Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Description

The County of Ontario (the "County"), is requesting Proposals for RFP# R26091 Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study . Proposals are to be submitted via the County's eProcurement Portal via https://procurement.opengov.com/portal/ontariocountyny PRIOR TO 4:00 pm on Tuesday, December 15, 2026 . Late responses will not be accepted. Project work includes feasibility study to address degradation of an unnamed tributary impacting the nearby City of Geneva drinking water plant located on Seneca Lake in Ontario County, NY. . Scope of Work EXECUTIVE SUMMARY Ontario County, in partnership with Seneca Watershed Intermunicipal Organization, seeks to address degradation of an unnamed tributary impacting the nearby City of Geneva drinking water plant located on Seneca Lake in Ontario County, NY. This phase of the project, with funding provided by the New York State Department of Environmental Conservation, will support the production of an Engineering Feasibility Study report consistent with NYSDEC guidelines. The partnership group seeks professional services for the production of this report and associated modeling elements budgeted at $45,000. INTRODUCTION Ontario County of New York, in partnership with Seneca Watershed Intermunicipal Organization (SWIO), hereby requests Engineering Proposals (Proposals) from qualified firms (Offerors) for the Geneva Drinking Water Plant Floodplain Restoration Project (The Project) in Ontario County, New York. This Request for Proposals (RFP) is open to all Offerors self-identified as professionally qualified and capable of providing the services described herein. The purpose of this RFP is to determine who will be awarded a contract for the proposed work. The project priorities are: Design Concept – Assess the feasibility of a proposed design concept that is appropriate for achieving the goals of protecting/enhancing localized resources (Geneva Drinking Water Plant, Geneva Country Club and Seneca Lake) via the stabilization of an unnamed tributary and enhancement/restoration of its floodplain. Some level of Hydrologic and Hydraulic (H & H) analysis is expected to be required to support this work. Project Readiness – The Engineering Design Outline (The Report) report will provide sufficient conceptual details on the design, placement and sizing of all proposed design elements to support further progression towards the production of full design documents and, ultimately, implementation. The Study will include all Floodplain Creation/Restoration/Reconnection Engineering Design Outline elements as required by New York State Department of Environmental Conservation (NYSDEC) as found in Attachment A of this RFP. PROJECT FUNDING & MWBE PARTICIPATION Principal funding for this Project is $45,000 and provided via New York State Department of Environmental Conservation’s (NYSDEC) Non-Agricultural Nonpoint Source Engineering Planning Grant awarded to Ontario County, with whom The Offeror will enter into contract. The underlying contract between Ontario County and NYSDEC contains utilization goals pursuant for participation by Minority-Owned Business Enterprises (MBE), Women-Owned Business Enterprises (WBE), and Service-Disabled Veteran-Owned Businesses (SDVOB) as follows: MBE - $7,500 WBE - $7,500 SDVOB - $3,000 Total - $18,000 The Offeror shall reference the New York State Directory of Certified Minority and Women Owned Businesses available at the following address to identify potential MWBE and/or SVOB firms to partner with if applicable: NYS MWBE Directory - https://ny.newnycontracts.com/FrontEnd/searchcertifieddirectory.asp SDVOB Directory - https://sdves.ogs.ny.gov/business-search PROJECT BACKGROUND An unnamed tributary to Seneca Lake located immediately adjacent to the City of Geneva drinking water facility and flowing through the Geneva Country Club (GCC) east of NYS Route 14 (Attachment B) is experiencing significant degradation that threatens the public water supply, while also contributing to larger watershed scale issues identified in the Seneca-Keuka Watershed Nine Element Plan. Large amounts of sediment and presumably additional pollutants are being deposited at the confluence with Seneca Lake, approximately 300 meters from the drinking water intake. Stream bank erosion is believed to be the primary source. A joint private-public partnership seeks to collaboratively restore the floodplain through a combination of stream channel reshaping, culvert resizing, channel relocation, and/or floodplain reconnection and storage expansion. The unnamed tributary is a class C stream (non-trout) and does not contain any regulatory floodway area along its length outside that portion located within the floodway for Seneca Lake (beyond the project boundary). The drainage area is approximately 397 acres with water flowing NW to SE. The headwaters area north of Snell Road is comprised predominately of medium-density housing. Between Snell Road and NYS Route 14 the landscape is larger forested. Once east of NYS Route 14, the main channel flows through GCC and City of Geneva property prior to reaching Seneca Lake. Four tributaries intersect with the main channel on the GCC property as well. The exact flowpath of the unnamed tributary and its associated tributaries are not presently mapped accurately via existing GIS software/datasets. PROJECT SCOPE The full project scope as outlined by the DEC can be found in Attachment C. The Offeror will be responsible elements listed under Objective 2: Engineering Design. These elements consist of H&H Modeling (Task 2.2) and Floodplain Restoration Design Report (Task 2.3). SWIO personnel will provide supplemental field data (Objective 2) with input from the selected Offeror to support completion of these tasks and facilitate communication with landowner partners for input on conceptual design at various stages of project completion. H&H Modeling The principal objective of the anticipated H&H modeling is to supplement development of The Report. The Offeror is free to use the model they deem appropriate to achieve the project goals. The Offeror shall identify the model to be used in The Proposal and provide a rationale for its use versus standard industry alternatives (e.g. HEC-RAS, HydroCAD, etc.). SWIO will provide field data as outlined within Attachment C to support model development, but data collection is limited to GCC and public properties at this time. Ontario County also has many newer and higher resolution GIS datasets covering the project area than those available through state and/or national databases which may prove useful for modeling purposes (available via the Ontario County GIS portal: https://www.ontariocountyny.gov/456/Geographic-Information-Systems-GIS ). A summary report of model design, performance and output shall be furnished to the Project Manager in a format of the Offeror’s choosing. Engineering Design Outline Requirements for Engineering Design Outline reports are clearly stated within Attachment A. For the purposes of The Proposal, The Offeror is to provide a basic conceptual design(s) approach for achieving the project goals based on existing information. This initial conceptualization will form the foundation of The Report and will be refined and assessed via H&H modeling and stakeholder feedback. The following information is provided to assist with initial conceptualization: Any proposed stream work is restricted to the NYS Route 14 Right-of-Way and GCC, City of Genva and/or Town of Geneva parcels Any proposed modification of the stream channel(s) cannot directly prohibit the use of GCC grounds for the purposes of golfing if grounds are presently supporting that use (e.g. setting aside significant acreage for an offline retention pond), though modifications that can be incorporated into play are fully anticipated (e.g. establishing a floodplain bench would likely result in the loss of a small amount of playable ground through the expansion of the existing water hazard). Modifications not located directly within zones of play are preferred (e.g. between and/or adjacent to holes) The road providing access to the drinking water facility cannot be relocated or removed Flooding of the drinking water access road (and adjacent GCC grounds) due to culvert obstruction and/or capacity limitations has been a recurring issue and presents a safety issue that must be resolved by this work A sand filter is located immediately NW of the drinking water facility and cannot be modified, nor can any proposed work potentially impact its functionality It is strongly encouraged that Offerors attend the pre-proposal site visit on October 29 to familiarize themselves with some of the unique site characteristics prior to developing an initial conceptualization. Do not attempt to visit the project site outside this time by trespassing on GCC and/or restricted drinking water facility grounds! If unable to attend, please submit any formal questions that may assist with conceptualization by the deadline identified in the project timeline section. The Offeror shall produce a Draft and Final version of The Report. The Draft shall be submitted in digital format to the Project Manager for review by a local advisory committee. Written comments from the review will be provided to The Offeror and a Final version drafted within 60-days of receipt addressing all substantive comments. Stakeholder Engagement As mentioned, SWIO will lead outreach efforts on this project. However, should The Offeror be willing to assist in these matters, this should be indicated within The Proposal and the extent of services clearly identified. Costs for these services should also be noted where appropriate. In the event an Offeror proposes providing these additional services, but total proposed costs exceed the project budget, these services and associated costs will be excluded, and The Proposal re-evaluated as such. For the purposes of this project, stakeholder engagement consists of periodic attendance at Town of Geneva, City of Geneva and GCC Board Meetings. Public comment periods and presentations are not required nor anticipated. PROJECT TIMELINE The expected contract term for this project is 15 months with the Final Engineering Design Outline report completed no later than 04/30/2028. The Project Schedule is negotiable within that term but must commence after Notice to Proceed following contract execution. The Offeror shall include a Project Schedule identifying start times and durations for all tasks: H&H Modeling, Draft Report, Final Report, and, if applicable, Stakeholder Engagement. PROCUREMENT OVERVIEW & PROJECT SCHEDULE Ontario County and its partners anticipate conducting the procurement of the requested services in accordance with the following list of project milestones (Table 1) leading to award of the Contract. This schedule is subject to revision and Ontario County reserves the right to modify this schedule if deemed necessary. Table 1. Proposed design phase timeline. TASK DATE Advertise RFP 10/15/26 Pre-proposal meeting and site tour 10/29/26 13:00 RFP questions due to POC 11/12/26 16:00 RFP responses to question 11/19/26 Proposal submission due 12/15/26 16:00 Notice of Award 01/15/27 Contract Execution 01/18/27 Notice to Proceed 02/01/27 Model Summary Report 09/30/27 Draft Engineering Design Outline 11/30/27 Final Engineering Design Outline 03/31/28 Each Offeror’s Proposal should consist of two separate elements: 1) a Technical Proposal; and 2) a Price Proposal. Offeror’s Proposal will be evaluated and scored by a local advisory committee based on the evaluation criteria established in this RFP. An Offeror’s Proposal must meet all requirements established by this RFP. Requirements of the RFP generally use the words “shall”, “will”, or “must” (or equivalent terms) to identify a required item to be submitted with an Offeror’s Proposal. Failure to meet RFP requirements may render an Offeror’s Proposal non-responsive. The extent to which an Offeror’s Proposal meets or exceeds evaluation criteria will be evaluated by the committee and reflected in the committee’s scoring (in their sole discretion) of the Offeror’s Proposal. Upon completion of the evaluation and scoring of Proposals, the highest scored Offeror whose Proposal is responsive, and whose price is within budget for services will be recommended for an award of a lump sum Contract. A copy of the County's standard form of consultant contract is attached for reference as Attachment D. RFP DOCUMENTS Each Offeror shall review the RFP documents and provide questions for clarification, including but not limited to terms that it considers to be ambiguous or to which it takes exception. Such questions or requests for clarification will be submitted to the POC. The partnership group will review all questions and/or requests for clarification received and, if it deems appropriate, may modify the RFP documents through an addendum. Offerors shall base their Proposals on the terms and conditions of the RFP documents included in the latest issued addendum. Offeror’s POC shall be notified via email and provided an electronic copy of any addenda to the RFP documents. Hard copies of the addenda will be available upon request. OFFEROR’S PRE-SUBMITTAL RESPONSIBILITIES AND REPRESENTATIONS Each Offeror shall be solely responsible for examining the RFP documents, including any addenda issued to such documents, and any and all conditions which may in any way affect its proposal or the performance of the work on the project, including but not limited to: Examining and carefully studying the RFP documents, including any addenda and other information or data identified in the RFP documents; Attending, if desired, the pre-proposal meeting located at GCC (1PM on 10/29/26 at the Geneva Country Club; parking available across the street at Big Alice Brewing located at 4180 NYS Rt 14, Geneva NY 14456) in order to become familiar with site conditions that may affect the cost, progress or performance of its work on the project; Determining that the RFP documents are sufficient to indicate and convey understanding of all terms and conditions for the performance of Offeror’s work on the project; and Notifying POC in writing of all conflicts, errors, ambiguities, or discrepancies that the Offeror discovers in the RFP documents. Any failure to fulfill these responsibilities is at the Offeror’s sole risk, and no relief will be provided by Ontario County or any of the project partners. TECHNICAL PROPOSAL EVALUATION Ontario County and its partners will evaluate each Proposal from each Offeror. In its sole discretion, Ontario County may hold interviews, ask written questions of the Offerors, seek written clarification and conduct discussions on the Proposals. Ontario County reserves the right to conduct an independent investigation of any information, including prior experience, identified in a Proposal by accessing public information, contacting independent parties, or by any other means. Upon completion of the evaluation of the proposals, the Offeror whose proposal is responsive, best meets the needs of the project, and whose price is within budget, will be recommended for an award of the lump sum Contract. If Ontario County determines that a Proposal does not comply with or satisfy requirements of the RFP documents, Ontario County may find such a Proposal to be non-responsive. Ontario County and its partners will identify the firms most highly qualified to perform the work according to the following scoring matrix: Point Allocation Criterion 10 Organization and clarity of proposal 15 Proposal meets work scope specifications and tasks with well-defined deliverables 15 Demonstrated experience with similar projects 15 Qualifications and experience of individuals assigned to the project 10 Creativity and approach to completing each task and the project as a whole 10 Communications and collaboration appropriate for the project 10 Schedule clearly shows completion of tasks (milestones) and project completion date 15 Cost Proposal is reasonable, clear and consistent with the RFP, showing allocations to individual tasks within the work scope 10 MWBE and SDVOB Participation 110 TOTAL POSSIBLE POINTS The score of each evaluation criterion will be ranked as listed below. The maximum number of points for the Technical Proposal and Price Proposal are 100 and 10, respectively. Scoring evaluation is as follows with points based on allocation for each criterion: Excellent (8-10 or 12-15pts): The Offeror has significantly exceeded the stated criteria in a way that is beneficial to the partnership group. This rating indicates a consistently outstanding level of quality for the stated criteria, with little or no risk that the Offeror would fail to meet the requirements of the solicitation. Good (5-7 or 8-11pts): The Offeror has exceeded the stated criteria. This rating indicates a generally better- than-acceptable quality for the stated criteria, with little or no risk that the Offeror would fail to meet the requirements of the solicitation. Fair (2-4 or 4-7): The Offeror has met the stated criteria. This rating indicates a minimally acceptable level of quality for the stated criteria, and the Offeror demonstrates a reasonable probability of success. Poor (1 or 1-3): The Offeror has failed to meet the stated criteria and/or lacks essential information and is conflicting and/or unproductive. This rating demonstrates significant weakness and/or unacceptable quality. There is no reasonable likelihood of success. TECHNICAL PROPOSAL CONTENT The Proposal will consist of all information required and will be submitted by 12/15/26, 4PM (EST). The following components must be included in the Proposal: Letter of Submittal - Shall be on the Offeror’s letterhead and identify the full legal name and address of the Offeror. The Offeror is defined as the legal entity who will execute the Contract. The Letter of Submittal shall be signed by an authorized representative of the Offeror’s organization. All signatures shall be original and signed in ink. Declare that the offer represented by the Proposal will remain in full force and effect for one hundred twenty (120) days after the date the Proposal is actually submitted. Identify the name, title, address, phone and email address of an individual who will serve as the Point of Contact for the Offeror. Offeror’s Qualifications - Offeror shall provide information regarding organizational structure, lead designer, and any personnel or other individuals that demonstrates the Offeror’s ability to successfully complete the work. Examples of previously completed work of similar scope and design are encouraged. Should the Offeror and/or any subcontracted Partners, be a certified MWBE, clearly indicate so. Scope of Services - Offeror shall demonstrate an understanding of the principal objectives of the project and indicate Offeror’s approach to achieving them in conjunction with the project partners. Offeror shall provide sufficient information to enable reviewers to understand and evaluate the Offeror’s proposed approach to: 1) achieving the proposed project goals via the initial conceptualization; 2) developing a H&H model to assess the feasibility of the conceptualization and support additional project work; 3) producing Draft and Final Engineering Design Outline reports consistent with the requirements identified in Attachment A; and, if applicable, 4) supporting project partners in stakeholder engagement. Schedule - Offeror shall provide a proposed schedule for the entire Project outlining the Offeror’s proposed plan to accomplish the work. It should include the Offeror’s proposed sequence of work, duration for each task, and deliverables required

Published attachments
Public questions and answers
  • The preproposal meeting on 10/29 is said to be at the Geneva Country Club, with parking said to be “across the street at Big Alice Brewing located at 4180 NYS Rt 14, Geneva NY 14456.” The brewery appears to have single-family homes across the street. On the face, the clubhouse and brewery parking lot appear to be about a 20-minute walk apart along Route 14 and Country Club Rd. Can you please clarify the meeting location and parking access?

    The Geneva Country Club (GCC) clubhouse is indeed located at the opposite site of the course from the meeting location. However, the entrance to the Drinking Water Facility (DWF) access road is located approximately 500 feet north of Big Alice Brewing. The main channel of the subject tributary flows under NYS Route 14 at the intersection of Rt 14 and the DWF access road. Additional branches to this tributary cross under Route 14 at the north end of Big Alice Brewing (emerging on a Town of Geneva parcel) and ~400 feet north of the DWF access road (emerging on the GCC course). Off-street parking is insufficient at both the GCC maintenance facility (located at the Rt14-DWF access road intersection) and DWF, while the GCC clubhouse is located further away from the project focus area than Big Alice. Big Alice Brewing represents the nearest off-street parking location and is confirmed as the meeting location. Parking availability exceeds 30+ vehicles. We will proceed from Big Alice to the DWF Access Road which bisects the GCC course and is the main project focus area. This will also allow for observation/discussion of the additional branches to the subject tributary which are not entirely evident on hydrologic datasets but may be critical to project scope.

  • Please clarify this proposal will be submitted via the OpenGov portal and a hard copy is optional. The proposal form states that “Proposals must be submitted in a sealed envelope plainly marked as to its contents. Required is one (1) original signed hard copy proposal and one (1) complete electronic copy.”

    Correct, the proposal can be submitted via the OpenGov portal. If you do not want to submit it via the portal then the proposal must be submitted in a sealed envelope with an electronic copy included.

  • Please confirm that an electronic, scanned, and/or inserted signature is acceptable for firms submitting electronically via the portal.

    That is acceptable. The corporate acknowledgement does need to be notarized though.

  • The RFP Scope of Work , Section 4.1, describes the deliverable to be produced under Task 2.3 as an Engineering Feasibility Study Report. In Section 4.2 and in later places of the Scope, the report is referred to as design outline / report. Please confirm the report prepared under Task 2.3 will be a feasibility study and not a 30% conceptual design.

    Confirmed. The deliverable requested is an Engineering Design Outline/Report consisting of the required elements identified in the included NYSDEC outline for such documents (Attachment A). This document refers to such a deliverable as a design outline/report/feasibility study. A 30% conceptual design is NOT sought, apologies for the confusion.

  • May a firm propose changes and exemptions to some of the contract clauses as indicated by providing a red-line strike out version submitted via the portal? Please let us know if this is an acceptable means of transmittal or if another type of transmittal is required.

    This is an acceptable means of transmittal, but we cannot guarantee that the County Attorneys will accept.

  • Can respondents review a copy of the grant agreement and proposed scope of work submitted for grant award to utilize in preparation of proposals?

    The proposed scope of work (listed as Tasks) is outlined in Attachment C

  • Please confirm that Ontario County / project partners will be executing Task 1 of the Grant Work Plan including a) collecting and analyzing discharge data, b) geolocate stream channels and delineation, c) conduct geomorphic transects, and d) geolocate and document water conveyance infrastructure. These items represent data required by respondents to perform task 2.2 and task 2.3.

    Confirmed. Ontario County via partners will provide the information identified in Task 1.

  • The RFP States: “For the purposes of The Proposal, The Offeror is to provide a basic conceptual design(s) approach for achieving the project goals based on existing information.” Are respondents to interpret this as instruction that proposal should include a basic conceptual design?

    A "30% Design" is not sought here by any means. The Offeror is to provide a basic approach that they believe has the possibility of achieving the identified water quality and flooding goals of the project if feasible. Ontario Co is providing funding for determining if an approach is or is not feasible; thus reviewers need to have some preliminary understanding of what approach is to be assessed by The Offeror.

Plain text

OpenGov categories

  • 91842 · Engineering Consulting
  • 91843 · Environmental Consulting
  • 91855 · Geological Consulting and Study
  • 91872 · Lakes, Rivers, and Other Waterway Management Consulting Services
  • 91882 · Scientific/Technical Consulting
  • 98814 · Erosion Control Services