State and local · OpenGov
Grounds Maintenance and Irrigation
Description
The Aviation Authority is requiring comprehensive grounds maintenance and irrigation services in accordance with industry best practices and focused on measurable performance, maximizing asset life, optimizing water use, enhancing operational efficiency, ensuring public safety, and consistently maintaining a best-in-class environment. All landscape assets shall meet appearance standards and be maintained at an acceptable quality level at all times. The stated frequencies/quantities are estimated service levels. Actual conditions may cause the frequencies/quantities to differ from the estimation and be adjusted accordingly. Discrepancy or ambiguity in the estimated frequencies/quantities do not relieve the Contractor from its contractual obligations. The Aviation Authority is only obligated to pay for services specifically authorized, satisfactorily performed and accepted by the Aviation Authority Authorized Representative (AAR). The Aviation Authority is not obligated to award all areas to a single Respondent, and reserves the right approve one or multiple awards for individual service areas, groups of service areas, or any combination thereof. This Solicitation will result in a 60-month performance-based Contract(s) to commence on or about 02/01/2027. The awarded Respondent(s) shall provide all labor, supervision, management, equipment, vehicles, tools, materials, supplies, permits, licenses, chemicals, and any other resources necessary, proper for, or incidental to, comprehensive grounds maintenance and irrigation management for Terminals A and B Landside Grounds, Cargo Road, North Parking Lots, and South Parking Lots at Orlando International Airport (MCO), and in accordance with this Solicitation. SCOPE OF WORK Overview The Contractor shall provide all labor, supervision, materials (including any replacement plant material required), supplies, tools, equipment, licenses, permits, chemicals, fertilizer, mulch, and all other items necessary, proper for, or incidental to, performing grounds maintenance and irrigation services on specified areas located throughout the Orlando International Airport (MCO), in accordance with this Solicitation. The Contractor acknowledges full understanding of the extent and character of the SOW and the conditions surrounding the performance thereof. The Aviation Authority is not responsible for any alleged misinterpretation of the work requirements and/or expectations or any misunderstanding of conditions surrounding the performance thereof. It is understood that the Contractor commits to fulfilling all requirements, obligations, and conditions set forth in this Solicitation. The Contractor shall refer to Attachment "A" for descriptive inventory and Attachments "C" through "F" for map locations where the Contractor shall perform grounds and irrigation for each year during the term o this Contract: Map 1—Cargo Road; Map 2—Terminals A & B Landside Grounds; Map 3—North Parking Lots; and Map 4—South Parking Lots . Regulations The Contractor shall comply with all applicable federal, state and local laws, ordinances, rules and regulations pertaining to the performance of the work specified herein. The Contractor shall obtain all permits, licenses and certificates, or any such approvals of plans or specifications as may be required by Federal, State and local laws, ordinances, rules and regulations, for the proper execution of the work specified herein. Contractor will abide by all State and Federal regulations on wages and hours of an employee dealing with the employment relationship between Contractor and its subsidiaries or related parties and its employees, including but not limited to the Florida Human Relations Act, the Federal National Labor Relations Act, the Federal Fair Labor Standards Act, the Federal Civil Rights Act of 1964, as amended, and the Americans with Disabilities Act. While working on airport property all Contractor's employees shall wear neat-appearing uniforms with the company name and/or logo and footwear of a style that complies with all legal and safety requirements, including and without limitation, the requirements of OSHA. Should the Contractor engage employees who are illiterate in English, it will be the Contractor's responsibility and obligation to train such employees to be able to identify and understand all signs and notices in and/or around the areas that relate to them or the services being performed by them pursuant to this Contract. In addition, the Contractor will have someone in attendance at all times who can communicate instructions to said employee. Contractor shall maintain a drug-free workplace within the meaning of the Florida Drug-free Workplace Act. No employee shall be hired by a Contractor for work on Aviation Authority's premises prior to such employee having tested negative for drugs. In addition, existing employees of the Contractor must be subject to drug testing by the Contractor upon reasonable suspicion of drug use. Results of all such drug tests are to be retained by the Contractor. Copies shall be provided to the Aviation Authority, if requested. Contractor shall transfer promptly from the Airport any employee or employees that the Aviation Authority advises are not satisfactory and replace such personnel with employees satisfactory to the Aviation Authority; but in no event shall Aviation Authority be responsible for monitoring or assessing the suitability of any employee or agent of Contractor. The Contractor's employees shall be instructed that no gratuities shall be solicited or accepted for any reason whatsoever from the tenants, customers or other persons at Orlando International Airport. The Contractor shall be responsible for ensuring that all articles found by its employees on Aviation Authority's premises are turned over to the Aviation Authority or the Aviation Authority's designated agent in charge of such articles. A valid Florida driver license (Commercial Driver License, if applicable) will be required of all personnel operating motor vehicles or motorized equipment on roadways in or around Orlando International Airport. During the performance of this Contract, Contractor shall keep current and, if requested by the Aviation Authority, provide copies of any and all licenses, registrations or permits required by applicable governing agencies. Contractor shall keep a copy of any and all licenses, registrations and permits on the job site while performing all contracted work. Contractor's Personnel The Aviation Authority requires that the On-Site Manager and Grounds Maintenance Crew all be full-time employees, and assigned exclusively to this Contract. The On-Site Manager shall have overall responsibility for this Contract, and the decision-making authority to act on the behalf of the Contractor in all performance-related matters. The On-Site Manager shall be point of contact responsible for coordinating, directing, and overseeing all activities. At all times, the Contractor shall maintain current escalation contacts for: On-Site Manager Operations Manager Account Manager Executive Contact Updates shall be provided to the AAR within 24-hrs. of any change. On-Site Manager The On-site Manager shall remain available as long as such individual is employed by the Contractor until the term is completed, and shall be posted at the terminal complex of the Orlando International Airport. The On-Site Manager shall possess an Associate’s Degree in Horticultural Science, or a related field, or an equivalent combination of education, training, and experience. The On-Site Manager shall also have a minimum of five (5) years of supervisory experience managing projects of similar scope, complexity, and nature, demonstrating the knowledge, skills, and abilities needed to effectively oversee and perform the work required under this Contract. The On-Site Manager shall be responsible for overseeing and ensuring that all work performed under this Contract complies with the stated requirements and quality standards and for providing assurance to the Aviation Authority of such compliance. The On-Site Manager shall serve as the Contractor’s authorized representative for all performance-related matters. Instructions and notices provided by the Aviation Authority to the On-Site Manager shall be binding upon the Contractor, and statements or commitments made by the On-Site Manager or authorized designee shall be binding upon the Contractor The On-Site Manager shall be available to the Aviation Authority at all times during any emergency declared by the Aviation Authority’s Chief Executive Officer, VP of Facilities, or their designee(s). The On-Site Manager and any proposed replacement shall be subject to the Aviation Authority’s prior written approval. Grounds Maintenance Crew The Contractor will assign only qualified, trained, competent and reliable personnel to perform the services. The use of "short-term temporary" or casual "day labor" is not permitted. Lead Irrigation Technicians Contractor shall have exclusive qualified personnel assigned to this Contract with at least three (3) years of experience in irrigation maintenance and shall be knowledgeable of Rainbird irrigation equipment. Also, the personnel must be knowledgeable of the Baseline irrigation system. Qualification of the Lead Irrigation Technicians shall be provided to the AAR for pre-approval. The Contractor shall have a minimum of two (2) full-time irrigation technicians working solely on the irrigation system. All Irrigation Technicians assigned to this Contract shall be dedicated exclusively to the services required and shall not be utilized for any work unrelated to this Contract for the duration of their designation. Certified Pest Control Operator The Contractor shall ensure that a FL-Certified Pest Control Operator is on-site to oversee all pesticide spraying operations and monitor the contract area for insects and diseases. The Contractor shall provide the AAR with a pdf copy of the current FL-Certified Pest Control Operator license. Arborist The Contractor shall provide an Arborist certified by the International Society of Arboriculture (ISA), with a minimum of 5 years of arboriculture experience, to be on-site and supervise all tree pruning services when performed. The designated on-site Arborist, including his/her replacement, shall be subject to approval by the Aviation Authority. Safety and Protection The Contractor shall be solely and completely responsible for initiating, maintaining, and supervising all safety precautions and safety programs in connection with all work performed under the Contract. Contractor personnel shall perform all work in a neat, safe, and professional manner. The Contractor shall be solely responsible for complying with all applicable safety regulations and Federal, State, and local laws, rules, and regulations, including, but not limited to, requirements of OSHA, the Environmental Protection Agency (EPA), the Florida Dept. of Transportation Maintenance of Traffic (FDOT-MOT), and any other applicable agency. The Contractor shall take all necessary precautions to protect employees, other persons at the work site, and the general public from injury or harm. The Contractor shall use maximum safety precautions at all times. All tools and equipment shall be maintained in good repair, safe for use, and used only for their intended purposes. The Contractor shall inform all workers and affected persons of the Safety Data Sheet (SDS) information for all products used on the project. No materials or equipment shall be left unattended or stored on the project site at any time. The Contractor shall provide appropriate safety gear to all employees as necessary, including, but not limited to, safety vests when working near roadways, approved signage and traffic-control devices as required by FDOT-MOT, and appropriate fall protection systems as required by OSHA when working on balconies or elevated areas. Any employee found without proper safety gear may be required to leave the property immediately. The Contractor’s supervisor and/or manager may also receive a safety violation from the Aviation Authority. The Contractor shall not be entitled to any relief from Contract requirements as a result of such removal or violation. The Contractor shall immediately report to the AAR any spill, release, dumping, or discharge of hazardous materials on Aviation Authority property. The Contractor shall be responsible for cleanup and all costs incurred for incidents caused by the Contractor. If hazardous materials are used, the Contractor shall comply with all applicable Federal and State right-to-know laws. Safety Data Sheets (SDS) shall be made available to all workers and Aviation Authority representatives. The Contractor shall immediately report to the AAR any spill, release, dumping, or discharge of hazardous materials on Aviation Authority property and shall be responsible for cleanup and all costs incurred for such incidents. Working Hours The Contractor shall normally conduct all work within an 8-hr. workday, Monday through Friday, excluding Aviation Authority-observed holidays, unless otherwise authorized in writing by the Aviation Authority. The Aviation Authority reserves the right to require the Contractor to perform work during Non-Standard Work Hours, which are defined as the period from 4:01 pm to 6:59 am, Monday through Friday, and all hours on Saturdays and Sundays. Any work performed during Non-Standard Work Hours shall require prior written approval from the AAR. The Contractor shall submit its anticipated work schedule to the AAR no less than 48-hrs. before initiating such work. The Contractor shall not perform work on Aviation Authority-observed holidays unless expressly authorized in writing by the AAR. As directed by the AAR, all Contractor personnel shall electronically sign in upon arrival at the MCO work site and sign out prior to leaving the work site. The required computer-based sign-in/sign-out process shall be completed using the designated computer located at the Aviation Authority’s Central Plant, on the west end of Level 1, Terminal A. In the event that an emergency condition is declared by the Aviation Authority’s CEO, VP of Facilities, or authorized designee, the Contractor shall provide services and perform work at such times and for such duration as deemed necessary by the Aviation Authority. The Contractor shall respond to the AAR’s written requests by providing verbal acknowledgment via telephone within 1-hr. of receipt and shall begin providing replacement services no later than 4-hrs. after receiving such written request. Aviation Authority-Provided Items The Aviation Authority shall provide the Contractor, at no cost to the Contractor, with water reasonably necessary for the performance of the Contract Services. The Aviation Authority shall designate the location(s) of available water supply access. The Aviation Authority shall also provide irrigation controller circuit cards, as required, for the operation and maintenance of the irrigation system. The Aviation Authority shall provide the Contractor, at no cost to the Contractor, employee parking in a location designated by the Aviation Authority. The specific parking location(s) shall be determined by the Aviation Authority in its sole discretion and may be changed as operational needs require. The Contractor shall be responsible for providing all ice, drinking water, meals, and other necessities for its personnel. Contractor personnel shall not obtain or remove ice, drinking water, supplies, or other materials from Aviation Authority facilities unless expressly authorized by the AAR. Annual Color Plant Materials, Installation, and Maintenance The Contractor shall furnish, install, and maintain approximately forty-two thousand five hundred (42,500) annual plants in 4-inch containers, with seasonal replacements occurring 4 times per year and at such additional times as directed by the AAR. Annual plantings shall be installed within the areas identified on Attachments "C" and "D". Once each year, or more frequently if directed by the AAR, the Contractor shall remove a minimum of 3-inches of existing soil from all annual planting beds. Following soil removal, the Contractor shall top-dress each bed with a minimum 4-inch layer of new planting soil suitable for annual color installations. The Contractor shall be responsible for maintaining all annual plantings in a healthy, vigorous, and attractive condition. Any annual plants that fail as a result of inadequate, improper, or deficient maintenance practices shall be replaced by the Contractor at no additional cost to the Aviation Authority. The Contractor shall replenish, amend, and incorporate planting soil into annual beds as necessary between planting cycles to compensate for settlement, erosion, decomposition, or other natural attrition and to maintain appropriate growing conditions. The Contractor shall maintain proper drainage within all annual planting areas. The Contractor shall promptly identify and correct drainage deficiencies to prevent standing water, soil erosion, root damage, or plant failure. Any annual plant losses attributable to inadequate drainage maintenance shall be replaced by the Contractor at no additional cost to the Aviation Authority. Plant Material Replacement, Establishment, and Site Restoration Contractor shall be responsible for replacing, at no cost to the Aviation Authority, any plant materials that die or are damaged beyond acceptable condition as a result of improper or negligent maintenance practices. Replacement plant material shall be identical to original plant material and must be approved by the AAR prior to replacement. In the event plant material dies, declines, or is damaged beyond an acceptable condition, as determined by the Aviation Authority, due to causes beyond the Contractor’s control, including but not limited to vehicle damage, vandalism, utility work, severe weather, or other Acts of God, the AAR may request that the Contractor submit a proposal to replace the affected plant material. Such proposal shall be based on the unit plant prices and applicable additional-work labor rates established in the Contract. The Contractor’s proposal shall include all costs associated with the replacement work, including, but not limited to, removal and disposal of damaged plant material, delivery, soil preparation, installation, staking, mulching, cleanup, supplemental watering, and all labor, equipment, and materials necessary to complete the work. All replacement plant material shall be subject to the prior approval of the AAR. Upon installation, the Contractor shall assume full responsibility for the establishment, maintenance, health, and survivability of the replacement plant material in accordance with the requirements of the Contract. The Contractor shall maintain all stakes, guying, flagging, ties, ribbons, and other support materials associated with newly installed plant material in a safe and structurally sound condition. Such support systems shall be adjusted, repaired, or removed as directed by the AAR and in accordance with accepted horticultural practices. Upon the removal of any tree, palm, shrub, groundcover, annual, or other necessary material, the Contractor shall leave the affected area in a safe, clean, and hazard-free condition. The Contractor shall provide and maintain all necessary temporary barriers, warning devices, and safety measures required to protect the public and Aviation Authority personnel until the area has been fully restored and any permanent repairs have been completed. The Contractor shall maintain all stakes, guying, flagging, ties, ribbons, and other support materials associated with newly installed plant material in a safe, secure, and structurally sound condition. Suppor
Published attachments
Addenda and notices
Official Notice #1: 26-167-ITN Pre-Submittal Meeting Slides for Grounds Maintenance and Irrigation · 1
Official Notice #2: Tentative Change in Dates, Solicitation Timeline · 2
Notice of Tentative Change in Dates, Solicitation Timeline Solicitation #: 27-167-ITN Solicitation Title: Grounds Maintenance and Irrigation The purpose of this Notice is to update the timeline of the solicitation, specifically: Q&A (Addendum) Issue Deadline: November 30, 2026 Response Submission Deadline: December 9, 2026 @ 3:30 PM Bid Opening (Non-Mandatory): December 9, 2026 @ 4 PM Committee Evaluation: January 5, 2027 Interviews (Optional): January 13, 2027 Conclusion of Negotiations (Non-Mandatory): January 29, 2027 Evaluation of Respondents' BAFOs by Committee (Non-Mandatory): February 9, 2027 Aviation Authority Board Contract Approval Date: February 17, 2027
OpenGov categories
- 98836 · Grounds Maintenance: Mowing, Edging, Plant (Not Tree) Trimming, etc.