Jones Road MP 1.71 Culvert Replacement Project , Project # 90-21F171900171 NOTICE IS HEREBY GIVEN that Lewis County will open sealed bids publicly at or after 12:15PM on Thursday, December 3, 2026 at Lewis County Courthouse in Chehalis, Washington for the Jones Road MP 1.71 Culvert Replacement Project 90-21F171900171 SEALED BIDS MUST BE DELIVERED BY OR BEFORE 12:15 PM O N T h ursday, December 3, 2026 ( B ids submitted after 12:15 PM Pacific Time will not be considered for this project.) Bids may be submitted electronically through the procurement portal at: https://procurement.opengov.com/portal/lewiscountywa o r sealed bids must be delivered to the Clerk of the Board of Lewis County Commissioners (351 N.W. North Street, Room 210, CMS-01, Chehalis, Washington 98532) no later than 12:15 pm on Thursday, December 3, 2026 and be in accordance with the plans, specifications, and other contract documents available through the procurement portal. Sealed bids must be in an envelope clearly marked: "SEALED BID FOR THE (Jones Road MP 1.71 Culvert Replacement Project) (F.A 90-21F171900171, FEMA No. 4593 DR, PW No. 57), TO BE OPENED ON OR AFTER 12:15 pm on Thursday, December 3, 2026 . Contact Person: Vince Hall , Assistant County Engineer , (360) 740-2762 , vince.hall@lewiscountywa.gov All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such contract and furnish satisfactory contract bond within the time stated in the specification, the bid proposal deposit shall be forfeited to the Lewis County Public Works Department. Informational copies of maps, plans, and specifications are on file at the Lewis County Public Works Department office in Chehalis, Washington. The contract documents may be viewed and downloaded from Lewis County's Web Site @ www.lewiscountywa.gov or you may call the Lewis County Engineers office @ (360) 740-1123 Ext. 2 and request a copy be mailed to you. Plan or specification changes shall be accomplished through official project addendums. The Lewis County Public Works Department in accordance with Title VI of the Civil Rights Act of 1964, (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color or national origin in consideration for an award. Upload Bid Proposal Documents and bid bond Please download the Bid Proposal Documents and upload completed proposal packet. Scope of Work Enter brief description - include location Engineer Estimate $2.3 million - $3.1 million CALL FOR BIDS Summary Background Contact Information Timeline Vendor Questionnaire Attachments Please download the Contract Provisions and Plans for construction.

Published attachments
Addenda and notices
Public questions and answers
  • Regarding Section 6-02.3(25) and the prestressed voided slab girders: The Standard Specs require the manufacturing plant to be certified by the PCI Plant Certification Program and approved by WSDOT as a Certified Prestress Concrete Fabricator prior to production. Will Lewis County accept prestressed voided slab girders from a PCI-certified plant (B3/C3) with current PCI Plant certification that is not currently WSDOT-approved under QC 6? The plant's aggregates are WSDOT source approved, its prestressed work has been ODOT inspected, and the plant has gone through ITD source approval and is in process of its first ITD project. The plant has reached out about WSDOT QPL approval process, but that process is currently at a standstill I believe due to the backlog in the WSDOT Materials Division. If the County would allow Western States Prestress to supply and bid on the project, the County would receive better competitive bid pricing while keeping production with a PCI-qualified plant. Thanks, Sam Jewell Direct: 541-221-8599 WESTERN STATES PRESTRESS, INC.

    Bid in Accordance with the Contract

  • Ref Sheets 5,6, B01 - There are overhead utility lines (power, comm), with the center of the runs approx 22 1/2' left of centerline roadway. The 24" steel piles for piers 1 and 2 are centered approx. 17' left of centerline roadway. This dimension does not include the limits for the pile hammer and leads. This would place the piling equipment and crane boom/load lines within 5' of the power lines. Will these lines be deenergized, removed or relocated during the project?

    Refer to the Contract Documents--Section 1-07.17

  • RE: Sheet 12 - Fiber Optic and Petroleum Gas lines - has there been any potholing done to precisely identify where these buried lines are? Due to the ground "quality", are there any precautions the contractor needs to take when constructing the staging area shown on sheet 5 over the underground lines?

    Refer to the Contract Documents--See Plan Sheet 5 of 20 and Appendix A

  • Please provide the current floodplain, grading and applicable federal authorizations. Do they cover the issued 100% plans, or are approvals still pending? Appendix F includes 90% drawings, and the printed floodplain and grading expiration dates precede the planned work. Permit appendix, PDF pp. 393–397

    The permits in Appendix F are the current permits. Although the permits reference the 90% plans, the contract plans are covered by the permits in Appendix F.

  • Should bidders schedule all in-water work, including removal of temporary diversion works, within August 1–30? If July 15 or September 15 can be used, who authorizes those dates and who provides the required fish observations? HPA, PDF pp. 385–388

    Bid in accordance with the Contract--refer to Special Provisions Section 1-07.5(2)

  • Where the C03 profile falls outside C04’s 30–36 in. cover range, should bidders follow the profile or adjust the grade? Please also confirm whether bacteriological sampling precedes hydrostatic testing as stated on C04, or follows it as shown on C05. Plans C03–C05

    This question will be addressed by addendum

  • Should the stabilized entrance carry a 12-in. culvert per the construction language or an 18-in. culvert per the payment language? Please confirm the required diameter and that it is incidental to the stabilized entrance item, separate from bid item 8. Special Provisions §8-01, PDF p. 65

    This question shall be addressed by addendum

  • Please clarify whether the 20-cfs contingency must provide 20 cfs on its own or can use the 4-cfs primary system as part of that capacity. Can the on-site backup pumps required by the HPA also count toward contingency capacity if the system can be operational within two hours? Special Provisions §8-31.3, PDF pp. 72–74; HPA provision 19

    Refer to the Contract Documents--refer to the last paragraph of Special Provision Section 8-31.3(1)A

  • §8-02.5 assigns long-term care to others after the one-year contractor guarantee, while HPA Condition 45 requires at least three years of maintenance and 80% survival. Please confirm that the County or its designee takes over after year one and that bidders should exclude years two and three from their price. Special Provisions, PDF p. 67 · HPA, PDF p. 388

    Bid in accordance with the Contract-refer to special provision 8-02.5

  • §5-04.3(3)D says an MTV is not required, then prohibits direct transfer and requires an MTV for travel lanes and shoulders paved with them. Is direct transfer allowed for this project? Special Provisions, PDF p. 46

    This question shall be addressed by addendum

  • Special Provisions §8-31.3(3)A (PDF p. 75) requires a contractor-provided directing biologist for fish exclusion. HPA No. 2026-5-16+01 separately refers to the WDFW Habitat Biologist for fish relocation notification (Condition 1, PDF p. 385) and to the permitting biologist for HPA modifications (PDF p. 389). Section 1-07.5(2) (PDF p. 22) also states that compliance costs are incidental to the contract. Please confirm whether the WDFW Habitat Biologist and the permitting biologist are the same role for this project, and whether their services are provided by the State or County at no cost to the contractor. Which costs should bidders carry: the contractor’s directing biologist for fish exclusion only, or also twice-daily fish observations, follow-up fish relocation, WDFW review or site visits, and any HPA modification fees? If the contractor is responsible for any of those additional costs, please identify which ones and the pay item they should be included under.

    Bid in accordance with the Contract-Refer to section 8-31.3(3)A

  • Will you please confirm that the project only has a preference for domestic materials and not a requirement.

    Bid in accordance with the Contract--Refer to contract provision 34 in Appendix C

  • Please confirm whether the Jones Road MP 1.71 Culvert Replacement Project requires at least 15% of project labor hours to be performed by registered apprentices under RCW 39.04.320. Section 1-07.9(5)A references apprenticeship reporting “when apprenticeship is a requirement of the Contract,” but we could not locate a project-specific utilization percentage or reporting procedure. If the requirement applies, please clarify: 1. Whether compliance is measured across the entire project, including subcontractors, or separately for each contractor. 2. Required utilization plans, forms, payroll records, reporting frequency, submission deadlines, and whether submissions are through L&I’s PWIA system or directly to the County. 3. Applicable incentives, penalties, and procedures for requesting an adjustment or documenting good-faith efforts. If the requirement does not apply, please confirm the applicable exemption or approved adjustment, including any effect of the project’s FEMA funding.

    This question will be addressed by addendum