State and local · OpenGov
FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY
Description
The Town of Manchester Water and Sewer Department is seeking a capable and reliable contractor to replace Siphon No. 1 and Siphon No. 3 at the Globe Hollow Water Treatment Plant, and to repair the associated discharge valves in the trough. Finished work shall match the repairs already completed on Siphon Nos. 2 and 4. Sequence may change due to operational needs. Both sedimentation basins that house the siphons will be drained by the Town before the start of the work. Siphon No. 1 shall be completed and returned to service first. Siphon No. 3 shall follow. The plant will remain in operation. PROJECT DETAILS SCOPE OF WORK The contractor shall furnish all labor, materials, equipment, tools, supervision, permits, fall protection, and incidentals required to complete the following: Confirm with Town operations staff that Siphon No. 1 and Siphon No. 3 have been drained and work can commence . Do not begin cutting, hot work, or disassembly on a unit until isolation of that unit is confirmed in writing. Repair Siphon No. 1 first. Work shall match the completed repairs on Siphon Nos. 2 and 4, including piping, fittings, joints, supports, hangers, anchors, hardware, and coatings. Measurements of the piping's should be made prior to demolition to verify that drawings are accurate. Drawings will be provided Once completed test Siphon No. 1 with the Town, return it to service, and confirm it is up and running for 1 week before starting work on Siphon No. 3. Repair Siphon No. 3 to the same standard as Siphon Nos. 2 and 4. Repair the discharge point in the trough as part of this bid, including piping, fittings, supports, seals, and any interface work needed for a watertight, serviceable discharge consistent with the adjacent repaired siphons. Protect the trough, adjacent process units, and finished surfaces from damage, debris, and coating overspray. Perform tightness testing and support Town staff start-up of each siphon. Provide as-built markups and a brief closeout confirmation that each siphon was returned to service. Work shall be performed one siphon at a time. The contractor shall not take both subject siphons out of a restorable condition at the same time. The plant will remain in service. The contractor shall not operate plant valves, breakers, or process controls without written authorization from Town operations. Siphon 1 shall be returned to service and operated for 1 week before starting Siphon 3 All materials removed are to be dispensed off site. At the end of the project the site is to be cleaned as to what it was when project started and approved by Town. Materials shall be equal or superior to those used on Siphon Nos. 2 and 4 and suitable for potable-water treatment plant service. NSF/ANSI 61-compliant materials are required for components that will contact process or finished water unless the Town directs otherwise in writing. Product data, shop drawings, and coating submittals are required before procurement or fabrication. Field conditions and the completed Siphon 2/4 standard govern where they conflict with drawings, subject to Town direction and approval PREVAILING WAGE SPECIAL NOTICE To All State and Political Subdivisions, Their Agents, and Contractors Connecticut General Statute 31-55a - Annual adjustments to wage rates by contractors doing state work. Sec. 31-55a. Annual adjustments to wage rates by contractors doing state work. Each contractor that is awarded a contract on or after October 1, 2002, for (1) the construction of a state highway or bridge that falls under the provisions of section 31-54 of the general statutes, or (2) the construction, remodeling, refinishing, refurbishing, rehabilitation, alteration or repair of any public works project that falls under the provisions of section 31-53 of the general statutes shall contact the Labor Commissioner on or before July first of each year, for the duration of such contract, to ascertain the prevailing rate of wages on an hourly basis and the amount of payment or contributions paid or payable on behalf of each mechanic, laborer or worker employed upon the work contracted to be done, and shall make any necessary adjustments to such prevailing rate of wages and such payment or contributions paid or payable on behalf of each such employee, effective each July first. The prevailing wage rates applicable to any contract or subcontract awarded on or after October 1, 2002 are subject to annual adjustments each July 1st for the duration of any project which was originally advertised for bids on or after October 1, 2002. Each contractor affected by the above requirement shall pay the annual adjusted prevailing wage rate that is in effect each July 1st, as posted by the Department of Labor. It is the contractor’s responsibility to obtain the annual adjusted prevailing wage rate increases directly from the Department of Labor’s Web Site. The annual adjustments will be posted on the Department of Labor Web page: www.ctdol.state.ct.us . For those without internet access, please contact the division listed below. The Department of Labor will continue to issue the initial prevailing wage rate schedule to the Contracting Agency for the project. All subsequent annual adjustments will be posted on our Web Site for contractor access. Any questions should be directed to the Contract Compliance Unit, Wage and Workplace Standards Division, Connecticut Department of Labor, 200 Folly Brook Blvd., Wethersfield, CT 06109 at (860)263-6790. Sec. 31-53b. Worker training requirements for public works projects. Enforcement. Regulations. Exceptions. (a) Each contract for a public works project entered into on or after July 1, 2009, by the state or any of its agents, or by any political subdivision of the state or any of its agents, described in subsection (h) of section 31-53 , shall contain a provision requiring that each contractor furnish proof with the weekly certified payroll form for the first week each employee begins work on such project that any person performing the work of a mechanic, laborer or worker pursuant to the classifications of labor under section 31-53 on such public works project, pursuant to such contract, has completed a course of at least ten hours in duration in construction safety and health approved by the federal Occupational Safety and Health Administration or, has completed a new miner training program approved by the Federal Mine Safety and Health Administration in accordance with 30 CFR 46 or, in the case of telecommunications employees, has completed at least ten hours of training in accordance with 29 CFR 1910.268, and, on or after July 1, 2012, that any plumber or electrician subject to the continuing education requirements of section 20-334d , who has completed a course of at least ten hours in duration in construction safety and health approved by the federal Occupational Safety and Health Administration five or more years prior to the date such electrician or plumber begins work on such public works project, has completed a supplemental refresher training course of at least four hours in duration in construction safety and health taught by a federal Occupational Safety and Health Administration authorized trainer. (b) Any person required to complete a course or program under subsection (a) of this section who has not completed the course or program shall be subject to removal from the worksite if the person does not provide documentation of having completed such course or program by the fifteenth day after the date the person is found to be in noncompliance. The Labor Commissioner or said commissioner's designee shall enforce this section. (c) Not later than January 1, 2012, the Labor Commissioner shall adopt regulations, in accordance with the provisions of chapter 54, to implement the provisions of subsections (a) and (b) of this section. Such regulations shall require that the ten-hour construction safety and health courses required under subsection (a) of this section be conducted in accordance with federal Occupational Safety and Health Administration Training Institute standards, or, in the case of a supplemental refresher training course, shall include, but not be limited to, an update of revised Occupational Safety and Health Administration standards and a review of required construction hazards training, or in accordance with Federal Mine Safety and Health Administration Standards or in accordance with 29 CFR 1910.268, as appropriate. The Labor Commissioner shall accept as sufficient proof of compliance with the provisions of subsection (a) or (b) of this section a student course completion card issued by the federal Occupational Safety and Health Administration Training Institute, or such other proof of compliance said commissioner deems appropriate, dated no earlier than five years before the commencement date of such public works project or, in the case of supplemental refresher training, a student course completion card issued by said Occupational Safety and Health Administration authorized trainer dated not earlier than five years prior to the date such electri BID SECURITY Each bid must be accompanied by a bid bond or bank check, payable to the Town of Manchester for five percent (5%) of the total bid. In the event of a base bid/alternate bid situation, the bid bond will be for five percent (5%) of the base bid. The bond must be furnished by a surety company satisfactory to the Town and must be a corporate surety licensed to sign surety bonds in the State of Connecticut. The Town of Manchester will not be liable for the accrual of any interest on any certified check submitted. Cashiers' checks made payable to the Town of Manchester will be accepted. SECURITY FOR FAITHFUL PERFORMANCE The Contractor shall furnish a surety bond or bonds as security for faithful performance of this Contract and for the payment of all persons performing labor and materials under this Contract. The Performance Bond and the Labor and Materials Bond shall be equal to one hundred percent (100%) of the contract price and shall be furnished within ten (10) business days of the Notice of Award or prior to the start of Work, whichever comes first. The surety on such bond or bonds shall be a duly authorized surety company qualified to do business under the laws of the State of Connecticut and satisfactory to the Town. Attorneys-in-fact who sign contract bonds must file with each bond a certified and effectively dated copy of their power of attorney. INTRODUCTION Summary Background Contact Information Timeline INSTRUCTIONS TO BIDDERS ELECTRONIC BIDDING INFORMATION Submitting Proposals Specifications and proposal forms must be obtained online at Town of Manchester Procurement Portal (opengov.com) . The exclusive means by which all prospective bidders may obtain proposal packages, direct inquiries, request and receive addenda and supplemental information, and submit bids and proposals, shall be through the Town of Manchester’s OpenGov portal. Proposals may be received up to the deadline date and time listed in the solicitation documents, via the Town’s e-Procurement Portal. The Town e-Procurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. The Town of Manchester strongly recommends completing your response well ahead of the deadline. Addenda Notification and Acknowledgement Addenda Notification: Bidders are required to register for an account via the Town’s e-Procurement Portal hosted by OpenGov. Once the bidder has completed registration, you will receive addenda notifications to your email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each bidder to periodically check the site for any addenda at Town of Manchester Procurement Portal (opengov.com) Submitting Questions and Receiving Responses Proposers shall submit all inquiries regarding this RFP via the Town’s e-Procurement Portal. Please note any deadline for submitting inquiries. All answers to inquiries will be posted on the Town’s e-Procurement Portal. Bidders may also click “Follow” on this RFP to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. When applicable, state bids will be considered for this service. The Purchasing Authority reserves the right to waive any informality or reject any and all bids. In addition to the bid specifications, all bids are subject to the terms, provisions and conditions of the Manchester Charter, Code of Ordinances, and Purchasing Guidelines. By bidding on the proposed purchase, the bidder agrees to such terms, provisions and conditions. An Equal Opportunity/Affirmative Action Employer BID OPENING INFORMATION Proposals must be received by the date and time indicated in the bid documents. RULES AND REGULATIONS FOR COMPETITIVE BIDDING These rules and regulations have been adopted by the Board of Directors of the Town of Manchester pursuant to Section 5-22 of the Town Charter. They are standard for all competitive bidding proposals issued by the Town of Manchester, Connecticut for contracts of all types where labor, materials, and necessary equipment to complete work is to be furnished to the Town, where the Town is to purchase supplies, materials, and equipment, where the Town is to sell surplus materials and equipment, or where the Town is to sell real estate. These rules and regulations shall be binding upon all prospective bidders and the Town of Manchester. GENERAL RULES 1. The Purchasing Authority may delete or modify any of the instructions to bidders for a particular proposal, indicating such change in the appropriate section of the proposal documents. The Purchasing Authority may insert special instructions in any special contracts which are subject to competitive bidding. 2. The proposal is signed by the proposer with full knowledge of, and agreement with, the general specifications, conditions, and requirements of this proposal. 3. The town has transitioned to electronic bidding. Vendors should submit solicitation responses electronically via the Town of Manchester Procurement Portal. Vendors will be asked to register and should do so prior to submitting proposal documents. 4.This proposal and any addenda will be issued on the Town of Manchester website bidding portal. It shall be the responsibility of the proposer to download this information. THE TOWN OF MANCHESTER WILL NOT MAIL A SEPARATE HARD COPY OF ADDENDUM TO PROPOSERS . Failure of any proposer to receive any such addendum or interpretation shall not relieve such proposer from any obligation under his RFP as submitted. All addenda so issued shall become part of the Contract Documents. 5. Proposal prices may not be withdrawn by bidder for 90 days after bid opening. 6. Proposals received later than the time and date specified will not be considered. Amendments to, or withdrawals of proposals received later than the time and date set for submission deadline will not be considered. 7. All deliveries of commodities or services hereunder shall comply in every respect with all applicable laws of the Federal Government and/or the State of Connecticut. 8. Purchases made by the Town of Manchester are exempt from payment of Federal Excise Taxes and the Connecticut Sales Tax and such taxes must not be included in bid prices. Federal Excise Tax exemption certificates, if requested, will be furnished. 9. The Proposer, where applicable, shall insert/include the price per stated unit and extend a total price for each item. In the event there is a discrepancy between the unit price and the extension, the unit price will govern. The total cost shall be the sum of the extended prices. 10. Proposer shall, where applicable, submit terms for payment in spaces provided in the proposal form, showing the amount of cash discount which shall apply to proposal prices when paid within the stated number of days in the proposal. 11. All inquiries shall be submitted within the time limitations specified in the bid documents and shall be requested via the online portal Q&A. All information given by the Town other than through the OpenGov Portal shall be informal and shall not be binding upon the Town nor shall it furnish a basis for legal action by any proposer or prospective proposer against the Town. 11A. The Town reserves the right to reject any and all proposals, to waive technical defects, and to make such awards including accepting a proposal, although not the lowest cost, as it deems in its sole discretion to be in the best interest of the Town. The Town reserves the right to reject any proposal if the proposer, any officer of the proposer, or any other company owned in whole or in part by any officer(s) of the proposer, is delinquent in the payment of any taxes or fees owed to the Town. The Town reserves the right to require a disclosure statement from the proposer listing the name(s) of all officers of the company. 11B. In the event the Town determines that a contractor is delinquent in any payment due the Town, then the Town may offset the delinquent amount due to the Town against the sums owed the contractor. 12. The Town of Manchester may make such investigation as deemed necessary to determine the ability of the proposer to discharge a contract. The proposer shall furnish the Town with all such information and data as may be required for that purpose. The Town reserves the right to reject any proposal if the proposer fails to satisfactorily convince the Town that he is properly qualified by experience and facilities to carry out the obligations of the contract and to satisfactorily complete the work called for herein, or if the proposal is conditional in nature. 13. Except where otherwise provided, a contract between the Town and a successful proposer shall consist of the Request for Proposal, Specifications, Plans, Proposal, and Acceptance by the Town and these Rules and Regulations. Acceptance by the Town may be by purchase order for the portion of the work awarded to a contractor. 14. All Requests for Proposal shall be publicly advertised in a newspaper having a general circulation within the Town of Manchester, Connecticut. 15. The Request for Proposal shall be made available on the Town of Manchester Purchasing Web Site via the OpenGov Portal. 16. Any act or acts of misrepresentation or collusion shall be a basis for disqualification of any proposal or proposals submitted by such persons guilty of said misrepresentation of collusion. In the event that the Town enters into a contract with any bidder who is guilty of misrepresentation or collusion and such conduct is discovered after the execution of said contract, the Town may cancel said contract without incurring liability, penalty, or damages. 17. In the event that any proposer wishes to protest the potential award of a proposal, the proposer must make it’s protest in writing, identify the protesting party, the RFP number, title and shall include a factual summary of the basis of the protest including any documents that shall be considered and request a conference with respect thereto. Said protest must be received in the Town of Manchester Purchasing Office, within FIVE (5) business days after the award decision. 18. A conference with respect to said protest shall be scheduled by the Purchasing Authority and shall be attended by the Purchasing Authority or their designee and such other persons as the Purchasing Department and the Town Manager shal Important Instructions for Electronic Submittal Proposers shall create a FREE account with Open Gov Procurement by signing up at https://secure.opengov.com/portal/townofmanchester . Once you have completed account registratio
Published attachments
- PREVAILING WAGE RATE SCHEDULE
- 20260316 Float assembly 2
- 20260316 Float assembly
- 20260316 Drive assembly
- 20260316 Skid plate assembly
- 202603160 cone valve assembly
- 20260316 Parking stand install
- 202603160 Idler assembly
- 20260316 FLoating Syphon
- 20260316 Syphon pipe Assembly
- 202603160 rename drive installation
- 20260316 General arrangement
- 20260316 Syphon pipe assembly 2
- Town of Manchester 2026 Holiday Calendar
- Prevailing Wage - Payroll Certification Form
- Prevailing Wage - Bulletins
- Prevailing Wage - Footnotes July 1, 2025
- Prevailing Wage - July 1, 2025 Rates Information
- Prevailing Wage - CTDOL Poster
- Prevailing Wage - Contractor's Wage Certification Form
- Prevailing Wage - Payroll Certification Form Sample
- Prevailing Wage - Notice to All Mason Contractors and Interested Parties
- FURNISH_AND_INSTALL_INSERTS_FOR_SIPHONS_1_&_3_AT_GLOBE_HOLLOW_WATER_TREATMENT_FACILITY_(Addendum_#1_Revision).pdf
Addenda and notices
Addendum #1 · 1
The due date has been extended to November 30, 2026. The time remains the same. Please use the See What Changed link to view all the changes made by this addendum.
OpenGov categories
- 91359 · Construction and Upgrades, Wastewater Treatment Plant
- 91391 · Maintenance and Repair, Wastewater Treatment Plant