Ironhouse Sanitary District (ESCO) WRF Energy and Infrastructure Improvements
Description
Ironhouse Sanitary District (District) is soliciting proposals from experienced and qualified Energy Services Companies (ESCOs) for the development of an Energy and Infrastructure Modernization Program Roadmap focused on comprehensive infrastructure improvements, energy efficiency, and long-term utility cost savings. The proposed roadmap will identify and evaluate opportunities to modernize District facilities, equipment, and operational systems while reducing energy consumption, improving operational efficiency, and achieving sustainable cost savings. Proposals shall be submitted electronically through the District's OpenGov Procurement Portal at https://procurement.opengov.com/portal/isd no later than 5:00 pm on Thursday, December 17, 2026 . Project Overview The intent of the WRF Energy and Infrastructure Improvements Program is to identify, evaluate, design, and implement a coordinated program of energy system improvements, process and facility modernization, controls upgrades, and operational efficiency measures under California Government Code sections 4217.10-4217.18. The District intends to work with a single ESCO through the following three anticipated phases, with defined Board decision points between phases: 1. Phase 1 - Project Scoping and Feasibility: Evaluate the District's identified Capital Improvement Program projects and other potential energy, operational, and infrastructure opportunities to determine which projects are appropriate for further development through the ESCO program. Phase 1 will establish preliminary scope, technical feasibility, energy and operational savings potential, lifecycle benefits, project constraints, planning-level cost, schedule, and compatibility with Government Code section 4217. At the conclusion of Phase 1, the ESCO shall recommend which projects should advance to Phase 2 and which should not. 2. Phase 2 - Project-Specific Preliminary Design and GMP Development: For projects authorized by the Board to advance, prepare project-specific Preliminary Design Reports and advance design through approximately 30% and 60% completion. Phase 2 will refine scope, cost, schedule, energy and operational savings, lifecycle analysis, constructability, permitting, sequencing, shutdown requirements, and project risks. The ESCO shall obtain appropriate subcontractor and equipment pricing and develop a proposed Guaranteed Maximum Price ("GMP"), including contingencies, allowances, assumptions, exclusions, ESCO fees, and markups, sufficient for Board consideration of implementation. 3. Phase 3 - Implementation and Construction: Upon Board approval of Amendment No. 2 and the applicable GMP, complete final design and implement the authorized improvements. Phase 3 may include final engineering, permitting, procurement, construction, installation, startup, testing, commissioning, training, warranty services, as-built documentation, operation and maintenance information, and measurement and verification as required by the applicable agreement. Board approval of Amendment No. 2 will constitute authorization to proceed with the approved Phase 3 scope within the established GMP. Following selection of the ESCO, staff intends to present a Professional Services Agreement ("PSA"), included as Exhibit A to this RFP, to the District's Board of Directors for approval of Phase 1 - Project Scoping and Feasibility at a negotiated not-to-exceed cost. The District anticipates two planned amendments to the PSA, each subject to separate Board approval: Amendment No. 1 for Phase 2 - Project-Specific Preliminary Design and GMP Development, and Amendment No. 2 for Phase 3 - Implementation and Construction. Authorization of any phase does not obligate the District to proceed to a subsequent phase. The Board may advance all, some, or none of the projects recommended by the ESCO, and the District reserves the right to modify, defer, exclude, or independently procure any project or project element. PROJECT GOALS The District's goal is to use energy, operational, maintenance, and lifecycle savings to support infrastructure revitalization and reliable wastewater service. Respondents shall support this goal by developing, implementing, and monitoring a program that, as applicable, achieves the following objectives. All projects and opportunities shall be evaluated using a 25-year lifecycle analysis unless the District expressly authorizes a different period for a specific purpose. Modernizes aging infrastructure and process equipment; Improves reliability, maintainability, and operational resilience; Achieves long-term cost savings through energy- and water-efficiency measures and associated greenhouse gas reductions; Promotes staff safety, health, well-being, and operational efficiency; Maintains facility functionality and compatibility with existing equipment and systems; Improves the use of controls, automation, data, and other technology to optimize performance and reduce energy consumption; Minimizes financial, operational, and technical risk to the District; Provides training to District employees on operation, maintenance, and repair of equipment and controls; and Provides comprehensive funding and financing solutions. SCOPE OF SERVICES The following is a preliminary scope of services that may be modified during contract negotiations with the selected ESCO. Respondents are encouraged to recommend refinements that will result in a high-quality, implementable roadmap. The District's currently identified priorities are described below; the list is not intended to limit the ESCO from identifying additional cost-effective or operationally beneficial opportunities. Identified District Projects and ESCO Evaluation Framework The District has identified several capital improvement projects for consideration under the proposed WRF Energy and Infrastructure Improvements Program. These projects reflect current and anticipated infrastructure needs and may include improvements identified in the District's master plans, capital improvement program, or subsequent operational assessments. The inclusion of a project in this RFP does not constitute a determination that the project qualifies as an energy conservation measure, is recommended for implementation under the ESCO program, or is eligible for procurement pursuant to California Government Code sections 4217.10–4217.18. Certain projects may not be specifically identified or recommended in the supporting master plans and may require additional technical, operational, financial, and engineering evaluation to determine their feasibility and suitability for inclusion in the proposed program. The selected ESCO shall evaluate the identified projects and determine their potential for energy savings, ope Background Ironhouse Sanitary District (hereinafter "District") is soliciting proposals from experienced and qualified Energy Service Companies ("ESCOs") for development of a WRF Energy and Infrastructure Improvements Program focused on Water Recycling Facility (WRF) infrastructure modernization, operational reliability, and utility energy savings. The program is intended to be consistent with the provisions of California Government Code sections 4217.10-4217.18 and to provide sustained energy efficiencies and energy cost savings. The District owns and operates a Water Recycling Facility (WRF) that was constructed in 2011 and currently treats approximately 2.6 million gallons per day (MGD) of wastewater. The WRF utilizes membrane bioreactor (MBR) treatment followed by ultraviolet (UV) disinfection to produce high-quality recycled water. The facility includes headworks, biological treatment and membrane systems, pumping, solids handling and dewatering, odor control, electrical and instrumentation systems, SCADA and PLC controls, and associated support facilities. The WRF is a continuously operating treatment facility serving the District's wastewater collection system. Proposed improvements must therefore be planned, designed, and implemented to maintain treatment reliability, regulatory compliance, and operational flexibility while minimizing disruption to ongoing plant operations. If awarded, the selected ESCO will conduct a comprehensive assessment of applicable District facilities and infrastructure. Prior to entering into a contractual agreement for project implementation, an agreed-upon scope of work and funding plan will require approval by the District's Board of Directors. Once the implementation plan is created, the District may choose to implement a design-build program consistent with California Government Code sections 4217.10-4217.18 that provides sustained efficiencies, infrastructure modernization, and cost savings for the District's operating budget. The District, at its sole discretion, may select the awarded respondent for subsequent phases of work. The District also reserves the right to reject any or all proposals. To be considered, the proposal must be submitted electronically through the District's OpenGov Procurement portal before 5:00 p.m. on December 17, 2026. Proposals submitted by email, facsimile, mail, or hand delivery will not be accepted unless expressly authorized by written addendum. Respondents are responsible for completing any OpenGov registration and submission requirements sufficiently in advance of the deadline. All questions regarding this RFP shall be submitted through the District's OpenGov Procurement question-and-answer portal no later than 5:00 p.m. on November 30, 2026. The District anticipates issuing responses to timely submitted questions by 5:00 p.m. on December 4, 2026. Responses that modify, clarify, or supplement the requirements of this RFP will be issued through OpenGov by written addendum. Respondents are responsible for monitoring the OpenGov solicitation page for addenda and other procurement notices and for acknowledging addenda as required by the portal. Schedule The District anticipates entering into the Ironhouse Sanitary District Professional Services Agreement included as Exhibit A to this RFP for Phase 1 - Project Scoping and Feasibility. The ESCO shall enter into the PSA within 30 days of the District’s Notice of Award, unless otherwise authorized by the District. The negotiated Phase 1 scope, compensation, schedule, deliverables, insurance requirements, and key personnel will be incorporated into the applicable PSA appendices. The District anticipates, but does not guarantee, two planned amendments subject to separate Board approval: Amendment No. 1 for Phase 2 and Amendment No. 2 for Phase 3 implementation and construction. Authorization of one phase does not constitute authorization of any subsequent phase. By submitting a proposal in response to this RFP, respondents certify that they have reviewed the terms and requirements of this RFP and Exhibit A. Any requested exception or proposed change to the PSA shall be clearly identified in the proposal submitted through OpenGov. Failure to clearly identify an exception will be construed as acceptance of the applicable requirement. Indemnification, insurance, licensing, and other risk-allocation provisions are subject to District approval. The selected ESCO’s proposal, together with negotiated scope, fee, schedule, deliverables, and key-personnel commitments, may be incorporated into the PSA or its appendices. To the extent of any conflict between the executed PSA and a proposal, invoice, or other submitted document, the executed PSA will control. All contracts and amendments are subject to the District’s approval authority. RFP Issued: November 5, 2026 Deadline to submit questions (Non-Mandatory): November 30, 2026, 5:00pm Questions shall be submitted via OpenGov District Responses to questions: December 4, 2026, 5:00pm Proposal Due: December 17, 2026, 5:00pm Interviews with 3-4 shortlisted ESCO candidates : 1/13/2027 & 01/14/2027 Ironhouse Sanitary District Administrative Building. 450 Walnut Meadows Drive, Oakley, CA 94561 Board consideration for Approval of ESCO agreement & Phase 1 funding: February 16, 2027 Submittal Requirements Proposals shall be submitted in accordance with the specified requirements covering the Scope of Work. Proposals shall be submitted electronically in PDF format, through the Procurement Portal, by 5:00 pm on Thursday, December 17, 2026 . This RFP does not commit ISD to pay any costs incurred in the preparation and presentation of submittals or to select any interested firms who respond. Consultants should meet the following preferred experience requirements for this project: Role Preferred Qualifications Firm (Prime Proposer) Minimum and Preferred Qualifications Provide specific information demonstrating the respondent’s technical qualifications, financial capacity, experience, and ability to perform the services described in this RFP. Unless otherwise stated as preferred, the following items identified as minimum qualifications must be satisfied by the respondent or, where expressly allowed, by the entity contractually responsible for the applicable work. 1. ESCO Credentials (Minimum) The respondent shall be accredited by the National Association of Energy Service Companies (NAESCO) and/or included on the U.S. Department of Energy (DOE) Qualified List of Energy Service Companies. Identify the applicable credential or listing and provide evidence of current status. 2. California ESCO Experience (Minimum) Demonstrate at least ten (10) years of experience as an established ESCO performing energy performance contracting or comparable energy/infrastructure modernization work in the State of California. 3. Contractor Licensing (Minimum for Implementation) The respondent or the entity contractually responsible for future construction shall hold an active California Class A General Engineering Contractor license and any additional classifications required for the authorized work. Provide license numbers and identify the responsible entity or entities. 4. Relevant Project Experience (Minimum) Demonstrate successful implementation of at least five (5) public-sector energy savings performance contracts or comparable ESCO projects during the past ten (10) years. Water and wastewater projects, particularly California projects involving operating treatment facilities, are strongly preferred. Substantially completed projects may be submitted if their status, completed scope, and demonstrated results are clearly identified. Respondents shall provide at least three (3) California water or wastewater treatment facilities where energy savings or operational savings have been measured and verified for a minimum of two years following implementation. References shall include: Facility name; Facility capacity (MGD); Project description; Capital cost; Verified annual savings; Customer contact information; and Description of respondent responsibilities. 5. Financial and Bonding Capacity (Minimum) Demonstrate financial capacity to perform the anticipated work and identify available surety bonding limits. The District may consider profitability, capital structure, ability to service existing debt, other commitments and contingencies, and other information reasonably relevant to the respondent’s ability to perform. If the District determines that additional financial assurance is appropriate, it may request a parent-company or project guaranty acceptable to the District. Bonding requirements for Phase 3 will be established based on the approved implementation scope and GMP. 6. Water and Wastewater Expertise (Preferred) Demonstrate experience implementing energy conservation and infrastructure modernization measures at public-agency water or wastewater facilities, including major mechanical equipment, pumping, blowers, motors, aeration, electrical systems, instrumentation, SCADA/PLC controls, structural/civil work, and improvements performed while maintaining continuous operations. Experience with aeration systems, blowers, membrane systems, biosolids facilities, SCADA systems, pumping systems, and wastewater treatment process optimization is strongly preferred. 7. Regulatory and Permitting Experience (Preferred) Demonstrate a track record of successfully navigating California regulatory requirements and obtaining permits and approvals for comparable water/wastewater or public works projects, including coordination with applicable state, regional, county, city, air-quality, fire, utility, and other permitting authorities. 8. Utility Incentives and Funding (Preferred) Describe experience identifying, securing, and administering utility incentives, rebates, grants, financing, and other funding mechanisms applicable to public-sector energy and infrastructure projects. 9. Professional Engineering (Minimum) Engineering services requiring licensure shall be performed under the responsible charge of professional engineers appropriately licensed in California. Identify the proposed mechanical, electrical, structural, civil, and other engineering disciplines necessary for the anticipated program and provide applicable license information. 10. Project Management, Continuity, and Responsiveness Identify the proposed Project Manager and key personnel, their availability, local or regional resources, and proposed response arrangements. Describe the firm’s approach to maintaining continuity of key personnel throughout the multi-phase program and its ability to provide timely support during critical construction, startup, shutdown, and commissioning activities. A Project Manager’s residence or office within 150 miles of the District is preferred but is not a condition of eligibility. 11. Subcontractor and Subconsultant Qualifications Identify proposed team members, their responsibilities, relevant licenses and credentials, and anticipated share of work. The team identified in the proposal is expected to remain committed to the project unless a substitution is approved by the District. 12. Litigation, Claims, and Disputes Disclose litigation, arbitration, claims, or disputes during the previous five years Evaluation Process Initial Screening Ironhouse Sanitary District reserves the right to award this contract not necessarily to the consultant with the lowest cost proposal, but to the consultant which will provide the best overall match to the RFP requirements that best serves the interest of ISD. ISD reserves the right to request additional information from any consultant prior to final selection and to consider information about a consultant other than that submitted in the proposal. ISD reserves the right to accept, reject, modify, or cancel in part or in its entirety this RFP. ISD reserves the right to waive informalities or technical defects of the proposal as the best interest of ISD may require. ISD also reserves the right to reject all proposals to make a partial award. ISD shall not, in any event, be liable for any expenses or costs incurred by consultants in preparing their proposals. Evaluation Process An evaluation panel will be established by ISD to evaluate the proposals and conduct interviews. The panel may short-list consultants for this RFP utilizing the same evaluation criteria to identify the highest ranked consultants, who may then be requested to interview with the panel. Consultants may be requested by ISD to provide supplemental information. Proposals will be reviewed and evaluated, and ranked utilizing the criteria listed in Evaluation Criteria. Interview Process ISD anticipates selecting only the top three 3-4 scoring Proposers to interview based on the proposal scores. All interviews will be conducted in-person with key personnel. Subconsultants may participate via Microsoft Teams teleconferencing platform and will need a computer with a camera and microphone to participate in the interview. ISD anticipates the interviews to be one hour in length. Proposers should plan for a 60-minute presentation and a 30
Published attachments
Addenda and notices
Addendum #1 · 1
The complete RFP that was originally attached has been incorporated in the Project Overview section in OpenGov. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2 · 2
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #3 · 3
1. Clarification of Relevant Project Experience Reference: Section 4 – Relevant Project Experience (Minimum) Question: Under Section 4, the RFP requires five (5) public-sector ESCO contracts within the past ten (10) years and states that water and wastewater projects, particularly California projects involving operating treatment facilities, are strongly preferred. However, the RFP also states that respondents shall provide at least three (3) California water or wastewater treatment facilities. Are three California water/wastewater projects required, or are they strongly preferred? Would comparable water and wastewater projects outside California be considered sufficient? District Response: The District clarifies that experience at three (3) California water or wastewater treatment facilities is strongly preferred but is not a mandatory minimum qualification . Respondents must demonstrate successful implementation of at least five (5) public-sector energy savings performance contracts or comparable ESCO projects within the past ten (10) years. Comparable water and wastewater projects completed outside California will be accepted toward satisfying the minimum experience requirement. Respondents demonstrating experience at three (3) or more California water or wastewater treatment facilities where energy or operational savings have been measured and verified for a minimum of two (2) years following implementation may receive higher scores under the applicable project experience evaluation criteria. Failure to demonstrate experience at three (3) California facilities will not, by itself, disqualify a respondent. The requirement to provide three (3) California facilities is hereby revised from a mandatory minimum qualification to a preferred qualification. 2. Additional Contractor Licensing Requirement Reference: Phase 3 – Implementation The following requirement is hereby added to the RFP: The selected Energy Services Company (ESCO) shall possess and maintain an active California Class A – General Engineering Contractor license , issued by the California Contractors State License Board (CSLB), prior to commencement of Phase 3 – Implementation. The selected ESCO shall provide documentation verifying its active Class A license before the District authorizes commencement of Phase 3. This requirement does not waive any earlier contractor licensing obligations imposed by applicable California law. 3. General Provisions Except as expressly m
Public questions and answers
Hello, Do you have a specific format that you want the ESCO fee provided? Thanks! Will
The District does not require a specific format for presenting ESCO fees unless otherwise specified in the RFP. Proposers may use their preferred format, provided all proposed fees are clearly identified, itemized, and sufficiently detailed to allow the District to evaluate and compare proposals. All applicable requirements of the RFP remain unchanged.