State and local · OpenGov
LAP Project - Gardens Parkway New Sidewalk and Bicycle Lanes
Description
The City of Palm Beach Gardens, FL, is soliciting sealed responses for LAP Project - Gardens Parkway New Sidewalk and Bicycle Lanes . Responses are to be submitted via the City's eProcurement Portal via https://procurement.opengov.com/portal/pbgfl PRIOR TO 3:00 pm on Friday, December 18, 2026 . Late responses will not be accepted. To enhance pedestrian safety, the City has secured funding through the Florida Department of Transportation's (FDOT) Local Agency Program (LAP) to develop a cycle track along with essential roadway and pedestrian improvements, including sidewalk upgrades, on Gardens Parkway. Bid Form - Gardens Parkway LAP Project MOBILIZATION/DEMOBILIZATION MOT SEDIMENT BARRIER CLEARING AND GRUBBING REMOVAL OF EXISTING CONCRETE TREE REMOVAL - ACCENT TREE REMOVAL TREE REMOVAL - PALMS REGULAR EXCAVATION COMPACTED SUBGRADE (12") COMPACTED SUBGRADE (4") OPTIONAL BASE GROUP 13 MILL EXISTING ASPHALT PAVEMENT (1") SUPERPAVE ASPHALTIC CONCRETE (TRAFFIC C) ASPHALT CONCRETE FRICTION (TRAFFIC C, FC-9.5,PG 76-22) INLET-DRAINAGE (CURB TYPE P-5) (≤10') INLET-DRAINAGE (CURB TYPE P-6) (≤10') INLET-DRAINAGE (DITCH BOTTOM TYPE J) (MODIFY) MANHOLE (DRAINAGE) (PARTIAL) ADJUST VALVE PEDESTRIAN/BICYCLE RAILING (ALUMINUM) (42" TYPE 1 PICKET) CONCRETE CURB & GUTTER (TYPE F) CONCRETE CURB & GUTTER (TYPE F WITH SPECIAL PROFILE) CONCRETE CURB (TYPE D) CONCRETE CURB (TYPE D MODIFIED) (6"-12" HIGH) CONCRETE SIDEWALK, 4" THICK CONCRETE SIDEWALK, 6" THICK PATTERNED PAVEMENT DETECTABLE WARNINGS PERFORMANCE TURF, ST. AUGUSTINE SOD LANDSCAPE COMPLETE - SMALL PLANTS - SEE PLANT DETAIL LIST ON LANDSCAPE PLANS SHT LD18 SHRUB AND BED PREP - INCLUSIVE OF SMALL PLANTS LANDSCAPING LINE ITEM 580-1-1 GROUNDCOVERS - INCLUSIVE OF SMALL PLANTS LANDSCAPING LINE ITEM 580-1-1 LANDSCAPE COMPLETE - LARGE PLANTS - SEE PLANT DETAIL LIST ON LANDSCAPE PLAN SHT LD18 TREES - INCLUSIVE OF LARGE PLANTS LANDSCAPING LINE ITEM 580-1-2 PALMS - INCLUSIVE OF LARGE PLANTS LANDSCAPING LINE ITEM 580-1-2 SHRUBS - INCLUSIVE OF LARGE PLANTS LANDSCAPING LINE ITEM 580-1-2 IRRIGATION SYSTEM - MODIFY EXISTING SYSTEM - SEE IRRIGATION SCHEDULE IN PLANS SHT IR-18 CONDUIT - SIGNALS (F & I) (UNDERGROUND) CONDUIT - PEDESTRIAN LIGHTING (F & I) (OPEN TRENCH) CONDUIT - PEDESTRIAN LIGHTING (F & I) (DIRECTIONAL BORE) Project Details Important Instructions for Electronic Submittals The City of Palm Beach Gardens is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid. Scope of Work or Project Details Please see the Attachments section for specifications and attachments. Introduction Summary The City of Palm Beach Gardens, FL, is soliciting sealed responses for LAP Project - Gardens Parkway New Sidewalk and Bicycle Lanes . Responses are to be submitted via the City's eProcurement Portal via https://procurement.opengov.com/portal/pbgfl PRIOR TO 3:00 pm on Friday, December 18, 2026 . Late responses will not be accepted. To enhance pedestrian safety, the City has secured funding through the Florida Department of Transportation's (FDOT) Local Agency Program (LAP) to develop a cycle track along with essential roadway and pedestrian improvements, including sidewalk upgrades, on Gardens Parkway. Timeline Release Project Date: November 6, 2026 Pre-Bid Meeting (Non-Mandatory): November 12, 2026, 10:30am City Council Chambers City Hall 10500 N Military Trail Palm Beach gardens, FL 33410 Response Submission Deadline: December 18, 2026, 3:00pm www.pbgfl.gov/procurement Project Contact Km Ra Chief Procurement Officer 10500 N Military Trl, Palm Beach Gardens, FL 33410, USA Palm Beach Gardens , FL 33410 Email: kmra@pbgfl.gov Phone: (561) 799-4197 Procurement Contact Km Ra Chief Procurement Officer 10500 N Military Trl, Palm Beach Gardens, FL 33410, USA Palm Beach Gardens , FL 33410 Email: kmra@pbgfl.gov Phone: (561) 799-4197 Pricing Proposal Vendor Questionnaire Attachments
Published attachments
- ITB2025-172CE, Exhibit E - Wage Rate Tables
- ITB2025-172CE, Exhibit A - Roadway Improvement Plans
- ITB2025-172CE, Exhibit B - Technical Specifications
- ITB2025-172CE, Exhibit C - FDOT Div 1 Specification Package
- ITB2025-172CE, Exhibit D - Form FHWA 1273
- ITB2025-172CE, Incorporation Affidavit
- ITB2025-172CE, LAP Project - Gardens Parkway
Addenda and notices
Official Notice #1: Pre-Bid Conference and Site Visit · 1
Attached is the Public Notice - Pre-Bid Conference and Site Visit
Addendum #1 · 1
Please see attached Addendum No. 1
Addendum #2 · 2
Please see attached Addendum No. 2
Official Notice #2: Addendums Pending FDOT Review and Approval · 2
Please be advised that several Addenda are currently pending FDOT's review and approval. FDOT advised us this morning that the approved Addenda are expected to be provided by the end of today. We will post each Addendum as soon as it is received. To ensure everyone has the opportunity to review the outstanding Addenda, please hold any additional questions until the remaining Addenda have been posted later today. Thank you for your patience and understanding.
Addendum #3 · 3
Please see attached Addendum No. 3
Addendum #4 · 4
Please see attached Addendum No. 4 and Attachments
Addendum #5 · 5
Please see attached Addendum No. 5
Addendum #6 · 6
Please see attached Addendum No. 6
Addendum #7 · 7
Please see Addendum No. 7 and Attachment
Public questions and answers
Is there an engineer's estimate?
A response will be provided via written Addendum and posted by early next week.
Is there an engineer's estimate for the project?
A response will be provided via written Addendum and posted by early next week.
The insurance requirements call for Marine General Liability Coverage minimum of $2,000,000. Can this requirement be removed? Why would marine coverage be needed?
A response will be provided via written Addendum and posted by early next week.
Will the municipality be responsible for the material testing scope or will that be on the general contractor?
A response will be provided via written Addendum and posted by the end of this week.
When is the deadline to submit a question?
There is no deadline to submit questions.
Exhibit A, Sheet 6, General Note 4, states that relocation of signs, irrigation systems, sidewalks, and utility valves is the contractor’s responsibility. General Note 33 states that utility locations are approximate. Please confirm how unknown irrigation or sidewalk conflicts encountered along the new south-side 8-foot sidewalk will be paid (incidental to another pay item, or by change order), and whether a utility or irrigation as-built or mark-out will be provided before construction.
A response will be provided via written Addendum and posted by next week.
Exhibit A, Sheet 6, pay-item notes mention 630-2-12 (1–2 inch HDPE directional bore under pavement), but the Tabulation of Quantities lists 630-2-11. Please confirm the correct bid item and quantity in the OpenGov Pricing Schedule.
A response will be provided via written Addendum and posted by next week.
Addendum No. 1 removes Marine General Liability coverage of $2,000,000, stating it was included in error. ITB §1.11 still prints that line. Please confirm that no marine coverage will be required at bid or award.
A response will be provided via written Addendum and posted by next week.
Addendum No. 2 states: “The contractor is responsible for all roadway material testing.” Exhibit B Section 344 allows Category 1 concrete to be accepted on batcher or contractor certification on the delivery ticket, and states that the Engineer may sample. Construction testing frequencies are shown on Exhibit A, Sheet 6. Please confirm the split between contractor quality-control testing and any City or Engineer acceptance testing of Class NS and Class II concrete, and whether the contractor must include all concrete sampling, slump, air, and compressive-strength testing in the bid.
A response will be provided via written Addendum and posted by next week.
ITB §1.7 states that all bidders on this project must be prequalified by the Florida Department of Transportation (Chapter 337.14, F.S., and Rule 14-22, F.A.C.). Exhibit C, Division 1, §8-1 requires that if any work is sublet, the Contractor shall perform with its own organization work amounting to not less than 40% of the total Contract amount. Please confirm that FDOT prequalification is required only of the prime bidder, and that specialty subcontractors (including concrete and structural flatwork) are not required to be FDOT-prequalified, provided they hold the appropriate licenses.
A response will be provided via written Addendum and posted by next week.
ITB §1.3 states that the contract is subject to FDOT’s DBE Program Plan and Goals, and that FDOT’s overall goal for FHWA-assisted contracts in federal fiscal years 2025–2026 has been set at 10.54%. Exhibit C, FDOT Division 1, §7-24 sets commitment, payment, and commercially useful function rules, and one sentence refers to a “voluntary DBE goal.” Please confirm whether 10.54% is a mandatory contract-specific goal for ITB2025-172CE, or the statewide aspirational or voluntary program goal. If it is mandatory, please confirm how Good Faith Effort documentation is to be submitted with the bid.
A response will be provided via written Addendum and posted by next week.
Exhibit A includes lighting plans and landscape/irrigation plans, but Tabulation of Quantities Sheets 3–5 have no lighting or landscape pay items and no light-pole foundation item. ITB §2.18 states the City will hire additional contractors to perform certain work complementary to this solicitation. Please confirm whether light-pole concrete foundations, and any sidewalk or curb work shown in the landscape set, are included in the OpenGov Pricing Schedule, incidental to another pay item, or performed by others under ITB §2.18.
A response will be provided via written Addendum and posted by next week.
Exhibit A, Sheet 3, lists pay item 635-2-14 (17" × 30" × 12" D pull box) as 1 EA in the Grand Total / Plan column; Sheet 5 lists a grand total of 16 EA for the same item. Sheet 3 also lists 635-2-11 (13" × 24") as 18 EA. Sheet 6, Signalization General Note 12, requires a 1-foot-wide (minimum) by 6-inch-deep continuous concrete apron at all pull boxes, typically sloped 1 percent away from the box. Please confirm the OpenGov bid quantities for 635-2-11 and 635-2-14, and confirm that the concrete aprons are incidental to those pay items.
A response will be provided via written Addendum and posted by next week.
Exhibit B §522-1 states that curb ramps, landings, transition slopes, sidewalk curb, and edge beams are included in the sidewalk items. Exhibit B §520-11 states that curb for sidewalk curb ramps and driveways is paid with the adjacent curb type. There is no separate driveway or curb-ramp pay item. The 135 SY of 6-inch sidewalk (pay item 522-2 on Sheet 3) appears to be the driveway crossings. Please confirm: (a) that all curb ramps, landings, and transitions are incidental to pay items 522-1 and 522-2; (b) that all driveway concrete is paid as 522-2 (6-inch sidewalk) plus the adjacent curb item, with no separate driveway pay item; and (c) that detectable warnings at ramps are paid only under 527-2.
A response will be provided via written Addendum and posted by next week.
Exhibit B §523 requires an APL product, submittal of pattern and color samples to the Engineer before installation, an overlay of 180 mils or less, ADA compliance, and a 14-day wait after adjacent new asphalt. Please identify the plan location, pattern, and color for the 4 SY shown on Exhibit A, Sheet 3, and confirm that 4 SY is the bid quantity.
A response will be provided via written Addendum and posted by next week.
Exhibit A, Sheet 3, lists 425-1-351 Inlet, Curb Type P-5 (≤10'), 4 EA; 425-1-361 Inlet, Curb Type P-6 (≤10'), 1 EA; and 425-1-609 Inlet, Ditch Bottom Type J (Modify), 5 EA. Sheet 11, “Type 9 Partial Placement over Existing J-Box (Offset in Front of Box),” calls for a new Inlet Top Type 9 (FDOT Index 425-024), #4 bars at 12 inches on center, 6-inch minimum dowels into the existing wall with epoxy bonding compound, and Class II concrete, 3,400 psi, 6-inch slump. The note states that the cost of the structure modification is included in the unit price of the new inlet top, and that the offset “may vary (see plan).” Please: (a) provide plan locations (station and offset or structure numbers) for the four P-5 inlets, the one P-6 inlet, and the five Type J modifications; (b) provide as-built information on the existing J-boxes (size, condition, wall thickness, invert, and any known defects), or grant permission for a pre-bid inspection of those structures; (c) confirm that pay item 425-1-609 includes all demolition, dowels, epoxy, new Type 9 top, reinforcement, Class II concrete, excavation, and compacted subgrade, with no separate payment for unforeseen repairs to the existing box; and (d) confirm whether the new P-5 and P-6 inlets are precast or cast-in-place, and the required concrete class.
A response will be provided via written Addendum and posted by next week.
Exhibit A, Sheet 3, describes 520-2-4A as Concrete Curb (Type D Modified) (6"–12" High), 1,891 LF. Sheet 11 includes a 24-inch Drop Curb Detail labeled “slope to fit driveway” and 3,000 psi. Please: (a) confirm that 520-2-4A is paid at the 24-inch drop-curb detail on Sheet 11, and clarify the relationship between the 6-inch to 12-inch height range in the pay-item description and the 24-inch detail title; (b) identify plan stations, a schedule, or other locations for the 1,891 LF, including where height transitions occur; and (c) confirm how transitions between standard Type D (520-2-4, 7,443 LF) and Type D Modified are measured and paid.
A response will be provided via written Addendum and posted by next week.
Exhibit B §527 and §522-5 require detectable warnings per FDOT Index 522-002 and state that only Approved Products List (APL) products may be used. Methods used to form detectable warnings in wet concrete are not permitted. Color may be safety yellow, brick red, or black on concrete. Please: (a) confirm the required color and whether the contractor may select any current FDOT APL product in that color, or whether a specific APL product is required; (b) confirm that surface-applied detectable warnings are required, and that cast-in or wet-formed methods are not permitted; (c) identify the plan locations for the 164 SF shown on Exhibit A, Sheet 3, and confirm whether existing detectable warnings at corners must be replaced beyond that quantity; and (d) confirm that 164 SF is the bid quantity in the OpenGov Pricing Schedule.
A response will be provided via written Addendum and posted by next week.
Exhibit B Section 344 (Concrete for LAP), Table 344-1, classifies sidewalks and curb and gutter as Concrete Work Category 1 and specifies Class NS, 2,500 psi minimum at 28 days. The typical sidewalk detail on Exhibit A, Sheet 11, also calls for 4-inch thickness and 2,500 psi minimum. However, the Type F curb detail and the 24-inch Drop Curb Detail on Sheet 11 are labeled 3,000 psi. Exhibit B §520-2.1 still states that curb concrete shall meet Section 347. The Type J inlet-modification detail on Sheet 11 cites Spec 346-3, Class II, 3,400 psi, 6-inch slump. Please confirm which specification and strength govern: (a) 4-inch and 6-inch sidewalk (pay items 522-1 and 522-2); (b) Type F curb and gutter (520-1-10 and 520-1-12); (c) Type D curb and Type D Modified (520-2-4 and 520-2-4A); and (d) Type J inlet modifications and new P-5 / P-6 inlets (425-1-609, 425-1-351, 425-1-361). For the inlet work, is Class II 3,400 psi (Spec 346-3 as cited on Sheet 11) correct, or does Section 344 control? May precast structures use ASTM C478 (4,000 psi) in lieu of Class II, per Table 344-1, note 2?
A response will be provided via written Addendum and posted by next week.
Exhibit A, TCP-1, Note 21 limits daytime work to 9:00 AM–3:00 PM. Night work is allowed only with City approval requested at least two weeks in advance to Giles Rhoads, Deputy City Engineer, at GRHOADS@PBGFL.GOV. ITB §2.12 states the City will allow after-hours, weekend, and holiday work to reduce disruption to school crossings, by mutual schedule. TCP-1 Note 19 prohibits excavations deeper than 18 inches on Saturdays or Sundays. Exhibit B §§520-8 and 522-8 require curb and sidewalk to be cured continuously for at least 72 hours. TCP-1 Note 6 requires the existing roadway to remain open. Please confirm: (a) whether the 9:00 AM–3:00 PM window applies to all concrete forming, pouring, finishing, joint sawing, and curing protection; (b) whether the City will routinely approve night or early-morning concrete placements so that pours can be finished and initially cured outside that window; (c) whether weekend concrete placement that does not involve excavations deeper than 18 inches will be allowed under ITB §2.12; and (d) how the 72-hour cure is to be maintained and protected within an active 9:00 AM–3:00 PM window on a roadway that must remain open.
A response will be provided via written Addendum and posted by next week.
ITB §1.2, page 3, states that installation shall be completed “no later than two hundred and forty (410) calendar days after notice to proceed.” The words read two hundred forty; the numeral, ITB §2.4, and the bid-rejection language all use 410 calendar days. Please confirm that the required contract duration is 410 calendar days after NTP, and that a bid committing to 410 days will not be rejected on the basis of the spelled-out figure.
A response will be provided via written Addendum and posted by next week.
Can the FDOT Prequalification requirement for this project be waived?
A response will be provided via written Addendum and posted by next week.
Does this contract apply to the Davis Bacon Act or to the Davis Bacon Related Acts?
A response will be provided via written Addendum and posted by next week.
1) MOT says work between 9am-3Pm Daily. However the MOT plans show a full time lane closure in each phase with new striping. If the lane is closed are we still restricted to 9Am-3PM or is that for only if we need additional lane closures outside the closed lane? 2) There is no Performance Turf Sod Pay item will you be adding one? 3) Does the 410 contract days allow for material acquisition? Electrical poles can take up to 30 weeks to acquire after approved shop drawings......
A response will be provided via written Addendum and posted by the end of this week.
1. Permits: Please confirm which permits are required for this project and identify any associated costs to be borne by the contractor.
A response will be provided via written Addendum and posted after FDOT review and approval.
What is the anticipated construction start date?
A response will be provided via written Addendum and posted after FDOT review and approval.
Pre-bid meeting: Is attendance at the pre-bid meeting mandatory?
A response will be provided via written Addendum and posted after FDOT review and approval.
Schedule of Values (OpenGov bid items): a. Bid Item 580-1-1, Landscape Complete – Small Plants (1/LS) -- There are Two items beneath it, Shrubs and Groundcovers, are marked with an asterisk (*) and appear to be included in this line item. Should we enter the pricing on line 580-1-1, or on the asterisked lines? The same question applies to Bid Item 580-1-2, Landscape Large Plants.
A response will be provided via written Addendum and posted after FDOT review and approval.
Fuel and bituminous adjustment: Since the project follows FDOT specifications, does the City of Palm Beach Gardens apply a bituminous and fuel price adjustment?
A response will be provided via written Addendum and posted after FDOT review and approval.
OpenGov categories
- 91327 · Construction, Highway and Road
- 91371 · Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc)
- 91395 · Paving/Resurfacing, Highway and Road