DEPT OF DEFENSE
- Posted
- Nov 3, 2026
- Due
- Nov 19, 2026, 2:00 PM EST
- Place of performance
- Galveston, TX
- NAICS
- 237990
- Set-aside
- No Set Aside
The U.S. Army Corps of Engineers, Mobile District, will conduct an industry day to discuss the design and construction of a flood risk management and bank stabilization project near downtown Selma, Alabama. The current design is anticipated to consist of approximately 1,000 linear feet of soldier-pile wall along the Alabama River. The soldier pile wall would be constructed to a top elevation of 100-ft NAVD88, and a secondary retaining wall would be constructed to a top elevation of 110-ft NAVD88. Rip-rap protection would be placed at the toe of the wall to a top elevation of 90-ft NAVD88. *UPDATE - The event is scheduled from 9:00 to 11:00 a.m. CDT on Thursday, October 28, 2026, at the Mobile District Office, 100 Canal St., Mobile, AL 36602.
Valerie Murphy
Primary contact
Jillian Saffle
Secondary contact
DEPT OF DEFENSE
DEPT OF DEFENSE
DEPT OF DEFENSE
DEPT OF DEFENSE
DEPT OF DEFENSE