State and local · OpenGov
HIGHLAND WAY PM 5. 60 AND 5. 80 STORM DAMAGE REPAIR PROJECTS, FEDERAL PROJECT No. ER- 15J2 (005 & 006)
Description
The County of Santa Cruz, Department of Community Development & Infrastructure is accepting sealed bids for the HIGHLAND WAY PM 5.60 AND 5.80 STORM DAMAGE REPAIR PROJECTS, FEDERAL PROJECT No. ER-15J2 (005 & 006) Bid opening will occur on Thursday, February 11, 2027 no later than 2:00 pm and soon thereafter, will be publicly opened and read. Highland Way PM 5.60 CONSTRUCTION AREA SIGNS TRAFFIC CONTROL SYSTEM TEMPORARY TRAFFIC STRIPE (PAINT) TEMPORARY RAILING (TYPE K) CHANNELIZER (SURFACE MOUNTED) TEMPORARY CRASH CUSHION MODULE WATER POLLUTION CONTROL PROGRAM TEMPORARY REINFORCED SILT FENCE CONTRACTOR-SUPPLIED BIOLOGIST (LS) CLEARING AND GRUBBING (LS) ROADWAY EXCAVATION STRUCTURE EXCAVATION (SOLDIER PILE WALL) STRUCTURE BACKFILL (SOLDIER PILE WALL) CONCRETE BACKFILL (SOLDIER PILE WALL) LEAN CONCRETE BACKFILL STEEL SOLDIER PILE (W14x68) 30" DRILLED HOLE TIMBER LAGGING GEOCOMPOSITE DRAIN CLEAN AND PAINT STEEL SOLDIER PILING GUARD RAILING DELINEATOR MIDWEST GUARDRAIL SYSTEM (STEEL POST) ALTERNATIVE IN-LINE TERMINAL SYSTEM (TL-2) ROLLED EROSION CONTROL PRODUCT (JUTE MESH) FIBER ROLLS HYDROSEED COLD PLANE ASPHALT CONCRETE PAVEMENT HOT MIX ASPHALT (TYPE A) PLACE HOT MIX ASPHALT DIKE (TYPE F) PLACE HOT MIX ASPHALT DIKE (TYPE C) CLASS 2 AGGREGATE BASE (CY) MISCELLANEOUS IRON AND STEEL GABION ROCK SLOPE PROTECTION FABRIC (CLASS 8) STRUCTURAL CONCRETE, DRAINAGE INLET MODIFY DRAINAGE STRUCTURE VEGETATION CONTROL MAT (RUBBER OR FIBER) DITCH EXCAVATION THERMOPLASTIC TRAFFIC STRIPE MOBILIZATION Highland Way PM 5.80 CONSTRUCTION AREA SIGNS TRAFFIC CONTROL SYSTEM TEMPORARY TRAFFIC STRIPE (PAINT) TEMPORARY RAILING (TYPE K) CHANNELIZER (SURFACE MOUNTED) TEMPORARY CRASH CUSHION MODULE WATER POLLUTION CONTROL PROGRAM TEMPORARY REINFORCED SILT FENCE CONTRACTOR-SUPPLIED BIOLOGIST (LS) CLEARING AND GRUBBING (LS) ROADWAY EXCAVATION STRUCTURE EXCAVATION (SOLDIER PILE WALL) STRUCTURE BACKFILL (SOLDIER PILE WALL) CONCRETE BACKFILL (SOLDIER PILE WALL) LEAN CONCRETE BACKFILL STEEL SOLDIER PILE (W14x68) 30" DRILLED HOLE TIMBER LAGGING MISCELLANEOUS IRON AND STEEL 12" PLASTIC PIPE DOWNDRAIN GEOCOMPOSITE DRAIN CLEAN AND PAINT STEEL SOLDIER PILING ROLLED EROSION CONTROL PRODUCT (JUTE MESH) FIBER ROLLS HYDROSEED 18" PLASTIC PIPE COLD PLANE ASPHALT CONCRETE PAVEMENT HOT MIX ASPHALT (TYPE A) CLASS 2 AGGREGATE BASE (CY) PLACE HOT MIX ASPHALT DIKE (TYPE A) GABION ROCK SLOPE PROTECTION FABRIC (CLASS 8) STRUCTURAL CONCRETE, DRAINAGE INLET CABLE RAILING DELINEATOR (CLASS 1) DITCH EXCAVATION THERMOPLASTIC TRAFFIC STRIPE MOBILIZATION Project Details Proposal Instructions Bidders shall create a free of charge account via the online procurement portal, OpenGov Procurement by signing up at https://procurement.opengov.com/signup . For additional information on account registration, see https://opengov.my.site.com/support/s/ Once account registration is completed, browse back to this page, https://procurement.opengov.com/portal/santacruzcounty , click on the “ HIGHLAND WAY PM 5.60 AND 5.80 STORM DAMAGE REPAIR PROJECTS, FEDERAL PROJECT No. ER-15J2 (005 & 006) ”, "Submit Response", and follow the instructions to submit the electronic bid. Only electronic proposals will be accepted. Proposal forms for this work must be uploaded via the online procurement portal, OpenGov Procurement. Copies of the forms are included in a separate book entitled: Book 1 of 2 Bid Book For Construction of HIGHLAND WAY PM 5.60 AND 5.80 STORM DAMAGE REPAIR PROJECTS, FEDERAL PROJECT No. ER-15J2 (005 & 006) Cashier's check or certified check, payable to the order of the County of Santa Cruz, of not less ten percent (10%) of the bid submitted, payable to the County of Santa Cruz and signed by the bidder as well as a corporate surety, shall accompany the bid. Bidder’s bonds shall be issued by a corporate surety duly admitted and authorized to issue bonds and undertakings by the State of California. Scan and upload a copy of your bid bond/cashier's check via the online procurement portal, OpenGov. No later than 4 p.m. on the 5th business day after bid opening, please mail the original Proposal forms, remaining Proposal forms due as stated in Section 2, and the bid bond/cashier's or certified check to the Contract Analyst , Rosa Ortiz ; Attn: Rosa Ortiz County of Santa Cruz, Department of Community Development & Infrastructure, Public Works Bid Proposal for HIGHLAND WAY PM 5.60 AND 5.80 STORM DAMAGE REPAIR PROJECTS, FEDERAL PROJECT No. ER-15J2 (005 & 006) 701 Ocean Street, Room 410 Santa Cruz, CA 95060 Any questions concerning the bid process, required submittals, evaluation criteria, bid schedule, and selection process should be sent through OpenGov. General Work Description The project is located in the County of Santa Cruz as follows: In the unincorporated area of the County of Santa Cruz, along Highland Way at Post Mile (P.M.) 5.80 and 5.60. Work includes construction of retaining walls to repair storm damage. Major work includes, but is not limited to: Soldier pile retaining wall (2) with timber lagging Midwest guardrail, Asphalt pavement, Erosion control and re-vegetation Traffic Control For the Federal training program, the n umber of trainees or apprentices is 0 . Federal-aid project No.: ER-15J2 (005 & 006) . Complete the work within 75 working days. Do not include plant establishment working days in your bid. The estimated cost of the project is $640,000.00 . Contract Documents A digital copy of the Contract documents is available free of charge and can be downloaded, see Attachments . A hard copy of the Contract documents is available for purchase for $75.00 at the County of Santa Cruz, Department of Community Development & Infrastructure, Public Works, Room 410, 701 Ocean Street, Santa Cruz, California. No partial sets will be issued. Introduction Summary Background Contact Information Timeline Vendor Submissions Pricing Proposal Attachments
Published attachments
- PLANS_HIGHLAND WAY PM 5.6
- PLANS_HIGHLAND WAY PM 5.8
- CEQA - Highland Way 5.6 & 5.8
- TCE Contract Highland Way PM 5.80 (Myers_Loi) _Fully.Ex
- TCE Contract_Highland Way PM 5.60 (Myers_Loi)_Fully executed
- NEPA CE_PR_15J2 (005)_Highland Way 5.6
- FYLF CRLF measures
- NEPA_CE-15J2 (006)_Highland Way 5.8
- Geotechnical Report Highland Way PM 5.6-FINAL
- Geotechnical Report Highland Way PM 5.8-FINAL
- HIGHLAND WAY 5.60 & 5.80 BOOK 1 OF 2_FINAL_20261007
- HIGHLAND WAY 5.60 & 5.80 BOOK 2 OF 2_FINAL_20261007
Addenda and notices
Official Notice #1: Delayed Bid Opening · 1
The bid opening for this project has been delayed and is tentatively scheduled for February 2027. An addendum will be released shortly stating the revised bid opening day and time.
Addendum #1 · 1
Addendum No. 1 has been issued for this project.
Public questions and answers
Is it possible to move the dates for 2 of the 3 bids that currently scheduled for Nov 5, that is a lot for a small business to close out 3 bids on same date.
Bid openings have been delayed, Highland Way PM 5.60 and PM 5.80 bid opening will now occur February 11, 2027. See Addendum No. 1 issued November 4, 2026.
What is the anticipated start date for this project?
The Contractor shall begin work per section 8-1.04 START OF JOB SITE ACTIVITIES. Contract Execution typically occurs withing 5-7 weeks after bid opening. Section 8-1.06 and 8-1.07 Provides standard language on SUSPENSIONS AND DELAYS. In the event that weather is unfavorable to complete work you may coordinate with the resident engineer to suspend job site activities until weather allows work to be completed.
Book 2, page 68, identifies October through May as the typical wet season and discusses special requirements for wet-weather earthwork, including full-time observation by an engineer experienced in those conditions. Is the engineer furnished by the county or contractor?
A County Resident Engineer will provide administration of the project during the wet season (October through May). Should earthwork during this time be unavoidable, earthwork activities must be approved by the Resident Engineer and scheduled with the Resident Engineer.
Can uninterrupted drilling and concrete placement exceed the specified 30-minute closure limit?
Please refer to Book 2 of 2, Special Provisions and Notice to Bidders, Section 12-4.01. Contractor may continue work exceeding 30 minutes if no traffic is accumulating within the project limits. Accumulated traffic within the project limits must be able to pass through the work zone and must not accumulate for more than 30 minutes at a time. Flaggers must be present to monitor traffic conditions.
Does form 9-L need to be submitted with the bid package? Please provide timeframe for when you need this form submitted.
Exhibit 9-L: Bidder's/Proposer's List will be due at the time of bidding and should be submitted with the bid package. An Addendum will be issued revising the Bid Form Submittal Schedule table in Section 2-1.33B(2)(c)(ii) to include Exhibit 9-L.