The City of Napa (“ City ”) requests proposals (“ Proposals ”) from qualified individuals or firms (individually, a “ Respondent ” and collectively, “ Respondents ”) for Generator Services (“ Project ”) by or before Monday, November 30, 2026 , at 4:00 pm , via electronic submission through the procurement portal at https://procurement.opengov.com/portal/cityofnapa , in the manner set forth in the Request for Proposal Procedures. DRAFT SCOPE OF SERVICES General The successful Contractor shall provide comprehensive maintenance and repair services for the City's generators. Contractor will be responsible for regularly scheduled maintenance and will ensure the continuous and reliable operation of all generators. Contractor shall possess and maintain a valid California C-10 Electrical Contractor license for the duration of the Agreement. Respondent shall provide its license number in its Proposal. Brands and models of each generator are listed in the pricing table. Scope of Work Routine Maintenance (Semi-annual) Contractor shall perform Level I preventive maintenance on a semi-annual basis in April and October of each year for all generators listed in the pricing schedule. Level I Maintenance shall include the inspection, testing, and maintenance activities identified in Items A through V below. Level I Maintenance performed in April shall be included in the annual Level II Maintenance price. Level I Maintenance performed in October shall be billed separately at the applicable Level I Maintenance price. Level I Maintenance . Contractor shall perform the following preventive maintenance: Inspection of the cooling system fan, fan blades, and remote cooling fan motor. Inspection of all cooling system hoses and adjustment of hose clamps, if necessary. Inspection of engine belts, check belt tension and adjust or repair, if necessary. Inspection of engine block heater for proper operation, temperature and flow. Inspection and cleaning of generator controller and interior, if required. Inspection of shutdown functions, including an emergency stop for proper operation. Inspect and test the Automatic Transfer Switch for proper operation, with or without load, as appropriate for the equipment and operating conditions. Document the testing method, results, and any deficiencies identified. Checking of settings for Automatic Transfer Switch. Verifying proper operation of the annunciator panel. Checking all bulbs in the controller and elsewhere for proper operation. Inspection and testing of both the engine battery charging alternator and the system battery charger. Adjust, as necessary. Start and operate the generator for a sufficient duration to verify proper operation. Record the operating duration, operating conditions, applicable readings, and any deficiencies identified during testing. Inspection and adjustment of all gauges. Inspection of anti-freeze/coolant level. Inspection of generator for oil, fuel and coolant leaks. Inspection of air induction exhaust system and silencer for leaks, cracks and deterioration. Draining of moisture from exhaust piping (if equipped). Checking batteries for water level, level of charge and corrosion on terminals. Checking of fuel system. Maintenance and service requirements for Transfer Switches, Controller, Switch Gear Cubicles, and Transformers: Clean cabinet, controls, timers, and furnish contacts as needed. While under load and while generator is operating, conduct infrared heat checks on all cabinet connectors, terminals, transformers, and contacts, as well as switchgear. Check, record, and report millivolt readings in panels and correct any findings that not within working parameters. Check and replace pilot lamps. Inspect all transformer cables and connections. Correct all hot spots and/or report discrepancies. Check, record, and correct any interlocks found in panels. Inspect all contact points and report all problems. Correct as required. U. Identify and perform minor adjustments as described under Included Maintenance and Minor Adjustments. Additional repairs shall be subject to Section 2.5 V. Any materials or parts used in complying with the contract shall be new and equal to or better than the original equipment. Included Maintenance and Minor Adjustments The prices quoted for scheduled maintenance shall include all inspections, testing, routine adjustments, cleaning, lubricants, filters, consumable materials, labor, and travel required to perform the applicable maintenance services identified in Sections 2.2 through 2.4. Minor adjustments identified during scheduled maintenance shall be performed at no additional cost when they can be completed without replacement parts or substantial additional labor. Repairs requiring replacement parts or substantial additional labor beyond the scheduled maintenance requirements shall be considered additional repair services and shall be subject to Section 2.5. Replacement of parts and materials expressly required under the scheduled maintenance services shall remain included in the applicable maintenance price. Level II Maintenance Contractor shall perform Level II preventive maintenance annually in April of each year for all generators listed in the pricing schedule, in conjunction with the scheduled Level I Maintenance. Level II Maintenance shall include all Level I Maintenance requirements and the additional preventive maintenance activities identified below: Change lubricating oil and filters. Oil analysis will be collected and a report provided to the City. Change fuel filter elements. Inspect and replace air filter element with DCA additives. Report coolant DCA levels to the City. Analyze engine oil. Pricing for Level II Maintenance shall include all Level I Maintenance costs. The City shall not be separately charged for Level I Maintenance performed during the April service. Level V Maintenance Contractor shall perform Level V Maintenance annually in April of each year for all generators listed in the pricing schedule, in conjunction with the scheduled Level II Maintenance. Contractor shall perform a full two-hour load test annually in April for each generator listed in the pricing schedule, in conjunction with the scheduled Level II Maintenance. Testing shall be performed progressively through different load levels, reaching at least eighty percent (80%) of the generator's rated capacity, in accordance with applicable manufacturer recommendations. Contractor shall document the test duration, load levels, maximum load achieved, operating conditions, relevant performance measurements, and any deficiencies identified. A written load-testing report shall be provided to the City upon completion. Pricing for Level V Maintenance shall be in addition to Level II Maintenance pricing. Any materials or parts used in complying with the contract shall be new and equal to or better than the original equipment. Repairs and Emergency Repairs A. General Repair Services Contractor shall notify the City when repairs are identified that fall outside the scheduled maintenance services described in Sections 2.2 through 2.4. Upon request by City staff, Contractor shall provide the City Facilities Superintendent, or designee, a written estimate identifying the proposed repairs, anticipated schedule, labor hours, applicable labor rates, replacement parts, and total estimated cost. Replacement parts shall be billed at Contractor's actual cost plus the fixed percentage markup identified in the attached pricing schedule. Contractor shall provide supporting documentation of actual parts costs upon request by the City. Contractor shall not commence any additional repair work without prior written authorization from the City Facilities Superintendent, or designee. The City reserves the right to obtain repair estimates from other vendors and is not obligated to authorize additional repair work identified by Contractor. B. Emergency Repair Services Contractor shall provide emergency repair services twenty-four (24) hours per day, seven (7) days per week, including weekends and holidays. Contractor shall maintain an emergency contact number and have qualified personnel available to respond to emergency service requests. Contractor shall acknowledge emergency service requests within one (1) hour and have qualified personnel on-site within two (2) hours of notification. Upon arrival, Contractor shall promptly diagnose the equipment failure and provide the City with a written estimate identifying the necessary repairs, anticipated costs, and estimated completion time. Contractor shall not commence any emergency repair work without prior written authorization from the City Facilities Superintendent, or designee. Written authorization may be granted via electronic mail. If repairs cannot be completed during the initial service visit, Contractor shall notify the City of the anticipated delay, required replacement parts, and recommended interim measures to restore or maintain generator operation. The replacement parts pricing provisions in Section 2.5(A) shall also apply to emergency repairs. Other Information A. Contractor Employees & Subcontractor Employees: All employees used on this job by Contractor or Subcontractor may be required to obtain security clearance to do work within the facility. B. All travel costs associated with scheduled maintenance, general repairs and emergency repairs shall be included in the applicable maintenance prices or repair labor rates identified in the Price Proposal Schedule. No separate travel, mileage or trip charges shall be permitted. C. The prices quoted for scheduled maintenance shall include compensation for bringing oil and coolant to proper operating levels, unless a significant leak is identified. Any additional repairs required to address such leaks shall be subject to Section 2.5. D. Compensation for all labor, materials, equipment, supplies and consumables expressly required under the applicable scheduled maintenance level shall be included in the corresponding maintenance price. E. Compensation for adhering to any safe practices related to the work shall be included in the prices quoted. F. Invoices for work shall be accompanied by reports for each station showing the following: The inspection task performed, and date performed The result of the inspection (pass/fail and observed/measured values) Fluids provided Notes regarding needed remedial or preventative tasks Invoices shall include the date, time, location, description of services performed (including applicable maintenance level or repair service), and final pricing matching the existing contract rates. Quality of Performance of Contractor A. Contract Manager. Contractor shall designate a Contract Manager and shall provide the name of that person in writing to the City staff and any other time the person in that position changes. The Contract Manager shall be available to City staff by telephone, at all times that Contractor is providing services pursuant to this Agreement. Contractor shall provide City with an emergency phone number where the Contract Manager can be reached outside of normal business hours. B. Generator Maintenance Quality of Work. Work shall be performed by competent and experienced maintenance personnel. The standards of performance which the Contractor is obligated to meet are those practices which leave the serviced equipment in a manner consistent with industry standards and in good working order free of hazards. C. Supervision of Contract. All work shall meet the approval of the City of Napa Public Works Department. There shall be a minimum of one semi-annual meeting with the Contractor and City staff to determine progress and to establish areas needing attention. A status report of activities performed and maintenance issues addressed by the Contractor will be submitted in writing to the City during this meeting. Any specific problem area which does not meet the conditions of the specifications set forth herein shall be called to the attention of the Contractor and if not corrected, payment to the Contractor will not be made until the condition is corrected in a satisfactory manner as set forth in the specifications. D. Administrative Charges. In the event Contractor fails to perform the services as set forth in this Agreement, City may assess an administrative charge against Contractor and may deduct such charge from any monies due or which may become due to Contractor in the following amounts: List of Administrative Charges Failure to comply with service intervals as outlined in this agreement - $200 per incident Failure to clean up spillage or litter caused by Contractor - $200 per incident E. Procedure for Review of Administrative Charges. The City staff may assess administrative charges pursuant to this Section 11 by issuing a written notice to Contractor (“Notice of Assessment”) of the administrative charges assessed, if any, and the basis for each assessment. The administrative charges assessment shall become final unless, within ten (10) calendar days of the date of the Notice of Assessment, Contractor submits a written request for a meeting with the City staff to present evidence that the assessment should not be made. The City staff shall review Contractor’s evidence and render a decision sustaining or reversing the administrative charges as soon as reasonably possible after the meeting. Written notice of the decision shall be provided to Contractor. In the event Contractor does not submit a written request for a meeting within ten (10) calendar days of the date of the Notice of Assessment, the City’s determination shall be final and City may deduct the administrative charges from amounts otherwise due to Contractor. Exercise of Rights. City’s assessment or collection of administrative charges shall not prevent City from exercising any other right or remedy, including the right to terminate this Agreement, for Contractor’s failure to perform the work and services in the manner set forth in this Agreement. F. Withholding of Payment. In addition to express provisions contained elsewhere in this Agreement, City may withhold from any payment otherwise due to Contractor such amount as reasonably determined necessary to protect City’s interest, or if City so elects, may withhold or retain all or a portion of any monthly payment or refund payment for any of the following reasons. City shall provide written notice to Contractor of the reason for withholding of payments. Reason for withholding payments may be, but is not necessarily limited to: Unsatisfactory work not caused by any condition beyond Contractor’s control; Contractor's failure to carry out instructions or orders of the City or its staff; Execution of work not in accordance with this Agreement; Claims filed by or against Contractor or reasonable evidence indicating probable filing of claims; Failure of Contractor to make payments to any subcontractor for material or labor; Unsafe working conditions allowed to persist by Contractor G. Payment of Withheld Amounts. Upon Contractor’s remedy of the grounds for withholding payment and demonstration of the remedy to the reasonable satisfaction of the City Representative, City shall pay all withheld amounts within ten (10) Business Days. City shall not be liable for interest on any delayed or late payment. Agreement Term and Annual Rate Increase A. The City anticipates entering into an Agreement for an initial term of three (3) years, commencing upon execution of the Agreement, with the option to extend the Agreement for up to two (2) additional one-year terms, subject to mutual written agreement and City approval. B. Contractor shall perform scheduled maintenance in April and October of each year, as specified in the Scope of Services. C. Contractor may request an increase in the rates identified in the attached pricing schedule on an annual basis, beginning on the first anniversary of the Effective Date of the Agreement and each anniversary thereafter during the term of the Agreement, including any extensions. Any requested increase shall not exceed the percentage increase in the Consumer Price Index for the San Francisco–Oakland area, as published by the Bureau of Labor Statistics for the immediately preceding year, or three percent (3%), whichever is less. D. Contractor shall provide the City with written notice of any proposed rate increase at least thirty (30) days in advance. No more than one (1) rate increase may be approved per calendar year. All rate increases are subject to the City's prior written approval and shall include an effective date. Approved increases shall apply only to services performed on or after the effective date of the increase. THE SERVICES Summary The City requires Generator Services (“ Services ”) for comprehensive maintenance and repair services for the City's generators. Contractor will be responsible for regularly scheduled maintenance, ensure the continuous and reliable operation of all generators. Brands and models of each generator are listed in the pricing table. Form of Agreement A copy of the City’s standard Services Agreement (General) (“ Agreement ”), is attached hereto in the Attachments section and incorporated herein. Respondents are strongly encouraged to have the Agreement reviewed by their legal counsel and insurance company. Any objections and/or proposed changes to the Agreement must be included in the Respondent’s Proposal pursuant to the Exceptions to Agreement provision within the Proposal Requirements section and are subject to City approval. Scope of Services The City has prepared a draft Scope of Services, see the Draft Scope Services section (“ Draft Scope of Services ”). The final scope of services to be included in the Agreement with the successful Respondent will be based on the Draft Scope of Services as well as the Proposed Scope of Services, provided by the successful Respondent in the Proposal Submittal section and may be the subject of negotiations between the City and the successful Respondent. Project Manager and Decision Maker For purposes of the Selection and Award section of this RFP, Matthew Price , Maintenance Superintendent , is the City’s project manager (“ Project Manager ”), and Jessica Lowe, Public Works Director is the City’s decision-maker (“ Decision-Maker ”). REQUEST FOR PROPOSAL PROCEDURES Requests for Information Questions or objections relating to the RFP, the attachments hereto, the RFP procedures, or the required Services must be submitted by 4:00 pm , Thursday, November 19, 2026 (the “ Request for Information Deadline ”) through OpenGov, the City's electronic procurement portal at https://procurement.opengov.com/portal/cityofnapa ("Procurement Portal"). Any questions or objections that are not submitted through the Procurement Portal and by the Request for Information Deadline will be deemed waived. City will not be bound by the oral representations of any City officials, employees, or representatives. Submittal Instructions A. General. Proposals must be received by the City by or before Monday, November 30, 2026 at 4:00 pm (“ Proposal Deadline ”). Respondent must submit a proposal through OpenGov, the Procurement Portal, at https://procurement.opengov.com/portal/cityofnapa , no later than the Proposal Deadline. B. Electronic Submission. OpenGov. The Proposal response all required forms and attachments must be submitted in PDF format via OpenGov at https://procurement.opengov.com/portal/cityofnapa . V endor Registration . To participate in the bidding process, each bidder must register with OpenGov at https://procurement.opengov.com/portal/cityofnapa . Once registered, each bidder must subscribe to the City of Napa portal. For ins

Published attachments
Public questions and answers
  • Do all of the generators utilize diesel fuel?

    The manufacturer and model information for each generator is provided in the pricing schedule (RFP Section 8-6 Price Proposal) to assist bidders in identifying and researching the equipment. The City is responsible for supplying fuel for all generators. The Contractor shall not be responsible for purchasing or furnishing fuel. Fuel required for scheduled maintenance, generator operation, and annual load testing will be supplied by the City.

  • How many ATS units per generator and what is their listed their rating? Will the service for the Automatic Transfer Switches permit them to be isolated and deenergized? This may cause the generator and building supported to be without power for a short period of time. This will be required in order to meet the provided scope of work outlined in Section T. Specifically # 1 "Clean Cabinet, Controls, Timers, and furnish contacts as needed" Due to ARC Flash potential in order to safely perform this service everything must be de energized. Should these services be quoted as a standalone service for a time before normal business hours in order to appropriately service the ATS?

    ATS Maintenance and De-Energization: None of our existing transfer switches are equipped with a maintenance bypass. Historically, the maintenance described as "Clean cabinet, controls, timers, and furnish contacts as needed" has consisted primarily of vacuuming the enclosure, inspecting the controls and timers, and visually checking components for obvious signs of wear, damage, or potential replacement needs. Section T also specifically requires infrared heat checks to be conducted while the equipment is under load and the generator is operating. This includes checking cabinet connectors, terminals, transformers, contacts, and switchgear. Additionally, the scope requires checking and recording millivolt readings, inspecting transformer cables and connections, checking interlocks, and inspecting contact points. Scheduling and Quoting: If the City determines that any portion of the specified maintenance requires the ATS to be completely de-energized, we would need to evaluate that work separately. This may require a separate quote and scheduling outside of normal business hours, with advance coordination of any necessary building power interruptions.

  • 1) To properly quote pricing, could you please provide the site addresses? 2) Additionally, to avoid unnecessary return visits, are you going to provide the serial numbers in order to source filters and parts data? 3) Section 2.6(B) prohibits separate travel, mileage, and trip charges. However, Section 4.7(E) and Attachment 2.1.1, Exhibit B, specifically identify travel as a potentially reimbursable expense. Please clarify whether travel expenses may be billed separately at agreed-upon rates or whether all travel expenses must be incorporated into maintenance pricing and repair labor rates. 4) Will the City permit an exception for extraordinary emergency circumstances, such as a declared state of emergency requiring the contractor to travel outside its normal service territory to procure a rental generator, replacement equipment, or critical parts? 5) Regarding Section 2.8, given the volatility of fuel prices, tariffs, insurance costs, and other operating expenses, would the City consider provisions allowing a contractor to request a rate adjustment beyond the annual CPI/3% limitation in the event of extraordinary, documented cost increases beyond the contractor's control? 6) Are all generator locations secured against unauthorized access by City employees, other contractors, and the general public?

    Please see the answers below: 1. The City has provided the equipment information available for purposes of developing proposed pricing. All generator locations are situated within Napa County, and bidders should account for associated travel and logistical considerations in their proposed rates. Specific site addresses will be provided to the successful contractor following contract award. 2. The City has provided the equipment information currently available and considers it sufficient for establishing preventative maintenance pricing. Contractors shall be responsible for verifying equipment-specific parts and materials necessary to perform the required services. 3. The provisions of the RFP govern the pricing requirements for this solicitation. Travel time, mileage, and trip charges shall not be billed separately and must be incorporated into the applicable maintenance pricing and repair labor rates. The references to potentially reimbursable travel expenses in the contract template do not supersede the pricing requirements established in the RFP. 4. Extraordinary expenses associated with emergency circumstances may be considered on a case-by-case basis and shall require prior written approval from the City. No additional expenses shall be incurred or reimbursed without such authorization. 5. No additional rate adjustments beyond the established rate increase provisions will be permitted. 6. Generator locations are situated at various City facilities, and security and acces

  • Can we charge a minimum 4 hours for callouts?

    Proposers shall complete the pricing proposal as presented in the RFP, including the requested hourly rate for emergency repair services. However, proposers may submit an alternative pricing structure for emergency callouts, including minimum billable hours, under Section 8.8 (Exceptions to the Agreement). Any alternative pricing structure shall clearly identify the proposed hourly rates and minimum billable hours. The proposed hourly rates shall be inclusive of all costs associated with providing emergency repair services, excluding replacement parts as addressed in Section 2.5(A). No additional fees or surcharges shall apply. The City reserves the right to review both pricing options and, at its sole discretion, accept or reject the alternative pricing structure based on what it determines to be most advantageous to the City. Submission of an alternative pricing structure does not constitute acceptance by the City or relieve the proposer of the requirement to complete the pricing proposal as presented. All other requirements associated with emergency repair services shall remain unchanged.