Guadalupe Light Rail Vehicle Wash Improvements

Description

General work description: The Santa Clara Valley Transportation Authority (VTA) will be soliciting an Invitation for Bids (IFB) for “Guadalupe Light Rail Vehicle Wash Improvements” (Project). For purposes of this Contract, Work consists of furnishing all labor, materials, tools, equipment, services, supervision, and incidentals necessary to remove and replace existing LRV Wash System located at Building F of the Guadalupe Division with a hybrid drive-through and gantry wash system. The Work will be conducted within an operating rail yard and adjacent to and within existing shop facilities. This Work will be subject to restrictions to ensure safety and the continuing operations of the yard and shop and the light rail system. Potential bidders need to submit Pre-Qualification application, and receive VTA approval in order to bid for this project; please refer to Appendix I for instructions. See link below to get the application: https://procurement.opengov.com/portal/vta/projects/283916 Project Details IFB C25134F Details Please see attachment containing the detailed IFB information and required forms. Important Instructions for Electronic Submittal Santa Clara VTA is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. Introduction Summary Background Contact Information Timeline Attachments Vendor Submissions

Published attachments
Addenda and notices
Public questions and answers
  • We are requesting to reschedule the pre-bid walkthrough date due to APTA conference conflict

    Please refer to Addendum 2 with an updated IFB schedule.

  • Section 1.9 PRE-QUALIFICATION REQUIREMENTS of the Invitation for Bids states: "This Contract requires Pre-Qualification of all prospective Bidders. The Pre-Qualification application is contained in Appendix I, Pre-Qualification Requirements. Prospective Bidders that are not pre-qualified may qualify during the solicitation period, and are strongly encouraged to submit their Pre-Qualification package at least Fifteen (15) days before Bid Opening. Prospective Bidders not currently pre-qualified, and intending to be pre-qualified, must request Pre-Qualification sufficiently in advance of the Bid Opening - as stated herein- so as to ensure there will be no need to extend the solicitation period or delay the award." Please note, Appendix I does not contain any pre-qualification documents, applications, or otherwise. Please provide the pre-qualification documents for Appendix I.

    Please search for "Pre-Qualification: Guadalupe Light Rail Vehicle Wash Improvements" or via link below: https://procurement.opengov.com/portal/vta/projects/283916.

  • The new train wash will be bidirectional : one direction is to wash the train and the other direction for bypass. The red and green light will be required for entrance and exit of the wash area. Please confirm.

    The new train wash is a drive-through system. Per Section 11 11 26, §2.03.D, the washer shall include duplex red/green LED traffic lights that signal when the wash bay is ready for the next train's entry and guide the train on where and when to stop or proceed. Per §2.02.D and §2.01.B.3.c, trains may pass through the wash bay without receiving a wash (No-Wash Cycle). Refer to Industrial Equipment - Overall Floor Plan, Drawing No. MP111, for traffic light locations and Industrial Equipment, Wash Equipment Schedule, Drawing No. MA610 (ref. W-27) for traffic light details and quantities.

  • The specification specified Galvanized steel for structural of the train wash equipment, to avoid any Zinc contamination to the wastewater discharge from the galvanized steel, will Aircraft Aluminum standard 6061-T6 will be allowed to be used for structural for the train wash equipment ?

    The Technical Specifications require galvanized steel, and aluminum 6061-T6 is not approved as a substitute for the structural components of the train wash equipment. Per Section 11 11 26, §2.01.B.4, all fabricated sections of the washer frame, brush yokes and arms, spray arch frames, and miscellaneous structures shall be hot-dip galvanized after fabrication per ASTM A123. Surfaces not suitable for galvanizing shall be coated with 95% zinc primer and covered with durable machine enamel. The equipment requirements in the Contract Documents remain unchanged. The system will be exposed to acidic and alkaline cleaning solutions and will be in contact with steel and stainless components, so material compatibility, galvanic isolation, and structural performance over the specified 30-year design life must be demonstrated in any substitution submittal. Product substitutions are addressed in Section 11 11 26, §1.10. Any proposed substitution must be submitted for each equipment item after award, and acceptance will be based on the technical requirements and determined by VTA.

  • The existing train wash equipment system on site doesn't have PH Neutralizing system, the new specification required to have PH Neutralizing system, the existing equipment room on site might not be big enough to accommodate the new PH neutralizing system. Will it be allowed to have some of the holding tanks located outside the equipment room if needed

    The Technical Specifications do not require a pH neutralizing system. Section 11 11 26, §3.03.G.1 states that, depending on the type of chemical cleaner chosen, a neutralization solution may be necessary to regulate the pH of wastewater, and the manufacturer shall provide an initial supply of detergent, acid, and neutralization solution. Per §2.03, the water softener and RO system selected must be compatible with the space constraints of the existing equipment room. Locating tanks outside the equipment room is not shown in the Contract Documents and is not permitted unless approved by VTA through the submittal process

  • To avoid the rainwater into the reclaim wash water system during the rainy day and overflow to the sewer discharge line, will Rain Valve be required ?

    No, a rain valve will not be required. The new pre-engineered canopy (Section 13 34 19) covers the wash bay and includes gutters and downspouts that collect rainwater and discharge it to splash pads installed under each downspout (§3.04.C), keeping rainwater separate from the wash wastewater. The wash wastewater is collected in an isolated system as shown on Plumbing Drawings, Drawing No. MP101, for wash wastewater / reclaim piping. Additionally overspray shields are required (Section 11 11 26, Article 2.03/C) to prevent water from spraying outside the wash bay and from driving rain entering the wash bay pits.

  • Do the main control panel of the train wash equipment need to communicate with the Control Tower?

    No. The Technical Specifications do not require the train wash main control panel to communicate with the Control Tower. Per Section 11 11 26, §2.02, the wash is controlled from its own control panel, and the RFID system (§2.03.O) communicates with the wash control system.

  • The profile of the LRT train in operation with minimal slope on the front and the back of the train body, it can be washed with a new designed Wrap Around Vertical Brush without stopping the train. Will Split Top Brush Rollover Gantry stop and go unit still be required?

    The gantry-mounted configuration, capable of both continuous drive-through operation and a stationary stop-and-clean mode, is a required performance characteristic of the system (Section 11 11 26, Article 2.01.B.3) and a salient characteristic that any substitute must meet (Article 1.10.E.1). In the Detailed Cleaning Cycle the vehicle stops at the gantry, where the front, rear, and sides are washed by two side brushes and two horizontal brushes (Article 2.01.B.3.b). A drive-through-only configuration, including a wrap-around vertical brush that washes without stopping the vehicle, does not satisfy this requirement. A system that requires custom design, engineering, or development to meet this Section is a prototype or first-of-kind system and will not be approved (Article 1.10.D). A manufacturer proposing a different configuration must request approval before bid opening under Article 1.10, using the Request for Substitution form issued with this Addendum. Refer to Addendum No. 006.

  • We request a separate allowance line item be provided to address direct costs incurred by the contractor/subs/vendors for Project RAP Permit Fee(s) and corresponding RWP staff / craft class fees? This will provide an established contract amount / method of reimbursement for fee(s) in lieu of bidders estimating / adding these values into corresponding bids.

    Refer to Addendum #005 The Contractor shall include in its Bid a fixed amount of $150,000 for all fees and charges described in this Section 6.15.12, including Restricted Access Permit fees, Roadway Worker Protection training fees, and related VTA Operations service charges. This amount is included in the Contract price and shall be shown as a separate line item, “Restricted Access Permit and Related Fees,” in the amount of $150,000 in the post-award Schedule of Values required by Section 7.59.1. The Contractor shall pay all such fees and charges directly to the Track Allocation Coordinator. Each month, the Contractor shall include the fees and charges paid during that period as a billing against this line item in its Progress Payment application, with supporting invoices or receipts, and the amount billed shall be deducted from the remaining balance of the line item. Payment under this line item is limited to actual fees and charges paid, without markup, up to a total of $150,000. Upon completion of the Work, any unbilled balance of this line item shall be deducted from the Contract price by the Final Balance change order.

  • We request a separate allowance line item be provided to address direct costs incurred by the contractor/subs/vendors for Project Permit Fee(s) (i.e. City encroachment permits, City Building permits, misc. environmental permits, etc.). This will provide an established contract amount / method of reimbursement for fee(s) in lieu of bidders estimating / adding these values into corresponding bids.

    No separate allowance line item will be provided. Special Conditions Section 6.7 requires the Contractor to obtain all necessary permits from the governing agencies with jurisdiction over the Work and to submit permit forms to VTA, and states that VTA will pay for all plan check application and permit fees. No building permit is required, as the VTA Guadalupe Division facility is outside the jurisdiction of the City of San Jose's Building and Fire Department. Because permit fees are paid by VTA, bidders shall not include them in their bids. Restricted Access Permit fees are addressed separately in Special Conditions Section 6.15.12 and are included in the Contract price.

  • The bid documents indicate that materials are to be "salvaged." Please detail out what materials are specifically to be "salvaged". Also, whether these "salvaged" materials are to be reused / reinstalled into the final construction, or if they are to be transported to an on-site or off-site VTA facility.

    The following items are identified in the Contract Documents to be salvaged: Overspray Shields (WS-4): The two (2) existing 8-foot overspray shields shown on Industrial Equipment, Demolition Floor Plan, Drawing No. MP110 (Status "E" and Supplied By "OFCI" on the Industrial Equipment, Wash Equipment Schedule, Drawing No. MA610) shall be removed, cleaned, and reinstalled in the final construction (Section 01 11 00, Items 4.2 and 4.3). All other scheduled equipment is new. Track Materials: Rails, ties, tie plates, and fastening hardware that VTA determines to be in good condition shall be cleaned, packaged, and delivered to the Yard location directed by VTA (Section 34 01 23). Insulated joint bars to be relocated or reinstalled shall be stored and protected on site by the Contractor Other Items: Any additional items shown on the Contract Drawings as "Remove and Salvage" shall be cleaned, packed, stored securely, and delivered to VTA (Section 02 41 19, Article 1.02.B). All other demolished materials become the Contractor's property and shall be legally removed and disposed of or recycled off-site (Section 02 41 19, Article 1.03.A). A material inventory shall be submitted for all salvaged and removed materials per Section 34 01 23, Attachment "A."

  • Spec 34 01 23 – states “...clean, store and protect on site insulated joint bars to be relocated or reinstalled...”. None of the Drawings indicated salvage / restoration of existing IJ's. Please clarify the location of existing IJ's to be salvaged / reused and what parts of these IJ's are to be salvaged / refurbished (i.e. bars, hardware, insulators, etc.). Be advised, contractors cannot guarantee pre-existing condition of salvaged materials nor their functionality or life span if reinstalled.

    The existing insulated joints to be salvaged and reinstalled are shown on the Civil and Track, Existing Conditions, Drawing No. CA101, and reinstallation locations are shown on Civil and Track, Trackwork Plan, Drawing No. CM102. The Contractor shall remove the existing insulated joints, and clean, store, and protect on site the complete insulated joint assemblies for reinstallation (Section 34 01 23, Article 1.01.B.4). Salvaged insulated joint components are expected to be reused but must be inspected by VTA prior to reinstallation. Components that VTA determines to be unsuitable for reuse shall be replaced with new material meeting Section 34 11 19. The Contractor is responsible for protecting the joints from damage during removal, storage, and handling, but is not responsible for their pre-existing condition or remaining service life.

  • Spec 34 11 12 – 2.01 states “ Contractor will provide design of embedded rail fastening system and submit to VTA for approval”. This specification does not provide any corresponding criteria for the fastening components to meet. Aside from some rudimentary details provided on Sheet TD109, what are bidding primes and vendors to base an acceptable design on so we can provide an acceptable / competitive bid price.

    Please refer to Question #15 - Track Isolation* Corrected

  • Spec 34 11 12 – 2.01 states “ Contractor will provide design of embedded rail fastening system and submit to VTA for approval”. This specification does not provide any corresponding criteria for the fastening components to meet. Aside from some rudimentary details provided on Sheet TD109, what are bidding primes and vendors to base an acceptable design on so we can provide an acceptable / competitive bid price. What is the fastener material comprised of, steel plate for the rail plate, are the clips to be resilient fasteners, what is the minimum ASTM for the anchor bolts / hardware, are any of the bolts or appurtenances to receive special coatings for isolation (what is the isolation criteria),do anchor bolts get epoxied in place, do anchor bolts receive hdpe insulators to prevent contact with the plate, are the anchor bolts to be coated for isolation, what are acceptable alternate materials that can be utilized, etc? Please provide further / appropriate design criteria so bidders can appropriately bid.

    Refer to Addendum #005 The embedded rail fastening system shall conform to VTA Standard Detail STW-018, LRT Standard Detail – Trackwork, Shop Track – Embedded Per STW-018: - Rail plates shall be 12" × 6" × 1/2" @ 36" O.C. steel conforming to ASTM A36/A36M, with elongated holes punched to the dimensions shown and deburre (per Drawing No. TD109) - Anchor bolts shall be epoxy-coated 7/8" diameter × 8" long, hex head, conforming to ASTM A307 Grade A, with two bolts per fastener assembly. Anchor bolt holes shall be drilled by the Contractor. Insulating spacers shall be installed at the bottom of each anchor bolt to isolate the bolt from the concrete - Each assembly shall include two rail clips with elongated holes, hex nuts, steel lock washers, and a Schedule 40 PVC protective cap filled with high-temperature grease, secured to the clip prior to grouting. - Fasteners shall be spaced 36 inches O.C.. - Rail trough grout shall be non-shrink, non-metallic, fiber-reinforced Portland cement grout, as specified in Section 03 61 11 - Non-Shrink Grout For Detail 2 on TD109, apply POLYQuik P-480, or an approved equivalent, to the interior sidewalls and bottom of the concrete trough to provide an insulating interface between the concrete and the insulating rail grout. Verify the coating thickness, surface preparation, and compatibility with the grout, and confirm its suitability for the required electrical isolation prior to installation. Detail 1 on TD109 and Detail 3 on TD109 shall be cons

  • 1. Sump pump existing conditions need to be provided for demo, during walk it was discussed it is currently under repair, please provide photos. 2. During the field walk, photos were not allowed, please provide photos taken, and also please provide photos of existing conditions of the IJ’s to be replaced. Please also provide photos of the rooms holding the equipment to remain in place. Plumbing drawings show removal of pipes that were not visible during the walk. Please provide photos of these locations as well. PLEASE PROVIDE PHOTOS OF EVERYTHING CURRENTLY EXISTING CONDITIONS OF THE FACILITY INCLUDING ADJACENT STAGING AREA AND SURROUNDING SITE. 3. During the walk no copper wire connecting to the existing building was exposed, please confirm the location of the copper wire is within the slab and that detail 1/CD101 is to pertain to existing reinforcement to be exposed as surrounding slab is demoed. Existing wall is to remain in place, please confirm if wall and slab were poured monolithic or individually.

    1. Refer to Addendum #005 for Existing Sump Pump Infrastructure Photos 2. Please refer to Official Notice #1: Pre-Bid & Site Tour Photos posted Oct 15, 2026 3:02 PM. Please refer to Addendum #005 for additional site photos 3. Detail 2 CD101 shows the connection to the existing #4/0 AWG bare cooper. Per the as-built grounding plan there is a existing #4/0 AWG bare cooper that will be located once the existing concrete slab is demolished (see DWG CM103). The reference as-built drawings are included as an attachment in Addendum #005

  • The drawings call for grates over the new drainage trough and the new sump pump, no specifications were provided, please provide.

    Refer to Addendum #005 Grating requirements for the drainage trench and the sump and collection pits are as follows: Drainage trench: Hot-dip galvanized steel bar grating, serrated and removable, 3 feet wide, designed to support AASHTO H20 loads (Drawing CM101, Note 7). Bearing bars shall be spaced at 1-3/16 inches on center with cross bars at 4 inches on center. Frames and anchors shall be as shown on Drawing TD109, Detail 5. Furnish trench grating in 3-foot by 3-foot panels, with partial panels, 2-foot minimum, as required to fit at trench and pit ends. Sump and collection pits: Aluminum bar grating, 2 inches deep, 19-SG-4 (1-3/16 inch bearing bar spacing), uncoated mill finish, for a maximum span of 4'-0", with removable connections (Drawing SX302, Sections [1 and 2]). The grating shall be designed for a 300 psf uniformly distributed live load (no limit on deflection), and for either a uniformly distributed live load of 100 psf or a concentrated live load of 1,000 pounds on a 1.0-foot by 1.0-foot area, with a maximum deflection of 1/4 inch or span/240, whichever is less. All aluminum surfaces in contact with concrete shall be coated with heavy alkali-resistant bituminous paint. Embed angles shall match the grating material, and removable connections shall be of the material recommended by the grating manufacturer. Pits and grating are also shown on Drawings MP112, MX212, SP100, MP101, MP400, and MD501. Furnish and install so that grating can be lifted by one person.

  • Can you confirm that NS Corporation is approved equal to Design

    No. As of the date of issuance of Addendum No. 006, no manufacturer other than the Basis of Design manufacturer (Westmatic Corporation, TwinLine Gantry Train Washer) has been approved (Section 11 11 26, Article 2.01.A.3). N/S Corporation is identified in Article 2.01.A.2 as eligible to submit a request for approval of a substitute. That listing is not pre-approval, prior review, certification, or acceptance. To be bid as equal, the specific model and configuration must be approved by addendum before bid opening under Article 1.10. Requests shall be submitted using the Request for Substitution Form included at the end of Section 11 11 26, by email to Kelly Tran at Kelly.Tran@vta.org (General Conditions Section 7.41.A), no later than 21 calendar days before the bid opening date, with the information required by Article 1.10.C. VTA will issue its determination in writing, and approved substitutes will be identified by addendum to all bidders not later than 10 calendar days before the bid opening date. A bid that proposes a manufacturer or product other than the Basis of Design that has not been approved by addendum before bid opening will be non-responsive as to this Section (Article 2.01.A.5).

  • Please confirm what work zone measures are required or to be provided that a work zone is not needed to protect track 9 , is the Contractor to provide appropriate RWP oversight (EIC, PAD and lookout) while work occurs within the 6'-0" envelope?

    Refer to Special Conditions Section 6.15.11, On-Track Safety, for the requirements and responsibilities for employee-in-charge and lookout personnel. The Contractor must coordinate with VTA Operations and Maintenance Groups for all work requiring shut downs and work zones in accordance to VTA's Restricted Access Procedures and Roadway Worker Protection Program. Daily shutdowns of the OCS - Section Insulators at Building A Track #10 and #11 East Roll-Up Door to Section Insulator at OCS Pole, #202A, northeast of wash per Section 9 – Contract Drawing Sheet OC103 require the contractor to provide a on site EIC and designated lookout. The lookout may serve the shutdown and track #9 work zone simultaneously as needed.

  • Section 31 00 00-3.11.C states “Do not backfill on or against structural concrete until the specified 28-day concrete strength has been attained”. Per the bid doc's the contractor is allotted a 21-calendar day (24 hr / day) period where Track 10 through the car wash can be shutdown to LRV traffic in order to facilitate construction of the new Car Wash tracks. Please advise how contactors are to meet this milestone when the trackwork cannot be backfilled within the given shutdown duration.

    Refer to Addendum #005 The 21-calendar-day shutdown period is not intended to modify the requirements of Section 31 00 00-3.11.C. The Contractor shall comply with the requirement that backfill not be placed on or against structural concrete until the specified concrete strength has been attained. The Contractor shall develop and submit an appropriate construction sequence and means and methods to meet the required shutdown duration. If necessary to meet the 21-calendar-day shutdown period, the Contractor may propose an alternative concrete mix design and/or accelerated or early-strength concrete with a specified strength and curing period that will allow the required backfill operations to proceed within the shutdown period. Any such proposed alternative shall be submitted for review and approval by the Engineer prior to implementation. The Contractor shall be responsible for demonstrating, through appropriate testing and documentation, that the required concrete strength has been attained prior to placement of backfill. No backfill shall be placed until the applicable strength requirement has been verified and approved in accordance with the Contract Documents. If a construction sequence is proven to require additional time and discussed with VTA, at minimum 21 calendar days, before the 24/7 shut down, VTA may in writing approve additional working days on top of the 21 day shutdown.

  • The bid design documents do not provide thicknesses of existing AC pavements to be removed. Also, no thickness is provided for new AC pavements to be installed. Please provide so we may appropriately bid these scopes.

    Refer to Addendum #005 VTA's project records, the Construction As-Builts dated 03/12/84, indicate that the existing asphalt concrete pavement is approximately 3.5 inches thick. This information is provided for reference only. VTA does not warrant its accuracy, and the Contractor is responsible for field-verifying existing conditions. The reference as-built drawings are included as an attachment in Addendum ( or official notice) #xxxxx New asphalt concrete pavement shall be 3.5 inches thick AC (at minimum) over 8.5 inches thick Class 3 aggregate base course compacted to 95% PM, and tack coat Diluted SS-1 or SS-1h emulsion in conformance with Section 94 of the Caltrans Standard Specifications. Hot Mix Asphalt: Type A, with the gradation of the combined aggregate conforming to one-half inch maximum size, or three-fourth inch maximum size, as indicated, and as specified in Section 39 of the Caltrans Standard Specifications. Asphalt Binder: Performance Grade asphalt binder, in accordance with Section 92 of the Caltrans Standard Specifications.

  • Regarding the new ballasted trackwork to be installed. Please provide the fasteners design to be assumed (i.e. clips, lag screws, spikes, clips, insulators, etc.). Please provide dimensional sizing for new wood ties to be furnished/installed.

    Refer to Addendum #005 Per VTA STW-010: - Timber Tie 8'x 9"x 7" - Resilient clip fastener assembly: rail spring clip, tie plate screw (flat steel washer, insulating sleeve), rolled steel plate, and insulating tie pad

  • Sheets TD101 and TD106 show embedded trackwork to be poured monolithically with the adjacent structural slab. This design does not allow for appropriate constructability of this portion of trackwork to the adjacent connecting pit and/or ballasted track. Nor does it provide any joints or separation between the track slab/pavements, and adjacent slabs should future maintenance / adjustment / access by VTA be required. Additionally, are these portions of track to receive any type of isolation measures. It seems these portions of trackwork should be a two-pour design, lower track slab and upper track pavement, similar to standard VTA embedded trackwork design on prior projects. Please confirm and provide a corresponding modified design as necessary.

    Refer to Addendum #005 To facilitate construction of the slab sections shown on Sheets TD101 and TD106, the track shall be constructed using the rail trough method. Accordingly, Details 1 and 3 on Sheet TD109 shall also be constructed using a rail trough, similar to Detail 2, and shall incorporate the same electrical isolation treatments.

  • Spec Section 03 35 00, Section 3.03.C states " 2. Floated Finish: Conform to ACI 301. Provide "floated finish" for track slabs and mud slabs and for slabs and flatwork to receive roofing and membrane waterproofing." and "3. Troweled Finish: Conform to ACI 301. Provide "troweled finish" for interior slabs and flatwork to be exposed in the completed structure, for slabs to receive resilient floor coverings, and for flatwork to receive elastomeric bearing pads". Please confirm what finish is to be applied to the new exterior slabs. Please note, the "Troweled Finish" has a low slip resistance value in wet conditions.

    Refer to Addendum #005 Concrete slabs within the LRT train wash facility shall receive a broom finish to provide a slip-resistant surface under wet conditions.

  • Please confirm if galvanized steel grating is to receive a painted finish. Per Spec Section 09 91 00, these materials are to receive paint.

    No. Galvanized steel floor grating is not to be painted. Section 09 91 00, Article 2.04.E (Coating System "D") excludes floor grating and checkered plates from the painting of galvanized steel products. The grating shall be hot-dip galvanized per Section 05 12 00, Part 2, E.1 and the Contract Drawings. Coating System "A" applies to the structural steel items listed in Article 2.04.A and does not apply to grating.

  • For the column foundations at grid lines 0 / C.1 & 5 / C.1 are we to assume Detail D / SX.301 is to apply to these foundations? Please confirm.

    Yes. Detail D on Drawing SX301 applies to the column foundations at grid lines 0/C.1 and 5/C.1, and to all column foundations on grid lines 0 and 5. Column foundations on grid lines 1.1, 2, 3, and 4.1 use Details B and C on Drawing SX301, as identified by the section cuts and the adjacent existing structure

  • The Table in the lower right corner of Sheet CM102 states "Precurve" rail. Please advise if this is existing precurve rail that is to be salvaged and reinstalled, or if the contractor is to furnish newly shop fabricated "precurve" rail for this installation.

    Contractor shall furnish and install new precurve rail shown on CM102

  • Please confirm who is responsible for EIC, Lookout during the project. VTA or the Contractor?

    The Contractor is responsible for providing individuals to serve as the EIC and Lookout. Refer to Special Conditions Section 6.15.11, On-Track Safety, for the requirements and responsibilities for employee-in-charge and lookout personnel. The Contractor must coordinate with VTA Operations and Maintenance Groups for all work requiring shutdowns and work zones in accordance to VTA's Restricted Access Procedures and Roadway Worker Protection Program

  • Please confirm the closest water source available to the contractor.

    Temporary water and other construction utilities are addressed in General Conditions Section 7.35, Temporary Construction Facilities and Utilities.

  • Please advise if bird / rodent deterrent measures (i.e. rafter spikes / nets, etc.) be required on this project?

    No. Bird and rodent deterrent measures are not required for this project.

  • During the pre-bid walk, several existing signs we observed on the car wash structure. No signage is noted within the bid documents. Please advise if any new signage is required with corresponding details.

    No new signage is required for this project. Existing signage shall remain on existing structures. Signage mounted to the overspray shields that are to be removed and reinstalled shall be reinstalled in its current configuration.

  • Are the existing structures (i.e. CMU building, wall, etc.) to receive painted finish? Please confirm. If yes, then please provide detail as to what elements are to receive this finish.

    No. Existing structures, including the CMU building and walls, are not required to be painted.

  • 1. Please confirm the time to perform the daily OCS LOTO / De-energization / Re-energization during the 120-calendar day period. Is this operation to occur within the daily 7:01am-4:59pm window or will it be performed prior to and after these times so work can comence in earnest at 7:01am and go upto 4:59pm without interruption?

    Refer to Special Conditions Section 6.1.11, Work Sequence and Constraints. Shutdown of OCS East of Pole #202A Section Insulator will not be permitted before 7:01a.m. Section Insulators at Building A Track #10 and #11 East Roll-Up Door to Section Insulator at OCS Pole, #202A, northeast of wash per Section 9 – Contract Drawing Sheet OC103 may be permitted as early as 5:00a.m. but is solely at the discretion of VTA Operations and must be coordinated in advance per section 6.1.11

  • Specification Section 11 11 26-2.01.A.1. states the following “Specifications are based on equipment identified herein by manufacturer’s name and model to establish a minimal acceptable standards of quality, features, performance, and construction.” Specification Section 11 11 26-2.01.A.1.a identifies “Westmaitc Corporation” as the “manufacture” that the above Car Wash System design/criteria is based on. Conversely, Specification Section 11 11 26-2.01 and Addendum #3, names three “acceptable manufactures” (N/S Corp, InterClean, and Whiting Systems). However, these firms are not “accepted” per say, but per the bid doc’s must follow the substitution process (Specification Section 11 11 26-1.10) in order to be utilized on the project. Specification Section 11 11 26-1.10 “Product Substitutions” states “Prior to manufacture, delivery or installation, submittals for each equipment item, by Equipment Identifier, shall be provided, and work shall not begin prior to final submittal approval. Acceptance shall be based on the technical requirements herein as determined by VTA.” This is where bidders are further directed to General Condition Section 7.41 where it states “…Contractor must select any product or manufacturer named, or must submit a request to substitute an equal product or manufacturer…such request must be made within 35 calendar days from date of the Notice of Award in order to receive consideration...”. Based on the above criteria, how are bidding primes and prospective s

    VTA has revised Section 11 11 26 in Addendum No. 006 to clarify the substitution process. VTA has not adopted the requested post-award approval process. Instead, substitutions are now approved before bid opening so that all bidders price equipment VTA has approved. Bids shall be based on the Basis of Design unless a substitute has been approved by addendum before bid opening (Articles 1.09.A and 2.01.A.5). The manufacturers listed in Article 2.01.A.2 are eligible to submit a request for approval, but they are not pre-approved (Article 2.01.A.3). Requests are due no later than 21 calendar days before bid opening, and approved substitutes will be identified by addendum to all bidders not later than 10 calendar days before bid opening (Article 1.10.B). Article 1.10.A applies notwithstanding Section 7.41 of the General Conditions, so the 35-day post-award request period in Section 7.41 does not apply to the vehicle wash system. After award, a substitute will be considered only if the Basis of Design is no longer available for reasons beyond the Contractor’s control (Article 1.10.I). An approved substitute remains subject to full submittal review and to the remedies in Article 1.10 (paragraphs G and H).

  • We have yet to find a fabricator / installer who is willing to submit a bid for this scope for the fact that it is a public works project. Butler firms for the most part only bid private projects. Accordingly, VTA should provide a more detailed bid design (i.e. member sizing, etc.) so alternative bid scope / pricing scopes can be pursued by bidding primes where the structure may need to be bid piecemeal by multiple fabricators/subcontractors. Without steel member sizing and further detail, individual subcontractors (i.e. steel, roofing, painting, etc.) are unable to develop a proper scope / pricing to bid this work.

    The canopy is specified as a pre-engineered metal building under Section 13 34 19, Metal Building Systems. Pre-engineered metal buildings are commonly used on public works projects. The Contract Documents establish the performance requirements, and the pre-engineered building manufacturer designs and furnishes the framing. The Contract Drawings show the canopy framing schematically and note that the actual framing is by the pre-engineered building manufacturer. Section 13 34 19 provides the acceptable manufacturers (Encore, Nucor Building Systems, VP Buildings, Butler Manufacturing Company, or an approved equal, Article 2.01), the assemblies (Article 2.02), the performance requirements (Article 2.03), the framing and roofing materials (Articles 2.04 and 2.05), and the submittal requirements (Article 1.03), including shop drawings, design calculations, and foundation loads sealed by an engineer licensed in California. Structural design criteria for the canopy, including superimposed dead load, roof live load, wind and seismic parameters, and foundation soil properties, are provided on Sheet SS001, Structural Design Parameters (Article 2.01). The foundations are shown on the structural drawings and shall be verified by the Contractor against the manufacturer’s actual loads (Article 1.03.G.3–4). VTA will not provide specific member sizes for the canopy framing. Member sizing and connection design are the responsibility of the pre-engineered building manufacturer.

  • Please advise on the joint layout for the structural slab. What are we to assume for expansion joints.

    Please refer to the Civil and Track Typical Sections, Sheet 15 - Sheet 22. 1" Expansion Joints w/ Joint Filler and Sealant (TYP) must be installed at all junctions of slabs and vertical surfaces per Section 03 15 00 2.01 B. This includes, but not limited to, slab junctions at existing concrete walls, existing foundations, new foundations, and as identified in the Contract Drawings. Section 03 30 00 1.05 B.1 states: Submit drawings that indicate the locations of all joints in concrete, including construction joints, expansion/isolation joints, and contraction/control joints. Section 03 35 00 3.03 D.1 additional states: Construction, expansion, isolation, and contraction joints will be located as indicated (per Contractors approved submittal). Construction joints will act as contraction joints. Where additional contraction joints are required to prevent shrinkage cracks, saw-cut such joints. All joints will be straight and true to line. Saw-cut joints not less than twelve hours nor more than twenty-four hours after placing concrete, unless otherwise approved by VTA.

  • Will a list of Prequalified Bidders be provided?

    VTA will not publish the approved Prequalified Bidders. Applicants/Bidders can seek in the "Followers" tab for the list of all Prime contractors.

Plain text

OpenGov categories

  • 236220 · Commercial and Institutional Building Construction
  • 237990 · Other Heavy and Civil Engineering Construction
  • 238110 · Poured Concrete Foundation and Structure Contractors
  • 238160 · Roofing Contractors
  • 238210 · Electrical Contractors and Other Wiring Installation Contractors
  • 238220 · Plumbing, Heating, and Air-Conditioning Contractors
  • 238290 · Other Building Equipment Contractors
  • 238910 · Site Preparation Contractors
  • 423850 · Service Establishment Equipment and Supplies Merchant Wholesalers