State and local · OpenGov
Inflow and Infiltration Sanitary Sewer Lining, Remediation, and Repair
Description
The City of Cape Coral was incorporated in 1970 and operates under the Council/City Manager form of government. The City Council has eight members consisting of the mayor and seven members all elected at large on a nonpartisan basis. City Council is responsible for all policy-making functions of the government and retains the services of a City Attorney, City Auditor and City Manager. The City Manager is responsible for all administration of the City, which provides a comprehensive range of municipal services including general government, public safety, community services, public works, planning, utilities, and parks and recreation. Cape Coral is the 8th largest city by population and the 3rd largest by land mass in Florida. Cape Coral currently has a population of more than 200,000 residents and is experiencing high growth. As a pre-platted community, Cape Coral could have more than 360,000 residents at buildout. The city has a sub-tropical lifestyle with thousands of waterfront residential properties on almost 400 miles of canals. About two-thirds of these canals provide boaters with direct access to the Gulf of Mexico. Technical Specification or Scope of Work Scope of Services The proposed projects will generally range in size from approximately 10,000 to approximately 25,000 linear feet of sanitary sewer collection lines and shall generally consist of cleaning and internally lining the existing vitrified clay sanitary sewer gravity collection system. The cleaning will generally consist of water jet cleaning and/or other means necessary to clean the collection lines in preparation for the lining process. The lines will also be video camera inspected prior to and upon completion of the lining process. The lining system will be a Cured-in Place Pipe (CIPP) system. The liner system consists of a hot water cured, pipe lining system. Once cured, the CIPP system will provide a continuous rigid pipe system between manholes. Individual services are to be cut out and sealed to the main line to minimize infiltration around the connections. Repairs to service laterals and mainline point repairs will be addressed with the contractor on a specific as-needed basis. Work Authorizations and associated Purchase Orders will be issued to the contractor based on individual project(s) scope and available funds. Qualifications The Contractor shall perform the work with installers who are qualified, fully licensed, and certified by the manufacturer of the selected CIPP product system. The Contractor shall have a minimum of three (3) years of continuous experience installing CIPP liners in pipe of a similar size, length, and configuration as contained in this contract. In addition, the Contractor must have firsthand experience on projects that are currently under way and/or have been completed within the last three (3) years involving cured in place pipe (CIPP) lining involving single projects/work orders with at least 10,000 to 25,000 linear feet of CIPP per project/work order. These projects/work orders should be on or for municipal sanitary sewer collection systems The lead person, including the superintendent, the foreman and the lead crew personnel for the CCTV inspection, resin wet-out/curing process, the CIPP liner installation, and the robotic service reconnections must each have a minimum of three (3) years of total experience with the CIPP technology proposed for this contract and must have demonstrated competency and experience to perform the scope of work contained in this contract. The name and experience of each lead individual performing work on this contract shall be submitted with the Contractor's Performance Work Statement (PWS). Personnel replaced by the contractor, on this contract, shall have similar, verifiable experience as the personnel originally submitted for the project. Bidder may submit copies of any other licenses or certificates which further demonstrate his/her capabilities. Technical Specifications - General GENERAL These Technical Specifications include the minimum requirements for the rehabilitation of sanitary sewer pipelines by the installation of Cured-in-Place Pipe (CIPP). The work will take place in various collection basins, generally within or near the southeast quadrant of the city. The rehabilitation of pipelines shall be done by the installation of a resin-impregnated flexible tube which, when cured, shall be continuous and tight-fitting throughout the entire length of the original pipe. The CIPP shall extend the full length of the original pipe and provide a structurally sound, joint-less and water-tight new pipe within a pipe. The Contractor is responsible for proper, accurate and complete installation of the CIPP using the system supplied by the Contractor. Neither the CIPP system, nor its installation, shall cause adverse effects to any of the Owner’s processes of facilities. The cleaning of the lines, installation of the CIPP, cutting and removal of the coupons, cleanup, restoration, and/or any other use of the product shall not result in the collection, formation or production of any detrimental compounds, waste and/or by-products in the collection lines, force mains, lift station or at the wastewater treatment plant. Any cost, including but not limited to, materials, equipment, supplies, labor, overtime labor rates, etc., incurred by the City as a result of the Contractor’s operation shall be back charged against any payments due the Contractor for work performed. The Contractor shall notify the Owner and identify any by-products as a result of the installation operations, test and monitor the levels, and comply with any and all local waste discharge requirements. The Contractor shall cleanup, restore existing surface conditions and structures, and repair any of the CIPP system determined to be defective. The Contractor shall conduct installation operations and schedule cleanup in a manner to cause the least possible obstruction and inconvenience to traffic, pedestrians, businesses, and property owners or tenants. Permits and licenses necessary for the performance of this work shall be secured and paid for by the Contractor prior to starting any work with the City Right-of-Ways. A Right-of-Way Permit may be acquired by contacting the Public Works Department, Transportation Division, Right of Way Inspector at (239) 242-3211. Traffic Control Plans for 2-lane roads shall be submitted to the City two weeks prior to the scheduled commencement of the work. Traffic Control Plans for 2-lane roads shall be typical plan submittals. Traffic Control Plans for 4-lane roads shall be submitted to the City four weeks prior to the scheduled commencement of the work. Traffic Control Plans for 4-lane roads shall be dimensioned pictorial plans of the positioning of the proposed signage, pavement markings, delineators, etc. All Traffic Control Plans shall be prepared in accordance with FDOT and MUTCD. DESCRIPTION OF WORK AND PRODUCT DELIVERY These specifications cover the work necessary to furnish and install, the (CIPP). The Contractor shall provide all materials, labor, equipment, and services necessary for traffic control, bypass pumping and/or diversion of sewage flows, cleaning and television inspection of sewers to be lined, liner installation, reconnection of service connections, all quality controls, provide samples for performance or required material tests, final television inspection, testing of lined pipe system and warranty work, all as specified herein. The product furnished shall be a complete CIPP system including all materials, applicable equipment and installation procedures. All CIPP systems or multi-component products will be required to meet the submittal requirements as contained herein. The CIPP shall be continuous and joint-less from manhole to manhole or access point to access point and shall be free of all defects that will affect the long term life and operation of the pipe. The CIPP shall fit sufficiently tight within the existing pipe so as not to leak at the manholes, at the service connections or through the wall of the installed pipe. If Leakage occurs at the manholes or the service connections the Contractor shall seal these areas to stop all leakage using a material compatible with the CIPP as directed by the Owner at the price as bid in the Proposal. If leakage occurs through the wall of the pipe the liner shall be repaired or removed and replaced as recommended by the CIPP manufacturer. Relining of the pipe segment without removing the existing liner system shall only be allowed with written approval by the City. The Contractor shall exhaust all available remedies prior to submitting a request in writing for permission to reline a lined segment of the collection system. The City will review each such request on a case-by-case basis and its sole discretion determine whether to allow an additional liner insert to be installed. Regardless of the City’s decision, the Contractor is responsible for providing a leak tight pipe segment. Final approval of the liner installation will be based on a leak tight pipe. The CIPP shall be designed for a life of 50 years or greater. As specified in the contract documents the installed CIPP shall be a structurally designed pipe within a pipe, to meet or exceed all contract specified physical properties, fitting tightly within the existing pipe all within the tolerances specified. The installed CIPP shall withstand all applicable surcharge loads (soil overburden, live loads, etc.) and external hydrostatic (groundwater) pressure, if present, for each specific installation location. The installed CIPP shall have a long term (50 year) corrosion resistance to the typical chemicals found in domestic sewage. All existing and confirmed active service connections and any other service laterals to be reinstated as directed by the Owner shall be re-opened robotically or by hand in the case of man-entry size piping, to t Technical Specifications - Products MATERIALS The CIPP System must meet the chemical resistance requirements for normal residential sanitary sewer flows and constituents. All materials, shipped to the project site, shall be accompanied by test reports certifying that the material conforms to the ASTM standards listed herein. Materials shall be shipped, stored, and handled in a manner consistent with written recommendations of the CIPP system manufacturer to avoid damage. Damage includes, but is not limited to, gouging, abrasion, flattening, cutting, puncturing, or ultra-violet (UV) degradation. On site storage locations, shall be approved by the Owner. All damaged materials shall be promptly removed from the project site at the Contractor’s expense and disposed of in accordance with all current applicable agency regulations. FABRIC TUBE The fabric tube shall consist of one or more layers of absorbent non-woven felt fabric, felt/fiberglass or fiberglass and meet the requirements of ASTM F 1216, ASTM F 1743, ASTM D 5813 & ASTM F 2019. The fabric tube shall be capable of absorbing and carrying resins, constructed to withstand installation pressures and curing temperatures and have sufficient strength to bridge missing pipe segments, and stretch to fit irregular pipe sections. The contractor shall submit certified information from the felt manufacturer on the nominal void volume in the felt fabric that will be filled with resin. The wet-out tube shall have a uniform thickness and excess resin distribution that when compressed at installation pressures will meet or exceed the design thickness after cure. The fabric tube shall be manufactured to a size and length that when installed will tightly fit the internal circumference, meeting applicable ASTM standards or better, of the original pipe. Allowance shall be made for circumferential stretching during installation. The tube shall be properly sized to the diameter of the existing pipe and the length to be rehabilitated and be able to stretch to fit irregular pipe sections and negotiate bends. The Contractor shall determine the minimum tube length necessary to effectively span the designated run between manholes. The Contractor shall verify the lengths in the field prior to ordering and prior to impregnation of the tube with resin, to ensure that the tube will have sufficient length to extend the entire length of the run. The Contractor shall also measure the inside diameter of the existing pipelines in the field prior to ordering liner so that the liner can be installed in a tight-fitted condition. The outside and/or inside layer of the fabric tube (before inversion/pull-in, as applicable) shall be coated with an impermeable, flexible membrane that will contain the resin and facilitate, if applicable vacuum impregnation and monitoring of the resin saturation during the resin impregnation (wet-out) procedure. No material shall be included in the fabric tube that may cause de-lamination in the cured CIPP. No dry or unsaturated layers shall be acceptable upon visual inspection as evident by color contrast between the felt fabric and the activated resin containing a colorant. The wall color of the interior pipe surface of CIPP after installation shall be a light reflective color so that a clear detailed examination with closed circuit television inspection equipment may be made. The hue of the color shall be dark enough to distinguish a contrast between the fully resin saturated felt fabric and dry or resin lean areas. Seams in the fabric tube, if applicable, shall meet the requirements of ASTM D5813. The outside of the fabric tube shall be marked every 5 feet with the name of the manufacturer or CIPP system, manufacturing lot and production footage. The minimum length of the fabric tube shall be that deemed necessary by the installer to effectively span the distance from the starting manhole to the terminating manhole or access point, plus that amount required to run-in and run-out for the installation process. The nominal fabric tube wall thickness shall be constructed, as a minimum, to the nearest 0.5 mm increment, rounded up from the design thickness for that section of installed CIPP. Wall thickness transitions, in 0.5 mm increments or greater as appropriate, may be fabricated into the fabric tube between installation entrance and exit access points. The quantity of resin used in the impregnation shall be sufficient to fill all of the felt voids for the nominal felt thickness. RESIN The resin shall be a corrosion resistant polyester or vinyl ester resin and catalyst system that when properly cured with the tube composite meets the requirements of ASTM F1216, ASTM F1743 or F2019, the physical properties herein, and those, which are to be utilized in the design of the CIPP for this project. The resin shall produce CIPP which will comply with or exceed the structural and chemical resistance requirements of this specification. The resin to tube ratio, by volume, shall be furnished as recommended by the manufacturer. STRUCTURAL REQUIREMENTS The physical properties and characteristics of the finished liner will vary considerably, depending on the types and mixing proportions of the materials used, and the degree of cure executed. It shall be the responsibility of the Contractor to control these variables and to provide a CIPP system which meets or exceeds the minimum properties specified herein: The CIPP shall be designed as per ASTM standards. The CIPP design shall assume no bonding to the original pipe wall. The design engineer shall set the long term (50 year extrapolated) Creep Retention Factor at 33% of the initial design flexural modulus as determined by ASTM D-790 test method. This value shall be used unless the Contractor submits long term data (ASTM D2990) to substantiate a higher retention factor. The cure pipe material (CIPP) shall, at a minimum, meet or exceed the structural properties, as listed below . MINIMUM PHYSICAL PROPERTIES Property Test Method Cured Compos Technical Specifications - Installation CONSTRUCTION REQUIREMENTS Preparation, cleaning, inspection, sewage by-passing and public notification. The Contractor shall clean the interior of the existing host pipe prior to installation of the CIPP liner. All debris and obstructions, that will affect the installation and the final CIPP product delivery to the Owner, shall be removed and disposed of by the Contractor. The CIPP liner shall be constructed of materials and methods, that when installed, shall provide a joint-less and continuous structurally sound liner able to withstand all imposed static, and dynamic loads on a long-term basis. The Contractor may, under the direction of the Owner, utilize any of the existing manholes in the project area as installation access points. If a street must be closed to traffic because of the location of the sewer, the Contractor shall furnish a detailed traffic control plan and all labor and equipment necessary. The plan shall be in conformance with the requirements of the local agency having jurisdiction over traffic control. Cleaning of Pipe Lines – The Contractor shall remove all internal debris from the pipe line that will interfere with the installation and the final product delivery of the CIPP as required in these specifications. Solid debris and deposits shall be removed from the system and disposed of properly by the Contractor. All sludge, dirt, sand, rocks, grease and other solid or semi-solid material resulting from the cleaning operation shall be removed at the downstream manhole of the section being cleaned. Passing material from manhole section to manhole section shall not be allowed. As applicable the Contractor shall either plug or install a flow bypass pumping system to properly clean the pipe lines. Precaution shall be taken, by the Contractor in the use of cleaning equipment to avoid damage to the existing pipe. The repair of any damage, caused by the cleaning equipment, shall be the responsibility of the Contractor. Disposal of Material – All solids or semi-solids resulting from the cleaning operations shall be removed from the site and disposed of at a site approved by the Owner. All materials shall be removed from the site no less often that at the end of each workday. Under no circumstances will the Contractor be allowed to accumulate debris, etc., on the site of work beyond the stated time, except in totally enclosed containers and as approved by the Owner. Contractor shall be responsible for all disposal costs. By-passing Existing Sewage Flows – If it is necessary for the Contractor to install a by-pass pumping system in order to properly control the sewer flows in a line segment, the Contractor will prepare and submit to the City for approval, a written detailed by-pass plan and design of adequate capacity and size to handle peak flows. The Contractor may not proceed until the by-pass plan has been reviewed and approved by the City. The Contractor will coordinate the installation of the approved by-pass plan with the City. The Contractor shall provide for the flow of existing mainline and service connection effluent around the section or sections of pipe designated for CIPP installation. Service connection effluent may be plugged only after proper notification to the affected residence and may not remain plugged overnight. Installation of the liner shall not begin until the Contractor has installed a sewage by-pass system and all pumping facilities have been installed and tested under full operating conditions including the bypass of mainline and side sewer flows. Once the lining process has begun, existing sewage flows shall be maintained until the resin/felt tube composite is fully cured, cooled down, fully televised and the CIPP ends finished. The Contractor shall coordinate sewer bypass and flow interruptions with the Owner at least 48 hours in advance and with the property owners and businesses at least 2 busin
Published attachments
- Insurance Requirements - 2027-ITB-UT-002-SS
- Sample Master Service Agreement - 2027-ITB-UT-002-SS
- Sample Work Authorization - 2027-ITB-UT-002-SS
- Sample Public Construction Bond - 2027-ITB-UT-002-SS
- Attachment E - DIV 00 - Contract Requirements Packet - 2027-ITB-UT-002-SS
- Inflow_and_Infiltration_Sanitary_Sewer_Lining,_Remediation,_and_Repair_(Addendum_#1_Revision).pdf
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum. Response Deadline and Bid Opening extended to December 17th, 2026 in order to review and address Vendor questions.
OpenGov categories
- 91063 · Public Utilities: Water, Sewer and Gas Maintenance and Repair
- 91345 · Construction, Sewer and Storm Drain
- 91356 · Construction, Utility/Underground Projects