State and local · OpenGov
Heat Exchanger and Condenser Services
Description
The County of Orange, OC Public Works , (hereinafter referred to as County) is requesting competitive bids from qualified vendors (hereinafter referred to as Bidder) for Heat Exchanger and Condenser Services . The County has attempted to provide all information available. It is the responsibility of each Bidder to review, evaluate, and, where necessary, request any clarification prior to submission of a bid. The awarded Contract, (hereinafter referred to as Contract) will be between the County and awarded Bidder, (hereinafter referred to as Contractor) in accordance with the model contract terms, conditions and scope of work. This is a fully electronic solicitation – only electronic bids submitted through the County’s online bidding system will be allowed; no other form of bid submittals will be accepted. Prior to submitting a bid, Bidders are advised to carefully read the instructions below, including the model contract and any solicitation attachments and/or exhibits. For assistance on uploading proposals via County’s eProcurement Portal, please contact procurement-support@opengov.com or https://help.procurement.opengov.com/en/ . All questions or requests for interpretations must be received within this solicitation's Question & Answer section as specified in the solicitation. Respondents are not to contact other County personnel with any questions or clarifications concerning this solicitation. Maintenance/Repairs Labor Rates A. Straight Time Rate First 8 hours between 6:00 a.m. - 5:00 p.m. - Monday-Friday: Journeymen labor Non-Journeyman labor Overtime, Weekend and Emergency Repair Rate First 8 hours between 6:00 a.m. - 5:00 p.m. - Saturday -Sunday or any time after 8 hours of continuous labor: Journeymen labor Non-Journeyman labor Double time and Holidays National Holidays or any time after 12 hours of continuous labor Journeymen labor Non-Journeyman labor Material Costs (if applicable) Cost Plus % Mark-Up Miscellaneous Items Miscellaneous Items may be purchased against the Contract. County will obtain price quotes from Contractor for all miscellaneous items purchased. A. Parts and Materials purchased by the Contractor for services will be charged at the actual cost of the parts (including all applicable taxes) plus the percentage stated above. County will pay for all freight charges. Parts and Materials purchases shall not exceed $5,000, per item including tax, unless the following process is followed. B. Miscellaneous Items above $5,000 must be pre-approved by the Plant Manager or Designee prior to processing. The County will obtain price quotes from Contractor for all Miscellaneous Items purchased above $5,000. C. Contractor is to provide a copy of the suppliers and shippers invoice for all purchases made to complete each project, dumpsters shall fall under the category of straight reimbursement; delivery slips and vendor invoices will be required to be submitted with Contractors monthly invoice for any parts over $500. Misc. Equipment/Supplies Tool Truck TBD Travel (cost per mile from office to CUF that exceeds 20 miles) TBD Cost Plus % Mark-Up Misc. Equipment/Supplies Tool Truck Travel (cost per mile from office to CUF that exceeds 20 miles) Scope of Work Attachment A - Scope of Work Introduction/Background OCPW Central Utility Facility (CUF) provides various combinations of steam, cooling water, and electrical power to over twenty County, City, State, and Federal facilities in the Santa Ana Civic Center Campus. Contractor shall provide all labor, materials, tools, equipment and permits required to provide maintenance and repair services on plant Condenser and heat exchanger equipment. Scope of Work: Contractor is to provide all labor, tools, equipment, parts and material required to provide Heat Exchanger and Condenser Maintenance and Repair to all equipment at OCPW CUF. Preventative maintenance will be on an annual basis and repairs or replacement will be made on an “as-needed”. Contractor’s Responsibilities/Requirements Licensing/ Qualifications Contractor shall have been in business for a minimum of five (5) years and have their primary shop facility located within forty (40) miles of the CUF. Contractor must have at least three (3) active service agreements with other similar facilities The Contractor must possess and maintain a valid, active license in good standing with the California Contractors State License Board (CSLB) throughout the duration of the contract. The mandatory classifications required for this scope of work include: C-4 Boiler, Hot-Water Heating and Steam Fitting Contractor license C-61 / D-38 Sand and Water Blasting Contractor license B . Minimum Requirements Contractor must have the financial stability to provide the services specified in this Contract for a period of 2 (two) months, as first payment will not be due for 2 months in accordance with Attachment B, Section VI. C. General Requirements There is limited parking available at the CUF and at no charge. Any parking fees incurred during the performance of the work shall be paid by the Contractor. Unless approved in advance, County facilities shall not be used for storage of any materials, tools or equipment used to perform the work. The County reserves the right to use alternate resources for completion of the work, to obtain competitive bids on any work, and to utilize information obtained under this Contract relative to necessary materials and equipment. When applicable, the contractor shall warrant all materials and labor for one (1) year after completion and acceptance of maintenance and/or repair work (or in accordance with the manufacturer’s warranty of longer than one (1) year. Have available sufficient labor, equipment, tools, materials, and permits to order and accomplish emergency and routine, scheduled service upon notification to proceed without delay or interruption. All personnel shall be qualified, knowledgeable, and experienced in the specific type of work and specific equipment covered under this Contract. Ensure that all technical and regulatory requirements are satisfied and that all work is fully completed All work shall be subject to inspection and approval of the County by either the CUF Plant Manager or designee. All work must be inspected and approved prior to acceptance and approval for payment. All records shall be the property of the County, and the Contractor shall not remove, duplicate, or disseminate the information contained in these records without the express written approval of the County. Utilize only personnel who are direct employees of the Contractor. The use of any subcontractor or subcontractor’s personnel shall have the approval of the CUF Plant Manager or designee prior to the start of any work. Complete work within regular County working hours, unless otherwise approved and/or directed by the Plant Manager. CONTRACTOR’S PERFORMANCE REQUIREMENTS General Conditions With the CUF Plant Manager or designee, discuss details of the project and coordinate the work and schedules prior to any scheduled maintenance and repair project. Review the manufacturer’s service manuals for equipment specifications and proper testing/repair procedures. Maintain a reasonable supply of parts necessary to perform work under this Contract. Ensure all parts used in performance of this work are new and meet or exceed original equipment manufacturer's specifications. Any parts other than those manufactured by the original equipment manufacturer shall be approved by the County before they are incorporated in the work. Provide periodic maintenance and inspections to include, but not be limited to, equipment replacement, frequency-based maintenance, routine checks, and repairs. Provide final reports listing all maintenance performed, recommendations for service, and a schedule for the next maintenance to be performed. Provide updated as-built drawings whenever work that modifies the equipment/system is performed. As-built drawings shall be in a format approved by the County . Contact the Plant Manager or representative, provide a written not-to-exceed cost proposal (labor, equipment, materials, working hours, etc.), and obtain written County approval prior to proceeding with the work. Prepare and submit a written report (work order or service ticket, for example) for each service and repair to include date/time of service, work performed, additional work required, labor hours, materials, recommendations, cost breakdown, and the next maintenance to be performed. Perform all work in accordance with standard industry practice and in compliance with all local, state and/or federal laws and regulations and/or County standards, whichever is stricter. Furnish, install, and maintain all warning devices, barricades, etc. required to adequately protect the public, County personnel, Contractor personnel, and others during the performance of the work. Contractor shall repair, replace, or have the cost of repair or replacement deducted from its payment, at the discretion of the Plant Manager, all damages sustained to County equipment or facilities as a result of the Contractor’s operations. Contractor shall be cooperative with County staff u General Information Background OCPW Central Utility Facility (CUF) provides various combinations of steam, cooling water, and electrical power to over twenty County, City, State, and Federal facilities in the Santa Ana Civic Center Campus. Contractor shall provide all labor, materials, tools, equipment, and permits required to provide maintenance and repair services on plant Condenser and heat exchanger equipment. Important Notice The County has attempted to provide all information available. It is the responsibility of each Bidder to review, evaluate, and, where necessary, request any clarification prior to submission of a bid. If any person contemplating submitting a bid in response to this IFB is in doubt as to the true meaning of any part of the solicitation documents attached hereto or finds discrepancies in or omissions from the specifications, they must submit a written request for clarification/interpretation to the County Deputy Procurement Agent (DPA), Diana Bagh , via the County’s online biding system. Clarification/Interpretation If clarification or interpretation of this solicitation is considered necessary by County, a written addendum shall be issued and the information will be posted on County’s online bid system. Any interpretation of, or correction to, this solicitation will be made only by addendum issued by the County DPA. All addenda will be submitted and posted on the County’s online bidding system. It is the responsibility of each Bidder to periodically check the County’s online biding system to ensure that they have received and reviewed any and all addenda to this solicitation. The County will not be responsible for any other explanations, corrections to, or interpretations of the documents, including any verbal information. All questions or requests for interpretation must be received within this solicitation's Question & Answer section by Monday, November 23, 2026 before 2:00 pm . Communication Bidders are not to contact other County personnel with any questions or clarifications concerning this solicitation. All questions regarding this solicitation must be submitted via the Question & Answer section of this solicitation within the County’s eProcurement Portal at: https://procurement.opengov.com/portal/ocgov . Any County response relevant to this solicitation other than through or approved by County is unauthorized and will be considered invalid. County's Deputy Procurement Agent, Diana Bagh , diana.bagh@pw.oc.gov , will provide all official communication concerning this solicitation. Bid Validity Bids will be valid for a period of 365 days after IFB closing date. Lobbyists County of Orange does not require and neither encourages or discourages the use of lobbyists or other consultants for the purpose of securing business. ORANGE COUNTY BOARD OF SUPERVISORS AND COUNTY AGENCY OFFICERS Board of Supervisors Janet Nguyen, First District Vicente Sarmiento, Second District Donald P. Wagner, Third District Doug Chaffee, Fourth District Katrina Foley, Fifth District County Agency Officers Claude Parrish, Assessor Hugh Nguyen, Clerk-Recorder Todd Spitzer, District Attorney-Public Administrator Don Barnes, Sheriff-Coroner Shari L. Freidenrich, Treasurer-Tax Collector Andrew Hamilton, Auditor-Controller General Instructions Review Before submitting a bid, Bidders shall carefully review the General Instructions and examine the solicitation contents, including the Model Contract Terms, Conditions and Scope of Work. Bidders shall include in their bid response a monetary sum to cover the cost of all items included in the Contract. The Model Contract contained in this solicitation is the Contract proposed for execution. Upon award, awarded Bidder will be required to sign and submit Contract for execution. Responsiveness Responsive bids shall include completed submittals/attachments provided in the Supplier Responses. Bid Submission Electronic Bids shall be submitted via the County’s online bidding system via the following link https://procurement.opengov.com/portal/ocgov . All required sections of the IFB as listed above, must be submitted via the County’s eProurement Portal. Bidder is solely responsible for “on time” submission of their electronic bid. The County will not accept late bids and no exceptions shall be made. County will only receive those bids that were transmitted successfully. Note: Electronic Bids cannot be viewed by County until after the solicitation deadline. If you encounter any problems with your registration, system, bid submission, or other system issues, please contact OpenGov’s support staff via the live chat option or via email at procurement-support@opengov.com . Pricing Bid Prices: The bid prices quoted on this solicitation shall be firm for the entire contract term of the awarded Contract. Addenda: Bid prices offered shall reflect all addenda issued by County. Scope of Work: Bids shall be submitted only for the items and/or services as stated in the Scope of Work, Attachment A of Model Contract; bids for other than the items and/or services listed will not be considered. Firm Prices : The County will only consider firm price bids. Profit: The net amount of profit will remain firm for the entire term of the Contract. Contract adjustments which increase Contractor’s profit will not be allowed. Price Decreases: All price/rate decreases will automatically be extended to the County. Please reference Paragraph – Price Increase/Decrease provision for additional information. Acceptance: Bids must be provided for each item separately, “ all-or-none ” bids will not be accepted unless in the best interest of the County. Substitutions Bids offering equivalent items meeting the standards of quality specified in the solicitation may be considered, unless otherwise specified, providing the bid clearly describes the article offered and how it differs from the specified brand. Unless Bidder specifies otherwise, it is understood that the Bidder is offering the brand item as specified in the solicitation. If Bidder bids an “equal,” Bidder must state the brand name and must submit complete specifications and/or provide samples with the bid. Determination of equality shall be at the sole discretion of the County. If it has been justified and accepted by the requesting agency/department and/or a County standards committee that only one brand can meet the County’s requirements, “no exceptions” shall be noted in the specifications. All requests for substitutions must be submitted within the Question and Answer period and upon approval by the County, the bidder shall include the approved substitution in the Pricing table for the item(s). Discrepancies Bidder shall take all responsibility for any errors or omissions in their bids. Any discrepancies in numbers or calculations shall be interpreted to reflect the lowest price to the County. If prior to contract award, a Bidder discovers a mistake in their bid which renders the Bidder unwilling to perform under any resulting contract, the Bidder must immediately notify the buyer and request to withdraw the bid. It shall be solely within the County's discretion as to whether withdrawal will be permitted. If the solicitation contemplated evaluation and award of "all or none" of the items, then any withdrawal must be for the entire bid. If the solicitation provided for evaluation and award on a line item or combination of items basis, the County may consider permitting withdrawal of specific line item(s) or combination of items. Bid Expenses The County shall not be liable for any expenses incurred by potential Contractors in the preparation or submission of their bids. Pre-contractual expenses are not to be included in the Contractor’s Pricing Sheet. Pre-contractual expenses are defined as, including but not limited to, expenses incurred by Bidder in: Preparing its bid in response to this IFB. Submitting that bid to the County. Negotiating with the County any matter related to the bid; and, Any other expenses incurred by the Bidder prior to the date of the award and execution, if any, of the Contract. Award Upon recommendation of Contract award, Bidder will be required to submit the following documents within seven (7) days of County notification, unless otherwise specified in the solicitation: Insurance : Certificate(s) of Insurance, including additional Insured Endorsement(s); refer to Model Contract, Article-Insurance W-9 Form : Current signed W-9 (Taxpayer ID No & Certification), which includes Contractor’s Legal Business Name(s). Out of State Suppliers are required to submit a 587/590 Form. Acceptance/Rejection/Award Bids submitted in response to this IFB may become subject to public disclosure under the California Public Records Act, and other applicable law. The County shall not be liable in any way for disclosure of any such records. Additionally, all bids shall become the property of the County. The lowest responsive, responsible Bidder will be recommended for contract award. Bids will be reviewed by the County for responsiveness to all requirements. The County has the right to reject any bid deemed unresponsive or lacking the resources or experience to adequately perform the services described herein. Only those responsible, responsive bids meeting all solicitation requirements and specifications shall be further reviewed for consideration for award. Award shall be based on the lowest, responsive, responsible bid. Please take notice, non-acceptance of the County of Orange terms and conditions, incorporated in model contract, may deem a bid non-responsive. County may not accept any other terms, conditions, or provisions contrary to those contained within this solicitation. Final award determination shall be based upon the lowest responsive, responsible bid, and may also include a review of Bidder’s ability to meet the requirements and perform the services specified in this solicitation; Bidder’s references and past performance; and Bidder’s acceptance of County of Orange terms and conditions. By submitting a response to this solicitation, Bidders agree to accept the decision of the County DPA as final. Awarded Bidder will be required to sign a contract upon award. If Bidder is a corporation, signature will be provided in accordance with the corporation’s code as specified in this solicitation. Rights Reserved to County The County reserves the right to: Request a sample for determining equality with the specified brand. Waive, at its discretion, any non-material defects, irregularity, or informality, which Co
OpenGov categories
- 40101802 · Heat exchangers
- 41104814 · Laboratory heat exchange condensers
- 72101511 · Air conditioning installation or maintenance or repair service
- 72154102 · Heat exchanger maintenance or repair service