INVITATION TO BID: Highland Village Stormwater Improvements Project (Phase 1)

Description

The City of North Miami Beach, FL (the "City"), is soliciting sealed responses for INVITATION TO BID: Highland Village Stormwater Improvements Project (Phase 1) . Responses are to be submitted via the City's eProcurement Portal via https://procurement.opengov.com/portal/citynmb PRIOR TO 5:00 pm on Thursday, December 3, 2026 . Late responses will not be accepted. Project work includes furnishing all materials, labor, and equipment necessary to install backflow prevention devices upstream of the existing outfalls located adjacent to NE 25th Avenue, including, but not limited to, excavation, demolition; installation of proposed drainage structures; connection to existing storm drain system HDPE Storm Sewer (sizes vary), sleeves (sizes vary) and inline backflow prevention device; remove and relocate as required: existing 2” water services; relocate existing 8” watermain; replacement of any sod, sidewalk, pavement damaged during construction, and other appurtenant and miscellaneous items for a complete, satisfactory and functional installation. SECTION 4.0 SCOPE OF SERVICES PURPOSE AND INTENT The City of North Miami Beach, Florida ("City") is soliciting bids from qualified Contractor(s) for the Highland Village Stormwater Improvements Project (“Project”). The City expects to retain a Contractor that can meet the challenges of a dynamic City, capable of providing reliable and expedient response times to meet project deadlines, staff requests, and outstanding service delivery. In addition, the awarded Contractor shall be able to provide technical assistance and maintain industry best practices throughout the project. All work performed as part of this project shall meet standards and specifications of the City, North Miami Beach Public Works Department, Miami-Dade County and any other regulatory agency that have jurisdiction within the project limits. SCOPE OF SERVICES The Awarded Bidder shall ensure smooth and efficient project planning, staffing, communication updates, and scheduling, through project completion, as required by the scope of services herein contained. Bidders shall include in their offer all required project labor, machinery, rentals, tools, travel, transportation, delivery, materials, equipment, supplies, permits, and related incidentals necessary to meet, in its entirety, the ITB requirements specified herein. The Awarded Bidder shall be responsible for ensuring it is in possession of all required City permits prior to commencement of work, and maintaining permits throughout the contract award, as required. All costs associated with obtaining required permits shall be the responsibility of the Awarded Bidder(s). The Awarded Bidder shall minimize the impact of this project on the general public ensuring that all service interruptions are kept to a minimum and providing temporary services, structures, and facilities as required. The existing water service to the Residents and businesses may not be interrupted for more than 4 hours without written permission from the City. All such facilities are considered part of this Contract and shall be provided at no additional cost to the City. The Awarded Bidder shall perform work between the hours 7:00 AM and 4:00 PM Monday through Friday, or as restricted by the local jurisdiction. Work outside these hours or on weekends and holidays is prohibited without permission from the City and local jurisdiction. The Awarded Bidder is to maintain appropriate signage, guards, and flagmen for the purpose of safeguarding the general public while work is ongoing. All work shall be completed in a safe and workmanlike manner every day and the Contractor shall secure the site prior to leaving at the end of each and every day. Specific responsibilities include but are not limited to the following; The Work to be performed under this Contract shall consist of furnishing all equipment, materials, supplies, and manufactured articles and for furnishing all transportation and services, including fuel, power, water, and essential communications, and for the performance of all labor, work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The Work shall be complete, and all work, materials, and services not expressly shown or called for in the Contract Documents which may be necessary for the complete and proper construction of the Work in good faith shall be performed, furnished, and installed by the Awarded Bidder as though originally so specified or shown, at no increase in cost to the CITY. The Work to be done under this Contract and in accordance with these Specifications and Drawings outlined in BID SET included hereafter and it consists of furnishing all equipment, superintendence, labor, skill, material, and all other items necessary for this project. The Awarded Bidder shall perform all work required for such construction in accordance with the Contract Documents and subject to the terms and conditions of the Contract, complete and ready for use. The Awarded Bidder is advised that this project will have a direct effect on the citizens living in the immediate vicinity of the work area and as such adequate notification, as approved by the City's Public Information Manager, is required prior to commencing any and all work. TECHNICAL SPECIFICATIONS Bidders are advised to thoroughly review all bid plans, drawings, and project documents to ensure a full understanding of the technical specifications and scope of work. The bid documents contain detailed construction requirements, materials standards, performance criteria, and applicable codes which are critical to the preparation of a responsive and responsible bid. It is the sole responsibility of each bidder to: Examine all drawings and technical specifications prior to submitting a bid Identify any discrepancies, omissions, or unclear items in the plans Submit any questions or requests for clarification by the deadline stated in the bid schedule Ensure that all proposed costs include compliance with the specified technical standards Failure to review the bid plans in detail shall not relieve the selected contractor from meeting all project requirements. SECTION 1.0 INTRODUCTION Bid ITB-2026-050 INVITATION TO BID: Highland Village Stormwater Improvements Project (Phase 1) Release Project Date: September 30, 2026 Pre-Bid Conference (Non-Mandatory): October 28, 2026, 1:00pm Microsoft Teams meeting Join: https://teams.microsoft.com/meet/262549495651116?p=8FPOvaVZRM0eYOyX5a Meeting ID: 262 549 495 651 116 Passcode: JK924Zn9 Question Submission Deadline: November 11, 2026, 5:00pm Response Submission Deadline: December 3, 2026, 5:00pm Bid Contact Kemesia Clarke Senior Purchasing Agent Contract Renewal 0 annual renewals Prices Good for 1 year Pre-Bid Conference Wednesday, October 28, 2026 1:00 pm Attendance is Non-Mandatory Location: ALL ATTENDEES must arrive 10 minutes before time. Bid Comments The City of North Miami Beach, Florida (“City”) is seeking bids to provide INVITATION TO BID: Highland Village Stormwater Improvements Project (Phase 1) . It will be the sole responsibility of the bidder to ensure that bid is submitted prior to the bid opening date and time listed. PAPER BID SUBMITTALS WILL NOT BE ACCEPTED. BIDS MUST BE SUBMITTED ELECTRONICALLY VIA https://procurement.opengov.com/portal/citynmb . SITE VISIT : There will be an official scheduled site visit to review the City’s expectations for this project and to discuss the overview of scope. Attendance to the site visit is optional. However, no bidder shall be allowed to visit the site at an alternative date & time. It will be the sole responsibility of the bidder to be familiar with the scope of the project prior to submitting a Bid. No variation in price or conditions shall be permitted based upon a claim of ignorance. Submission of a Bid will be considered evidence that the Bidder has familiarized themselves with the nature and extent of the work, equipment, materials, and labor required. The entire bid response must be submitted in accordance with all specifications contained in this solicitation. THE SITE VISIT WILL BE HELD ON Wednesday, October 28, 2026 1:00 pm . The City of North Miami Beach reserves the right to waive any informality in any or all bids and to reject any or all bids. For information concerning technical specifications, please utilize the question/answer feature provided by OpenGov at https://procurement.opengov.com/portal/citynmb/projects/186319 . Questions of a material nature must be received prior to the cut-off date specified in the solicitation. Material changes, if any, to the scope of services or bidding procedures, will only be transmitted by written addendum. SECTION 2.0 GENERAL TERMS AND CONDITIONS DEFINITIONS When used in Contract Documents (defined below) or in related documents, the following terms shall have the meanings given below: Addendum: A modification of the Plans, Specifications or other Contract Documents distributed to prospective Bidders prior to the opening of Bids/Proposals. Advertisement for Bids: The public notice inviting the submission of bids for the work. Bid/Proposal Bond: A bond executed by a Bidder/Proposer and its Surety in the attached form guaranteeing that the Bidder/Proposer, if awarded the Contract will execute the same and will timely furnish the required Performance Bond, Payment Bond, and evidence of Insurance. Calendar Day: Every day shown on the calendar. Change Order: A written agreement executed by the City, the Contractor and the Contractor’s Surety, covering modifications to the Contract recommended by the Project Manager and approved by the City Manager and/or City Commission. Contract: The written agreement between the City and the Bidder for performance of the Work in accordance with the requirements of the Contract Documents and for the payment of the agreed consideration. Contract Documents: The Instructions to Bidders, Bid Form, Bid Bond, Contract, Performance Bond, Payment Bond, General Conditions, Special Conditions, and Scope of Work, together with all Addenda. Contract Manager: North Miami Beach’s City Manager or designee or duly authorized representative designated to manage the Contract. Contractor: The individual, firm, partnership, corporation, or joint venture whose bid is accepted and who enters into a Contract with the City of North Miami Beach and who is liable for the acceptable performance of the work and for the payment of all legal debts pertaining to the Work. Contract Date: The date on which the Agreement is effective. Contract Time: The number of days allowed for completion of the work. The Contract Time will be stipulated in the Bid Form, unless extended by a Change Order. All contract time shall be measured in calendar days. City: A political subdivision, Incorporated City within Miami-Dade County of the State of Florida, whose governing body is a City Commission consisting of a Mayor, Vice Mayor and five City Commission members. City Manager: The Manager of the City of North Miami Beach, Florida. Days: Reference made to Days shall mean consecutive calendar days. Deliverables: All documentation and any items of any nature submitted by the Contractor to the City’s Contract Manager for review and approval in writing pursuant to the terms of the Agreement. Key Team Member: Individuals who will be assigned to the Project who play an important role in the design, construction, or management of the Project. Lessee: Any individual, partnership or corporation having a tenant relationship with the City of North Miami Beach. Owner: The term Owner as used in this Contract shall mean the City of North Miami Beach. Owner: The term Owner as used in this Contract shall mean the City of North Miami Beach. Performance Deposit: Certified Bank Check executed by the Contractor, on the attached forms, assuring that the Contractor will, in good faith, perform and guarantee the work in full conformity with the terms of the Contract Documents and will promptly pay all persons sup plying the Contractor with labor, materials, or supplies, used directly or indirectly by the Contractor in the prosecution of the Work. Project: The construction and services required by the Contract Documents, which includes all labor, materials, equipment, and services to be provided by the Contractor to fulfill the Contractor’s obligations. Project Manager: The duly authorized representative designated to manage the Project. Bid: The written offer of a Bidder to perform the work or service. Bid Documents: Bid Guarantee or Bid deposit. The Advertisement for Bid, Instructions to Bidders, Bid Form, Bidder Bond, Contract, Performance Bond, Payment Bond, General Conditions, Special Conditions, and Scope of Work, together with all Addenda. Bid Form: The form on which Bids are submitted. Bidder: Any individual, firm, partnership, or corporation submitting a Bid in accordance with the Instructions to Bidders. Scope of Service: Document which details the work to be performed by the Bidder. Subcontractor or Sub consultant: Any person, entity, firm, or corporation, other than the employees of the Contractor, who furnishes labor and/or materials, in connection with the Work, whether directly or indirectly, on behalf of and/or under the direction of the Contractor and whether or not in privity of Contract with the Contractor. The words “Work”, “Services”, “Program”, or “Project”: All matters and things required to be done by the Bidder in accordance with the provisions of the Contract. The words “Directed”, “Required”, “Permitted”, “Ordered”, “Designated”, “Selected”, “Prescribed”, or words of like import to mean respectively, the direction, requirement, permission, order, designation, selection or prescription of the City's Contract Manager; and similarly the words "approved", acceptable", "satisfactory", "equal", "necessary", or words of like import to mean respectively, approved by, or acceptable or satisfactory to, equal or necessary in the opinion of the City’s Contract Manager. In resolving disputes and in all respects the City Manager’s decision shall be final. VENDOR REGISTRATION INSTRUCTIONS It is the policy of the City to encourage full and open competition among all available qualified vendors. All vendors regularly engaged in the type of work specified in the Solicitation are encouraged to submit Bids. At the time of contract award (including small purchase orders), Bidders must complete a Vendor Application. For information and to apply as a vendor, please visit our website at www.citynmb.com to download an application and submit it to Procurement Management Division, 17011 NE 19 Avenue, Suite 315 North Miami Beach, Florida 33162. To get solicitation document, specifications and updates go to www.citynmb.com . CONE OF SILENCE AND REQUEST FOR ADDITIONAL INFORMATION “Cone of Silence,” as used herein, means a prohibition on any communication regarding a particular Request for Proposal (“RFP”), Request for Qualification (“RFQ”) or Invitation to Bid (“ITB”). Pursuant to Section 2-11.1(t) of the County Code, all solicitations, once advertised and until an award recommendation has been forwarded to the appropriate authority are under the “Cone of Silence”. Any communication or inquiries, except for clarification of process or procedure already contained in the solicitation, are to be made in writing to the attention of the Chief Procurement Officer. Such inquiries or request for information shall be submitted to the Chief Procurement Officer and shall contain the requester’s name, address, and telephone number. The request may also be electronically mailed to bids@citynmb.com or mailed to Procurement Management Department, 17011 NE 19 Avenue, Suite 315, North Miami Beach, Florida 33162. During the Cone of Silence, the following is prohibited: Any communication regarding this solicitation between a potential vendor, service provider, Bidder, lobbyist, or consultant and the City’s professional staff including, but not limited to City Commission, the City Manager and his or her staff. All communication regarding this solicitation should be sent in writing only to the Procurement Management Division at bids@citynmb.com . BIDDERS RESPONSIBILITIES Bidders are required to submit their bids upon the following express conditions: Bidders shall thoroughly examine the drawings, specifications, schedules, instructions, and all other contract documents. Bidders shall make all investigations necessary to thoroughly inform themselves regarding site(s) and facilities for delivery of material and equipment as required by the solicitation conditions. No plea of ignorance, by the Bidder, of conditions that exist or that may hereafter exist as a result of failure or omission on the part of the Bidder to make the necessary examinations and investigations, or failure to fulfill in every detail the requirements of the contract documents, will be accepted as a basis for varying the requirements of the City or the compensation due the Bidder. Bidders are advised that all City contracts are subject to all legal requirements provided for in the City of North Miami Beach Purchasing Code and applicable Miami-Dade County Ordinances, State Statutes and Federal Statutes. SUBMISSION OF BIDS Bids and Addenda thereto shall be submitted electronically via the City’s eProcurement Portal via https://procurement.opengov.com/portal/citynmb by 5:00 pm on Thursday, December 3, 2026 . ADDENDA The Procurement Management Department may issue an addendum in response to any inquiry received, prior to the bid opening, which changes, adds to, or clarifies the terms, provisions, or requirements of the solicitation. The Bidder should not rely on any representation, statement, or explanation, whether written or verbal, other than those made in this solicitation document or in any addenda issued. Where there appears to be a conflict between this solicitation and any addenda, the last addendum issued shall prevail. It is the Bidder’s responsibility to ensure receipt of all addenda and any accompanying documents. Bidder(s) shall acknowledge receipt of any formal Addenda via https://procurement.opengov.com/portal/citynmb . Failure to acknowledge Addenda shall deem the response non-responsive provided, however, that the City may waive this requirement in its best interest. REJECTION OF BID The City reserves the right to reject any or all bids prior to award. Reasonable efforts will be made to either award the contract or reject all bids within one hundred and twenty (120) calendar days after Bids opening date. WITHDRAWAL OF BID Bids may not be withdrawn and shall be deemed enforceable for a period of 120 days after the time set for the Bid opening. Bids may be withdrawn prior to the time set for the Bid opening. Such request must be in writing. The City will permanently retain as liquidated damages the Bid deposit furnished by any Bidder who requests to withdraw a Bid after the Bid opening. LATE BIDS OR MODIFICATIONS Only Bids received as of opening date and time will be considered timely. Bids and modifications received after the time set for the Bid opening will be rejected as late. CONFLICTS WITHIN THE SOLICITATION Where there appears to be a conflict between the General Terms and Conditions, Special Conditions, Scope of Services, Bid Submittal Section, or any addendum issued, the order of precedence shall be as follows: The last addendum issued, the General Terms and Conditions, the Special Conditions, the Scope of Services, and the Bid Submittal Section. CLARIFICATION OR OBJECTION TO BID SPECIFICATIONS If any person contemplating s

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Please use the See What Changed link to view all the changes made by this addendum. Pre-bid Conference information. Bid Submission Deadline extended. Microsoft Teams meeting Join: https://teams.microsoft.com/meet/262549495651116?p=8FPOvaVZRM0eYOyX5a Meeting ID: 262 549 495 651 116 Passcode: JK924Zn9

  • Addendum #2 · 2

    Please use the See What Changed link to view all the changes made by this addendum. Response deadline extended, Retainage corrected, Summary of work revised.

Public questions and answers
  • Reference: Sheet G-2.0, Engineer's General Notes 10 and 18; Sheet C-4.0; Bid Items 11 and 14; Spec Section 02745 Sheet G-2.0 Note 10 requires the trench to be restored full depth including a 2" layer of asphalt, followed by the remaining 2" of asphalt after trench restoration is complete. Sheet C-4.0 and Bid Items 11 and 14 call for 1" milling and 1" Type SP-9.5 resurfacing. Please confirm the required asphalt thickness for the trench patch and for the overlay, and the bid item under which the trench patch asphalt is to be paid.

    Restoration shall be as noted on plans. Sheet C-3.1 detail 213 requires 2-inches of asphalt during trench restoration. Sheet C-4.0 requires final restoration of 1-inch mill and 1-inch overlay. 1-inch-thick-square yards of asphalt installed shall be paid under Bid item 11 "FURNISH AND INSTALL 1” FDOT SP-9.5 ASPHALT"

  • Reference: Sheet C-2.0 Stormwater Improvements Plan; Bid Items 01 and 02 Sheet C-2.0 appears to show the proposed 30" corrugated HDPE as one 8 LF segment and the proposed 18" corrugated HDPE as 8 LF segments at the outfalls and at structure S-1. The Bid Schedule lists 20 LF of 30" HDPE (Item 02) and 40 LF of 18" HDPE (Item 01). Please confirm the quantities for Items 01 and 02, or advise where the additional lengths are located.

    Length needed are shown per plan. Intent is that the insert-check-valve must comfortably fit within one segment, per manufacturer's recommendations, and the pipe segment must connect back to the adjacent pipes and structures; therefore, additional feet may be needed depending on field conditions.

  • Reference: Bid Item 09; Spec Section 01025, 1.03.G Bid Item 09, 12" Type B Stabilized Subgrade, is listed as 50 LF, while Item 10, 8" Limerock Base, is 50 SY. Please confirm whether Item 09 should be measured in square yards (SY) and confirm the quantity.

    Confirmed. Bid Item 09, 12" Type B Stabilized Subgrade, shall be measured in square yards (SY).

  • Reference: ITB Section 3.29; Sample Agreement Articles 7.3 and 7.4 ITB Section 3.29 states "A retainage of ten percent (5%) will be deducted from the monthly payment." Please confirm the retainage percentage, and whether it is reduced at 50% completion or at Substantial Completion.

    Retainage amount shall be five percent (5%).

  • Do you have a Budget for this project?

    The City will not disclose the project budget or engineer’s estimate as part of this solicitation. Bidders shall prepare their bids based on the scope of work, plans, and specifications provided.

  • What is the estimated budget for this project?

    The City will not disclose the project budget or engineer’s estimate as part of this solicitation. Bidders shall prepare their bids based on the scope of work, plans, and specifications provided.

  • Reference: Specifications Section 01010, 1.04.A (p. 01010-2); Sheet C-2.0; Bid Schedule Section 5.0 Specification Section 01010, 1.04.A describes the work as including "remove and relocate as required: existing 2" water services; relocate existing 8" watermain". The Bid Schedule has no pay item for water main or water service relocation, and Sheet C-2.0 shows a proposed 4" PVC water main labeled "BY PROJECT WATR2007F". Please confirm whether relocation of the existing 8" water main and 2" water services is part of this contract. If it is, please provide the extent, details and bid items; if it is not, please confirm this work is by others under Project WATR2007F and advise the anticipated schedule of that project relative to this one.

    The water main and water service relocation work will be completed separately under NMB Water and is excluded from this stormwater contract. Specification Section 01010 1.04.A has been revised and is attached as Addendum No. 2

  • Could you please us the Engineering Estimate

    The City will not disclose the project budget or engineer’s estimate as part of this solicitation. Bidders shall prepare their bids based on the scope of work, plans, and specifications provided.

  • what is the budget/engineers estimate?

    The City will not disclose the project budget or engineer’s estimate as part of this solicitation. Bidders shall prepare their bids based on the scope of work, plans, and specifications provided.

  • Reference: ITB Sections 3.31 and 3.32; Sample Agreement Article 5; Technical Specifications ITB Sections 3.31 and 3.32 state that the Substantial Completion and Final Completion calendar days are outlined in the Technical Specifications, but no contract time was found in the Technical Specifications. Please provide the number of calendar days to Substantial Completion and to Final Completion.

    Substantial Completion of project shall be in 270 calendar days after Notice to Proceed. Final Completion of project shall be in 35 calendar days after Substantial Completion.

Plain text

OpenGov categories

  • 91115 · C.I.P., Construction/Rehabilitation, Other than Buildings
  • 91187 · Storm Drainage
  • 91327 · Construction, Highway and Road
  • 91345 · Construction, Sewer and Storm Drain
  • 91381 · Maintenance and Repair, Sewer and Storm Drain (Including Removal)
  • 92517 · Civil Engineering
  • 92528 · Drainage Engineering
  • 96800 · Public Works And Related Services