Skip to content
← Back to search
Combined Synopsis/SolicitationActive

GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF

AGRICULTURE, DEPARTMENT OF · USDA FOREST SERVICE

Contract Details

Notice ID
1240BH26R0013
Opportunity Type
Combined Synopsis/Solicitation
Sub-Agency
FOREST SERVICE
Office
USDA FOREST SERVICE
Posted Date
Wednesday, September 30, 2026
Response Deadline
Oct 14, 2026, 5:00 PM EDT
PSC Code
Z2PZ
Set-Aside
Small Business Set Aside - Total
Place of Performance
Fifty Six, AR, 72533, USA
Status
Active

Description

On September 30, 2026, amendment 0003 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the proposal due date from 09/30/2026 to 10/14/2026. This amendment must be acknowledged and submitted with your quote. *************************************************************************************************************************************** On September 17, 2026, amendment 0002 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013. 2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013. This amendment must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** On August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post Golder Specifications labeled C04m Attachment 11 Golder 1240BH26R0013. This SF30 must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** This project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall

Read full description (2,585 characters)

conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.

Documents and contact

No public document links were provided with this record.

Check the official notice for attachments and access requirements ↗

Contact
James Edington
Email
james.edington@usda.gov
Loadingchange history…
Loadingrelated notices…