Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Independence Jail Landscaping

Description

The Independence Jail Landscaping Project consists of excavation, grading, irrigation, planting, and other related construction activities involving the landscaping of the project. The project includes installation of new landscaping and a new irrigation system. The Contractor shall furnish all labor, materials, equipment, and documents necessary to complete the work in accordance with the project plans. Contractor must have 1-year experience in Landscaping and provide an example of previous work. The Contractor shall provide a Soil Management Report and analysis for the selected plant materials, consistent with the Model Water Efficient Landscape Ordinance (MWELO) requirements included in the attached documentation. All work shall be performed in conformance with the attached plans and the defined project scope of work. Contractor will need to provide submittals and fulfill contract requirements prior to work. The Contractor shall provide instruction and training on proper planting techniques, warranty requirements, and ongoing plant maintenance, and shall implement appropriate measures to protect the installed landscaping included in with the warranty. Base Bid Mobilization & Demobilization Excavation Existing Surface (Trees, Existing Landscape Irrigation Lines, and Landscape Irrigation Systems) . Any electrical, plumbing, other utilities are to remain in place and not to be disturbed. Install & Purchase: Irrigation System. Place & Purchase: Crushed Stone (ANEJO GOLD). Place & Purchase: Crushed Stone (APACHE SUNSET). 4' Wide Path 3/4" Crushed Stone Path Rock Placement. Place & Purchase: Soil Mulch. Place & Purchase: Selected Plants. Progressive Clean Up Soil Management Report & Analysis Additive One Place Concrete Barrier Excavation Existing Surface (Trees, Existing Landscape Irrigation Lines, and Landscape Irrigation Systems) Install & Purchase: Irrigation System Place & Purchase: Crushed Stone (ANEJO GOLD) Crushed Stone (APACHE SUNSET) Place & Purchase: Soil Mulch Place & Purchase: Selected Plants Rock Placement Progressive Clean Up Soil Management Report & Analysis INTRODUCTORY DOCUMENTS NOTICE INVITING BIDS The Inyo County Public Works Department is soliciting bids for the Independence Jail Landscaping . Bid Packages, which include the Notice Inviting Bids, Bid Proposal Forms, Contract and Bond Forms, Special Provisions, and Plans, are available at no charge at the County of Inyo's procurement website at https://procurement.opengov.com/portal/countyofinyoca . Bidders are responsible for ensuring that they have registered as interested bidders on Open Gov's bidder registration system; bidders who fail to register as interested bidders may not be notified should any Addenda be issued. If the Department issues any Addenda to the Bid Package that is not acknowledged, the Bid Proposal may be rejected. Bids must be submitted electronically via the County of Inyo's procurement website at https://procurement.opengov.com/portal/countyofinyoca . For How-To videos and technical support with the OpenGov system, please visit OpenGov How-To Videos and Technical Support . To be considered, bids must be electronically submitted to Open Gov on or before Friday, December 11, 2026 at 3:00 pm , at which time they will be publicly opened and read aloud. No hard copy, mailed, emailed, oral, telegraphic, telephonic, or faxed bids will be accepted. General Work Description: The Independence Jail Landscaping Project consists of excavation, grading, irrigation, planting, and other related construction activities involving the landscaping of the project. The project includes installation of new landscaping and a new irrigation system. The Contractor shall furnish all labor, materials, equipment, and documents necessary to complete the work in accordance with the project plans. Contractor must have 1-year experience in Landscaping and provide an example of previous work. The Contractor shall provide a Soil Management Report and analysis for the selected plant materials, consistent with the Model Water Efficient Landscape Ordinance (MWELO) requirements included in the attached documentation. All work shall be performed in conformance with the attached plans and the defined project scope of work. Contractor will need to provide submittals and fulfill contract requirements prior to work. The Contractor shall provide instruction and training on proper planting techniques, warranty requirements, and ongoing plant maintenance, and shall implement appropriate measures to protect the installed landscaping included in with the warranty. Estimated Construction Costs: 97,140.00 Contract Time: 90 Calendar Days Liquidated Damages: $200/Calendar Day An optional job walk is scheduled for Wednesday, December 2, 2026 at 10:00 am at the 550 S. Clay Street, Independence CA 93526 . All project work is more particularly described in the plans and special provisions. All of the work shall be in accordance with all applicable Federal, State, and local laws, codes, and regulations. Technical questions related to project work, site conditions, or other related inquiries should be submitted through OpenGov . All questions must be submitted on or before Wednesday, December 9, 2026 at 3:00 pm . Do not submit questions via any method other than through OpenGov, and do not contact County staff directly to ask questions. All questions and responses (if the County chooses to provide a response) will be posted at the County of Inyo's procurement website at https://procurement.opengov.com/portal/countyofinyoca on Thursday, December 10, 2026 . Bids shall conform to and be responsive to the Contract Documents. Bids are required for the entire work described in the Contract Documents. The c ontract, if awarded, will be based on the lowest responsible bid total price. Each Bid must be submitted on the Bid Proposal Forms furnished as a part of the Bid Package. Each Bid must be accompanied by a Proposal Guarantee in the amount and form described in the Bid Package, in an amount not less than 10% of the amount of the bid, made payable to the order of the County of Inyo. The check or bond shall be given as security that the bidder will enter into the Contract with the County and furnish the required Faithful Performance Bond, Labor and Materials Payment Bond, Certificates and/or original endorsements of insurance, or other required documents. The check or bond may be retained by the County for ninety (90) days or until the Contract is fully executed by the successful bidder and the County, whichever first occurs. The successful bidder shall be required to furnish a Faithful Performance Bond and a Labor and Materials Payment Bond on the forms provided in the Bid Package and in the amount of 100% of the Contract amount. Insurance requirements for the project can be found in the Attachments section of this bid package. The successful bidder must be licensed as required by law, and consistent with the Contract Documents, at the time the contract is awarded, which license shall be a current California C-27 Landscape Contractor or combination of license classifications necessary to complete the work. license or a combination of all specialty classifications that will be required for complete performance of all of the work in accordance with the Contract Documents, and if applicable, a joint venture license as defined in the Business and Professions Code, Section 7029 . Failure of the bidder to obtain proper and adequate licensing for an award of a contract shall constitute failure to execute the contract and shall result in the forfeiture of the security of the bidder. In addition to the requirements set forth in this Notice Inviting Bids, all bids shall be subject to the requirements set forth in the Special Provisions, Standard Specifications of the Inyo County Public Works Department, dated May 2020 , Contract Documents and other applicable law. The Contract is subject to the State Contract nondiscrimination and compliance requirements pursuant to Government Code, Section 12990 , and other applicable law. The Contract is also subject to and incorporates by refer BID PROPOSAL FORMS Pricing Proposal Form Bid Submission Conditions and Instructions In submitting this Bid, Bidder understands and agrees that: BID DEADLINE. Bids must be received no later than 3:00 pm on Friday, December 11, 2026 via Inyo County's electronic bid submission portal on OpenGov.com, at which time they will be publicly opened and read aloud. No mailed, hand-delivered, oral, telegraphic, telephonic or fax proposals or modifications will be accepted. No provision in this section is intended or shall be construed to alter the terms and conditions specified in the Contract Documents for payment of any amounts in the event the Project contract is awarded to Bidder pursuant to this Bid. INCLUSION OF ALL COSTS. This Bid includes all costs for all labor, materials, tools, taxes, insurance, transportation, and other related supplies and services to perform all services and provide all materials as required by, and in accordance with, the Contract Documents for the Project. CONTRACT DOCUMENTS. The Contract Documents shall constitute the Contract between the parties, which will come into full force and effect upon acceptance, approval, and execution by the Inyo County Board of Supervisors. The Contract Documents are complementary and are incorporated herein by reference and made a part hereof with like force and effect as if all of said documents were set forth in full herein. The Contract Documents include all documents defined as "Contract Documents" in the Standard Specifications of the Inyo County Public Works Department, dated May 2020. ACCEPTANCE. County reserves the right to reject any and all Bids, or part of any Bid, to postpone the scheduled Bid deadline date(s), to make an award in its own best interest, and to waive any irregularities or technicalities that do not significantly affect or alter the substance of an otherwise responsible Bid and that would not affect a Bidder’s ability to perform the work adequately as specified. However, this Bid shall remain open and shall not be withdrawn for a period of ninety (90) calendar days after the date designated in the Notice Inviting Bids for publicly opening this Bid. If Bidder receives written notice of the award of the Project Contract to Bidder on or before the sixtieth day, Bidder shall execute the Contract and deliver to County the executed Contract and all of the bonds, certificates and/or endorsements of insurance coverage, and other required documents no later than fifteen (15) calendar days after the date on which Bidder receives such notice. This solicitation in no way obligates County to award a Bid Contract described herein, nor will County assume any liability for the costs incurred in the preparation and transmittal of Bids in response to this solicitation. County reserves the right to not accept any Bid, to reject any or all Bids, to reject any part of any Bid proposal, to negotiate and modify any Bid, and to waive any defects or irregularities in any Bid at County’s sole discretion. Furthermore, County shall have the sole discretion to award a Bid Contract as it may deem appropriate to best serve the interests of County. In this regard, County may consider demonstrated quality of work, responsiveness, comparable experience, professional qualifications, references, and proposed fees. Awards will not be based on cost alone. County does not guarantee a minimum or maximum dollar value for any Contract(s) resulting from this solicitation. If the Contract Documents require or permit this Bid to include two or more Alternates, County reserves the right to award the Contract for that Alternate which County, in its sole discretion, determines at the time of award to be in County's best interest. TIME OF COMPLETION. The Bidder further specifically agrees to complete all the work no later than the Time for Completion specified in the Contract Special Provisions. BID PROTEST. In the event a dispute arises concerning the bid process prior to the award of the contract, the complaining party must follow the mandatory adminsitrative procedure set forth in Inyo County Code Chapter 6.30 and pursuant to the following bid protest procedures: Only a bidder who has actually submitted a Bid Proposal is eligible to submit an appeal request/bid protest against another bidder. Subcontractors are not eligible to submit bid protests. A bidder may not rely on the bid protest submitted by another bidder, but must timely pursue its own protest. Appeal must be in writing. The appeal must contain a complete statement of the basis for the protest and all supporting documentation. Materials submitted after the Bid Protest Deadline will not be considered. The protest must refer to the specific portion or portions of the Contract Documents upon which the protest is based. The protest must include the name, address and telephone number of the person representing the protesting bidder if different from the protesting bidder. A copy of the protest and all supporting documents must also be transmitted by fax or by e-mail, by or before the Bid Protest Deadline, to the protested bidder and any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest. Must be submitted within ten (10) calendar days of the date of the recommended award or denial of award letters. An appeal of a denial of award can only be brought on the following grounds: Failure to follow the selection procedures and adhere to requirements specified in the Bid Package or any addenda or amendments. There has been a violation of conflict of interest as provided by California Government Code Section 87100 et seq. A violation of State or Federal law. Appeals will not be accepted for any other reasons than those stated above . All appeals must be sent to: Nate Greenberg, Purchasing Director, 224 N. Edwards St., Independence, CA 93526 County’s Purchasing Director shall make a decision concerning the appeal, and notify the Proposer making the appeal, within a reasonable timeframe prior to the tentatively schedul Vendor Certifications and Questionnaire SPECIAL PROVISIONS Specifications Approval and Introduction The Independence Jail Landscaping (Project), a public works project of Inyo County, is to be constructed and completed in accordance with these Special Provisions, the Project Plans, and, insofar as they are referenced herein, the Standard Specifications of the Inyo County Public Works Department dated May 2020 (Standard Specifications). The Special Provisions, the Project Plans, and the sections of the Standard Specifications referenced herein, constitute a portion of the “Contract Documents” (as that term is defined in section 1-1.07 of the Standard Specifications) governing the project and shall therefore be binding upon and observed by the person/entity with whom the County of Inyo enters into contract for construction of the Project. Copies of the Project Plans and the Standard Specifications may be obtained from the Inyo County Public Works Department in Independence, California and are included in this bid package. Unless indicated otherwise, all references in this document to sections are to those in the Inyo County Standard Specifications May 2020 or to other sections in these Special Provisions. In case of any irreconcilable conflict between the requirements of the Inyo County Standard Specifications May 2020 referenced herein or the Caltrans Standard Specifications and these Special Provisions, these Special Provisions shall prevail and be observed. These Special Provisions have been prepared by the Inyo County Public Works Department under the direction of Michael Errante, Director of Public Works, and are approved for the work contemplated herein. Special Provisions II. Project Description The Independence Jail Landscaping Project consists of excavation, grading, irrigation, planting, and other related construction activities involving the landscaping of the project. The project includes installation of new landscaping and a new irrigation system. The Contractor shall furnish all labor, materials, equipment, and documents necessary to complete the work in accordance with the project plans. Contractor must have 1-year experience in Landscaping and provide an example of previous work. The Contractor shall provide a Soil Management Report and analysis for the selected plant materials, consistent with the Model Water Efficient Landscape Ordinance (MWELO) requirements included in the attached documentation. All work shall be performed in conformance with the attached plans and the defined project scope of work. Contractor will need to provide submittals and fulfill contract requirements prior to work. The Contractor shall provide instruction and training on proper planting techniques, warranty requirements, and ongoing plant maintenance, and shall implement appropriate measures to protect the installed landscaping included in with the warranty. Contract Award and Execution (Section 3) 3-1.04 C ontract Award Section 3-1.04 of the Standard Specifications shall be amended as follows: Whenever possible, the award to the lowest bidder, if made, will be made no later than thirty (30) calendar days after the opening of bid proposals. However, failure of the County to make award within thirty (30) calendar days after the opening of the bid proposals shall not relieve the Contractor of its requirement to deliver an executed contract and bonds, and any other required documents, within 15 days of Notification of Award, as further described in Section 3-1.18: Contract Execution. 3-1.05 Contract Bonds (Public Contract Code §§ 10221 and 10222) The successful bidder must furnish 2 bonds: Payment bond to secure the claim payments of laborers, workers, mechanics, or materialmen providing goods, labor, or services under the Contract. This bond must be equal to at least 100 percent of the Contract amount. Performance bond to guarantee the faithful performance of the Contract. This bond must be equal to at least 100 percent of the Contract amount. The bond forms are included in the Attachments. 3-1.06 Contractor License For a federal-aid contract, the Contractor must be properly licensed as a contractor from contract award through Contract acceptance (Pub Cont Code § 10164). For a non-federal-aid contract: The Contractor must be properly licensed as a contractor from bid opening through Contract acceptance (Bus & Prof Code § 7028.15) Joint venture bidders must obtain a joint venture license before contract award (Bus & Prof Code § 7029.1) 3-1.07 Insurance Policies The successful bidder must submit original certificates of insurance and amendatory endorsements or copies of the applicable policy language effecting coverage to meet the requirements in Section 4 of this solicitation, titled County Insurance Requirements . If any discrepancies exist between the Insurance section of the attached sample contract and Section 4 of this bid package, Section 4 governs. If the successful bidder uses any form of self-insurance for workers compensation in lieu of an insurance policy, it shall submit a certificate of consent to self-insure under Labor Code § 3700. 3-1.08 Small Business Enterprise Participation Section 3-1.08 is amended as follows: This project is subject to Inyo County Ordinance No. 1258, which creates contracting preferences for local and/or small businesses, and is codified in Inyo County Code Chapter 6.06. The bidder must : Take necessary and reasonable steps to ensure that small business enterprises (SBEs) have opportunity to participate in the contract. Make work available to SBEs and select work parts consistent with available SBE subcontractors and suppliers. To qualify for the SBE contracting preference, the bidder mu

Plain text