State and local · OpenGov
FY27 Traffic Signal Materials
Description
Ada County Highway District (ACHD) seeks competitive bids from qualified vendors to furnish and deliver traffic signal materials for Fiscal Year 2027, including signal heads, LED inserts and retrofit kits, video and radar vehicle detection equipment, and accessible pedestrian signal units. All materials shall comply with the solicitation specifications and applicable contract requirements. Deliveries shall be coordinated with ACHD and completed within ninety (90) calendar days following issuance of the applicable Purchase Order. Schedule A, FY26 Traffic Signal Materials, SIGNAL HEADS AND LED INSERTS Side Pole Mounting Brackets - Signal Head 3-section Side Pole Mounting Brackets - Signal Head 4-section 12" Pedestrian Hybrid Beacon - Signal Heads - Red, Red, and Amber 12" Three Section Vehicle Signal Heads - Red Ball, Amber Ball, and Green Ball Pedestrian Signal Countdown Heads Pedestrian Head Mounting Brackets, Single Head (L or R) 12" Three Section Vehicle Signal Heads - Red Arrow, Amber Arrow, and Green Arrow 12" Four Section Vehicle Signal Heads - Red Arrow, Amber Arrow, Amber Arrow, and Green Arrow Schedule B, FY26 Traffic Signal Materials, LED RETROFIT KITS LED Red Ball Display Retro-Fit Kit LED Amber Ball Display Retro-Fit Kit LED Green Ball Display Retro-Fit Kit LED Red Arrow Display Retro-Fit Kit LED Amber Arrow Display Retro-Fit Kit LED Green Arrow Display Retro-Fit Kit LED Pedestrian Display 16" Hand/Man Retro-Fit Kit Schedule C, FY26 Traffic Signal Materials, VIDEO DETECTION Two Camera Video Detection Processor Card Video Detection Expansion Module Color Video Monitor Color Video Detection Camera Camera Junction Box Mastarm Video Detection Mounting Video Detection Communications Module Schedule D, FY26 Traffic Signal Materials, VIDEO DETECTION Single Point Video Detection Camera with mounting hardware Single Point Camera Repeater Single Point Video Detection Processsor Schedule E, FY26 Traffic Signal Materials, RADAR VEHICLE DETECTION Radar detection stop bar detection head Radar detection advanced detection head Radar detection processor Schedule F, FY26 Traffic Signal Materials, ACCESSIBLE PEDESTRIAN SIGNAL UNITS Accessible Pedestrian Signal 4-Wire Push Button Assemblies SPECIFICATIONS Specifications Please refer to the " Attachments " section for Specifications and other pertinent supporting documents. NOTICE Ada County Highway District Invitation To Bid FY27 Traffic Signal Materials TO27-06 Sealed bids for FY27 Traffic Signal Materials will be received within the Ada County Highway District (ACHD) eProcurement portal located at https://procurement.opengov.com/portal/achdidaho , until 3:00 pm (local time), Wednesday, November 18, 2026 , at which time the bids will be publicly opened via Zoom. All proposals must be electronically sealed and submitted via ACHD's eProcurement portal https://procurement.opengov.com/portal/achdidaho . Manual/Paper bids will be deemed non-responsive. The Invitation to Bid (ITB) seeks competitive bids from qualified Firms to provide and deliver traffic signal materials, including signal heads, LED components, vehicle detection equipment, and accessible pedestrian signal units, in accordance with the solicitation specifications. All questions or requests for clarification regarding this Invitation to Bid, including the content and requirements of the Bid and Contract Documents, must be submitted in writing through the "Question and Answer" section of the ACHD eProcurement Portal and no later than 4:30 pm on Thursday, November 12, 2026 . Questions submitted by any other method, including manual delivery or email, will not be accepted , nor will questions be accepted after the designated Question and Answer deadline. Bidders are strongly advised to observe the stated deadline for submitting inquiries. To ensure timely receipt of updates, bidders are encouraged to select “Follow” on this Bid within the eProcurement Portal to receive automated email notifications when responses are posted. Notwithstanding such notifications, it remains the sole responsibility of each bidder to monitor the eProcurement Portal for updates and responses regularly. Any interpretation, clarification, or modification of the ITB that may affect its substance will be issued only in writing in the form of an Addendum and will be made available through the eProcurement Portal. It is the bidder’s responsibility to review and acknowledge all Addenda prior to submitting a Bid. The Final Addendum, which will be issued to all registered Bidder Holders no later than 4:30 pm on Friday, November 13, 2026 . The successful Bidder may be required, upon issuance of the Notice of Award, to furnish supply, material, payment, and performance bonds, each in an amount equal to one hundred percent (100%) of the total Contract value. No such bonds shall be required at the time of bid submission. ACHD has prepared the Contract Documents, and copies must be obtained from the eProcurement Portal . ACHD reserves the right to reject all bids or reject any bid not conforming to the intent and purpose of the Contract Documents whenever such action appears to be in the best interest of ACHD. Award of a contract pursuant to this procurement may be delayed, without penalty, for up to sixty (60) calendar days after the date of bid. Dated Tuesday, November 3, 2026 ADA COUNTY HIGHWAY DISTRICT Dates of Publication: November 3 and 10, 2026 INTRODUCTION Summary Background Contact Information Timeline INSTRUCTIONS TO BIDDERS MULTIPLE DOCUMENTS TO MAKE UP ENTIRE AGREEMENT Sections 2 through 7 as well as the Notice , taken together, shall make up the entire Agreement between the Ada County Highway District (ACHD) and the successful Bidder. The Bidder should carefully read and understand all these documents. By signing and submitting the proposal in VENDOR QUESTIONNAIRE , the successful bidder does herein agree to abide by the terms and conditions of the entire Agreement. DOCUMENT INTERPRETATION All Bidders submitting a Bid shall have thoroughly examined all the content contained in the Invitation To Bid (ITB) Documents. Should there be any doubt as to any meaning or intent of any ITB statement or provision, the Bidder should submit their inquiries in writing as prescribed in the ITB Legal Notice. Any interpretation that may alter or change the ITB Documents will be in writing, in the form of an Addendum, which will be furnished to all bidders receiving the ITB Documents. ACHD will not be responsible for any other explanation or interpretation of the ITB Documents. Bidders shall acknowledge all Addenda on the Submittal Form with their Bid Documents or be deemed non-responsive. BIDDER UNDERSTANDING Each Bidder must adequately inspect the ITB Documents and make themselves thoroughly familiar with the content of the ITB Documents. It shall be the Bidder's obligation to verify, to their complete satisfaction, all information contained in the ITB Documents. The submission of a Bid Document will constitute an incontrovertible representation by the Bidder that they have been given adequate opportunity to be acquainted with the ITB Documents. Further the Bidder has, to their satisfaction, resolved any questions regarding any perceived conflicts, ambiguities, errors, and discrepancies contained within the ITB Documents. PREPARATION OF BID Bidders must provide all information in the form and in the format required in the ITB Documents, and submit their Bid Document by the date and time specified. If samples or supporting documentation is required, such documentation must be submitted with the Bid Document. If Addenda have been issued concerning the solicitation, Bidders must acknowledge all Addenda as instructed. Failure to acknowledge all Addenda as instructed will be a basis for rejecting the submission as non-responsive. Bidders shall sign their Bid Document in the space(s) provided therefore. If the Bidder is a corporation, the legal name of the corporation shall be entered together with the original signature of an agent authorized to sign contracts on behalf of the corporation. If the Bidder is a partnership, the true name of the firm shall be entered together with the original signature of the partner(s) authorized to sign contracts on behalf of the partnership All blank spaces in the Bid Document must be filled in, preferably in black ink or typewritten. No changes may be made in the phraseology of the forms nor may the Bidder add any phraseology conditioning the acceptance of the award. In case of a discrepancy between unit and total prices, unit prices shall govern. A Bid Document may be deemed unresponsive if it contains omissions, erasures, alterations, or additions of any kind not initialed by the Bidder signatory; or items which fail to conform to the conditions of the ITB Documents. COMPLIANCE The proposal submitted must comply with the Specifications and the General Terms and Conditions included herein, and any addendum issued. Failure to comply will result in rejection of the bid as void and non-responsive. BID SUBMITTAL Sealed bids will be received for FY27 Traffic Signal Materials through the Ada County Highway District’s eProcurement Portal located at https://procurement.opengov.com/portal/achdidaho The Ada County Highway District's (ACHD) e-Procurement Portal Clock is the official clock for the determination of all deadline dates and times. Bid Document Responses will not be accepted after the submission deadline regardless of any technical difficulties, such as internet connectivity issues. Submissions will not be considered, even if attempted within the final thirty (30) minutes , nor will exceptions be made for calls made to procurement close to the deadline. The Ada County Highway District strongly recommends that all respondents complete and submit bid document response well in advance of the specified deadline. Respondents are solely responsible for ensuring that their bid document response are timely submitted to ACHD via the eProcurement Portal. ACHD assumes no responsibility for any failures of computer systems or equipment that may result in partial or incomplete submissions, nor for failure to meet the required deadline as outlined in the solicitation. Should any technical issues arise during the submission of the bid document response within OpenGov (ACHD e-Procurement Portal), please utilize the "chat" feature of the "contact us" section under OpenGov Support for assistance. Neither OpenGov nor ACHD guarantees uninterrupted access to the OpenGov website or error-free services. Furthermore, neither party will be held liable for any inadvertent disclosure of repository information or unauthorized access by third parties. "Disruption to electronic communications" or "service loss" refers to unplanned events that significantly hinder or entirely prevent the normal functionality of electronic communications systems, such as cyberattacks, intentional disruptions (e.g., government shutdowns), power outages, or natural disasters. It does not apply to other technical issues, including operator errors or internet connectivity problems. In the event of a disruption to electronic communications or service loss by OpenGov within four (4) hours of submission deadline, ACHD will investigate the reported incident in coordination with OpenGov. If the disruption is confirmed, ACHD will work to provide the best possible resolution to ensure respondents have the opportunity to submit their responses. ACHD will notify all affected parties via email through OpenGov regarding any incidents and the resolutions. BID FORMS Bidders must provide all information required in the Bid and submit the Bid by the date and time specified. If supporting documentation is required, such documentation must be submitted with the response to this solicitation. If addenda have been issued in relation to the solicitation, bidders must acknowledge all addenda. Failure to submit these required documents will be a basis for rejecting the submission as non-responsive. The bidder shall sign the bid in the space(s) provided therefore. If the bidder is a corporation, the legal name of the corporation shall be entered together with the original signature of an agent authorized to sign contracts on behalf of the corporation. If the bidder is a partnership, the true name of the firm shall be entered together with the original signature of the partner(s) authorized to sign contracts on behalf of the partnership. All blank spaces in the bid form must be filled in, preferably in black ink or typewritten. No changes may be made in the phraseology of the forms nor may the bidder add any phraseology conditioning the acceptance of the award. In case of a discrepancy between unit and total prices, unit prices shall govern. A bid will be deemed unresponsive if it contains omissions, erasures, or alterations not initialed by the bidder signatory, additions of any kind, prices not called for, prices which are obviously unbalanced, or items which fail to conform to the conditions of the Invitation To Bid. INTERPRETATIONS OF QUANTITIES IN BID SCHEDULE The quantities appearing in the bid schedule are approximate and are prepared for the comparison of bids. The scheduled quantities may be increased, decreased, or omitted. ACHD retains the right to place multiple orders throughout the duration of the agreement. Furthermore, ACHD may elect to extend the duration of the agreement. BID OPENING Bids will be opened at the date, time, and place specified in the Introduction . No person will be denied the right to be present during the bid opening process. Bids may be received up to but not later than Wednesday, November 18, 2026 at 3:00 pm via the Ada County Highway District’s eProcurement Portal located at https://secure.procurenow.com/portal/achdidaho . The Ada County Highway District’s e-Procurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, bids will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. The Ada County Highway District strongly recommends completing your response well ahead of the deadline. ELECTRONIC OR WRITTEN MODIFICATION OF PROPOSAL In all instances, a Bidder may modify their Bid at any time prior to the scheduled closing date and time for the receipt of bids through the eProcurement portal. In all instances, Bid modifications that are not submitted as required herein or that contain irregularities that make the Bid incomplete, indefinite, or ambiguous will be rejected. WITHDRAWAL OF BID Any bid may be withdrawn prior to the scheduled date and time set for bid opening by clicking un-submit within the e-procurement portal by the bidder or their authorized agent. No bid may be withdrawn after the date and/or time set for the bid opening. BID SECURITY If Bid Security is required, bids must be accompanied by an original certified check, cashier's check, or a bid bond (collectively referred to hereafter as “Bid Security”) issued by a surety authorized to issue such bonds in the State of Idaho, in the amount of ten percent (10%) of the total amount of the bid submitted. PDF versions will be acceptable for Bid Submittals. Original checks will be required to be physically delivered to ACHD within 48 hours of the submission deadline. Special Note: Bid Security: If required by this solicitation, each bid shall be accompanied by the bid security specified in the solicitation documents. If Bid security is required, it will be listed under the "Vendor Questionnaire" section. If the Bid Security is not being requested under the Vendor Questionnaire Section, then please disregard. RETURN OF BID SECURITY If Bid Security is required, within 15-calendar days after award of the contract, ACHD will return Bid Securities, other than bid bonds, to all Bidders whose bids are not to be further considered in awarding the contract. The Bid Security, including bid bond if applicable, of the Successful Bidder shall be retained until the contract has been fully executed and the Successful Bidder has furnished all required contract security and met all other conditions of the Notice of Award. Any guarantees which have been forfeited shall be retained. ADDENDA Prior to the bid opening, any interpretation or change in the Bid and Contract Documents will be made only in writing in the form of addenda. Addenda, if any, will be furnished to all bidders receiving a set of the documents from ACHD. Bidders shall acknowledge all addenda on the Bid Proposal document. ACHD will not be responsible for any other explanation or interpretation of the Bid and Contract Documents. Any oral explanations, instructions, and interpretations given to bidders prior to the bid opening will not be binding on ACHD unless supplemented by written addenda. Addenda, if any, will be furnished to all prospective Bidders receiving a set of the ITB Documents from ACHD. Bidders shall acknowledge all Addenda as instructed. Failure by Bidders to acknowledge all Addenda as instructed shall result in their Bid Documents being deemed non-responsive. BURDEN OF PROOF It is the bidder's responsibility to furnish ACHD with sufficient data to determine whether or not the product(s), service(s), and/or supplies offered conform to the specified requirements. ACHD is not liable for any costs incurred by bidders prior to issuance of a purchase order or execution of the Agreement. FIRM BIDS Prices submitted are to be considered firm. No cash discounts can be accepted or used in determining a low bid. DATA TO BE FURNSHISED WITH BIDS The following submittal shall be provided with the bid: List of additions, deletion or variation from the specification. Description of service availability, if applicable. Complete statements of all applicable warranties. SERVICE REQUIRED The successful bidder shall be able to provide service to ACHD, where applicable, for the items bid and delivered. EXECUTION OF AGREEMENT The successful bidder must execute an Agreement with ACHD within 15 days after award by ACHD. FOREIGN ENTITIES If bidder is an entity not organized and existing under the laws of the State of Idaho, that it will be appropriately authorized, registered, qualified, certified or otherwise in compliances with the laws of the State of Idaho relating to doing business in Idaho as a foreign entity prior to any award of a contract under this Invitation to Bid. At any time after the bid opening, at the request of ACHD, the bidder will provide ACHD with proof of compliances within five (5) business days following the request. The bid may be rejected if bidder does not provide such proof prior to the date scheduled for the award. PROTESTS FROM THE BIDDER Any protests concerning the specifications, bidding procedures or method of evaluation must be made in writing and received by ACHD at least three (3) business days before the date and time upon which bids are scheduled to be opened. Failure to timely raise such protest in writing shall be deemed to operate as a waiver as to any objections that may have been raised on the part of the bidder. BID ANALYSIS AND AWARD The Purchase Agreement contract will be awarded to the qualified bidder submitting the lowest bid price complying with the bidding procedures and meeting the specifications for the goods sought to be procured. ACCEPTABILITY Acceptability of the item shall be judged solely by ACHD. Decisions shall be final and in the best interests of the ACHD. MATERIALS Materials shall be free from defects and shall be those ordinarily used for the intended service, unless otherwise specified herein. It is the intent of the Specifications to permit the bidder to supply any item(s) specified or offer an equivalent. Whenever any particular item is indicated by patent, proprietary or brand name, or by name of manufacturer, such wording is for t
Published attachments
Public questions and answers
Schedule D, Line 3 (Single Point Video Detection Processor, qty 40) and Line 1 (Single Point Video Detection Camera, qty 30). Are all 40 processors to be deployed with new sensors supplied under this bid, or are some of them replacement processors for sensors already installed in the field? If the latter, can you please provide the make and model of the existing sensors they must operate with?
These are not intended to be replacements for equipment in the field. The quantities are estimates for what is needed and the pricing will establish a not to exceed amount for the contract.
Can you confirm whether a Performance Bond will be required upon award?
For awards exceeding $100,000, the successful Bidder shall furnish a Material and Payment Bond upon award. A Performance Bond is not required for the goods furnished under this solicitation.
Do these LEDs need to be BABA certified?
Yes.
The spec lists Dialight part numbers. Leotek Frontier took over the Dialight product line and maintains the same part numbers . Would it be acceptable to submit the Frontier part numbers? If we can provide partial quantities of Dialight and Frontier could we offer a combination of both?
The Frontier LEDs are acceptable as long as they meet the same specifications. We would want them to all be the same product not a combination.
Will the county accept as an approved equal a 12" signal head molded from 100% virgin polycarbonate with no glass fill, in place of the “minimum 10% glass-filled LEXAN” if it meets or exceeds all other A.3 requirements, including internal top and bottom ribbing, 80MPH wind survivability on a single-point mount?
Yes.
Will the county accept poly backplates?
Yes.
Schedule D, Line 1 (Single Point Video Detection Camera with mounting hardware, qty 30, EACH). The Specifications call for at least one fisheye sensor per system (page 14) and also allow "1 fisheye sensor and up to 4 traditional video detection cameras" per processor (page 13). Will ACHD accept an equivalent VIVTDS that uses rectilinear cameras instead of a fisheye sensor? If so, how should Line 1 be priced, given the unit of measure is EACH: as the complete camera set for one intersection (the cameras that replace one fisheye sensor, with mounting hardware), or per individual camera?
The system must use a single point fisheye camera system.