benefit-Cost Analysis (BCA) for the at-grade crossing location. Work with H-GAC Data Analytics and Research (DAR) team to analyze the benefits portion of the benefit-cost analysis using REMI software.” 1. Will the contractor be responsible for the subscription to REMI (Regional Economic Models, Inc.), or is this held by H-GAC DAR? 2. Who is the audience for REMI outputs? Local key interested parties H-GAC is in communication with? Or are they expected to be incorporated into US DOT BCA work to justify grant funding?

    1. No. The consultant is not required to maintain a REMI license, provided they can supply information and data that are compatible with the project's needs and deliverables. 2. REMI outputs are primarily anticipated to support local interested parties and project stakeholders. However, some project sponsors may choose to use the information to support future federal discretionary grant funding opportunities.

  • How will H-GAC select grade separation studies for support services and is the contractor expected to contribute to and oversee any selection framework implementation?

    H-GAC conducted a call for projects that concluded on October 16th.

  • Does H-GAC anticipate assigning multiple grade-separation locations concurrently under this contract or does H-GAC expect individual locations to proceed sequentially through the study process?

    H-GAC anticipates that multiple grade separation study locations may be active under the contract at the same time. However, project delivery is expected to follow a phased approach, with individual study locations progressing through the study process according to program priorities, funding availability, data collection needs, stakeholder coordination requirements, and consultant capacity. Therefore, while assignments may overlap in time, completion of studies is anticipated to occur in phases rather than all locations advancing and concluding simultaneously.

  • Are all tasks identified in the scope expected to be performed for each study location assigned under the contract, or will H-GAC determine the applicable tasks and level of effort for each location based on its specific needs and stage of development?

    All tasks detailed in the scope are expected to be performed for each study.

  • For the task-level schedule and sample flowchart, should proposers illustrate the overall program workflow across multiple potential study locations, including how assignments could overlap, or provide a representative workflow and schedule for a single study location?

    The task-level schedule should cover a single location in detail. Once selected, the consultant will provide a detailed task schedule for all known locations.

  • Can H-GAC provide its current expectation regarding the approximate number of study locations that may be authorized during the contract period, recognizing that the solicitation does not guarantee a minimum number of assignments or expenditures?

    Up to five individual crossings.

Plain text

OpenGov categories

  • 90664 · Planning, Urban (Community, Regional, Area wide, and State)
  • 90666 · Planning, Site (Installation and Project)
  • 90772 · Safety Engineering and Accident Studies; OSHA Studies
  • 91892 · Urban Planning Consulting
  • 95890 · Traffic Safety Program Management Services
  • 96877 · Traffic Safety Services