State and local · OpenGov
IFB 37756 AOA SINGLE ACCESS POINT GATE
Description
Advertisement for Construction Contract IFB 37756 Table 1 MOBILIZATION SURFACE PREPARATION MARKING - WHITE MARKING - BLACK REFLECTIVE MEDIA REMOVE CHAIN LINK FENCE AND LINE POST REMOVE CHAIN-LINK SLIDE GATE AND OPERATOR CHAIN-LINK PEDESTRIAN GATE - 5 FT WIDE INSTALL, MAINTAIN, AND REMOVE CONSTRUCTION BARRICADES INSTALL, MAINTAIN, AND REMOVE TRAFFIC CONES INSTALL, MAINTAIN, AND REMOVE CONSTRUCTION SIGNAGE INSTALL, MAINTAIN, AND REMOVE TEMPORARY FENCE INSTALL, MAINTAIN, AND REMOVE ADDITIONAL JERSEY BARRIERS REMOVE AND RESET FENCE FLAGPERSON ESCORT GATE GUARD BOLLARDS WITH POST BOLLARDS - SURFACE MOUNTED GUARD SHACK AND FOUNDATION REMOVE AND SALVAGE CARD READER REMOVE AND SALVAGE DUAL HEIGHT CARD READER PEDESTAL REMOVE AND SALVAGE SECURITY CAMERA AND POLE DUAL HEIGHT PEDESTAL CONCRETE FOUNDATION RELOCATE PERMANENT JERSEY BARRIERS INSTALL SALVAGED CARD READER PEDESTAL 20 FT BARRIER ARM GATE 12 FT BARRIER ARM GATE REMOVAL AND DISPOSAL OF PAVEMENT REMOVE AND DISPOSE BOLLARD REMOVE AND SALVAGE GROUND MOUNTED SIGNS REMOVE AND SALVAGE DIRECTIONAL, REGULATORY AND WARNING SIGNS REMOVE AND DISPOSE CONDUIT - ALL SIZES LOAM EXCAVATION TRIMMING AND FINE GRADING SACK INSERT INLET PROTECTION CONSTRUCTION ACCESS STANDARD MAINTENANCE AND CLEANING OF EROSION, SEDIMENT, AND POLLUTION PREVENTION CONTROLS GRAVEL BORROW SUBBASE COURSE CLASS 19.0 HMA Bid ADVERTISEMENT No Pre-Bid Meeting SECTION 00010 - ADVERTISEMENT FOR BID Bids will be received by the Rhode Island Airport Corporation (RIAC) (the Owner) electronically through RIAC’s OpenGov procurement portal at: https://procurement.opengov.com/portal/pvdairport , or, where permitted during the OpenGov transition as described below, as sealed paper bids at the Office of Procurement, Rhode Island T. F. Green International Airport, 2000 Post Road, 3rd Floor, Warwick, RI 02886-1533 until December 11, 2026 at 10:00 A.M. Eastern Time, at which time all bids will be publicly opened and read aloud at Warwick Conference Room, 2000 Post Road, Warwick, RI, with simultaneous virtual attendance available through the link posted in the OpenGov project, for the following project: AOA Single Access Point Gate Rhode Island T.F. Green International Airport Warwick, Rhode Island RE: RIAC Construction Contract (IFB) No. 37756 SUBMISSION METHODS . As RIAC transitions to OpenGov, bids may be submitted through RIAC’s OpenGov procurement portal at https://procurement.opengov.com/portal/pvdairport or as sealed paper bids as described in Section 00100, Information to Bidders. Paper submissions will be accepted during this transition only for solicitations advertised before December 31, 2026. For solicitations advertised on or after December 31, 2026, bids must be submitted through OpenGov, and paper submissions will not be accepted. For solicitations advertised before December 31, 2026, paper submissions remain permitted through the bid due date and time, even if an addendum is issued or the due date is extended to December 31, 2026, or later. Paper bids already received remain valid and do not need to be resubmitted through OpenGov. The same deadline applies to both permitted submission methods . Electronic bids must be successfully submitted and recorded by OpenGov by the deadline. Paper bids sent by mail, courier, or hand delivery must be physically received by the Office of Procurement at the address above by the deadline; a postmark or delivery attempt is not sufficient. RIAC accepts paper deliveries during normal business hours, Monday through Friday, 8:30 a.m. to 4:00 p.m. Eastern Time, excluding national and state holidays. It is the sole responsibility of the bidder to ensure receipt of its bid on or before the due date and time. RIAC will not accept any bid received after the due date and time. NO EXCEPTIONS. Email, fax, and electronic submission methods other than OpenGov are not accepted. RIAC accepts no financial responsibility for any costs incurred by a firm in responding to this IFB, participating in oral presentations, or meeting with RIAC prior to being awarded the contract. The proposals in response to this IFB become the property of RIAC and may be used by RIAC in any way it deems appropriate. All information submitted in response to this IFB is a public record subject to disclosure under the Access to Public Records Act, except to the extent that Act or other law exempts it; marking information confidential/proprietary does not make it exempt. Firms may redact in the public copy any trade secrets or commercial or financial information which is of a privileged or confidential nature pursuant to the Access to Public Records Act (R.I. Gen. Laws § 38-2 et seq.). If a firm does not submit a redacted public copy, RIAC will treat the firm as not claiming that any of its information is exempt as a trade secret or as commercial or financial information, but RIAC will still withhold information that the Act or other law requires it to withhold. For electronic submissions, upload any redacted public copy as a separate file in the designated OpenGov submission field. For paper submissions, include a separately labeled redacted public copy with the bid package. Submitting a redacted public copy does not guarantee confidential treatment; RIAC will determine under the Access to Public Records Act whether the redacted information is exempt from disclosure (Section 00100, Information to Bidders, Article XXII). By submitting a proposal, the firm certifies that it has fully read and understands the IFB, has full knowledge of the scope of work to be provided, and accepts the terms and conditions under which the work is to be performed. RIAC will be the sole judge in determining as equivalent products (if applicable). The United States Department of Transportation (U.S. DOT) issued an interim final rule on October 3, 2025, determining that U.S. DOT will no longer apply a presumption of “social and economic disadvantage” based on race, ethnicity, or sex to the certification of disadvantaged business enterprises (DBEs). U.S. DOT adopted that rule, with minor changes, by its final rule of September 25, 2026 (91 FR 60885). DBE eligibility now requires an individualized showing of social and economic disadvantage, and each Unified Certification Program must reevaluate the DBEs it has certified (49 CFR § 26.111). Until the Rhode Island Unified Certification Program completes that reevaluation, RIAC may not set a DBE contract goal or count DBE participation toward DBE goals (49 CFR §§ 26.51(h) and 26.55(i)). This solicitation therefore has no DBE contract goal. What the project will include: Removal of a slide gate and gate readers Removal of AOA fence Removal and milling of asphalt pavement Installation of asphalt pavement Installation of concrete gate control island Installation of gravel fill area Installation of fence and barrier arm gates with access control Installation of pedestrian gate with access control Installation of guard shack Installation of concrete encased conduit and cables Installation of handholes Grading turf area for positive drainage from pavement Application of pavement marking The contract time is as stated in Section 80 of the General Contract Provisions. This project will be constructed during the Spring of 2027. BID SECURITY. Each bid shall be accompanied by a certified check, ca CONE OF SILENCE CONE OF SILENCE To ensure a proper and fair evaluation, RIAC has established a “cone of silence” applicable to all Competitive Selection Processes, including RFPs, RFQs, NOIs, and IFBs. The cone of silence is designed to protect the integrity of the procurement process by shielding it from undue influences. The cone of silence will be imposed on all Competitive Selection Processes beginning with advertisement for the same and ending with the contract award. The cone of silence prohibits any communications whether in writing or verbally regarding a specific RFP, RFQ, NOI, or IFB between: A potential proposer (which includes vendors, service providers, bidders, lobbyists and consultants) and their representative(s) and RIAC staff or RIAC consultants engaged to assist the Authority on a specific RFP, RFQ, NOI, or IFB, except for communications with RIAC’s procurement agent or other supporting procurement staff responsible for administering the procurement, provided the communication is strictly limited to procedural matters of the Competitive Selection Process. A potential proposer and their representative(s) and a RIAC Board member. A potential proposer and their representative(s) and any member of the selection committee or negotiation team. Further, Proposer(s) shall not offer any gratuities, favors or anything of monetary value to any RIAC employee of Board member in connection with any competitive procurement. Unless specifically provided otherwise in the applicable solicitation document, in addition to the exceptions set forth above, the cone of silence does not apply to: Communications with RIAC’s legal department. Oral communications at the pre-proposal or pre-bid conference. Oral communications during publicly noticed selection committee meetings that are specifically for presentations, demonstrations or interviews. Oral communications during publicly noticed negotiation meetings. Oral communications during any duly noticed Board meeting. Communications relating to protests made in accordance with RIAC’s Procurement protest policy. Any violation of the cone of silence by a respondent and their representative(s) will render voidable their response as well as any resulting contract awarded to them. Any communications regarding matters of process or procedure from a respondent or lobbyist must be submitted to the assigned procurement agent. SPECIFICATIONS See attachments for Specifications and Plans - for Invitation for Bids 37756 REQUIREMENTS BID BOND REQUIREMENTS Each sealed bid shall be accompanied by a certified check, cashier's check, or satisfactory Bid Bond, in an amount equal to five percent (5%) of the bid, payable to the Rhode Island Airport Corporation. PERFORMANCE BOND AND LABOR/MATERIAL PAYMENT BOND REQUIREMENTS Payment and Performance Bonds shall be furnished as specified in the Invitation for Bids 37756 . AIRPORT BADGING REQUIREMENTS Each employee of the Contractor shall carry an Identification Badge issued by RIAC to be worn in a visible location, as prescribed by the Transportation Security Administration (TSA). The badge is to be worn on their person at all times while performing services on RIAC premises. Contractors will be charged a fee of $330 for each badge of which $250 is refundable upon return of each badge. Identification Badges may not be issued until the Contractor has complied with RIAC and TSA requirements regarding the issuance of Identification Badges including a background check of each prospective employee. The Contractor shall provide a personal history form for each prospective employee assigned to the contract. Information is to include a 10-year background check as required by the TSA. INSURANCE REQUIREMENTS Evidence of the following minimum insurance coverage must be provided prior to award: a. General Liability limits of $1,000,000 per occurrence. b. Motor Vehicle Liability Insurance with limits of $1,000,000 per occurrence. c. Worker’s Compensation coverage to Rhode Island statutory limits or documentation evidencing an approved self-insurance program. d. Umbrella Liability limits of $10,000,000 excess of $1,000,000 primary layer for airfield construction services, otherwise $5,000,000. e. Errors and Omissions coverage with minimum limits of $1,000,000 per claim. RIAC and the State of Rhode Island shall be named as additional insured on all policies of insurance with the exception of the Errors and Omission (Professional Liability) and Worker’s Compensation insurance. DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION The firm must indicate that it will comply with all applicable Federal, State and Local regulations and laws, including Affirmative Action and the Disadvantaged Business Enterprise programs. Please refer to the appropriate sections in the Invitation for Bids 37756. BID RESPONSE BID FORM