Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Kenton County Golf Course Clubhouse Renovation and Expansion

Description

The Kenton County Fiscal Court (County) is requesting proposals for a full renovation and addition to the existing Kenton County Golf Course Clubhouse. Golf Course Clubhouse Total Cost of Project Information to Bidders Important Instructions for Electronic Submittals The County of Kenton is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid. Scope of Work or Project Details Please see the Attachments section for specifications and attachments. Questions and Answers Bidders/Offerors shall submit all inquiries regarding this bid via the county eProcurement Portal, located at https://procurement.opengov.com/portal/kentoncount y. Questions must be submitted by 5:00 pm on Tuesday, November 17, 2026 . All answers will be posted on the County's eProcurement Portal no later than 5:00 pm on Wednesday, November 18, 2026 . Questions will not be accepted after the deadline. Bidders should also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. Bid Submission Sealed bids are due no later than 2:00 pm , on Monday, November 30, 2026 , at which time they shall be opened in public. Bidders shall submit their proposals through the County's eProcurement Portal located at https://procurement.opengov.com/portal/kentoncounty/projects/319381 . Bids will automatically be unsealed at 2:00 pm , on Monday, November 30, 2026 , at which time they will be posted on the County's eProcurement Portal located at https://procurement.opengov.com/portal/kentoncounty/projects/319381 . Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. Kenton County strongly recommends completing your response well ahead of the deadline. Bid/Proposal Preparation Bids/Proposals must be submitted via the county eProcurement Portal https://procurement.opengov.com/portal/kentoncounty . All information and certifications called for must be furnished. Bids/Proposals submitted in any other manner, or which fail to furnish all information or certificates required, may be summarily rejected. Bids may be modified or withdrawn prior to the time specified for the opening of bids/proposals. Any required documents or forms shall be filled out legibly in ink or typewritten with all erasures, strikeovers and corrections initialed in ink by the person signing the bid. The bid shall include the legal name of the bidder, the complete mailing address, and be signed in blue ink by a person or persons legally authorized to bind the bidder/offeror to a contract. Name of person signing should be typed or printed below the signature. Errors in Bids/Proposals Bidders/Offers are cautioned to verify their bids/offers before submission. Negligence on the part of the bidder/offeror in preparing the bid/proposal confers no right for withdrawal or modification of the bid/proposal after it has been opened. In case of error in the extension of prices in the bid/proposal, the unit prices will govern. All price extensions are to be checked by the buyer to insure the total bid/proposal is accurate. It is the responsibility of the Bidder responding to the RFP to carefully examine the specifications and become totally informed regarding the requirements. There will be no additional allowances made after the award of this contract due to lack of knowledge of the requirements. References to brand names, models, and /or types of equipment, product, or commodity throughout this solicitation are representative of the equipment, product, and commodity desired by the Kenton County Fiscal Court. Vendors shall provide the specified equipment, product, or commodity, or an approved equivalent. The materials supplied must comply with these specifications and be satisfactory to the Kenton County Fiscal Court. Incurred Costs Kenton County will not be liable for any costs incurred by bidders/offers in replying to this Request for Bids/Proposals. Introduction Public Notice The Kenton County Fiscal Court is seeking sealed proposals for the purchase of Kenton County Golf Course Clubhouse Renovation and Expansion for Kenton County Parks and Recreation , located at 3908 Richardson Rd, Independence, KY 41051. Bid documents are available on the Kenton County website at www.kentoncountyky.gov or may be obtained through Kenton County's eProcurement portal located at https://procurement.opengov.com/portal/kentoncounty . Bids must be submitted through the County's eProcurement portal at https://procurement.opengov.com/portal/kentoncounty/projects/319381 and received no later than 2:00 pm on Monday, November 30, 2026 . KENTON COUNTY FISCAL COURT KRIS A. KNOCHELMANN, JUDGE/EXECUTIVE Timeline Release Project Date: October 27, 2026 Pre-Proposal Meeting (Non-Mandatory): November 5, 2026, 10:00am Kenton County Golf Course Clubhouse, 3908 Richardson Rd, Independence, KY 41051 Question Submission Deadline: November 17, 2026, 5:00pm Question Response Deadline: November 18, 2026, 5:00pm Proposal Submission Deadline: November 30, 2026, 2:00pm Terms and Conditions Authority This Request for Bid/Proposals is issued pursuant to applicable provisions of the Kenton County Purchasing Ordinance 121.46. Reserved Rights Kenton County reserves the right at any time and for any reason to cancel this Request for Bids/Proposals, accept or reject any or all bids/proposals or any portion thereof, or to accept an alternate bid/proposal. Kenton County reserves the right to waive any immaterial defect in any bid. Kenton County may seek clarification from any bidder/offeror at any time and failure to respond promptly is cause for rejection. Incurred Costs Kenton County will not be liable for any costs incurred by bidders/offers in replying to this Request for Bids/Proposals. Award It is the intent of Kenton County to award a contract to the lowest responsible bidder/offeror meeting specifications. Kenton County reserves the right to determine the lowest responsible bid/offer on the basis of an individual item, groups of items, or in any way determined to be in the best interests of Kenton County. Award will be based on the following factors (where applicable): adherence to all conditions and requirements of the bid/proposal specifications; price; qualifications of the bidder/offeror, including past performance, financial responsibility, general reputation, experience, service capabilities, and facilities; delivery or completion date; product appearance, workmanship, finish, taste, feel, overall quality, and results of product testing; maintenance costs and warranty provisions; and repurchase or residual value. Bids/proposals accepted by the Kenton County Fiscal Court will be available to all local municipalities in Boone, Campbell and Kenton Counties. Pricing The price quoted for each item is the full purchase price, including delivery to destination, and includes all transportation and handling charges, premiums on bonds, material or service costs, patent royalties and all other overhead charges of every kind and nature. Unless otherwise specified, prices shall remain firm for the contract period. Discounts Prices quoted must be net after deducing all trade and quantity discounts. Where cash discounts for prompt payment are offered, the discount period shall begin with the date of receipt of a correct invoice or receipt or final acceptance of goods, whichever is later. Occupational Licenses All Bidders/Offerors must have or obtain a Kenton County and Cities Occupational License prior to performing any work in Kenton County or any of it’s Cities, Kenton County Ordinance 225.19, Section III (a). Bidders/Offerors must be in full compliance with all Kenton County and Cities’ Occupational License Ordinances (KENTON COUNTY FISCAL COURT ORDINANCES 78-6-1, 220.8, 223.0, 223.7, 225.19, 225.25) prior to awarding of a contract. Kenton County shall have the right to reject any bids/offers from Bidders/Offerors that are not in compliance with Kenton County and Cities’ Occupational License Ordinances. Taxes Kenton County is not subject to Federal Excise tax. Per Kentucky Administrative Regulation 103 KAR 30:225E, Kenton County is exempt from state and local taxes. Specifications Reference to brand names and numbers is descriptive, but not restrictive, unless otherwise specified. Bids/Proposals on equivalent items will be considered, provided the bidder/offeror clearly states exactly what is proposed to be furnished, including complete specifications. Unless the bidder/offeror specified otherwise, it is understood the bidder/offeror is offering a referenced brand item as specified or is bidding/offering as specified when no referenced and does not propose to furnish an “equal”. Kenton County reserves the right to determine whether a substitute offer is equivalent to and meets the standard of quality indicated by the brand name and number. Samples Samples of items, when called for, must be furnished free of expense and, if not destroyed in the evaluation process, will, upon request, be returned at the vendor’s expense. Request for the return of samples must accompany the sample and include UPS Pickup Slip, postage or other acceptable mode of return. Individual samples must be labeled with bidder/offeror’s name, item reference, manufacturer’s brand name and number. Variances State or list by reference on the reverse side of the Bid/Proposal form herein any variations to specifications, terms and/or conditions. Indemnification Seller shall indemnify and hold harmless Kenton County, its agents, officials, and employees from and against all injuries, losses, claims, suits, costs and expenses which may accrue against Kenton County as a consequence of granting the Contract. Default Time is of the essence of this contract and if delivery of acceptable items or rendering of services is not completed by the time promised, Kenton County reserves the right, without liability, in addition to its other rights and remedies, to terminate the contract by notice effective when received by Seller, as to stated items not yet shipped or services not yet rendered and to purchase substitute items or services elsewhere and charge the Seller with any or all losses incurred. Kenton County shall be entitled to recover its attorney’s fees and expenses in any successful action by Kenton County to enforce this contract. Bid Bond A Bid Bond amounting to five (5%) percent of the proposed bid/proposal price must be provided with the response. The Bid Bond may be in the form of a surety bond, cashier check or other form of surety satisfactory to the county attorney. If the contract is awarded to the bonded bidder, the bidder will accept the contract as bid, or else the surety will pay the Fiscal Court a specific amount because of default on part of the bidder. Performance Bond A Performance Surety Bond amounting to one hundred (100%) percent of the Contract price must be provided prior to execution of the contract assuring Kenton County that the project will be pursued with due diligence and completed according to the plans and specifications. This requirement may also be met by a letter of credit. Inspection Materials or equipment purchased are subject to inspection and approval at Kenton County’s destination. Kenton County reserves the right to reject and refuse acceptance of items which are not in accordance with the instructions, specifications, drawings or data of Seller’s warranty (express or implied). Rejected materials or equipment shall be removed by, or at the expense or, the seller promptly after rejection. Warranty Seller warrants that all goods and services furnished hereunder will conform in all respects to the terms of this solicitation, including any drawings, specifications or standards incorporated herein, and that they will be free from latent and patent defects in materials, workmanship and title, and will be free from such defects in design. In addition, Seller warrants that said goods and services are suitable for, and will perform in accordance with, the purposes for which they are purchased, fabricated, manufactured and designed or for such other purposes as are expressly specified in this solicitation. Kenton County may return any nonconforming or defective items to the Seller or require correction or replacement of the item at the time the defect is discovered, all at the Seller’s risk and expense. Acceptance shall not relieve the Seller of its responsibility. Regulatory Compliance Seller represents and warrants that the goods or services furnished hereunder (including all labels, packages and container for said goods) comply with all applicable standards, rules and regulations in effect under the requirements of all Federal, State and local laws, rules and regulations as applicable, including the Occupational Safety and Health Act as amended, with respect to design, construction, manufacture or use for their intended purpose of said goods or services. Seller shall furnish “Material Safety Data Sheets” on all chemicals. Equal Employment Opportunity Contractor shall comply with the Kentucky Human Rights Act, HRA 344.150 – 344.270 as amended and any rules and regulations promulgated in accordance therewith, including, but not limited to the Equal Employment Opportunity EEO 45.550 – 45.640 which is incorporated herein by reference. Furthermore, the Contractor shall comply with the Employment Discrimination Act, EDA 344.040, 344.050 as amended. Royalties and Patents Seller shall pay all royalties and license fees. Seller shall defend all suits or claims for infringement of any patent, copyright or trademark rights and shall hold Kenton County harmless from loss on account thereof. Law Governing This contract shall be governed by and construed according to the laws of the Commonwealth of Kentucky. Pursuant to the provisions of KRS 45A.343, the contractor or vendor is required to reveal to Kenton County any final determination of a violation of KRS Chapters 136, 139, 141, 337, 338 and 342 by the contractor or vendor within the previous five (5) years; and further that said contractor or vendor has been and is in continuous compliance with the provisions of KRS Chapters 136, 139, 141, 337, 341, and 342 for the duration of the contract. The failure of a contractor or vendor to reveal a final determination of a violation to a local government, or to comply with the statutory requirements, is considered grounds for cancellation of a contract and disqualification of the contractor or vendor from eligibility for any Kenton County contracts for a period of two (2) years. Evaluation and Selection Proposals will be evaluated based on cost, vendor qualifications, and completeness of proposal. The County reserves the right to clarify any information submitted in response to this RFP and to negotiate terms with the selected vendor if deemed necessary. All parties must possess and submit valid insurance certificates, performance bond if required, and necessary permits and licenses as required by federal, state, and local law. The County reserves the right to not award a contract, to reject any and all responses, or to advertise for new bids if the County judges its interests to be better served thereby. Insurance Requirements The selected vendor shall, at its own expense, maintain in force at all times during the performance of this contract the insurance coverages listed below, with companies authorized to do business in the State. Each policy shall include limits not less than those stated. Certificates of Insurance (COIs) shall be provided ten (10) days prior to contract execution. Commercial General Liability Unless otherwise provided herein, Liability Insurance in the amount of $1,000,000.00 must be maintained throughout the life of the contract. A Certificate of Insurance, naming the Kenton County Fiscal Court as Additional Insured, must be submitted prior to execution of the Contract. All liability policies shall apply on a Primary and Non-Contributory basis with any insurance maintained by the County. All policies shall contain a Severability of Interest / Cross Liability clause. The vendor shall require all subcontractors to carry insurance coverages and limits consistent with these requirements, as applicable to their scope of work. Certificates of Insurance for subcontractors shall be provided to the County upon request. The policy must provide that the County (as Additional Insured) shall be given at least a 10 day advance written notice of any proposed cancellation, material change, or termination of the policy. Minimum Limits: Each Occurrence: $1,000,000 General Aggregate: $2,000,000 Worker's Compensation Workers’ Compensation covering all employees and subcontractors as required by law, with Employer’s Liability coverage for accidents and occupational disease. Minimum Limits: Each Accident: $500,000 Disease – Policy Limit: $500,000 Disease – Each Employee: $500,000 Workers’ Compensation covering all employees and subcontractors as required by law, with Employer’s Liability coverage for accidents and occupational disease. Kenton County will request proof of Certification at award and at such other times during the life of the Contract as it deems necessary. Pricing Proposal Vendor Questionnaire Attachments

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Sign in sheet, meeting minutes, push out proposal due date. Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #2 · 2

    Includes changes and answers to questions from Q&A.

Public questions and answers
  • Are all the propane lines shown on P200 and all site electrical work in the parking lot to be included with this pricing?

    Answer in Addendum 2.

  • Are only the bathroom cabinets and countertops to be included as casework for the project? Are there any selections for the laminate and countertops that should be priced out?

    Answer in Addendum 2.

  • Is there a trim profile/detail for the wainscotting on Drawing I-101 detail b1?

    Answer in Addendum 2.

  • The architectural elevations call out the fence by civil - not called out the site plan. Is there a material selected for the new fence and extents of what should be included?

    Answer in Addendum 2.

  • Section 114000 refers to the foodservice drawings, but notes on K4–K6 reference item specifications and general product specifications. Please provide any separate item-by-item foodservice equipment specifications, or confirm that K1–K9 and Section 114000 constitute the complete foodservice bid documents.

    Answer in Addendum 2.

  • Detail A5/A-201 calls out what looks like a stone wall for the fireplace. Detail E5/A110 calls out a different detail. Is A5/A-201 intended to be used for the pavilion? Or elsewhere?

    Answer in Addendum 2.

  • Please confirm whether the ESF-2 assemblies shown on A-100 are new storefront or existing to remain. If new, provide the corresponding elevations, dimensions and glazing requirements.

    Answer in Addendum 2.

  • In Spec Section 10 75 00 Flagpoles, there are three Flagpoles listed out to be priced. These are not marked on the plans. Can this be amended to show the Flagpole Locations?

    Answer in Addendum 2.

  • Has a budget been established for submission to the bonding company?

    Answer in Addendum 2.

  • Section 064116-1.4 Indicates that AWI certification is required. The AWI certified fabricators do not typically bid on these projects. If no AWI certified bidders provide a bid, can we include non AWI Certified fabricators?

    Answer in Addendum 2.

  • The structural sheets show a metal building; the architectural sheets show wood trusses. Please confirm.

    Answer in Addendum 2.

  • Are the propane lines to the 32 hitting-bay heaters and the conduits to the range to be included in our base bid amount?

    Answer in Addendum 2.

  • Please confirm if the generator is the be included in the base bid. It is shown in the specs but not on the drawings.

    Answer in Addendum 2.

  • I’m reaching out with a question regarding the new fence enclosure noted on sheet A-201 along the east and south elevations. The drawings indicate to refer to the civil drawings for additional information; however, after reviewing all of the civil drawings, I was unable to locate a fence layout or any specifications.

    Answer in Addendum 2.

  • is it even needed i looked at drawling's seen nothing but your summary on constructconnect said window tinting?

    Answer in Addendum 2.

  • Is there a public planholder list or other approved route for a supply-only vendor to identify bidding prime contractors for 27-13? We’re looking to confirm whether any golf or locker equipment is in scope before contacting an eligible prime.

    Answer in Addendum 2.

  • Sheet A-701 shows ADA signage but no programming or quantities, will this be provided? Sheet A-201 shows Fireplace Logo detail for dimensions only. Can you clarify if this is new replacement or relocation and what material details would be for new replacement? Specifications list ADA panel signs, dimensional letters and plaques. We see no drawings with details for dimensional letters or plaques. Can you clarify if there are any of these sign types on the project?

    Answer in Addendum 2.

  • What material is required for Restroom Vanities/Vanity tops? If solid surface - what Group? If PL - provide spec. At Dining 112, are there design drawings for 2 bars at North & NE and the service bar at NW?

    Answer in Addendum 2.

  • Is wood base & chair rail only located in Restrooms per E:B1/I-101? Suggest tile base in Toilet Rooms & Wet Walls. Or is this trim intended at other FOH locations like Dining Room 112 or Banquet 117? Assume small panel mould profile to create picture frames below chair rail?

    Answer in Addendum 2.

  • Drawings indicate existing building has sprinkler system. At pre-bid, no existing system exists. Advise

    Answer in Addendum 2.

  • Per spec, PVC cannot be used in plenu, rated ceiling, is basement ceiling plenum?

    Answer in Addendum 2.

  • Provide specification: Do want insulated? Motorized? Standard color or powder coated?

    Answer in Addendum 2.

  • Do you need to be a plan holder on the BCI Plan Room to be able to submit a proposal for this project?

    Answer in Addendum 2.

  • Could Subcontractors be submitted 1 hour after the bid for the low bidder? Due to this project bidding at 10:00 AM, it will be difficult to get the required information on time.

    Answer in Addendum 2.

  • The spec book for KCGC Clubhouse renovation (26 0533 - 4) states that receptacles can be installed using MC cable, and light fixtures can have MC whips not longer than 8'. That is to the extent of the MC use per the spec book. MC could also be used for all lighting circuitry, and lower amperage equipment hookups that have concealed wiring. Overall, MC is a more cost effective installation, so I would just like to confirm the requirement of EMT in concealed locations.

    Answer in Addendum 2.

  • Has the pre-bid minutes been released yet? And how do we get them?

    Answer in Addendum 2.

  • There are fire alarm specs, and on sheet E501 they provide a fire alarm equipment legend, but I’ve not found a plan with fire equipment shown. Is this design-build or are the FA drawings able to be provided?

    Answer in Addendum 2.

  • 13. Maintenance, acceptance, and warranty - Sections 329200 and 329300 The specifications require 12 months of plant maintenance, a 24-month plant warranty, and minimum turf maintenance of 60 days for seed and 30 days for sod. Who performs mowing and watering during those periods? How will acceptance, maintenance start dates, and handoff be documented for phased installations? 14. Tree removal and temporary erosion controls - Site and landscape scope coordination Please confirm whether existing-tree removal, stump removal, temporary seeding, erosion-control installation, and removal of those controls are assigned to other trades. Which existing trees must we protect during landscape installation? 15. Wage requirement discrepancy - GC invitation; Supplementary Conditions The GC's invitation states that the project is not prevailing wage, but the Supplementary Conditions reference a prevailing-wage compliance affidavit. Please confirm the applicable requirement in writing and provide a wage schedule if one applies. 16. Landscape material tax treatment - GC invitation; County solicitation The invitation identifies the project as tax exempt, subject to confirmation. What documentation and purchasing procedure should GroundSystems use, and how should taxes on our furnished materials be carried in the proposal?

    Answer in Addendum 2.

  • 05. Existing irrigation and watering access - Existing irrigation; landscape establishment Is our scope limited to protecting the existing irrigation system, or must we relocate heads, repair lines, or extend coverage to new planting and turf areas? Will an operational water source be available throughout installation and establishment, and who pays for water? 06. Soil testing and planting-bed preparation - Sections 329200 and 329300 Are approved soil-test results available? If additional testing is required, who provides it? Please confirm the required soil depth and preparation across planting beds, including the mondo grass areas. 07. Soil amendments - Sections 329200 and 329300 Please confirm the specified 1:4 compost-to-topsoil mix for turf and 1:4 sphagnum-peat-to-topsoil mix for plants. May soil-test recommendations or approved compost substitutions modify those mixes? 08. Landscape edging - L-101, Note 6 What edging material, dimensions, finish, and installation detail are required? Please identify the locations where installed edging is intended rather than a cut bed edge.09. Root barriers L-101, Note 8 Please identify the trees requiring rigid plastic root barriers and provide the approved product, depth, length, and installation configuration. 10. Plant sizes, spacing, and substitutions L-101 What minimum height is required for the 10-gallon Slender Silhouette sweet gums? How should the 2-inch-caliper requirement be interpreted for multi-trunk redbuds? Please confi

    Answer in Addendum 2.

  • 01. Sod limits - L-101, Note 15 Does the required 3-foot sod strip apply only to new paving bordering lawn, or also to existing cart paths and pavement? Please identify the limits and confirm that planting beds against pavement take precedence over the sod strip. 02. Seeding and restoration limits - L-101, Note 16 Please identify the full limits of landscape restoration. Are we responsible for disturbance from other trades, utility trenches, staging areas, and the golf course operator's ongoing site work? 03. Topsoil supply and placement - C-200; Section 329200 Who is responsible for furnishing, hauling, spreading, and amending topsoil? Is suitable stockpiled topsoil available, and who carries any imported topsoil needed to make up shortages? 04. Grading handoff - C-200; Section 329200 At what elevation and condition will the site contractor turn over landscape areas? Will those areas be left sufficiently below finish grade to accommodate the specified 6-inch turf planting-soil layer and sod thickness? Who handles unsuitable soil, construction debris, and excessive compaction?

    Answer in Addendum 2.

  • E&F/S3.1 indicate a 6" perf. corrugated foundation drain, and says to see civil drawings. I did not see a foundation drain indicated on the civil drawings. Please advise if required, and if so please advise routing & tie in points.

    Answer in Addendum 2.

  • A-100/A-401 Room 112 on the northside there is what appears to be a countertop on top of a half wall based on A302; however i have not found any details/sections for this wall and countertop. If that is what is required, could you please provide details/materials for the countertop/wall.

    Answer in Addendum 2.

  • A1/A101 in the NW Corner of the plan, there is a note D31 which says to demolish and rebuild wing wall with coping cap. It appears this may not be the correct note for this location. Please advise.

    Answer in Addendum 2.

  • A1/B1 on A410 Appear to show a structural steel metal pan stair & Landing. The hatch on these plans appear to be concrete. Details A5/B5 A410 however indicate it is a 14ga checker plate tread. Please verify what is required.

    Answer in Addendum 2.

  • The material legend on I-101 has a Polyvinyl Safety floor listed for the kitchen; however no manufacturer or product is listed. Could you please provide information on this flooring.

    Answer in Addendum 2.

  • Do we have to stick to the spec on the walk-in k4 through K4.4? Are there aloud to be alternates as long as equivalent for all equipment? K19 is a hand sink without a faucet it is also a single hole. Are there any other options or just normal hand sinks?

    Answer in Addendum 2.

  • RFI 01. Provide a dedicated telecom / low-voltage plan showing all data outlets, cable counts and IDF/MDF locations. RFI 02. Confirm the two-kitchen POS note references are two separate outlets; identify number of Cat6 cables per POS and exact locations. RFI 03. Identify the source/end point for pavilion HDMI, acceptable cable/extension method and who supplies the TV box and faceplate. RFI 04. Clarify whether pavilion future 3 in conduit requires cable now, or is pathway-only for future use.

    Answer in Addendum 2.

  • There isnt a very clear list of what equipment in the kitchen is being reused. And what equipment is being purchased that isnt being reused. Can we please get a more clear list of which equipment is being reused in the kitchen and what equipment will need purchased please and thank you. Want to make sure we are pricing it based off whats needed and not double price things if somethngs being reused from the kitchen equipment. Just a list of new equipment needing purchased and equipment needing reused. And where that reused kitchen equipment will be stored.

    Answer in Addendum 2.

  • Civil Sheet, C-100 shows keynote 6, retaining wall by others, please confirm if this is done by others, or should be in our base bid. If we are to pick it up, detail E&F on sheet S3.1 shows FDN Drain, and to refer to civil sheets, civil sheets do not show FDN Drain.

    Answer in Addendum 2.

  • - Drawings show ‘rigid insulation’ over substrate board on some details, 2” rigid insulation w/ Z furring in another detail, and direct over 5/8” plywood sheathing. The specifications mention 2.7” insulation under area of roofing. But do not specify a material or above or below roof deck. Please clarify if there is insulation above the existing roof deck, thickness, type and locations. - Drawings do not show any downspouts at all on the elevations nor roof plan. - Coping cap is in specifications but not shown in drawings. Where is this located? - The drawings do not show roof penetrations. Please confirm penetration qtys and layout.

    Answer in Addendum 2.

  • Can a local fabricator be used in lieu of the 5 manufacturers listed in the specifications?

    Answer in Addendum 2.

  • 1. The FA spec mentions speakers, but the symbol legend shows horn/strobes. Does this need to be a voice system? 2. FA specs page 6 & 7 mention smoke control but no other references in electrical or mechanical drawings. Please clarify if smoke control is to be provided and what the scope would be.

    Answer in Addendum 2.

  • Given the space will remain open during construction, what should we include for the shutdown required to swap MDP and additional conduits being ran to transformer? This could be a couple days of shutdown.

    Answer in Addendum 2.

  • Is the owner contracting with an AV/LV vendor for telecommunications work, or is it to be included in our bid?

    Answer in Addendum 2.

  • Are exhaust ducts required to be welded?

    Answer in Addendum 2.

  • 24. What is the design intent of exterior soffit and trim? A103 calls out painted 1x fascia, and wood soffit to match existing. Spec section 074600 calls out for Hardie trim and soffit.

    Answer in Addendum 2.

  • During the pre bid a question about sales tax was asked. Just wanted to confirm, is sales tax to be included in the base bid per the specs? Does the job require prevailing wages? There is a note in the specs that call out "Compliance of payment of prevailing wages for the previous period"

    Answer in Addendum 2.

  • Are all the items noted on K3 furnished and installed by the kitchen contractor? And plumbing and electrical connections needed as noted on the K series drawings? And will this contractor be hired directly buy the owner? The hood is noted on drawing K3 but called out to be furnished and installed on the mechanical drawings. Is there a list showing what pieces of kitchen equipment are OFOI and CFCI?

    Answer in Addendum 2.

  • P501 and Spec 22 13 16 call for the sanitary piping to be either cast iron or PVC with a note saying PVC is not to be used in pair plenum ceilings. Is the basement ceiling considered a plenum?

    Answer in Addendum 2.

  • With next week being Thanksgiving, it may cause problems receiving subcontractor quotes on time? Is there any way to extend the deadline to make proposals more competitive?

    Answer in Addendum 2.

Plain text