DEPT OF DEFENSE
- Posted
- Oct 20, 2026
- Due
- Nov 13, 2026, 2:00 PM EST
- NAICS
- 237110
- Set-aside
- Small Business Set Aside - Total
This notice records an award. Find active opportunities
This solicitation resulted in an award to CHANDLER CONSTRUCTION SERVICES, INC. for approximately $16,471,000 on January 12, 2026. Similar contracts are typically issued by DEPT OF DEFENSE under 237110 (Water and Sewer Line and Related Structures Construction).
Award details updated on March 24, 2026 following modification notice.
THE CAMERON REACH WATER MAIN CONTRACT CONSISTS OF THE FURNISHING, INSTALLING, AND PLACING INTO SUCCESSFUL OPERATION APPROXIMATELY 65,000 LF OF 12-INCH DIAMETER WATER MAIN PIPE, 1,000 LF OF 8-INCH DIAMETER WATER MAIN PIPE AND ALL ASSOCIATED WORK. THE CONTRACT INCLUDES ALL PIPE, VALVES, APPURTENANCES, ROADWAY BORES, HORIZONTALLY DIRECTIONALLY DRILLED PIPE, BACKFILL, COMPACTION, TESTING, QUALITY CONTROL, SAFETY, AND ALL OTHER RELATED WORK REQUIRED TO PLACE THE PROJECT INTO SUCCESSFUL OPERATION. THIS CONTRACT WILL BE A PORTION OF THE LAKE MARION REGIONAL WATER SYSTEM WITH PORTIONS OWNED, OPERATED, AND MAINTAINED BY BOTH SANTEE COOPER AND CALHOUN COUNTY. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK WITH LOCAL UTILITY OWNERS, PROPERTY OWNERS, LAKE MARION WATER TREATMENT PLANT PERSONNEL, AND CALHOUN COUNTY. THIS SOLICITATION IS HEREBY POSTED ON 24 OCTOBER 2025. THE PURPOSE OF THIS AMENDMENT 0001 IS TO PROVIDE An UPDATED CD02 PLAN SHEET. THIS AMENDMENT IS HEREBY POSTED AS OF 20 NOVEMBER 2025. This award was made to Chandler Construction in the amount of $16,471,000.00 and is hereby posted on 1.12.2026.
Evelyn HALLIBURTON
Primary contact
This is the history collected by Gov Contract Finder. Times show when information was captured or a version was assembled, not when SAM.gov originally changed it. Earlier revisions may be missing.
Publications are grouped by matching evidence; revision relationships are inferred.
The original SAM.gov root publication has not been verified.
Opportunity version
Initial information
FY26 Lake Marion Cameron Reach Water Lines
Solicitation: W912HP26RA003
Publication: 248f3933143b49a6985d5c4f222b941f
Current publication
Changed fields: AAC Code, Active, AdditionalInfoLink, ArchiveDate, ArchiveType, Award$, AwardAmount, AwardDate, AwardNumber, Awardee, BaseType, CGAC, City, ClassificationCode, CountryCode, Department/Ind.Agency, Description, FPDS Code, Industry, Link, NaicsCode, NoticeId, Office, OrganizationType, PopCity, PopCountry, PopState, PopStreetAddress, PopZip, PostedDate, PrimaryContact, ResponseDeadLine, SecondaryContact, SetASide, SetASideCode, Sol#, State, Sub-Tier, Title, Type, ZipCode, descriptionUrl, fullParentPathCode, fullParentPathName, groupingConfidence, logicalOpportunityId, naicsCodes, pointOfContact, resourceLinks, samNoticeId, samRootId, solicitationNumber, source, sourceResourceCount, sourceResourceIds
First established information: Department/Ind.Agency, Description, Office, Sub-Tier
Opportunity capture
Initial information
FY26 Lake Marion Cameron Reach Water Lines
Solicitation: W912HP26RA003
Publication: 248f3933143b49a6985d5c4f222b941f
Current publication
DEPT OF DEFENSE
DEPT OF DEFENSE
DEPT OF DEFENSE
DEPT OF DEFENSE