State and local · OpenGov
Highway 195 Ground Storage Tank
Description
BID NO. 27-16 Highway 195 Ground Storage Tank CITY OF KILLEEN, TEXAS The City of Killeen will receive sealed bids for 27-16 , Highway 195 Ground Storage Tank electronically through the City’s eProcurement Portal or addressed to the City of Killeen, Attn: Purchasing Division, 802 N. 2nd Street, Building G, Killeen, Texas 76541, until 3:00 pm on Tuesday, December 1, 2026 . Mailed or hand delivered bid submissions must be sealed and plainly marked with the name and address of the bidder and “ BID NO. 27-16 , Highway 195 Ground Storage Tank , 3:00 pm on Tuesday, December 1, 2026 ”. Submittals received after the closing time will be returned unopened. Vendors may register and submit bids electronically at https://procurement.opengov.com/login . Bids will be opened and read aloud through Zoom online video conferencing promptly after 3:00 pm on Tuesday, December 1, 2026 ; A brief delay may occur due to processing of hand-delivered submissions or technical difficulties. Zoom access is shown below. The general public will not be allowed inside the facility. Zoom access: For viewing follow; https://us02web.zoom.us/j/3397887656?pwd=Z0VWU1czOGRpQ245enJWS1hCSnJJUT09 Call: 1-346-248-7799 Meeting ID: 339 788 7656 Password: 04142020 A Mandatory pre-bid meeting and site visit will be held on Tuesday, November 10, 2026 at 2:00 pm located at Transportation Conference Room 3201-A South W. S. Young Drive Killeen Texas 76542 . Bid questions will be accepted on the OpenGov e-bidding site , until 3:00 pm on Tuesday, November 24, 2026 . Questions will be answered in the form of an addendum and posted on the OpenGov E-Bidding site . It is the bidder’s responsibility to obtain and acknowledge all addendums. Complete information regarding this solicitation may be obtained from the City of Killeen website ( https://www.killeentexas.gov/414/Purchasing) and OpenGov E-Procurement Portal ( https://procurement.opengov.com/login) . The City of Killeen reserves the right to reject any or all bids and waive any irregularities. CITY OF KILLEEN, TEXAS Sophonia Price Director of Procurement and Contract Management Total Mobilization Payment (4% of total bid) Access Road Improvements Lead Paint Test Demolition of the Existing Tanks and Foundation Site Grading SWPPP Erosion/Sedimentation Control Yard Piping Fire Hydrant Assembly with Gate Valve 24" Butterfly Valve Valve Vault with Hatch, sump, and sump pump Connect to Existing Waterline Trench Safety Plan Chain Link Fence with Mow Strip Gate 2.6 MG Ground Storage Tank Site electrical - Conduit, Wire, Duct banks, etc. Lighting SCADA and Communication System 80ft Antenna Tower with Foundation Instrumentation Mixer with injection stem and tubing Electrical Building and Foundation (Including all hardware) Miscellaneous Construction Items (10% of total) Bid Form NOTE – CITY-ESTABLISHED UNIT COSTS Certain bid items have City-established unit costs that are not to be modified by the bidder. These amounts will be included in the total bid price for evaluation purposes. All remaining unit costs are to be completed by the bidder. Bid Item 24 – City-Established Unit Cost Miscellaneous Construction Items (Allowance) Quantity: 1 LS Unit Cost: $250,000.00 Vendor Questionnaire Vendors must provide complete and accurate responses to all questions in this questionnaire, including any required confirmations and the upload of all specified supporting documents (e.g., forms, attachments, and templates). All required fields, checkboxes, and uploads must be addressed. Failure to fully answer any question, provide required confirmations, or include all requested documentation may render your submission non‑responsive and subject to disqualification from further consideration in the solicitation process. Attachments
Published attachments
Addenda and notices
Addendum #1 · 1
Updated Timeline: Question and Answer: November 24, 2026 at 3:00pm Submissions Deadline: December 01, 2026 at 3:00pm Please use the See What Changed link to view all the changes made by this addendum.
Official Notice #1: 11.10.26 Mandatory Pre-Bid meeting and Site visit · 1
Attached is the sign in sheet and the agenda for the Mandatory Pre-Bid meeting held 11.10.26 at 2pm
Official Notice #2: Supplemental Copies of Vendor Questionnaire Documents · 2
The documents included with this notice are provided as supplemental copies of the documents referenced in the Vendor Questionnaire. Vendors are still required to access the Vendor Questionnaire, review the applicable requirements, complete the required documents, and attach them to their bid submission as instructed. This notice is provided for convenience and does not replace or modify the solicitation requirements.
Addendum #2 · 2
The following clarification and revised Bid Proposal form are issued as part of this Addendum: 1. Bid Proposal Form – Bid Item 24 The City has established a fixed unit cost of $250,000.00 for Bid Item 24 – Miscellaneous Construction Items (Allowance). This amount is not to be modified by the bidder and will be included in the total base bid for evaluation purposes. 2. Electronic Bid Submission Bidders must enter their unit prices electronically in OpenGov for Bid Items 1 through 23 . Bid Item 24 is City-established at $250,000.00 and is not to be modified. The attached revised Bid Proposal form reflects this change and replaces the previously provided form. All other solicitation requirements remain unchanged.
Public questions and answers
Will the district consider a welded steel tank bid alternate?
The City of Killeen will not accept a welded steel tank as an alternate. Proposals must comply with the tank type and construction requirements specified in the solicitation.
Will you consider moving the bid date to Dec 3 2026?
Please refer to Addendum #1 for updated timeline.
Drawing C7 and Section 33 16 13, Paragraph 2.2.E.1.a specify an 8-inch drain line, whereas Drawing Sheet C9, Detail 3 indicates a 6-inch gate valve at the splash pad. Please specify the tank drain pipe invert elevation, centerline elevation, and discharge location. Also confirm the intended function of the 6" gate valve shown on 3/C9.
The gate valve shall be 8” to match the drain line size. Plan revision will be issued. The elevation of the drain line shall be as low as it can be installed to allow most of the tank drain by gravity.
General Conditions Article 6.08 and Section 209.3: Please provide a list of applicable permits and associated fees required for this project, and confirm whether the City permit, plan review, and inspection fees are waived or must be included in the bid.
The City will take care of all permits and permit fees; therefore, the contractor is not responsible for these.
General Conditions Article 6.01.B: Please confirm that the subcontractor's supervisor may serve as the onsite representative when the tank contractor is not actively performing work onsite.
Subcontractor's supervisor may serve as the onsite representative when the tank contractor is not actively performing work onsite.
Supplementary Conditions Section 15, Sheet G1 Note 20, and Section 33 16 13 Paragraph 3.7.D.1.a: Please confirm whether the Owner will provide water for initial watertightness test and disinfection at no cost to the Contractor, and identify approved connection locations and any applicable fees.
City will provide water for initial testing and disinfection at no cost to the contractor. Contractor is responsible for the disinfection and shall submit detailed outline of the disinfection procedure per Spec. 33 16 13.
Please provide the Engineer's Opinion of Probable Cost or estimated project budget if available.
Engineer’s opinion of probable cost is $4.97M without miscellaneous construction items.
Supplementary Conditions Item 16 and Sheet E1.2 General Note 6: Please confirm the availability of temporary electrical power at the site (voltage, amperage, connection location) or confirm if the Contractor must provide generators.
Both existing power poles on site have a single-phase transformer with 120-240 secondary voltage which can be used to set up temporary power for construction.
When do you anticipate issuing the Notice to Proceed (NTP)?
The bid award is scheduled to go to Council on 1/5/27 with a NOA following shortly after that date. A NTP will be issued after contracts are processed, hopefully by the end of January.
When do you anticipate issuing the Notice of Award (NOA)?
The bid award is scheduled to go to Council on 1/5/27 with a NOA following shortly after that date.
Please confirm whether American Iron and Steel (AIS), Build America, Buy America (BABA), the Buy American Act, or other domestic material requirements apply to this project.
There is no AIS or BABA required for this project.
Drawing C8 Notes 1 and 2: Please clarify the basis of payment should rock excavation exceed the depths anticipated by the Geotechnical Report, and confirm whether a unit-price item or Change Order will be provided for removal and replacement of unsuitable material encountered beyond the contract limits.
The Geotechnical Report indicates limestone/rock extending to the maximum depths explored, including depths of approximately 35ft and 50ft, and Note 2 indicates that variations in limestone depth may occur. Rock excavation required within the Contract limits shall be considered included in the bid, and no separate unit-price item will be provided for rock excavation. If unsuitable material is encountered that requires excavation and replacement beyond the limits indicated by the Contract Documents, such additional work shall be performed only as authorized by the Owner/Engineer and will be addressed in accordance with the Contract provisions for changes in the Work.
Geotechnical Report (Table 1 and Addendum II): Please confirm whether the 4,000 psf allowable bearing capacity applies uniformly beneath both the membrane floor slab and the perimeter footing. Also, please advise whether deeper embedment of the perimeter footing into competent limestone would permit a higher allowable bearing capacity. If so, provide the allowable bearing pressure, required embedment, and associated total and differential settlement estimates.
The 4,000 psf allowable bearing capacity applies beneath both the membrane floor slab and the perimeter footing. The RQD values of the limestone rock cores in the upper 15 feet of the logs are relatively low (ranging from 0 to 65); therefore, we would not recommend higher allowable bearing pressures at deeper embedment depths.
Groundwater was not encountered during the geotechnical investigation. Please confirm the design groundwater elevation and whether the tank must be designed to resist hydrostatic uplift under empty-tank conditions.
Based on the location of the tank, the tank is unlikely to experience the hydrostatic uplift.
Drawing C8: Please confirm no perimeter drain is required for the prestressed concrete ground storage tank.
There is no perimeter drain required for the ground storage tank.
Drawing C7 shows a sump but does not indicate a sloped floor. Please confirm whether the floor is sloped toward the sump and whether the FFE 1071.50 represents the high or low point of the tank floor. If floor is sloped from the center toward the perimeter, confirm the required slope percentage.
The tank floor doesn’t have to be sloped, the sump is used to help drain the remaining water from the tank.
Specification Section 33 16 13, Paragraph 2.2.D.1.b: Please confirm Type IL cement may be utilized as it is currently the industry standard.
Type IL cement is acceptable.
Drawing C5, Drawing C9, Section 09 96 00 Paragraph 3.10, and Section 601.5.C: Please confirm that interior and underfloor ductile iron piping fully encased in concrete does not require an exterior epoxy coating.
No epoxy coating is needed for fully concrete encased ductile iron pipe.
Drawing C7 and Drawing C9: Please confirm that through-floor piping locations may be adjusted as required by the tank manufacturer for constructability and footing clearance while maintaining hydraulic performance.
Through-floor piping locations may be adjusted as required by the tank manufacturer for constructability and footing clearance while maintaining hydraulic performance.
Drawing C9 Detail 2: The 24-inch inlet/outlet underfloor piping centerline is 6.8 feet below finished floor elevation. Please consider raising the piping to approximately 3 to 4 feet below FFE or provide an alternate foundation detail.
24-inch pipe can be raised, but it has to meet min. 42-inch depth of cover for the portion outside the tank.
Drawing C7, Drawing E5.0, and Section 33 16 13 Paragraph 2.2.E.1.g: Please confirm the tank will receive penetrations/wall taps for a pressure transducer, chlorine analyzer, and visual level gauge, and confirm they should be included under Bid Item 21 - Instrumentation. In addition, confirm one E&H Micropilot FMR20B radar level sensor is also required and is to be mounted on the underside of the roof hatch or requires a separate dome penetration.
Radar type level sensor will be used instead of level transducer penetrating through the tank wall. 4 sample tabs are needed per sheet C7. Level transducer and water sample tabs are for future use. Only chlorine analyzer and visual gauge will be needed and those are covered under bid item 21.
Drawing E3.1, Drawing E5.0, and Bid Items 19 and 21: Please clarify the scope of work and limits of responsibility for the Contractor versus CPUSA or the Owner regarding instrumentation, SCADA, RTU panels, and communication accessories.
Electrical GC is responsible for furnishing and installing all conduit and conductors associated with SCADA, communications, and instrumentation systems, while City intergrader will provide device terminations, programming, startup, testing, and commissioning. This would also include the polyphaser equipment, coaxial cable terminations, and associated junction boxes. Regarding the radio antenna work, GC will be responsible installing the towner, City would be responsible for climbing the tower and setting/adjusting the antennas.
Please identify all required conduit, cable, and mixer penetrations through the tank roof or wall and confirm that all required sleeves/nozzles are shown in the Contract Documents.
Required conduits/cable/penetrations include Radar type level sensor, mixer, flexible tube for future chloramine injection, min. 4 sleeves are needed. 4 sample tabs are needed per sheet C7 on the tank side wall.
Drawings G2 and G6; Bid Item 2: Please clarify whether Access Road Improvements include permanent upgrades along the entire access road or only improvements necessary for construction access with subsequent restoration to existing condition.
As discussed during the pre-bid meeting, contractors are responsible for assessing site access and identifying any required access road improvements prior to submitting their bids. Please refer to the project plans and specifications for applicable requirements. The access road improvements are for construction access but will be left in place after the project is complete.
Bid Item 6: Please clarify the scope of bid item 6 (SWPPP), and whether the Contractor is responsible for preparing, permitting, implementing, and inspecting the SWPPP.
Contractor shall be responsible for preparing and implementing SWPPP. No additional permit is needed. City inspector will perform routine inspection on the implantation of SWPPP.
Section 33 16 13 Paragraph 3.3.A.2 vs Drawing G1 Note 11 and Sections 302/303: Please clarify whether stripped topsoil is to be stockpiled for reuse on site or removed and disposed of off-site.
Stripped topsoil can be reused and excessive topsoil will need to be removed and disposed off-site.
Drawing C1: Please provide the voltage of the existing overhead power lines that will remain during construction, and indicate whether these lines will be de-energized during construction. Also confirm the power lines that are to be relocated will be de-energized prior to Contractor mobilization.
As discussed during the pre-bid meeting, the maximum allowable power outage is 30 minutes. Additional clarification regarding existing overhead power line voltage, de-energization, and relocation requirements will be provided by the Engineer.
Drawing C1, Demolition Note 11: Please confirm whether the Owner will completely drain the existing tanks before Contractor mobilization. Provide any available information on the quantity and characterization of sediment/sludge remaining in each tank, and clarify responsibility for removal and disposal of residual water and sediment/sludge, including any required testing or disposal restrictions.
Both existing tanks are not in service. There might be some rainwater at the bottom of the tanks. Quantity of sediment/sludge is unknown. Contractor shall be responsible for removing any sediment/sludge remaining in each tank.
Drawing C1 requires paint analysis for lead/asbestos before demolition. Please confirm whether lead/asbestos abatement and disposal (if deemed necessary) will be compensated via Change Order or is covered under Bid Item 24.
It would be compensated via either CO or Bid Item 24.
Drawing C1: Please clarify whether existing tank foundations must be completely removed or only removed to a certain depth below grade, and provide available as-built drawings and foundation dimensions for the existing tanks, if available. Also confirm the entire tank ring wall(s) must be removed, or only portions that conflict with proposed yard piping and tank foundation.
Please follow the note on sheet C1 “Contractor to remove top 2ft of ring wall outside the proposed tank footprint”. For the portion overlapping with the proposed tank foundation, contractor shall remove necessary depth of existing ring wall to give enough space for the construction of the new tank foundation.
Drawing C1: Please confirm whether oiled sands are present beneath the existing tank foundations, and if present, provide handling, disposal, and payment terms for removal and replacement.
We don’t have good records of the existing tanks. If oiled sand is present once existing tanks have been removed. Contractor shall notify the owner immediately and send the proposal for testing and disposal of oiled sand. Testing has to be done by environmental consultant, and disposal shall follow environmental consultant’s recommendation.
Specification Section 33 16 13 Paragraphs 1.5.A.11 and 2.2.D.7.e.2)(3): Please confirm one logo is required on the tank, and provide artwork and dimensions if possible.
Only one logo is required with min. 20 ft wide by 24 ft high. Contractor shall provide dimensioned drawing of the tank with logo to the City to confirm the exact dimension. Logo shall face SH195.
Drawing Sheet C10, Detail 3: Please confirm standard mill-finish aluminum pipe is acceptable in lieu of an anodized finish for the dome handrail.
We would prefer anodized aluminum for better durability.
Specification Section 33 16 13 Paragraph 2.2.E.1.c.1 vs Drawings C7 and C8: Please confirm whether the tank requires two roof ventilators or a single 24-inch dome vent.
2 roof ventilators per plan and specification
Please confirm the required Risk Category for the prestressed concrete ground storage tank, including the applicable wind importance factor. Clarify whether the tank is designated as an essential facility requiring Risk Category IV.
Please use Risk Category III.
Section 33 16 13, Paragraph 2.2.C.1; Drawing C8. The specification requires the overflow to accommodate 10 MGD with a maximum water height of 12 inches above the overflow weir, while maintaining at least 12 inches of freeboard to the lowest dome spring line, dome reference line, or top of prestressed wall. Drawing C8 specifies an overflow elevation of 1125.00 and a wall/dome reference elevation 1126.00, providing only 12 inches of total clearance. If the full 12-inch overflow head is required, no freeboard would remain at the design overflow rate. Please confirm the required overflow weir elevation, design overflow head, and minimum wall/dome reference elevation. Clarify whether the wall/dome reference must be raised or the overflow elevation revised to satisfy the minimum freeboard requirements per AWWA D110.
Overflow wire doesn’t have to be at the edge of the tank wall. As long as it can have min. 24-inch between top of the weir and the bottom of the dome.
Drawing C1: The proposed tank overlaps existing tank foundations. Demolition may leave buried concrete, disturb the underlying limestone, or create uneven bearing conditions beneath the new tank. Please provide remediation requirements for disturbed limestone, over-excavated areas, and remaining foundation fragments following demolition. Also confirm how additional remediation after demolition (if directed by the Geotechnical Engineer) will be measured and paid.
All old concrete, tank remnants, etc. must be removed and the void filled with flowable fill under the proposed tank foundation. If the areas are large enough to facilitate compaction equipment, compacted and tested select fill may be used to fill the void. It is not allowed that the tank to be constructed over undocumented materials.
Drawing G6: Please confirm whether any portion of the access road from East Trimmier Road to the tank site exceeds a 15% slope.
Based on our records, it does not appear any portion of the access road from Trimmier Road to the tank site exceeds 15% slope. The steepest portion which is paved with concrete is about 14%.
Tnemec high-performance coatings are called out for piping and equipment protection. I would like to also offer Tnemec Series 156 and 157 Enviro-Crete to be accepted for the Ground Storage Tank exterior coatings. Tnemec Enviro-Crete are equal or better coatings and a natural fit for prestressed tanks and crack bridging. thank you for consideration.
The proposed Tnemec Series 156 and 157 Enviro-Crete coatings are subject to review and approval by the City. All proposed coating systems must meet the applicable performance and specification requirements outlined in the solicitation.
currently, is there an avaialble source of water at the site (i.e. fire hydrant, yard hydrant) that can be used during the demolition? if not, where is the nearest source of water?
Contractor shall use water from existing 24-inch waterline next to the site.
the OHP lines that are to remain, will they be deenergized prior to the tank removal? will the lines to be deenergized, will this occur prior to tank demo?
OHP will need to stay in service during the demolition of existing tanks.
What exactly is the reasoning for a paint analysis? Our standard tank dismantle procedure is based on torch cutting the steel with the paint intact. Workers will be wearing proper personal protection equipment, including PAPR’s, disposable clothing, and utilizing engineering controls (long torches and minimal cutting). We have worked on many military bases, and have not had to remove the LBP from any of these projects. We have also worked for multiple chemical companies, railroad and power companies, and for multiple general contractors, complying with the most stringent requirements requested. OSHA Reg. 29CFR 1926.62 does not require paint removal prior to torch cutting. 1. are you going to require paint abatement on the cut lines? 2. do you accept our method of demoliton regardless of the results?
Lead and asbestos may be present in the existing tank coatings and are potential hazardous materials. Testing is recommended for worker safety. Means and method for proper handling of potential hazardous materials are the contractor’s responsibility.
please provide an inspection report for each tank. we are looking to see what their size is, (volumn and ht x dia)
Both tanks have been out of service for an extended period of time. Inspection reports may not be available. Larger tank is roughly 60 ft in diameter and 30 ft tall. The small tank is roughly 36 ft in diameter and 30 ft tall.
Drawing E3.1: The one-line diagram shows a flow meter connected to the RTU panel. However, a flow meter location or specification is identified anywhere in the bid documents. Drawing E4.0 depicts circuit CC-100-02 assigned to the chlorine analyzer. Please confirm whether a flow meter is required or whether the symbol on E3.1 is incorrect. If required, provide the meter type, size, manufacturer/model or performance specifications, installation location and piping details, and power and signal requirements.
There is no flow meter for this project. We will issue an addendum with the updated sheet.
Drawing G6 and Bid Item 2: Please consider adding an Owner-directed allowance for improvements to the approximately 3,700 LF existing access road. Without defined improvement limits, quantities, or a typical road section, bidders may carry substantially different scopes and costs. A common allowance would provide a consistent basis for bidding, with the final scope and expenditures authorized by the Owner/Engineer.
There will not be an allowance for improvements to the access road. It is the contractor’s responsibility to improve the access road to a condition that the contractor can build the tank on top of the hill. The improvements will be left in place after the project is completed.
Some of the links provided in Addendum 1 don't seem to work. For example, the links to References and Emergency Business Services do not work. Can these links be looked at in order for us to provide them with the bid submission?
The referenced documents are available through the links provided in the Vendor Questionnaire, which vendors should access and complete as part of their bid submission. These documents are not provided through the addenda. For convenience, copies have also been attached separately as Notice 2 to the solicitation.
OpenGov categories
- 83073 · Steel Tanks, Water Works Type, Elevated and Tower
- 90900 · Building Construction Services, New (Incl. Maintenance And Repair Services)
- 91164 · C.I.P., Utilities
- 91223 · Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.)
- 91300 · Construction Services, Heavy (Incl. Maintenance And Repair Services)
- 91319 · Construction, Curb and Gutter (Includes Maintenance, Repair, and Removal)
- 91327 · Construction, Highway and Road
- 91339 · Construction, Pipe Culvert
- 91345 · Construction, Sewer and Storm Drain
- 91356 · Construction, Utility/Underground Projects
- 91360 · Construction, Water System/Plants, Main and Service Line
- 91361 · Construction, Vertical, Concrete, Pour-In-Place, Form/Place/Finish
- 91389 · Maintenance and Repair, Utility/Underground Projects
- 92500 · Engineering Services, Professional
- 96100 · Miscellaneous Services, No. 1 (Not Otherwise Classified)