Install Concrete Pad for Metal Storage Building at Fire Station #63

Description

Install a concrete pad and utilities for a metal storage building. The concrete must meet all specifications on the plans and will be able to hold the weight of fire apparatus of approximately 55,000 lbs each. Bidders shall be aware that electrical, above-ground fire sprinkler & building installer vendors have been selected. The following is the scope of work needed: Demolition (saw cut and removal of existing AC material) Utilities (trenching for electrical and fire sprinklers, electrical pipe installation) Concrete Pad Installation (includes subgrade preparation, form work, rebar installation, concrete pour and finish work, AC conforms, building anchorage installation) Remove existing storm drain inlet connection and install/connect new Bio-Retention Area. Bidders shall review and adhere to the following: Green Building Checklist Site management & bmps per plans Construction waste reduction, disposal and recycling Product gwp compliance Finish material pollutant control Coordinate and work with other contractors as required to execute all work listed on plans. Schedule, attend, and complete all required inspections for listed scope of work with the applicable City of Santa Cruz inspectors. All refuse and recycling activities during construction must comply with Chapter 6.12 of the Santa Cruz Municipal Code and be accounted for on the Construction Waste Management Plan. All work must comply with the building permit plans, as well as state and local codes. A bid bond is required for the project bid. A labor and performance bond and a materials bond will be required after the project is rewarded. The total available funding for this project is $200,000 . Respondents are encouraged to submit cost proposals within this budget. Proposals exceeding the available funding may be evaluated but will be subject to additional review regarding project feasibility and funding availability. Materials: Demolition (includes saw cutting). Concrete Pad Installation (includes earthwork, formwork, rebar, installation, finish work, AC conform labor & material, as per sheet C2.0) Labor: Demolition (includes saw cutting, removal and disposal of existing material). Concrete Pad Installation (includes earthwork, formwork, rebar, installation, finish work, AC conform labor & material, as per sheet C2.0) Removal & Disposal fees of Existing Material Materials: Concrete (35’x42’x4”, as per sheet MB1) Materials: New Bio-Retention Area (as per Sheets C2.0 & C5.1) Labor: New Bio-Retention Area (as per Sheets C2.0 & C5.1) - Includes removal of existing storm drain infrastructure and connection to existing storm drain lateral Materials: Utility (electrical & fire sprinkler) Trenching and Electrical Pipe Installation Labor: Utility (electrical & fire sprinkler) Trenching and Electrical Pipe Installation Materials: 2” PVC Pipe Schedule 40 (for electrical) - See attachment C2.0 Labor: 2” PVC Pipe Schedule 40 (for electrical) - See attachment C2.0 10% Contingency PRELIMINARY SCOPE OF WORK Project Objectives The project involves the installation of a concrete pad and utilities for a metal storage building. The concrete must meet all specifications on the plans and will be able to hold the weight of fire apparatus of approximately 55,000 lbs each. Its primary goal is to establish a functional storage facility for fire department apparatus and equipment. Scope of Work The following is the scope of work needed: Demolition (saw cut and removal of existing AC material) Utilities (trenching for electrical and fire sprinklers, electrical pipe installation). Two trenches will be installed. The fire sprinkler trench will be located at the rear of the building for the fire sprinkler line. The trench will be approximately 40 feet long and the depth will be 30” per NFPA 10.4.2.2. It will remain open until the sprinkler contractor installs the piping. The contractor awarded this project will backfill the trench upon completion of the pipe installation. The backfill specifications will comply with NFPA 24 Section 10.9. The electrical trench will be for a new electrical line. It will run from the existing storage building into the existing building, extending approximately 12 feet into the structure. The trench will be approximately 25 feet long and will include two elbows, one at each end. The conduit will be 2-inch Schedule 40 PVC. The electrical trench specifications will be per 2022 California Electrical Code requirements, 24” trench depth for commercial PVC. The electrical line will run from the existing storage building, extending approximately 12 feet into the new building. Look at the attachment for the electrical line and fire sprinkler line highlighted in red. Concrete Pad Installation (includes subgrade preparation, form work, rebar installation, concrete pour and finish work, AC conforms, building anchorage installation) The building manufacturer will provide and drill anchor bolts into the concrete, so the awarded contractor will not need to do that. Remove existing storm drain inlet connection and install/connect new Bio-Retention Area. The pipe size and depth will need to be field verified. Use 4" pipe for bidding purpose. Bidders shall review and adhere to the following: Green Building Checklist Site management & bmps per plans Construction waste reduction, disposal and recycling Product gwp compliance Finish material pollutant control Coordinate and work with other contractors as required to execute all work listed on plans. Schedule, attend, and complete all required inspections for listed scope of work with the applicable City of Santa Cruz inspectors and special inspector Pacific Crest Engineering per the building permit plans. All refuse and recycling activities during construction must comply with Chapter 6.12 of the Santa Cruz Municipal Code and be accounted for on the Construction Waste Management Plan. Existing AC and concrete can be disposed of at the City of Santa Cruz Resource Recovery Facility, located at 605 Dimeo Lane, Santa Cruz, CA Fee for clean AC - $68 per ton Fee for AC mixed with dirt - $100 per ton (If majority of material is dirt, contractor is responsible for soil testing and will provide test results to the Public Works staff) All work must comply with the building permit plans, as well as state and local codes. Contractor is responsible for scheduling and coordinating City Building Department inspections Inspection and permit fees are the responsibility of the City Please review the attached issued building permit plans and specifications. Minimum Qualifications Licensing: Contractor must hold a valid and current general A or B contractor license as required by the State of California or provide justification for an alternative license for the scope of work for this project. Experience: Contractor shall demonstrate a minimum of three (3) years of relevant experience at the level of journeyman, foreman, or licensed contractor. Insurance and Bonding: Contractor must maintain, at a minimum, general liability insurance, workers’ compensation insurance, and all required surety bonds in compliance with state and local regulations. Certifications: While not mandatory, certifications from recognized industry organizations are strongly encouraged and may be used to demonstrate proficiency as a general contractor. Business Requirements: Contractor must be properly registered and in good standing with the State of California, including appropriate business structure (e.g., corporation, limited liability company) and possession of a valid Tax Identification Number. Local Business License: Contractor must possess a valid and current business license issued by the City of Santa Cruz prior to contract award and maintain it for the duration of the project. DIR Registration: Contractor and all subcontractors shall be currently registered with the California Department of Industrial Relations (DIR) in accordance with California Labor Code Section 1725.5 prior to bid submission, contract award, and the performance of any public works work. ATTENTION: See sample contract for specific insurance and other associated requirements. Contractor Responsibilities Standards of Conduct. The Contractor is responsible for maintaining standards of employee competence, conduct, courtesy, appearance, honesty, and integrity satisfactory to the City. Supervision. The Contractor shall always provide adequate and competent supervision during the Contract term. The Contractor shall be readily available to meet with the City. Contractor shall provide the telephone numbers where its representative(s) can be reached. City Premises. Contractor’s employees and agents shall comply with all City rules and regulations while on City premises. Removal of Employee. City may request the Contractor immediately remove from assignment to the City any employee found unfit to perform duties at the City. The Contractor shall comply with all such requests. Communication. Contractor shall ensure that onsite employees can communicate in English both verbally and in writing. Safety Requirements All work performed under this contract shall be conducted in accordance with the standards customarily adhered to by an experienced and competent provider of the goods and/or services called for under this Contract using the degree of care and skill ordinarily exercised by reputable providers of such goods and/or services. All work will be performed in a safe manner and shall comply with all safety provisions and regulations. Contractor shall abide by all CAL/OSHA requirements, including the labeling of containers. Contractors who have ten (10) or more employees shall have an injury/illness program as required by OSHA. The City reserves the right to issue restraint or cease and desist orders to Contractor when unsafe or harmful. Responsibilities of City A designated City contact will be available during the course of the project. Access to the facilities/reports/systems/records/etc. needed to complete the work will be provided through the designated City contact . Information regarding past work performed on this project can be requested through the City contact and will be provided if the information is reasonably accessible and available. Vendor’s Employee Conduct Vendor will agree to remove any employee whose conduct is improper, inappropriate, or offensive as determined by the City. A removed employee(s) is not to work on City premises without the written consent of the City. The Vendor will remove any employee from working in, or delivering to, City facilities who is convicted of a felony during his/her employment. Emergency Response Vendor will provide the name and contact information of a representative who will be available 24 hours a day, 7 days a week, in the event of an emergency. During the emergency, Vendor will provide the City of Santa Cruz with all available supplies, materials, equipment and/or services on a priority basis. Time is of the essence for delivery. Delivery location(s) and estimated arrival will be mutuality agreed upon, by the City and Vendor, at time of order and will be determined based on need and existing conditions. It is understood that current conditions, such as power outages, road closures, and damages to the Vendor’s facility and/or equipment, will be taken into consideration. The City expects emergency deliveries to occur within 4 hours of order placement and may be required during evenings, weekends, and holidays. INTRODUCTION Summary Background Contact Information Timeline The City will make every effort to adhere to the following tentative schedule. All dates set forth in this IFB are subject to change at the City’s sole discretion. Any change will be set forth in an addendum. All references in this IFB to “time” are Pacific Standard Time. GENERAL INFORMATION FOR BIDDERS Summary Scope of Work All applicants must provide thorough and comprehensive responses that clearly demonstrate their team’s approach to and consistency with the below-mentioned standards. The City invites qualified firms to respond to this Invitation for Bids (IFB) for the project (“Project”) titled below: Install Concrete Pad for Metal Storage Building at Fire Station #63 IFB No. FIRE-0302 The City anticipates awarding a contract to a vendor for a six-month term with the option of two six (6) month term extensions if City so elects. The Bidder will provide the services outlined in Section PRELIMINARY SCOPE OF WORK . The successful Bidder shall furnish all tools, equipment, materials, tax, apparatus, facilities, labor, transportation, supervision, and management, not specifically provided by the City, to complete the work described in this IFB. The successful Bidder will provide a brief statement of services, as detailed further in Section PRELIMINARY SCOPE OF WORK . Contact If you have any questions concerning this solicitation, please ask questions utilizing City’s e-Procurement Question & Answer feature. This IFB document may be downloaded from the City’s e-Procurement Portal at https://procurement.opengov.com/portal/santacruzca/projects/316038 . For technical assistance, contact OpenGov using the real-time chat feature on the Portal (located in the lower right-hand corner of the screen), or via email at procurement-support@opengov.com for support. All questions must be received by the date and time stated in Timeline in the Introduction Section. Pre-Bid Meeting & Site Visit A non-mandatory pre-bid meeting is scheduled on the date and time and at the location stated in Timeline in INTRODUCTION Section. The purpose of this meeting is to give Bidders the opportunity to familiarize themselves with the City’s requirements. Clarification and a review of the IFB process will be discussed at the pre-bid meeting. To expedite the sign-in process, the city will accept a company business card containing the attendee’s name and contact information, as a valid sign-in. Attendance at the pre-bid meeting is not mandatory, however, it is strongly encouraged. The City complies with the Americans with Disabilities Act. If you require reasonable accommodations in order to attend the pre-bid meeting, please call the contact listed in the INTRODUCTION section at least 48 hours prior to the meeting. Bid Submittal Due Date and Public Bid Opening All bids will be submitted via the City’s e-Procurement Portal at: https://procurement.opengov.com/portal/santacruzca/projects/316038 before due date. Each bid received before 2:00 pm on Thursday, November 19, 2026 will be publicly opened during a Zoom Meeting as stated in Timeline in INTRODUCTION section . Bids received after the deadline will be deemed non-responsive. If one or more members of the public are present, the name of each bidder and the total amount of each bid will be read aloud at the Bid Opening meeting. Those wishing to attend the meeting should log into Zoom to ensure that they can access the meeting ahead of time. Bidders take full responsibility for City’s receipt of its Bid. The City will not be liable for any expenses incurred by Bidders in responding to this solicitation. Basis of Award Award shall be made to the lowest responsive and responsible bidder whose bid is most economical for the purpose intended according to criteria designated in this solicitation. All items included on the Bid Form will be part of the the Basis of Award for this solicitation, unless otherwise specified in this solicitation. Supplemental items if identified may also be awarded in the impending contract, however, will not be the basis of award. All bidders are required to complete complete all lines of the Bid Form. Failure to meet this requirement may be a sufficient reason to declare the bid non-responsive. Definitions In this IFB document: “Bidder” means contractor, firm, supplier, vendor, or consultant submitting a bid to this IFB. “Bid” means the complete submittal of bidder to the City in response to this IFB, including any written documentation submitted with the submittal. “Subcontractor” means those performing any portion of the services as subcontractors, vendors, suppliers, and other business entities and individuals that is not the bidder. “Key Staff”, if required, means the employees of the Contractor or subcontractor(s) that will provide project leadership or expertise in lead technical services and are considered essential to the success of the word. “Contract” also means Purchase Order or Agreement. INSTRUCTIONS FOR BIDDERS Questions and Requests for Clarification and Addenda Questions or concerns regarding any aspect of this IFB shall be sent via City’s e-Procurement Portal’s Question & Answer feature and received by the date identified in Timeline in INTRODUCTION Section . Any questions or objections not submitted within the time and manner stated above or to anyone other than the above-stated contact will be deemed waived. The City is not bound by the oral representation of any City employee or official. Answers to questions received will be sent out via an addendum. The City may determine it is necessary to revise any part of this IFB. Revisions will be made by written addenda and it is the Bidder's sole responsibility to comply with any addenda to this IFB and acknoeledge addenda via City's e-Procurement Portal. Addenda will be posted on the City’s e-Procurement Portal, https://procurement.opengov.com/portal/santacruzca/projects/316038 , under Bidding Information. Bid Submittal Sealed bids are due no later than the Date and time specified in Timeline in INTRODUCTION Section . All bids will be submitted via City's e-Procurement Portal before the due date. Prior to any bid being accepted, the bidder must demonstrate compliance with all bid specifications for such product. The burden of proof of compliance with this specification is the responsibility of the bidder. No exceptions to or deviations from this specification shall be considered unless each exception or deviation is specifically stated as an exception and accompanied by a detailed description of the exception and/or deviation . If no exception or deviation is shown, the bidder shall be required to furnish the equipment exactly as specified herein. Failure to comply with all requirements, instructions, and conditions of the invitation for bids and this specification may result in rejection of bid. Non-Response to IFB If the Bidder does not wish to submit a bid, write “no bid at this time” and the Bidder name on the Bid Sheet and return by the bid due date. Failure to respond to this Invitation for Bids may result in removal of the Bidder from the bid list for the solicited item. Responsive Bids Bids are considered responsive when they: Comply with all requirements, instructions, and conditions of this solicitation. Comply with the bid specifications and do not have unacceptable exceptions. Include pricing for all items listed. Include all required submittals. Acknowledge all bid addenda. Have signatures on the Bid Sheet. Are received by the bid due date and time. Non-responsive bids may not be considered and may be rejected. Reservation of Rights The City may exercise at its sole discretion the following rights. By responding to this IFB, Bidders acknowledge and consent to the following rights. The City reserves the right to: Postpone, cancel, or issue a subsequent IFB. Reject any or all bids. Reject any bid that is conditional in any way or that contains erasures, items not called for, items not in conformity with applicable law, changes, additions, alternate bids, or any responsive or submitted by a Bidder that is not responsible. Issue addenda to amend, modify, add or delete requirements of this IFB. Remedy technical errors in the IFB process. Disqualify Bidders who are deemed non-responsive t

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Maximum Bid Requirement Amendment: Please use the See What Changed link to view all the changes made by this addendum.

  • Official Notice #1: Pre-Bid Meeting Sign-In Sheet Posted · 1

    Please be advised that the Sign-In Sheet from the Pre-Bid Meeting held on November 10, 2026 has been uploaded to the project portal.

  • Addendum #2 · 2

    Civil Sheet Revisions (C1.0-C5.1)

  • Addendum #3 · 3

    Bid Bond Upload Added. Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #4 · 4

    Complete attached Bid Bond Form and upload in submittal.

Public questions and answers
  • The geotechnical report and the plans have conflicting requirements for excavation and recompaction as well as engineered fill. The plans call for 12" of over-ex and recompaction for the building pad. The geotechnical report calls for 48" of existing soil to be removed and backfilled with a minimum of 30" of engineered fill. Please clarify what will be required.

    Please see Addendum #2 - Revised Civil Sheets (C1.0-C5.1).

  • Please confirm that the subgrade for the Heavy-Duty AC Pavement section shown in detail 1, sheet C5.1 needs to be over-excavated and recompacted to a depth of 24", per section 6 of the recommendations in the geotechnical report.

    Please see Addendum #2 - Revised Civil Sheets (C1.0-C5.1).

  • Who is responsible for compaction testing?

    Pacific Crest Engineering will perform compaction testing. Cost of testing is not included in the solicitation.

  • Will temporary chain-link construction fencing be required for this project?

    The site is enclosed at the Public-Right-of-Way. No construction fencing is required. Delineators and caution tape may be necessary for vehicles driving onsite.

  • Will there be any coordination required between the contractor and the fire department during construction activities?

    Yes. Contractor will need to coordinate with City Project Manager to relay schedule and impacts to the site.

  • Please provide a material for underneath the 6" Vertical Curb shown on Detail 7 of Sheet C5.1.

    Class II base rock is required under the 6" vertical curb.

  • Please provide the Core Mix for the 24" min. of Soil Media for the Bio-Retention Area

    Soil Media Mix Proportions: - Mineral Aggregate (Sand): 60% to 65% by volume (typically clean fine sand). - Compost: 35% to 40% by volume (aged, weed-free organic compost meeting US Composting Council standards).

  • Please confirm that the handling and disposal of unsuitable soils will be viewed as extra work.

    Bid what is specified on the plans, once awarded anything beyond the scope would be a change order.

  • Provide further information on the construction of the overflow device. What is the size of the overflow pipe? What type of material is the pipe to be? Will a beehive style grate be required at the top?

    See Addendum #2, sheet C2.0 of revision 2 "Bid Revisions".

  • Please confirm percentage required for Bid Bond.

    The bid bond is 10% of the total amount of bid.

Plain text

OpenGov categories

  • 15015 · Concrete, Polymer, All Types
  • 15016 · Curing Mixtures, All Types (For Curing Concrete)
  • 15035 · Hardeners, Concrete and Plaster
  • 21072 · Risers and Cones, Reinforced Concrete
  • 31530 · Coatings, Protective (For Masonry Including Concrete Floor)
  • 63109 · Coatings, Masonry (For Brick, Cinder Block, Concrete, etc.) (To Include Silicate Protective Coatings and Products), Environmentally Certified Products
  • 65834 · Pipe, Concrete
  • 74565 · Patching Mix, Asphalt Concrete
  • 90933 · Contractor Compliance Monitoring Services
  • 91051 · Masonry, Concrete, and Stucco Maintenance, Finishing, and Repair (Includes Inside Concrete Sawing and Grouting Work)
  • 91223 · Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.)
  • 91430 · Concrete